HomeMy WebLinkAboutResolution 26-014 - Amending the 2026 Fee ScheduleCITY OF SAINT ANTHONY VILLAGE
RESOLUTION 26-014
A RESOLUTION AMENDING THE 2026 FEE SCHEDULE
WHEREAS, the City of Saint Anthony Village has approved an ordinance allowing fees to be
established by resolution; and
WHEREAS, staff has established a fee schedule that can be amended annually; and
WHEREAS, attached is the 2026 Fee Schedule with amendments since approved in December
2025.
NOW THEREFORE BE IT RESOLVED that the City Council of City of Saint Anthony
Village, Minnesota approves the attached 2026 Fee Schedule.
Approved this 13th day of January, 2026.
ATTEST: �-
Nicole DeDeyn, Citjklerk
Review for Administration:
Wendy Webster, Mayor
Charlie Yunker, City Manager
Saint Anthony Fee Schedule
Table of Contents
General Construction
Building 2
Electrical 3
Fire 4
Mechanical 4
Miscellaneous 4
Plumbing 5
Manufactured Home / Accessory
Installation Permit 5
Land Use Applications 5
Licenses 6
Miscellaneous Fees 6
Park Contributions 6
Right of Way 6-7
Utilities
Fire Control Devices 7
Irrigation Rates 7
Sewer Rates 7
Storm Water Facilities Rates 7
Water Meters 7
Water Rates 7-8
Page 1
GENERAL CONSTRUCTION
Building Permits
TOTAL VALUATION FEE
$1 to $2,000 $83.50
$2,001 to $25,000 $83.50 for the first $2,000 plus $16.55/additional $1,000 or fraction
thereof, to including $25,000
$25,001 to $50,000 $464.15 for the first $25,000 plus $12.00/additional $1,000 or
fraction thereof, to including $50,000
$50,001 to $100,000 $764.15 for the first $50,000 plus $8.45/additional $1,000 or
fraction thereof, to including $100,000
$100,001 to $500,000 $1,186.65 for the first $100,000 plus $6.75/additional $1,000 or
fraction thereof, to including $500,000
$500,001 to $1,000,000 $3,886.65 for the first $500,000 plus $5.50/additional $1,000 or
fraction thereof, to including $1,000,000
$1,000,001 and up $6,636.65 for the first $1,000,000 plus $4.50/additional $1,000 or
fraction thereof
Inspections outside of normal business hours (minimum charge, 2 hours)
$75.00 per hour
(or the total hourly cost to the jurisdiction, which is the greatest.This
cost shall include supervision, overhead, equipment, hourly wages,
and fringe benefits of the employees involved.)
Re-inspection; fees assessed under provisions of §33.061 $65.00
Inspections for which no fee is specifically indicated (minimum charge, 1/2 hour $75.00 per hour
Additional plan review required by changes, additions, or revisions to plans (minimum
charge, 1/2 hour) $105.00 per hour
For use of outside consultants for plan checking and inspections, or both Actual costs
(including administrative and overhead costs)
Plan review 65% of Building Permit fee
Plan Review when there is a Master Plan
When approved, the review fee shall not exceed 25% of the permit fee for submittal
documents reviewed using a Master Plan set.
•The review fee for a Master Plan set shall be 65% of the permit fee.
25% of Building Permit fee
Review of State Approved Construction Documents 25% of Building Permit fee
Pre-Final inspection (new home or structure) $75.00
Re-inspection
A re-inspection fee may be assessed:
•Each inspection or re-inspection when the work for which the inspection was scheduled is
not complete at the time of the scheduled inspection. For valuation-based building permits,
this fee is not assessed the first time an inspection fails, and a re-inspection is required.
•When the address of the jobsite is not posted.
•When the inspection record card is not posted or provided at the worksite.
•When the approved plans are not readily available for the inspector.
•When access to conduct the inspection is not provided.
•When the inspector is not met by the individual responsible (no show).
•When corrections are required to be re-inspected for residential maintenance permits
•When work completed has deviated from the approved plans without prior approval from
the building inspections department.
•Re-inspection fees are due on or before the scheduled re-inspection.
•Payment shall be made payable to the Municipality
$65.00
Special Investigation
•Applicable when work was started prior to obtaining any permit required by City Code.
•This fee is due at the discretion of the City Manager, regardless of whether a permit is
issued.
100% of Permit Fee, in addition to original fee amount.
