HomeMy WebLinkAboutCC PACKET 10102006CITY OF ST. ANTHONY
Our Mission is to be progressive and livable community, a walkable village, which is safe. and secure.
CITY COUNCIL MEETING AGENDA
October 10, 2006
Council Chambers
7:00 pm
Call to Order.
Pledge of Allegiance.
Roll Call.
Consideration, Discussion, and Possible Action on All of the following items:
I* Approval of the October 10, 2006, City Council Meeting Agenda. (action requested.)
II. Proclamations and Recognitions.
III. Consent Agenda.
These items are considered routine and will be enacted by one motion. There will be no separate discussion of these items unless a Councilmember or citizen so requests, in which
event the item will be removed from the Consent Agenda and placed elsewhere on the agenda.
A. Approval of September 26, 2006, Council Meeting Minutes. (p.1- 9)
S. Licenses and Permits. (p. 10)
C. Claims. (p. 11-12)
D. Resolution 06-074; Approval of Election Judges for the 2006 State General Election. (p. 13)
IV. Public Hearings. None.
ReportsV. -
VI. General Business of Council. (action requested on all items)
A. Ordinance 06-005; Section 526.00 Manufactured Home Park Ordinance. (p. 14 -19)
Todd r, WSB & Associatesreporting e .
.
B. Resolution 06-075; Reject bid for Foss Road Lift Station and Utility Improvement Project;
and orderp lans and specifications to be incorporated into the 2007 Street Reconstruction
Project. (p. 20 - 28)
C. Resolution 06-076; Accept the Feasibility report .and order plans and specifications for
g
Hi hcrest Road and Old Highway 8 Sidewalk and Lighting Improvements: (p. 29 - 30
and booklet 1)
D. Resolution 06-077; Accept the Feasibilitystud and order plans and specifications for
Y
2007 Street Reconstruction Project. (p. 31- 32 and booklet 2)
E. Resolution 06-078' Award bid for Automatic Water Meters and I & I Reduction Program.
(p. 33 - 39)
VII.ep ors From City Manager and Council a hers.
FACouncil Meetings\2006\10102006\agenda.doc
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
CITY OF ST. ANTHONY
CITY COUNCIL REGULAR MEETING MINUTES
September 26, 2006
CALL TO ORDER,
Mayor Faust called the meeting to order at 7:00 p.m.
PLEDGE OF ALLEGIANCE.
Mayor Faust invited the Council and audience to join him in the Pledge of Allegiance.
ROLL CALL.
Present: Mayor Faust, Council members Gray, Horst, Stille, and Thuesen.
Absent: None.
Also Present: City Manager Mike Mornson, Assistant City Manager Kim Moore -Sykes
CONSIDERATION, DISCUSSION, AND POSSIBLE ACTION ON THE FOLLOWING ITEMS:
I. APPROVAL OF SEPTEMBER 26, 2006 CITY COUNCIL MEETING AGENDA.
Motion by Councilmember Thuesen, seconded by Councilmember Horst, to approve the City
Council Meeting Agenda of September 26, 2006.
Motion carried unanimously..
II. PROCLAMATIONS AND RECOGNITIONS.
None.
III. CONSENT AGENDA,
A. Approval of September 12, 2006, Council Meeting Minutes
B. Consider licenses and permits.
C. Claims.
Motion by Councilmember Stille, seconded by Councilmember Gray, to approve the Consent
Agenda.
IV. PUBLIC HEARINGS.
None.
V. REPORTS FROM PLANNING COMMISSION.
None
VI. GENERAL POLICY BUSINESS OF THE COUNCIL.
Motion carriedunanimousl�y.
City Council Regular Meeting Minutes
September 26, 2006
Page 2
1 A. Ordinance 06-003; Single Sort Recycling
ling
2
3 Assistant City Administrator Moore -Sykes presented the final reading of Ordinance 06-004,
4 Single -Sort Single Recycling. She stated single -sort is a recycling strategy utilized by many
5 haulers as part of the services they offer.
6
7 Assistant City Administrator Moore -Sykes reported Staff was instructed to research the
8 possibility of a pilot program for single -sort recycling and if the City had the legal authority, to
9 sunset this pilot program once it was implemented.. She reported the City Attorney indicated the
10 City could implement a pilot program with a sunset date as determined by the Council. Assistant
11 City Administrator Moore -Sykes indicated Staff found that since 2001, a number of metro -area
12 cities such as Brooklyn Park, Brooklyn Center, Crystal, Roseville, and New Hope implemented a
13 pilot program before approving a permanent single -sort recycling program.
14
15 Assistant City Administrator Moore -Sykes stated the consensus of the cities that did initiate a
16 pilot program before approving a permanent single -sort recycling program was that it gave them
17 time to work out any issues that emerged during the pilot program. She reported it provided them
18 an opportunity to review tonnage amounts collected and compare those amounts collected by the
19 dual sort collection method. She mentioned it also gave cities an opportunity to educate residents
20 about recycling, flush out issues that need to be addressed in a single -sort recycling ordinance
21 and collect feedback from the residents using single -sort recycling.
22
23 Assistant City Administrator Moore -Sykes reported Council directed haulers licensed in St.
24 Anthony to provide three container size options to residents. She stated at the August 22, 2006
25 Council meeting, both Waste Management and Walters indicated they had three sizes that have
26 been available to their respective customers. Assistant City Administrator Moore -Sykes
27 indicated BFI, while not in attendance, reported to Staff they would also provide three different
28 sized to their customers.
W
30 Assistant City Administrator Moore -Sykes summarized the report on the reduction of negative
31 impacts. She stated noise would be reduced by the fact that collection trucks would pick up
32 recyclables every other week, not weekly as currently required by the City's Ordinance.
33 Assistant City Administrator Moore -Sykes reported the every other week pick up would also
34 reduce the pollutants spewed into the air. She stated the City Engineer recently reported that
35 reducing the number and frequency of trips by the trucks on City streets would have a positive
36 affect on roads and would cause them to last longer.
37
38 Assistant City Administrator Moore -Sykes mentioned the suggestion to use pup trucks to collect
39 garbage and recycling from residences on alleys. She stated she contacted Dave Fridgen, New
40 Brighten, who stated ACE is the only hauler he knew that used pup trucks, but only for their
41 convenience; not that of the resident or customer. She state Mr. Fridgen reported the haulers
42 drive their large collection trucks up and down the alleys. Assistant City Administrator Moore -
43 Sykes mentioned the same appeared to be true for Columbia Heights where BFI provides an
44 information sheet and asks residents to bring their carts to the edge of the alley.
45
City Council Regular Meeting Minutes
September 26, 2006
Page 3
1 Assistant City Administrator Moore -Sykes stated the only area she could find where pup trucks
2 were used to collect garbage was mostly used in the Western States where residents lived in the
3 foothills and or mountain areas of their communities. She stated the pup trucks were used in
4 these areas to save on wear and tear of the larger trucks. She mentioned these residents were also
5 charged on average, an additional $5.00 per pick up.
6
7 Assistant City Administrator Moore -Sykes reported that single -sort recycling programs appear to
8 be responsible for an increased amount of recyclable materials collected, thereby resulting in
9 coming closer to reaching the recycling goals the State of Minnesota charged counties and cities
10 with over 20 years ago. She indicated in a report submitted by the Roseville City Council in May
11 2002, a citizen's advisory committed reported they found significant increases, between 15% and
12 30%, in recycling participation by residents in communities where single -sort recycling had been
13 implemented.
