Loading...
HomeMy WebLinkAboutRES 25-030 APPROVING THE PROJECT MANAGEMENT AGREEMENT WITH OERTEL ARCHITECTS FOR THE ROOF REPLACEMENT PROJECTS AT THE MUNICIPAL LIQUOR STORES AND PUBLIC WORKS FACILITYCITY OF SAINT ANTHONY VILLAGE STATE OF MINNESOTA RESOLUTION 25-030 A RESOLUTION APPROVING THE PROJECT MANAGEMENT AGREEMENT WITH OERTEL ARCHITECTS FOR THE ROOF REPLACEMENT PROJECTS AT THE MUNICIPAL LIQUOR STORES AND PUBLIC WORKS FACILITY WHEREAS, the roofs at the municipal liquor stores and public works building are deteriorating and are in need of repair, and; WHEREAS, Oertel Architects has submitted a project management areement for managing the roof replacement projects, and: WHEREAS, council authorizes city staff to enter into the agreement and sign on the City's behalf. NOW, THEREFORE, BE IT RESOLVED by the City Council of St. Anthony Village that the council approves the project management agreement with Oertel Architects for the roof replacements at the municipal liquor stores and public works facility. Adopted this 22°a day of April, 2025. ATTEST: City Clerk Reviewed for administration: i � r Wendy Webster, Mayor Charlie Yunker, City Manager (AIN VOTRTEL ARCHITECTS DATE: 03/04/2025 TO: Saint Anthony Village Staff RE: Roof Replacement PROJECT UNDERSTANDING 1795 St. Clair Avenue St. Paul, MN 55105 (651) 696-5186 www.oertelarchitects.com m a feOr iill PUBLIC WORKS • Existing Roof 0 4" of rigid insulation — approximately R22 0 22,400 SF of ballasted EPDM roofing 0 900 LF of metal parapet cap • Proposed Work o Replace roof membrane with white adhered system ■ White EPDM or TPO o Provide code minimum R30 roof insulation — approximately 6" of insulation ■ Insulation needs to be screwed down o Plan for future PV panel roof installation o Add required rail around roof hatch LIQUOR STORE - MARKETPLACE • Existing Roof o R25 roof insulation — approximately 4" 0 7,250 SF of ballasted EPDM roofing 0 360 LF of metal parapet cap • Proposed Work o Replace roof membrane with ballasted EPDM o Provide code minimum R30 roof insulation —approximately 6" of insulation o Add required rail around roof hatch LIQUOR STORE — SILVER LAKE VILLAGE • Existing Roof o R22.2 roof insulation —approximately 4" 0 8,600 SF of ballasted EPDM roofing 0 450 LF of metal parapet cap • Proposed Work o Replace roof membrane with ballasted EPDM o Provide code minimum R30 roof insulation — approximately 6" of insulation o Add required rail around roof hatch OERTEL ARCHITECTS- I . 1795 St. Clair Avenue St. Paul, MN 55105 OERTEL (651) 696-5186 ARCHITECTS www.oertelarchitects.com DELIVERABLES AND FEE SCHEMATIC DESIGN — 50% DRAWINGS • Roof plan of each building outlining scope of work • Cost Estimates • Virtual meeting with city staff to verify scope of work $4,800 DESIGN DEVELOPMENT — 75% DRAWINGS • Updated roof plans • Key details • Key specifications • Cost Estimates • Submittal to city for internal review $6,150 CONSTRUCTION DOCUMENTS — 99% DRAWINGS • Roof plans • Details • Specifications • Cost Estimates • Virtual meeting with city staff $12,210 BIDDING —100% DRAWINGS • Completed drawings and specifications • Addenda as necessary • Bid recommendation $1,900 CONTRACT ADMINISTRATION • Additional service to be billed hourly as needed $0 PROJECT FEE BY PHASE SCHEMATIC DESIGN $4,800 DESIGN DEVELOPMENT $6,150 CONSTRUCTION DOCUMENTS $12,210 BIDDING $1,900 CONTRACT ADMINISTRATION $0 TOTAL FOR SERVICES $25,060 TRAVEL EXPENSES $50 TOTAL FEE $25,110.00 OERTEL ARCHITECTS- 2 (AN OERTEL ARCHITECTS Oertel Staff Fee Chart Andrew Cooper $175.00 /hr President / Senior Architect Dan Greuel $125.00 /hr Architect Architectural Support $90.00 / hr Designer This Agreement is Authorized by: Oertel Architects, Ltd. By:! Authorization drew Cooper, AIA, President This agreement is accepted by: Saint Anthony Village By: Authorization Authorized Representative Officer Authorized to Enter Agreement 1795 St. Clair Avenue St. Paul, MN 55105 (651) 696-5186 www.oertelarchitects.com 03/04/2025 (1/az/Zs Date of OERTEL ARCHITECTS- 3