Permit Renewal within 6 mos. of expiration (no plan changes, no code changes, new permit
number 50% of the original Permit Fee
Solar Permit Fee based on Building permit valuation
Refunds & Fee Adjustments
Plan review No refund
Building Maintenance Permit Fee No refund
Permit Fee (work started) No refund
Permit Fee (permit processed & ready to issue) 80%
Permit Fee (work not started & within 6 months of permit issuance)60%
Page 2
Electrical Permits- Single Family Homes, Apartments, Condos, and Assisted Living
Single Family or Townhome -
Building or Garage
Electrical panel change out, repair or service upgrade, new panel replacement is $125.00, sub
panel $75.00
Up to 300 amps $75.00
400 amps $100.00
For each additional 100 amps add $25.00
Single Family or Townhome
Building or Garage
New circuits or reconnected circuits spliced outside of electric panel are at full fee
Charge for each up to 100 amps $12.00
Charge for each 101-200 amps $20.00
For each additional 100 amps add $10.00
Single Family or Townhome Minimum fee (only one inspection)$60.00, plus $1.00 surcharge
Single Family or Townhome Minimum fee (Includes rough-in and final inspection)$120.00, plus $1.00 surcharge
Single Family or Townhome Maximum not over 200 amps, and up to 25 circuts (Includes 2
rough-ins and final inspection (failed inspections are an additional $60.00 each)$225.00 plus $1.00 surchage (additional circuits are $12.00/ea)
Apartment Building Remodel Projects
Fee per unit of an apartment or condominium complex. This does not cover service, unit
feeders or house panels. (and includes up to 15 circuits per unit.)
House Wiring and service is separate. Above fees apply.
$110.00
Transformers
0 -10 kilovolt-amperes $5.00
11 - 75 kilovolt-amperes $55.00
75 - 299 kilovolt -amperes $70.00
Over 299 kilovolt-amperes $175.00
Retro fit lighting $ 1.00 per fixture
Solar PV Systems-The inspection fee for the installation is as follows (plan review fee is
$100.00 per hour)
0 watts to and including 5,000 watts $100.00
5,001 watts to and including 10,000 watts $165.00
10,001 watts to and including 20,000 watts $245.00
20,001 watts to and including 30,000 watts $330.00
30,001 watts to and including 40,000 watts $410.00
40,001 watts and larger $410.00 & $25 for each additional 10,000 watts over 40,000 watts
Swimming Pools (Includes 2 inspections)120 plus circuit fees (circuits are $12.00/ea)
Street Lights and lot lights $10.00 per each standard pole
Low voltage (fire alarm and air conditioning control wiring) $ 1.00 per fixture
Electronic Inspection fee for these item only (furnace, air conditioning, bath fan, fireplace and
receptacle for water vent.$40.00
Residing projects $60.00
Re-inspection fee in addition to permit fees $60.00
Refunds issued only for permits over $60 Permit fee minus $50 admin fee
Commercial Electrical Permits
TOTAL VALUATION FEE
$1 to $1,000 $60.00 per trip
$1,001-$2,000 $60.00 for the first $1,000 plus $3.25/additional $100 or fraction
thereof, to including $2,000
$2,001 to $25,000 $82.00 for the first $2,000 plus $14.85/additional $1,000 or fraction
thereof, to including $25,000
$25,001 to $50,000 $423.55 for the first $25,000 plus $10.70/additional $1,000 or
fraction thereof, to including $50,000
$50,001 to $100,000 $691.05 for the first $50,000 plus $7.45/additional $1,000 or
fraction thereof, to including $100,000
$100,001 to $500,000 $1,063.55 for the first $100,000 plus $6.00/additional $1,000 or
fraction thereof, to including $500,000
$500,001 to $1,000,000 $3,463.55 for the first $500,000 plus $5.10/additional $1,000 or
fraction thereof, to including $1,000,000
$1,000,001 and up $6,013.55 for the first $1,000,000 plus $4.00/additional $1,000 or
fraction thereof
Page 3
Solar PV Systems-The inspection fee for the installation is as follows (plan review fee is
$100.00 per hour)See solar system fees in residential section
Re-Inspection fee (this in addition to all other charges)$60.00
Special Investigation
•Applicable when work was started prior to obtaining any permit required by City Code.
•This fee is due at the discretion of the City Manager, regardless of whether a permit is
issued
100% of Permit Fee, in addition to original fee amount.