14
15 Assistant City Administrator Moore -Sykes reported more recent surveys by other cities
16 confirmed the earlier findings. Stated North St. Paul found that recycling participation by
17 resident increased about 3 5%; Shoreview found an increase between 3 0% and 40%; and New
18 Brighten, considering single -sort recycling, estimates a 15% increase in recyclable material
19 collection.
20
21 Assistant City Administrator Moore -Sykes reported the negative aspects of single -sort recycling
22 include customers considering single -sort could see an increase in their monthly costs of between
23 seven and nine percent. She stated haulers reported the increase would be due to increased labor
24 costs in sorting the recyclables at their facilities and some haulers have included a fuel surcharge
25 that is passed along to their customers.
26
27 Assistant City Administrator Moore -Sykes reported another negative impact was garbage being
28 added to the recyclable materials that contaminated recyclables, making them unusable. She
29 stated haulers would then claim the whole truckload contaminated and would send it to the
30 landfill. She reported the State of Minnesota had since implemented regulations to control this
31 and have aggressively enacted an education program for their customers.
32
33 Assistant City Administrator Moore -Sykes reported the issue of glass appears to be more of an
34 issue between the haulers, the counties and the end users of recycled glass. She stated some
35 would not take the mixed colored glass.
36
37 Assistant City Administrator Moore -Sykes stated Council asked Staff to research the question of
38 whether or not the City should require multi -family residences provide recycling to their tenants.
39 She stated Ramsey County advised Staff they were very interested in having the owners of multi -
40 family units participate in a recycling program which would bring the City into compliance with
41 County policy that states all residents are to have the opportunity to recycle.
42
43 Assistant City Administrator Moore -Sykes reported the City Ordinance required curbside
44 recycling for the R-1, R-2 and R-3 zoning districts, however it was silent on the R-4 zoning
45 district. She mentioned Ramsey County cites of Mounds View, New Brighton, Shoreview, and
46 White Bear Lake have recycling ordinances requiring multi -family complexes participate in
City Council Regular Meeting Minutes
September 26, 2006
Page 4
1 recycling. She reported some communities still treat large multi -family complexes as commercial
2 businesses and do not require the complex to have a recycling program, but by State statute, they
3 are required to provide the opportunity to recycle. Assistant City Administrator Moore -Sykes
4 mentioned Hennepin County had a policy that closely mirrored State statutes.
5
6 Councilmember Thuesen asked how likely it increased costs would be if the Council elected to
7 adopt single -sort recycling and did many other communities see a cost increase.
8
9 Assistant City Administrator Moore -Sykes stated she could not say how likely it would be and
10 recommended directing this question to the garbage collectors.
11
12 Councilmember Stille asked if the adoption of this ordinance would provide for recycling, in the
13 R-4 district.
14
15 Assistant City Administrator Moore -Sykes replied it would not if unless we put it in the
16 ordinance. She pointed out the Mounds View ordinance included in Council packets. She also
17 pointed out Little Canada is the only community she did not find with multi -family recycling.
18
19 Mayor Faust stated it was Council's intent to have R-1 through R-4 included in the ordinance.
20 He stressed the appropriate language is needed in order to adopt it. Mayor Faust stated he
21 assumed the pilot program would last for one year.
22
23 Assistant City Administrator Moore -Sykes replied most pilot programs were for ayear. She
24 stated some cities have done their own pilot and gave haulers a specific timeframe.
25
26 Mayor Faust asked why BFI was not in attendance.
27
28 Assistant City Administrator Moore -Sykes replied BFI is in contract negotiations with several
29 cities.
30
31 Mayor Faust asked where the negative aspects stated on the staff report came from. He
32 questioned the increase of seven to nine percent as he thought single -sort recycling was reported
33 to reduce the cost for haulers.
34
35 Assistant City Administrator Moore -Sykes replied the information was collected from several
36 communities. She mentioned the increased came from additional labor costs at the sorting
37 facility.
38
39 Mayor Faust commented that for Council to be fair to St. Anthony residents, it would be best to
40 deny the ordinance.
41
42 Councilmember Gray asked if the cities identified used a single source hauler and if that were the
43 reason for the increase.
44
45 Assistant City Administrator Moore -Sykes replied Arden Hills used a single source hauler
46
4
City Council Regular Meeting Minutes
September 26, 2006
Page 5
1 Mayor Faust asked the haulers to speak to the concerns.
2
3 Ms. Jennifer Klennert, Waste Management, and Mr. Eric Sederstrom, Walter's Recycling from
4 Walters approached the podium.
5
6 Ms. Klennert explained the prices she quoted are in single -sort communities and each hauler
7 prices a little differently. She explained in communities serviced by Waste Management the
8 majority of residents are on a flat fee schedule that had not changed since the late 90's. She
9 stated Waste Management had no intention to adjust the fee. Ms. Klennert explained increases
10 are typically on the refuse portion and not the recycle portion. She stated Waste Management felt
11 $5.00 is a fair price. She also mentioned Waste Management had not .increased the fees when
12 communities converted to single sort.
13
14 Mr. Sederstrom stated Walter's recycle is built into one line item. He reminded Council the goal
15 was to encourage people to recycle more and reduce the size of the refuse/garbage carts and thus
16 save money on that portion.
17
18 Assistant City Administrator Moore -Sykes informed Council the meeting agenda states the
19 ordinance number is 06-003, however the ordinance for approval in Council's packet indicates
20 the correct number as ordinance 06-004.
21
22 Councilmember Stille stated the ordinance should incorporate the R-4 district to ensure City
23 compliance with Hennepin and Ramsey County ordinances. He mentioned Council learned
24 more with each reading. He expressed Council did not want more than a one year pilot.
25
26 Mayor Faust mentioned the two issues not part of ordinance include the sunset date and inclusion
27 of districts R-1 through R-4.
28
29 Councilmember Thuesen remarked he is in favor of a one-year pilot and the inclusion of districts
30 R-1 through R-4.
31
32 Councilmember Gray stated he is in favor of a sunset date and there are issues that have not been
33 looked at. He stated by taking one year to look at the results of the pilot would address issues
34 Council have not thought of.
35
36 Councilmember Stille agreed with all reasons for doing a pilot and could consider expanding if
37 needed. He mentioned there is an economy to scale to look at moving forward and this is the
38 first step.
39
40 Councilmember Horst expressed interest in changing and adopting the ordinance to include the
41 sunset date and districts R-1 through R-4.
42
43 Mayor Faust asked City Manager Mornson when the pilot took effect after the ordinance was
44 approved. He also asked if three readings would be required to end the pilot.
45
5
City Council Regular Meeting Minutes
September 26, 2006
Page 6
1 City Manager Mornson replied the ordinance took effect after it is published in the newspaper.
2 He stated the readings could be waived and recommended December 31, 2007; districts R-1
3 through R-4 would make single -sort recycling available to residents and multi -family complexes.
4
*5 Mayor Faust stated he hoped this met the legal requirements.