Refunds issued only for permits over $120 Permit fee minus $50 admin fee
Fire Fees
False Alarms - Fire 4th false fire alarm in a calander year $200.00 (increase $50.00/each
after 4th)
Fire Inspection
Outside of normal business hours $100.00
Designated City Holidays $100.00
Re-Inspection Fee 1st Re-Inspection - no charge. Every re-inspection after $50
Fire Inspection Permit Fees
Alarm system installations (each alarm device) $5.00/device ($50.00 minimum)
Automatic Suppression Systems - Fire Pump $100.00
Extinguishing Systems (head or nose) $5.00/device
Minimum fee for commercial and required residential fire sprinkler systems $50.00
Minimum fee for voluntary single family residential fire sprinkler systems $30.00
Tank Installation (fuel, oil, gas, etc.) $100 per tank
Tank Removal $50 per tank
Fireworks/Pyrotechnic Displays $100.00
Mechanical Permits
Residential (R 1, R 1A, and R 2)
New Appliances $37.50 per appliance, $75 minimum
Gas line only permit $75.00 includes all gas line
Gas Fitting / Connection $50. 00 (with a mechanical permit / includes all gas lines /fittings
Fixture maintenance (furnace, gas range, gas dryer, hot water heater, air conditioner, gas
piping, duct work, Boiler, piping, hydronics systems, and the like activity requires a regular
mechanical permit)
$50 for first appliance, $75 for two appliances, additional $37.50 for
each additional appliance
Add $50 Administrative fee and $1.00 surcharge to all permits
All 3% of contract price
Plan review fee 65% of permit fee
Special Investigation
•Applicable when work was started prior to obtaining any permit required by City Code.
•This fee is due at the discretion of the City Manager, regardless of whether a permit is
issued.
100% of Permit Fee, in addition to 100% of Permit Fee, in addition
to original fee amount.
Permit Renewal within 6 mos. of expiration (no plan changes, no code changes, new
permit number 50% of the original Permit Fee
Refunds & Fee Adjustments
Plan review No refund
Building Maintenance Permit Fee No refund
Permit Fee (work started) No refund
Permit Fee (permit processed & ready to issue) 80%
Permit Fee (work not started & within 6 months of permit issuance)60%
Inspections outside of normal business hours
Includes travel time both ways
$75.00/hr.
$150.00 minimum
Inspections for which no fee is indicated
Miscellaneous and Special Services
$75.00/hr.
$37.50 minimum
NOTES TO TABLE:
The minimum permit fee for commercial, industrial, institutional, or business occupancies is
$20 plus state permit fee surcharge.
Miscellaneous Permits
Chicken Permit $75.00
Demolition Permit $75.00 Residential
$100.00 Commercial
Hydrant Meter Rental $500 deposit plus cost of water usage per Tier IV water fee
Public Safety $20.00
*Electrical Permits $60 and under - expires 6 month after issue date.
*Electrical Permits over the minimum fee and up to $1,000 - expires 1 year after issue date.
Commercial, light industrial, and multi family (C, LI, R 3,and R-4)
Page 4
Zoning Permit
Driveway/Walkway
Fence/Retaining Wall
Above Grade Pools/Spas
Security Alarm Permits: (§112.32)
Commercial $30.00
Residential $15.00
Storage Tank Removal $95.00
Plumbing Permits
Residential (R 1, R 1A, and R 2)
New Fixtures $10.00 per fixture, $75.00 minimum
Lawn Irrigation $50.00
Fixture maintenance: (The replacement of only one existing fixture or appliance.
Examples include the replacement of a Sink, Water Softener, Hose Bib, or Water Heater.
Alterations, additions, and/or removal of vent systems, drain/waste/vent piping, water
lines or other like activity requires a regular plumbing permit.)
$50 for first appliance, $75 for two or more appliances
All 3% of contract price
Lawn sprinklers, residential $20.00
Lawn sprinklers, commercial $30.00
Plan review fee 65%of permit fee
Special Investigation
•Applicable when work was started prior to obtaining any permit required by City Code.
•This fee is due at the discretion of the City Manager, regardless of whether a permit is
issued.
100% of Permit Fee, in addition to original fee amount.
Permit Renewal within 6 mos. of expiration (no plan changes, no code changes, new permit
number 50% of the original Permit Fee
Refunds & Fee Adjustments
Plan review No refund
Building Maintenance Permit Fee No refund
Permit Fee (work started) No refund
Permit Fee (permit processed & ready to issue) 80%
Permit Fee (work not started & within 6 months of permit issuance)60%
Inspections outside of normal business hours
Includes travel time both ways
$75.00/hr.
$150.00 minimum
Inspections for which no fee is indicated
Miscellaneous and Special Services
$75.00/hr.
$37.50 minimum
Single Wide $250.00
Double Wide $450.00
Appeal $500.00 and an Escrow deposit of $1,500.00
Comprehensive Plan $750.00 and an Escrow deposit of $1,500.00 for Residential and
$3,500.00 for Commercial
Conditional Use Permit (§154.243)$1,000.00 and an Escrow deposit of $750.00 for Residential and
$2,500.00 for Commercial
Easement Vacation $200.00
Final Plat (§153.04) $500 with an Escrow deposit of $750.00
Garage Setback permit (§154.176) $60.00
Planned Unit Development (§154.205)$ 1,500.00 and escrow deposit of $2,500 + $50.00 escrow per
residential unit
Preliminary Plat (§153) $750.00 with a $1,500.00 Escrow deposit
Rezoning (§154.242) $750.00 with a $1,500.00 Escrow deposit
Sign Permit (§157)$75.00 for cost of $1.00 to $500.00, plus $5.00 each $100.00 over
$500.00
Sign Plan review (§157) $75.00
Site Plan (§154.241) $500.00 with an Escrow deposit of $750.00
Subdivision/Lot Split (§153) $500.00 with a $1,500 Escrow deposit
Variance (§154.245)$1,000.00 and an Escrow deposit of $750.00 for Residential and
$2,500.00 Commercial
Add $50 Administrative fee and $1.00 surcharge to all permits
Commercial, light industrial, and multi family (C, LI, R 3,and R-4)
MANUFACTURED HOME / ACCESSORY INSTALLATION PERMITS
LAND USE APPLICATIONS
Add $25 Administrative fee and $1.00 surcharge to all permits
$75.00
Page 5
Bus/Transit Bench (§94.32) $40 per bench annually
Dangerous Dog $500.00
Gasoline service stations
(stations with multiple products dispensed through 1 hose)
$75.00 for station and one production line, plus $15.00 for each
product line dispensed.
Haulers of Garbage or Recyclables (§115.051) $150.00
Kennel (§91.15) $50.00
Alcoholic Beverages: (March 15th renewal date; annually) (§116)
Beer: off-sale; 3.2% malt liquor license $125.00
Beer: on-sale; 3.2% malt liquor license $375.00
Beer: Temporary on-sale 3.2% malt liquor license None
Liquor: on-sale intoxicating liquor $8,000.00
Liquor: Sunday on-sale $200.00
Wine: only $400.00 license fee & $100.00 processing fee
Wine: with strong beer endorsement $1,500.00 license fee & a 100.00 processing fee
Wine: temporary None
Rental Dwelling License (§152)
Single, Duplex, Triplex $175.00
Multiple Dwelling $175.00 base fee plus $12.00 per unit for 3 or more
Late Penalty $100.00 per month
Reinspection Fee $100.00
Pawnbroker (§113.37) $8,000 license fee; $750 investigation fee
Physical culture and health service or club, reducing club or salon, sauna parlor, therapeutic
massage studio (§114.021)
$500.00 investigation
$250.00 Therapist
Secondhand good dealer (§113.03) $5,000.00 license fee; $750.00 investigation fee
Tobacco or tobacco related products (§115.003) $300.00
Towing/Motor Vehicle Starting (§115.026) $30 for first vehicle and $20 for each additional vehicle
Beekeeping License $75.00
Third Dog License $20.00
Security False Alarm (§112.35)First 2 are free, 3rd is $75.00 and each
additional is an additional $25.00
Vehicle Impounding Fee (§71.33)
$85.00 for tow
$25.00 per day storage (applied the first day)
$25.00 Tow Company Administration
$15.00 SAPD Administration
Convenience fees
Utility billing payments made over the phone: $0.95 per transaction
Licenses, permits and other invoices payments via credit/debit
cards:
2.95 % of transaction amount or $2.95, whichever is greater
E-checks: $0.95 per transaction
Sidewalk and weed control (§95.33)
$95 for initial visit
$95 for services per hour
$25 administrative fee
Hydrant Meter Use $50 fee, plus $500 escrow
Cannabis Business Registration $500 Initial license; $1,000 Renewals
Park Contribution
Duplex lot $1,800/unit
Townhouse development $2,000/unit
Mobile Home $1,000/unit
Multi-family, apartment or condominium $1,500/unit
Commercial/Industrial $4,000 per acre
Right of Way
Escrow
Right of Way Permit Escrow:
$2,000.00 minimum escrow (for up to 10 lots). Plus $20 escrow per
additional lot. All applications to be reviewed by the Public Works
Director. Additional escrow may be requested depending on scope
of work.