6
7 Councilmember Stille asked if "sunset" was the correct word or should "expired" be used.
8
9 Everyone agreed "expired" was the better choice.
10
11 Mayor Faust asked if the ordinance included enough about containers, the availability of three
12 sizes, and the use of the word "smaller" to meet the intent. He also asked about including plastic
13 under recyclables.
14
15 Motion by Councilmember Horst, seconded by Councilmember Gray, to approve Ordinance
16 2006-004, Amending Chapter Five of the City Code, Being the Licenses, Permits, and Business
17 Regulations with the addition of districts R-1 through R-4 making single -sort recycling available
18 to residents and multi -family complexes.
19
20 Motion carried unanimously.
21
22 VII. REPORTS FROM CITY MANAGER AND COUNCIL MEMBERS.
23
24 City Manager Mornson reported he had several meetings with owners and residents of the Lowry
25 Grove Mobile Home Park and an agreement was reached. He stated the first reading to the City
26 Council would occur on October 10, 2006. City Manager Mornson stated the City Attorney is
27 currently reviewing the agreement.
28
29 City Manager Mornson mentioned Mr. Todd Hubmer would report on the 2007 Street projects,
30 the Foss Road lift station project, the Highcrest Sidewalk Feasibility project, automatic water
31 meter bids, and I/I at the October 10,'2006 Council meeting.
32
33 City Manager Mornson stated on September 15, 2006 the Minneapolis City Coordinator invited
34 him to tour the new library to get to know each other as they had similar issues such as parks and
35 roadways. He mentioned Minneapolis would host a meeting on November 29 and 30 and would
36 invite the Council's of all the first ring suburbs that are adjacent to Minneapolis. City Manager
37 Mornson stated this could be the start perhaps of something big.
38
39 City Manager Mornson stated the revised Comprehensive Plan Task Force meeting would be
40 held on October 18 and the meeting is scheduled for November 8 with a public hearing being
41 planned for November 21, 2006.
42
43 City Manager Mornson presented an update on Silver Lake Village stating an amendment to the
44 original development agreement for Phase I would be needed. He mentioned construction had
45 not begun on Phase I because of the high request for Phase IIA. He mentioned the land is
46 prepared for 26 unit patio homes with seven sold to date.
6
City Council Regular Meeting Minutes
September 26, 2006
Page 7
1 City Manager Mornson reminded Council members the Kiwanis peanut sales would be on
2 Friday, September 29.
3
4 City Manager Mornson reported the Three Rivers Park would be removing 12 outdated buildings
5 from the site based on recommendations from a consultant. He mentioned the timeframe for the
6 removal had not been established.
7
8 City Manager Mornson reported St. Anthony did not receive the sidewalk grant for Highcrest.
9 He indicated out of 76 applications, only 17 were funded. He mentioned other projects met the
10 demand for the funding over St. Anthony.
11
12 City Manager Mornson reported on Fire Department activities including a pancake breakfast at
13 Applebee's on October 7 and an open house on October 11. He mentioned the Fire Department
14 turns 50 in October and the Police Department turns 50 summer 2007.
15
16 City Manager Mornson stated employee groups had approached Staff on establishing Health
17 Savings accounts, giving employees the ability to put pre-tax money aside for future medical
18 expenses.
19
20 City Manager Mornson indicated on November 16, 2006, the League of Minnesota Cities,
21 Association of Metro Municipalities and Metro Area Managers Association will be holding their
22 Legislative Policy Adoption meeting. The speaker is Bill Morris a research survey professional.
23 He will be speaking on the election results from the prior week
24
25 Councilmember Horst reported the Weatherman has landed in Salo Park. He stated the sculpture
26 had been placed in Salo Park along the northern edge of the pond.and could be viewed up close
27 by walking the trail around the pond. He hopes for a dedication to occur shortly.
28
29 Councilmember Stille reported attending a Family Services meeting on September 21 where
30 suggestions brought up by focus groups were discussed. He stated plans to implement
31 suggestions were made. Councilmember Stille stated more volunteers are needed.
32
33 Councilmember Stille reported attending the Comp Plan Task Force on September 13. He stated
34 the Task Force talked about land use issues and would meet in October.
35
36 Councilmember Stille reminded everyone to have lots of dollars to purchase peanuts from
37 Kiwanis Club members on September 29, 2006.
38
39 Councilmember Thuesen reported attending the Comp Plan Task Force on September 13. He
40 stated the Task Force is moving forward but there is lots of work yet to do. He stated he
41 appreciated the public input, as the Comprehensive Plan would drive the City for the next ten
42 years.
43
44 Councilmember Thuesen reported attending the Vital Aging Meeting on September 18, 2006. He
45 stated it is a fantastic organization and encourage everyone to get involved.
46
7
City Council Regular Meeting Minutes
September 26, 2006
Page 8
1 Councilmember Gray stated he attended a portion of the Citizens Police Academy on September
2 21, 2006. He emphasized it is a terrific the program with about 20 citizens from St. Anthony,
3 Lauderdale, and Falcon Heights in attendance. He stated the Police Department did a terrific job
4 and would do another class as early as next spring. He mentioned any one with interest should
5 sign up.
6
7 Councilmember Gray stated he attended a Chamber of Commerce meeting on September 22,
8 2006 where he listened to Captain Nick Holton, a graduate of St. Anthony and West Point. He
9 reported Captain Holton recently completed a tour in Iraq and would return again for another
10 tour. Councilmember Gray stated Captain Holton was very interesting and made very candid
11 comments. He expressed that Captain Holton is a great example of a St. Anthony resident that
12 had done well and continues to do so.
13
14 Mayor Faust reported attending the Vital Aging Meeting on September 18, 2006. He stated this
15 is a group of residents who are not supported by any government program and he would be
16 honoring them in a few weeks for what they have done. Mayor Faust commented a historical
17 group also meets monthly and there would be article in the monthly newsletter.
18
19 Mayor Faust reported attending the Association of Metro Municipalities Policy Committee on
20 September 19, 2006. He commented this is where policies are approved and then taken forward
21 to the State Legislature.
22
23 Mayor Faust stated he also attended the Middle Mississippi Water Management Organization on
24 September 19, 2006. He reported an opportunity to invest in shared -type usage of equipment
25 was approved; for example, a seeder to seed ditches. Mayor Faust stated the meetings are
26 proving to be fruitful and best practices are coming out of them
27
28 Mayor Faust stated he attended the League of Minnesota Cities monthly board meeting on
29 September 21, 2006
30
31 Mayor Faust reported he also heard the wonderful speech from Captain Nick Holton at the
32 Chamber of Commerce Meeting on September 22, 2006. He reported the Chamber sent phone
33 cards to each member of Captain Holton's unit to support his troops in Iraq.
34
35 Mayor Faust reported Kenzington celebrated its 20th anniversary. He stated this project was
36 probably the impetus that started Redevelopment Projects in the City.
37
38 VIII. COMMUNITY FORUM.
39
40 Hearing none, Mayor Faust moved forward with the agenda.
41
42 I. INFORMATION AND ANNOUNCEMENTS.
43 None.
44
45 X. MISCELLANEOUS INFORMATIONAL DOCUMENTS,
46 None.
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
City Council Regular Meeting Minutes
September 26, 2006
Page 9
XI. ADJOURNMENT,
Mayor Faust adjourn the meeting at 7:50 p.m.
Respectfully submitted,
Dianna Wise
TimeSaver Off Site Secretarial, Inc.
ATTEST:
City Clerk
Mayor
Saint Anthony. Village
DATE: October 10, 2006 Approved:
TO: Mayor and Councilmembers
FROM: License Clerk
ITEM: License and Permits for Approval:
General Contractors License:
Topline Advertising, Maple Grove, NiN
Heating and Air Conditioning License:
Air America Heating & Cooling, Blaine, MN
Kath, Little Canada, MN
Marsh Heating & A/C, Brooklyn Park, 1\4N
River City Sheet Metal, Fridley, MN
Ron's Heating & A/C, Mpls, MN
Motor Vehicle Starting License:
Applicant: Murphy's Service Center
Address: 3501 29thAve
10
ACS FINANCIAL . SYSTEM
10/03/2006 13: Check
Register
ST. ANTHONY VILLAGE
GL540R-V06.72 PAGE .1
BANK
VENDOR
-CHECK#
DATE
AMOUNT
FIRS BREMER
BANK'NA
008621
ALLIANCE ME CHANI CAL
1357
10/11./06
975. 60
004068
AMCON ST .ANTHONY LLC
1358
10/11/06
•. .11343.99 '
008794
ARCTIC GLACIER INC.
1359
10/11./06•
457.60
004293
BELLBOY" CORP.
1360.10/11/06
11,663.73
009173
BERLSON IMPORTS.,
1361
10/11/06
3,10.00
.00001
CANNON RIVER WINERY
1362
1.0/11/06
1.08.00'
004231.
CAPITOL BEVERAGE SALES
1363
•10/11/06
231378.75
004080
CHISAGO LAKES DIST. CO.,
1364
10/11/06
11703.63
• •004095
'COCA COLA ENTERPRISES IN
1365
1.0/1.1./06
11201.30
008557
DAILEY DATA & A.SSOCIA.TES
1366
1.0/11/06
.633.92
009174
DAY DISTRIBUTING CO
1367
10/11/06
260.00
008437
DIRECTV INC
1.368
1.0/1.1/06
29.77
004120
EAGLE. WINE CO
1.369
1.0/11/06
3,135 .69
004135
ELECTRO WATCHMAN INC
1370
1.0/11/06
194.90
008697
EXTREME BEVERAGE
1371
1.0/11/06
32.00
001030
G & K SERVICES INC
1372
1.0/11/06
130.03
009102
GRAND PERE WINES, INC
1373
10/11/06
111.44.00
0041.72
GRAPE BEGINNINGS, INC.
1374
10/11/06
41375.08
004175
GRIGGS COOPER & CO INC
1375
10/11/06
7,17l:47
004207
HOHEN'STEIN' S, INC
1376
10111106
41211.-95
.009335
RU AiNADENTAL
1.377
1.0/11/06
34.43
004589.
INTERWEAVE MINNESOTA
1378
1.0/11./06
004125
JO' TAYLOR DISTRIBUTING
1379
1.0/1.1/06
.43.50
24,1.88 .75
004220
JOHNSON BROTHERS LIQUOR
1.380
1.0/1.1/06
32,220.02
008254
LMCIT o BERKLEY A.DMIN18T
1381
10/11/06
243.00
009114
M. AMUNDSON LLP
1382
1.0111/06
11405.55-
004265
MARK VII SALES INC
1383
1011.1/06
12,396.24
002850
MEDICA CHOICE
1384
10/11/06
41290.54
009106•
MT GLOBAL
1.385
1.0/11/06
195.50
009084
MUZAK -- NORTH CENTRAL'
1386
10/11/06
52.77
008996
NEEDHAM DISTRIBUTING CO
1387
10/1.1/06
328.65
008883
NEW FRANCE WINE COMPANY
1388
10/11/06
301.00
000045
OFFICE DEPOT
1389
10/11/06
64.89
009275
PAT KERNS WINE MERCHANTS
1.390
10/11/06
21000.00
004354
PAUSTIS & SONS
1391
10/11/06
31370.42
' 004360
PHILLIPS WINE & SPIRITS
1392
1.0/1.1./06
32f376.19
004376
00$787
PRIOR WINE CO
1393
10/11/06
41723.51.
PROMOTIONAL PAGES, INC.
1.394
1.0111/06
590.'00
000710
PRUDENTIAL LIFE INSURANC
1395
10/11/06
13.92
004385
QUALITY WINE CO
1396
1.0/11/06
20,613.48
0'09119
RECHECK
1.397
10/1.1./06
30.00
009072
SPECIALTY WINES & BEV. L
1.398
1.0/11/06
974.50 .
009083
ST.'ANTHONY RETAIL REVEL
1399
10111/06
2,948.12
001810
ST. ANTHONY VILLAGE KIWA
1400
1.0/11/06
140.00 '
008824
TRI -COUNTY BEVERAGE, INC
1.401.
1.0/11/06
272.00
008888
VALPAK OF MINNEAPOLIS --ST
1.402
10/11/06
1,450.00
.008895
VERIZON DIRECTORIES CORP
1.403
1.0/11/06
13.75
008316 '''WINE
COMPANY/THE
1404
10/11/06
1,009.67
00831.0
009126
WINE MERCHANTS INC
WINE SOURCE INTERNA.IONA.L
1405
1406
10/11/06:
10/11/06
3,183 .47
112.00
004499
WORLD CLASS WINES, INC.
1407
1.0/1.1/06
21290.64
BREMER
BANK NA.
214,337.32**
ACS FINANCIAL SYSTEM
10/03/2006 09: Check Register
BANK VENDOR CHECK#
FIRS BREMER BANK NA
000020
AA BATTERY CO
009369
ACTION RADIO & COMMUNICA
008901
ALPHA VIDEO & AUDIO INC.
008268
AMERICAN PAYMENT CENTERS
007835
ARCH WIRELESS-METROCALL
000320
BEISSWENGER APPLIANCE.
008555
RIFFS, INC.
008869
BORGEN RADIATOR
007168
BOYER FORD TRUCKS, INC.
007253
BRAKE & EQUIPMENT WAREHO
008728
•CARLSON TRACTOR & EQUIP.
00061.0
CATCO
004065
CENTRAL - LOCK & SAFE CO
008577
CITY OF ST. PAUL
.009258
CODE PARTNERS, LLC
009321
COMMERCIAL TRUCK & TRAIL
' 004101
COMMER.S CONDITIONED WATE
004107
. COMPTOIP S COMMERCIAL*CLN
009343
DEPARTMENT OF LABOR & IN
000820
DORSEY & WHITNEY
008153
FILTERFRSH
009229
FIRSTLAB
008647
FR.AIVALLONE r S HARDWARE
001030
G & K SERVICES INC
001250
G•RAINGER
001300
HACH COMPANY
005121.
HARTMANJJAY- '
008221
HEDBACK,ARENDT, & CARLSO
008625 -
HENN CNTY CHIEFS OF POLI
008987
HENN'EPIN COUNTY TREASURE
009372
HENNEPIN TECHNICAL COLLE
008252
HOME DEPOT CREDIT SER.VIC
009095
INTERSTATE POWER SYSTEMS
001980
LEAGUE OF MN CITIES
009373
MALL IN'CKRODT , INC
008263
MCLEOD USA, INC.