Fees
Annual Fee $75.00
LICENSES
MISCELLANEOUS FEES
Page 6
Hole $150.00
Trench $70.00 for first 100 lineal feet, $25.00 for each additional 50 lineal
feet (plus hole fee)
Boring $150 for first 100 lineal feet, $0.70 for each additional 50 lineal feet
(plus hole fee)
Obstruction permit base fee $50 plus $.05/lineal foot
Permit Extension fee $55.00
Street Excavation (§150.046) $75.00
Small Cell Wireless ROW Rent $150.00 per year (plus $25.00 per site)
Small Cell Wireless Monthly Electrical Fee
Actual Cost or $73.00 per radio node less than or equal to 100
maximum watts;
$182.00 per radio node over 100 maximum watts (whichever is
greater)
Fire Control Devices
Size Amount
2"$8.25
3"$11.00
4"$16.50
6"$22.00
8"$27.50
10"$44.00
Irrigation Rates $4.41 per 1,000 gallons
Sewer Connection Permit $850.00-per Metropolitan Council Environmental Services (MCES)
units initial or re-determination.
Sewer Rates $5.12 per 1,000 gallons, quarterly Collection system charge $23.25
per residential equivalency unit.
Storm Water Facilities
Classification Quarterly Charge
1-Cemetaries, parks, golf courses, railroads, vacant land $18.94 per acre
2-R-1, R-1A, and R-2 residential $18.35 per unit
3-R-3 residential $18.35 per unit
4-Schools and institutional uses $61.15 per acre
5-R-4 residential, churches and manufactured home park $78.211 per acre
6-Commercial and industrial $99.98 per acre
Water Connection Permit $850.00-per Metropolitan Council Environmental Services (MCES)
units initial or re-determination.
Residential Water Meters
Size Amount
¾”$360.00 ($175.00 meter + $185.00 radio)
1”$460.00 ($275.00 meter + $185.00 radio)
Commercial Water Meters Cost of meter dependent upon size and type required. Cost will be
included in plumbing permit
Water Rates (billed quarterly)
RESIDENTIAL Consumption (gallons)Rate/per
1,000 gallons
TIER 1 0-7,500 $3.56
TIER II 7,500-15,000 $3.75
TIER III 15,000-22,500 $4.13
TIER IV 22,500-30,000 $4.73
TIER V Over 30,000 $5.93
Water Usage billing will be computed quarterly based on metered water used according to the tiered rates system below, quarterly Distribution system charge
$27.00 per residential equivalency unit.
UTILITIES
Page 7
COMMERCIAL Consumption (gallons)Rate/per
1,000 gallons
TIER 1 0-7,500 $3.56
TIER II 7,500-53,500 $3.75
TIER III 53,500-175,000 $4.13
TIER IV 175,000-300,000 $4.73
TIER V Over 300,000 $5.93
WILSHIRE Consumption( gallons)Rate/per
1,000 gallons
TIER 1 0-7,500 $3.56
TIER II 7,500-510,000 $3.75
TIER III 510,000-610,000 $4.13
TIER IV 610,000-710,000 $4.73
TIER V Over 710,000 $5.93
SAVHS Consumption (gallons)Rate/per
1,000 gallons
TIER 1 0-7,500 $3.56
TIER II 7,500-850,000 $3.75
TIER III 850,000-1,150,000 $4.13
TIER IV 1,150,000-1,450,000 $4.73
TIER V Over 1,450,000 $5.93
HAPPY’S Consumption (gallons)Rate/per
1,000 gallons
TIER 1 0-7,500 $3.56
TIER II 7,500-3,650,000 $3.75
TIER III 3,650,000-4,650,000 $4.13
TIER IV 4,650,000-5,650,000 $4.73
TIER V Over 5,650,000 $5.93
Late payment penalty for quarterly utility bills is equal to 5% of the account balance at the
date the account becomes past due.
Page 8