•002240
METROPOLITAN COUNCIL
009255
MIDWgST SIGN- & SCREEN PR.
002360
MN CONWAY FIRE & SAFETY
002395
MTI DISTRIBUTING, INC
009283
MUNICIPAL EMERGENCY SERV
008884
MURLOWSKI PROPERTIES
00715.9
NAPA AUTO PARTS
'008326
NEWMAN TRAFFIC SIGNS
009266
NORTHERN WATER. WORKS SUP
,00002
OFFICE DEPOT
000045
OFFICE DEPOT
008528
PACE ANALYTICAL SERVICES
008805
PETTY CASH - BREMER BANK
.008970
PIPE SERVICES CORPORATIO
008274
PITNEY BOWES, INC,
009203
POSITIVE ID, INC.
009370
PREMIUM BUSINESS PRODUCT.
009139'
PROPERTY KEY, INC.
008462
RAMSEY COUNTY
008963
REED BUSYNESS INFORMATIO
0 0 93 5 6
REGIONS INTERSTATE B ILL I
.00001
SCHULTZ/JOHN
003350
SEH
008199
S IGN.A,TURE CONCEPTS .YN'C .
009320
,
SMITH & WESSON
008042
SOURCEONE GRAPHICS, INC.
008344
SPIESS/JEFF
003155
ST ANTHONY FIRE RELIEF A.
003150
ST ANTHONY MUNI C I PAL L I Q
008626
SURPLUS SERVICES '
007337
TIMESAVER OFF SITE SECRE
008907
TOUSLEY FORD
009371
TR COMPUTER SALES, LLC
.003560
TRACY PRINTING
009374'
-TWIN TOWN IRRIGATION
009307
UNITED RENTALS HIGHWAY T
008227
VERIZON WIRELESS -
003698
VIKING ELECTRIC SUPPLY
003700
VIKING INDUSTRIAL CENTER
004494
WASTE MANAGEMENT -- BLAIN
009364
WIRELESS WORLD
008273
WSB & ASSOCIATES, INC.
002680
XCEL ENERGY
003840
ZEP MFG COMPANY
BREMER BANK NA
ST. ANTHONY VILLAGE
GL540R-VO6.72 PAGE 1
DATE AMOUNT
1276 10/11106
78.76
1277
10/ll/06
51479.53
1278
10/11106
130.00..
1279
10%11/06
75.00
1280
IOIII/06
18,75
1281
10/11106
74.51
1282
IOZII/06
264.52
.1283.
10%11./06 .
118.18
1284.10/11106
14.66
1285
1011I/06
99.24
1286
10/11106
36.39
1287
1011.1%06
50.86'
1288
10/11/06
73,36
1.289
10/1.1/06
41.01
1290
10/11/06
10,055.17.
1291
10111106
145.20
1292
10/11/06
106.50
1293
10/11.106
41015.05
1.294
10/11/O6
942.20
1295
10/11/06
137.50
1.296
10/11106
1.27.70
1297
l0/11/06
30.00
1298
IOZII106
64.56
1.299
10111/06
11036.54
1300
10/11 /06
239.39
1301
1.0/11/06
223.44
1302
1.0/11106
244.82 '
1.303
10/11/06
5,000.00
1304
10/11/06
1.00.00
1305
1.0/11/06 -
1.65.43
1.306
10/11%06
185.00
1.307
10%11406
91.96
1308
1.0/11/06
42.60
1.309
1O/11/06
25.00
1320
10/11/06
175.73
1311
10/1.1./06
213.13
1.312
1.0/1.1.106
341834.07
1313
1.0/11 f 06
1.28.07
1314
10/11/06
42.68
1315'
10/11/06
230.11
1316
10/•11/06
569.50
131.7
1.0/11/06
261..1.7
1318
10/11 06
33.74
1.319
10/11,/06
125.57
1320
1.0/11 06
288.30
1321
10/11406
•245.89
1.322
10/11106
447.38
1323
10/11/06
26.00
1324
10111106
204.8.
1325
10/11/06
31421..60
1326
10111/06
177.87
1327
10/11/06
198.20
1.328
3.0/1,1./06
21897.00
1329
1.0/11/06
50.00
1.330
10/11/O6
31052.50
1331
1.0/11/06-
546.96
1332
10111406'
27,35
1333
10/11/06
409.06
1334
1011.1/06
42.00
1335
10/1,1%06
84.60
1336
1.0/1.1/06
243.47
1.337
1.0111406
28.62
1338
10/1,1/06
45.00
1339
1.0/11106
52, 275.00
1340
1,,0/11/06
1.20.90
1.341
1,0/11106
20.00
1.342
1.0/1.1/06
288.00
1.343 10/11406
251.48
1344 10/1.1/06
71S38.50
1345 10/11406
285.76
1.346 10/11/06
12,740.00
1.347 10/11/06
94.69
1.348 10/11/O6
404.21
1349 1.0/11106
22.67
1350 10/1.1/06
1.6.83
1351. ' 10ZII106
461.08
1352 10/11/06
21.29
1.353 10/1.1106
60, 724.38
1.354 10/1.1/06
1.4,579.92
1.355 10/11/06
81.45
228,509.37
flm
CITY OF ST. ANTHONY'
RESOLUTION 06-074
A RESOLUTION .APPROVING ELECTION JUDGES FOR THE
2006 STATE GENERAL ELECTION
WHEREAS, Council approval is required by M.S. 204B.21, subd. 2, in the selection of
election judges; and
WHEREAS, the following individuals have submitted application to the City Clerk to be
Election Judges for the November 7, 2006, State General Election:
Precinct 1 Hennepin
Precinct 2 Hennepin
Leslie LaCount, Chair
Kathie Clemens, Head Judge
Nancy Soldatow
Carol Panning
Jeanette Fleming
Mary Rockwood
Judy Monson
Glenn Monson
Julie Kaszkowiak
Virginia Baggenstoss
Alvina Engelmeier
Lori Rupplafleur
Judy Makowske
Judy Lucking
Holly Arnold -Rains
Kari Nelson
Donna Kripotos
Dorothy Roman
Precinct 1 Ramsey
Lana Doolan
fames Paul, Chair
Gerald Cangerni
Marjorie Dow
Mary Bauer
Gail Studer
Charlene Peterson
Myrna Doran
Gayle Mattison
Office staff will assist with absentee voting - Phuongmai Dang, Robin Hartfiel, Jackie
Senko, and Sandy Simon. The absentee ballot board will consist of election judges as
listed above.
Adopted this 10thday of October, 2006.
ATTEST:
City Clerk
Reviewed for Administration:
13
Mayor
City Manager
Report Date*:
Agenda Section: V1, A
Meeting Date: 10/10/2006
ITEM DESCRIPTION:
Ordinance 06-005; Manufactured Home Park Ordinance
MANAGER'S REVIEW:
Please find attached a proposed ordinance 2006-005 in relation to the closure of a
manufactured home park. City staff drafted this ordinance direction from the City Council.
A petition was presented to the City Council at the August 22, 2006, Council meeting.
Staff held meetings with property owners of the park as well as some of the homeowners on
September 19thand 20th. The City Attorney has reviewed the ordinance and his comments
are including in this packet.
In preparing the proposed ordinance., staff researched other ordinances from the cities
including Oakdale, Apple Valley., and Mounds View. Some of the highlights of the proposed
ordinance are as follows:
Section 526.1.1-- Provides for several, definitions.
Section 526.12 - Provides for a nine-month notice to the city and owners of the
manufactured home in the park.
Section 526.13 & 526.14 - The closure statement presented to planran'g comrmssion for
review. Statement passed onto City Council who holds a public hearing within 90
days after submitting it.
Section 526.15 - Mandates the park owner paying for relocation costs.
Section 526.16 - Alternate compensation mandates an appraisal of a manufactured
home for those that cannot relocate.
In addition to this ordinance, there are additional requirements in Minnesota Statutes
3270.95.. If the council has any questions on any of this please feel free to contact me.
NNE111 RaM 1, 1
M111111 I
0
%111 AMMiN
FACouncil Meetings\2006\1 0 1 02006\staff reportNMP ord 05.doc
flv
O�DRSSY
bf1RSEY & WHITNEY LLP
MEMORANDUM
TO: Mayor and Members of the City Council
Michael Mornson, City Manager
FROM: Jerome P. Gilligan
DATE: October 3, 2006
RE: Amendment of City Code to With Respect to Closure of Manufactured Home
parks
Minnesota Statutes, Section 327C.095, sets forth requirements to be followed by the
owner of a manufactured home park to close all or a portion of the park or to convert it to
another use. This statute requires that the Planning Commission review the closure statement
required to be given by the owner to the park residents, and the City Council to hold a public
hearing to review the closure statement and any impact that the park closing may have on
displaced residents and the park owner. Under the statute the City may require that reasonable
relocation costs be paid to displaced residents.
It is being proposed that the City Council adopt an ordinance pursuant to the authority
contained in Minnesota Statutes, Section 327C.095, which provides for payment by the owner
to the resident of relocation costs for relocating a manufactured home to a manufactured home
park located within a 25 mile radius, and for alternate compensation if the resident cannot
relocate the manufactured home to a park within 25 miles. Such alternate compensation will be
either the purchase by the owner of the home at its estimated market value, or payment by the
owner to the resident of -the average of the relocation costs awarded to other residents of the
park. The resident has the option to choose which alternate compensation it is to receive.
Providing for alternate compensation allows a displaced resident who is unable to relocate or
doesn't want to relocate, the ability to sell his manufactured home at its appraised value.
The proposed ordinance provides for certain remedies if the owner fails to comply with
the requirements of the ordinance, including withholding building permits for the reuse of the
park if the required relocation costs and alternate compensation is not paid by the owner, and
provides that any land use approvals by the City in connection with the reuse of the park shall
be conditioned on the compliance with the ordinance requirements.
if the City does not adopt this ordinance, a resident would only be entitled to relocation
costs under the statute if the resident's manufactured home cannot be relocated to another park
within a 25 -mile radius. The adoption of the ordinance allows a resident to also receive
relocation costs if the home is relocated within a 25 -mile radius of the park, and the option to
elect to have the home purchased at its estimated market value if the resident is unable to
relocate the home within a 25 -mile radius of the closed park. The City is authorized to require
such payments under the provisions of Minnesota Statutes, Section 327C.095.
DORSEY & WHITNEY LLP
15
City of St. Anthony
Ordinance 2006-005
AN ORDINANCE AMENDING CHAPTER 5 OF THE CITY CODE.
BEING THE LICENSES, PERMITS, AND BUSINESS REGULATIONS
The City Council of the City of St. Anthony ordains as follows:
526.10 Purpose. In view of the unique nature and issues presented by the closure or
conversion of manufactured home parks, the City Council finds that public
health, safety and general welfare will be promoted by requiring relocation
assistance and/or compensation to displaced residents of such parks. The
purpose of this Section is to require park owners to pay displaced residents
reasonable relocation costs and purchasers of manufactured home parks to pay
alternative compensation, pursuant to the authority granted under Minnesota
Statutes, Section 327C.095.
526.11 Definitions. The following words and terms when used in this Section shall the
following meanings unless the context clearly indicated otherwise:
Closing Statement - A statement prepared by the park owner clearly stating the
park is closing, addressing the availability, location and potential costs of
adequate replacement housing within atwenty-five (25) mile radius of the park
that is closing and the probable relocation costs of the manufactured homes
located in the park.
Displaced Resident - A resident of an owner -occupied manufactured home who
rents a lot in a manufactured home park, including the members of the resident's
household, as of the date park owners submits a closure statement to the City's
Planning Commission.
Lot - An area within a manufactured home park, designed and used for the
accommodation of a manufactured home.
Manufactured Home - A structure, not affixed to or part of the real estate,
transportable in one or more Sections, which in the traveling mode, is eight (8)
feet or more in width or forty (40) feet or more in length, or, when erected on site,
is three hundred twenty (320) or more square feet, and which is built on a
permanent chassis and designed to be used as a dwelling with or without a
permanent foundation when connected to the required utilities, and included the
plumbing, heating, air conditioning, and electrical system contained in it.
Manufactured Home Park - any site, lot, field or tract of land upon which two or
more occupied manufactured homes are located, either free of charge or for
FACouncil Meetings\2006\1 0 102006\Ord Park Closing.doc
16
compensation, and includes any building, structure, tent, vehicle or enclosure
used or intended for use as part of the equipment of the manufactured home par.
This definition does not include facilities, which are open only during three or
fewer season a year.
Park Owner - The owner of a manufactured home park and any person acting
on behalf of the owner in the operation or management of a park.
Person - Any individual, corporation, firm, partnership, incorporated and
unincorporated association of any other legal or commercial entity.
526.12 Notice of Closing. If a manufactured home park is to be closed, converted in
whole or part to another use or terminated as a use of the property, the park
owner shall, at least nine (9) months prior to the closure, conversation to another
use or termination of use, provide a copy of a closure statement to a resident of
each manufactured home and to the Planning Commission.
526.13 Notice of Public Hearing, The Planning Commission shall submit the closures
statement to the City Council and request the City Council to schedule a public
hearing y . The Cit shall mail a notice at least ten (10) days prior to the public
hearing to a resident of each manufactured home in the park stating the time,
place and purpose of the hearing. The park owner shall provide the City a list of
the names and addresses of at least one resident of each manufactured home in
the park at the time the closure statement is submitted to the Planning
Commission.
526.14 Public Hearing. A public hearing shall be held before the City Council for the
purpose of reviewing the closure statement and evaluating what impact the park
closing may have on the displaced residents and the park owner. Within 90 days
a hearing will be held after receiving a closure statement.
526.15 Payment of relocation costs. After service of the closure statement by the park
owner and upon submittal by the displaced resident of a contract or other
verification of relocation expenses, the park owner shall pay to the displaced
resident the reasonable cost of relocating the manufactured home to another
manufacture home park located within a twenty-five (25) mile radius of the park
that is being closed, converted to another use, or ceasing operation. Reasonable
relocation costs shall include:
a. The actual expenses incurred in moving the displaced resident's
manufactured home and personal property, including the reasonable
cost of disassembling, moving, and reassembling any attached
appurtenance, such as porches, decks, skirting and awnings, which
F:\Council Meetings\2006\1 0 102006\Ord Park Closing.doc
17
were not acquired after notice of closure or conversion of the park, and
utility "hook-up" charges.
b. The costs of insurance for the replacement value of the property being
moved.
c. The costs of repairs or modifications that is required in order to take
down, move and set up the manufactured home.
526.16 Payment of Alternate Compensation. If a resident cannot relocate the
manufactured home within a twenty-five (25) mile radius of the park that is
being close or some other agreed upon distance, the resident is entitled to
additional compensation to be paid by the owner of the park, in order to mitigate
the adverse financial impact of the park closing. If the resident tenders the title
to the manufactured home, the alternate compensation shall be in an amount
equal to the estimated market value of the manufactured home. The value as
determined by a current appraisal performed by either an appraiser designated
by the park owner, and approved by the city manager or the county assessors
market value. The resident has the option to choose one or the other. This
appraisal shall start no later than 30 days after the notice of park closure and end
no later than 120 days before park closure. The park owner will incur all costs.
The park owner shall pay such compensation into an escrow account, established
by the park owner, for distribution upon transfer of title to the home. Such
compensation shall be paid to the displace residents no later than 90 days prior
to the closing of the park or its conversion to another use. Title to manufactured
home should be presented to park owner or purchaser concurrent to receiving
compensation.
If a resident cannot relocate the manufactured home within a twenty-five (25)
mile radius of the park, which is being close or some other agreed upon distance,
and the resident elects not to tender title to the manufactured home, the resident
is entitled to relocation costs based upon an average of relocation costs awarded
to other residents in the park.
The total compensation to be paid to displaced residents by the park owner and
purchaser of the park shall not exceed twenty-five (25%) percent of the purchase
price of the park.
526.17 verification of Costs. The displaced resident must arrange for relocating the
manufactured home and submit a contract or other verified cost estimate to the
park owner as a condition to the park owner's liability to pay relocation expenses
and pay the relocation costs identified in Section 525.15 of this ordinance.
FACouncil Meetings\2006\10102006\Ord Park Closing.doc
18
526.18 Enforcement.
1. Violation of any provision of this Section shall be a misdemeanor.
2. Injunction or other appropriate civil remedy may enforce any provision of
this Section.
3. The city may withhold issuance of a building permit in con4.
junction with
reuse of manufactured home park property unless the park owner has paid
reasonable relocation costs and the purchases of the park has provided
alternative compensation in accordance with the requirements of the
ordinance. Approval of any application for rezoning platting, conditional
use permit, planned unit development or variance in conjunction with a
park closing or conversion shall be conditional on compliance with the
requirements of this ordinance.
These ordinance changes shall be in full force and effect upon passage by the City
Council and publication of the Ordinance or a Summary thereof, in the City's official
newspaper.
First Reading: October 10, 2006
Second Reading:
Adopted:
ATTEST:
City Clerk
Publish: St. Anthony Bulletin
I=
FACouncil Meetings\2006\1 0 102006\Ord Park Closing.doc
19
WSB
& Associates Inc.
Infrastructure I Engineering I Planning I Construction
October 3, 2006
Honorable Mayor, City Council, and City Staff
City of St. Anthony Village
3 3 01 Silver Lake Road N.E.
St. Anthony Village, MN 55418
Re: Foss Road Lift Station, Utility Improvement, and Appurtenant Work
City of St. Anthony Village
WSB Project No. 1626-13
Dear Mayor, Council Members and City Staff:
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
Bids were received for the above -referenced project on September 27, 2006, and were opened and read aloud.
A total of three (3) bids were received for the project. The bids were checked for mathematical accuracy and
tabulated. Please find enclosed the bid summary and tabulation.
The engineer's estimate for the base bid was $899,200. The low base bid for the project was $1,099,848,
which is approximately $200,000 more than the engineer's estimate. Based on the small number of bidders
and high bid prices for the project, we recommend that the City Council reject all bids for the Foss Road Lift
Station and Utility Improvements. Attached for your consideration is Resolution 06-075A rejecting all bids
for the Foss Road Lift Station and Utility Improvement Project.
Based on the bid prices received, we recommend adding the lift station plans and specifications to the 2007
Street Reconstruction Project. We believe this will generate an increased number of contractors interested in
the project. We also recommend eliminating the alternate bids (Control Shelter and Generator and Control
Building) to eliminate the high costs.
Attached for your consideration is Resolutions 06-075B ordering plans, specifications and advertisement for
bid for the Foss Road Lift Station and Forcemain Improvements. These plans will be incorporated into the
2007 Street Reconstruction Project.
Sincerely,
WSB &Associates, Inc
Todd E. Hubmer, P.E.
Project Engineer
Enclosures
lh
Minneapolis I St. Cloud
Equal O p p o rtu? � Employer KA01626-13\Admin\Construction Admin\Rejecdon ltr 100206.doc
CITY OF ST. ANTHONY
RESOLUTION 06-075
A RESOLUTION REJECTING ALL BIDS FOR THE FOSS ROAD LIFT STATION AND
UTILITY IMPROVEMENT PROJECT; AND ORDER PLAN AND
SPECIFICATIONS TO BE INCORPORATED INTO THE 2007 STREET
RECONSTRUCTION PROJECT
WHEREAS, pursuant to resolution of the Council, plans and specifications were prepared by
WSB & Associates, Inc. with reference to the improvement of:
1. Sanitary Sewer in Chandler Drive to Foss Road Lift Station
2. Foss Road Lift Station forcemain from the Lift Station to the City of
Roseville
3. Foss Road Lift Station,
WHEREAS, bids where received and opened on September 27, 2006, and exceeded the
anticipated costs for the project.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of St. Anthony that:
1. All bids received for the Foss Road Lift Station and Utility Improvements be
rejected, and bid bonds be returned to the contractors.
2. The Council will consider the improvements to the Foss Road Lift Station
and Forcemain in accordance with the recommendations of the Consulting
Engineer.
3. WSB & Associates, Inc. is hereby designated as the engineer for this
improvement. They shall prepare plans and specifications for making such
improvement and incorporate them into the 2007 street reconstruction plans
and specifications.
Adopted this day of
ATTEST:
City Clerk
Reviewed for administration:
Mayor
, 2006.
City Manager
21 K.101626-13WdminlResolutionslResolution 06-075.doc
0)
C
0
m
O
O
O
O
O
O
O
O
Ln
N
O
to
O
LO
w
N
w
�
O
O
O
O
O
O
O
O
O
ti
O
O
O
O
O
U)
O
O
O
OM
In
O
O
O
O
O
to
O
O
O
M
(D
w
M
M
t--
1-
T
M
M
O
O
M
M
N
't
T
W
N
O
N
M
M
O
LO
W
O
r
M
O
w
O
m
N
O
O
�t
O
O
O
d
1�
64
1-
M
6F3
r
69
tom-
N
63
w
69.
O
M
r_
r
H}
d
O
N
693
ti
E9-
N
O
T
6F3
d•
Itt
a
64
It'
M
d'
64
N
O
r
69
O
&
6%
--
c
6%
M
�--
r
69
N
d
N
6%
M
d
6%
M
aD
6%
T"
E9
O
4
613
M
M
69
O
oD
W,
M
L
6F3
U
L
a
io
0
0
0
0
0
o
0
r
0
W
o
w
o
m
In
N
0
m
o
o
0
�t
0
m
o
w
r
o
o
w
o
co
d
0
o
o
0
o
M
LO
0
0
0
0
0
0
0
0
C
O
U
O
O
Cl
M
�
69
0
07
6F3
O
6H
M
E93
r
N
M
6F3
M
69
bF3
O
�t
�'
M
'�i'
69
M
r
69
Ln
r
64
O
64
r
y�}
t`
T
613
h
U)
6%
O
r
r
693
%-
M
r
4f}
M
69
O
00
d
4
r
603
CD
r
6%
6
M
6F3
co
C
O
U
U
U
Y
p
cc
a-
C
f)
0
0
0
0
0
0
0
0
o
0
m
r`
a
o
O
00
o
0
0
0
0
0
0
0
0
0
o
0
0
d
0
0
o
0
0
UO
0
d
0
0
o
0
0
0
0
0
0
0
o
o
LO
(c
o
o
o
0
O
O
0
O
M
0
O
0
6
O
M
L6
N
�t
m
LO
N
M
w
N
r
Ln
ti
0
0
d
O
0
O
O
0
N
M
0
m
It
(0
M
M
M
O
h
Ln
N
W
O
LO
O
M
ti
M
O
O
It
d'
M
to
r
�t
M
M
C!)
N
�}'
GF}
6%
64
6%
N
69
q'
69
N
693
e-
Eg
,.
bi'
CN
T
6F}
T.
69
L6
64
'd•
69
r
6%
r
69-
IZ
r
L9•
M
M
6H
0
Eta
(D
EU}
6%
r
6F3
Ln
6f3
t_
64
(0
69
U
•L
(Q
•f -
LO
r
O
OO
O
O
O
O
O
O
O
LO
r
O
O
O
O
O
O
O
O
O
O
O
O
O
O
d
O
O
O
O
O
O
r
O
O
O
O
O
O
O
O
O
T
O
N
O
N
`
O
O
O
N
It
O
O
Ln
6%
0
O
LO
69i
T
619-
M
6%
M
6%
LO
693
0
6%
M
64
O
O
0
N
r
6f3
O
T
693
M
693
O
r
693
M
6%
T
69-
M
T
693
t`
M
6%
O
O
r
693
O
O
r
693
C)
r
6%
0
O
O
1-:
69}
M
N
693
M
V-
613
M
't
6%
Ct)
4
O
U
69
m
CL
A
O
O
O
O
O
O
d
O
O
O
a
O
O
O
O
d
O
O
O
O
O
O
O
O
O
.
O
O
OO
.
O
O
.
O
O
O
.
O
o
O
.
Ln
Ln
O
.
o
0
O
.
m
N
Lq
ti
W
Ln
.
N
T
O
.
O
o
O
.
O
O
O
.
O
O
Ich
O
.
Ln
ti
(0
o
.
O
O
0
.
O
O
O
.
O
O
O
.
L[)
N
O
.
O
O
LO
O
.
O
o
00
O
.
M
O
.
O
0
O
O
.
O
W
00
0
.
U)
t`
N
O
.
O
O
O
N
O
O
Ln
64
<t
64
N
691,
M
6%
't
c"
Eg
O
O
6R3
0
N
6%
1`
663
M
1"
693
0
M
6%
o
,-
693
ti
6%
(D
69.
M
r
603
(0)
M
693
r
M
r
693
00
N
M
44
00
693
ti
693
r
o
r
693
N
693
1-
69.
CD
69.
U
•L
CL
0
o
O
o
0
0
0
o
O
o
0
0
0
0
o
a
o
0
0
0
0
0
0
0
0
E
Co
O
O
O
00
O
O
<t
tot).
O
O
N
v).
0
r-
69•
0
M
69.
o
O
r
6%
a
Ln
6%
Ln
M
6%
Ln
N
693
0
O
O
LO
0
O
T
6F3
0
O
r
6%
0
Ln
r
693
0
w
693
0
M
693
0
O
N
693
0
w
(D
69>
0
O
O
T
6%
0
O
N
T
6%
0
m
69
0
O
O
o
0
N
r
6%
0
U)
T
69
0
O
'Ct
69
N
W
�
o
LO
69}
M
69
O
r
69•
L
O
C
.O
U
�-
W
D
r
r
r
o
O
M
LO
w
It
M
o
M
0
N
LO
0
N
N
U)
N
LA
r
O
o
O
It
1`
LO
1q,
"T
O
tom-
r
O
M
M
M
Ln
(0
0
O
LO
LO
w
LO
CD
n
M
r
O
'a'
N
to
CO
d'
o
LO
T-
W
W
W
i--
F-
D
D
F-
i-
a❑
�
D
D
�
�
OJ
W
w
W
W
>-
>-
w
z
LL
z
>-
>-
>-
>-
>-
z
�'
z
z
J
i
u.
Z
U-
z
>-
c
J
0
F-
1-
z
J
z
J
0
CA
CY
0
J
J
J
d
O
C�
O
O
Q
0
ca
W
W
CL
w
o
=
m
T-
T-
O
M
w
X
Q
m
m
W
J
D
.-.
U
D
F-
W
z
U
z
(9
I --
W
F...
z
LL
Z
C)
x
Y
U
Cl)
W
2
.1
Q
W
w
i-
W.
U
`�
o
W
0
0>
>O
w
w
W
p
w
C
0
>
LO
a
m
FQ
IY
Q
c
W>
�--
Of
w
m
w>
O
w
w
a
c
ce
C7
Q
a.
a-
cry
Q
a.
CL
zco
z
O
0>
O
U
>a
�'"
m~
g
Z
O
U
Z
-j
Q
z~~
O
0(
lod
Q
S
z
0
F-
0
0
z
E
w
w
Q
Cl)
F-
Q
W
z
a
¢>
>
Q
O
m
w
Cn
w
i--
z
m
m
W
Z
Q
U
_z
v
x
.�
Z
1)_
LL.
m
Q
w
z>>
O
w
W
O
Z
O
F.
Z
0
D
U
x
W
O
w
J
w
F-
a
w
Z
CJ?
O
D
w
U
w
LU
>
O
F-
C7
z?
c7
F-
Z
U
w
U
w
m
w
U
m
aD
w
O
w
.c�
(�
m
0
Q
U
!-•
w>>
d
M
O
O
U
F-
w
F-
w
w
W
LL
w
0
0=
0
F-
m
x
z
Z
'
cr)m
a.
-�
Q
W
0
0
0
Z
Z
Q
W
F-
w
U
w
w
U
U
0
w>>
2
2
�
w
0
m
J
OU
O
U'
Z
OU
a.
a=
-�
Z
Z
U
N
W
U
O
a.
�
�
Of
01010O
U)(0
0
Q
F-
h-
m ID
I
UU
(0
CD
d
QT
LL
r
O
N
O
h
O
N
OO
r
LO
O
LO
O
T
T
M
T
r
o
r
O
1'-
O
N
N
M
N
d
O
r
O
r
O
r
O
N
O
N
O
T
O
T
O
r
O
tl-
O
U
O
p
E
U)
LO
e-
N
w
r
O
o
e-
o
w
N4
O
m
O
Ln
'd•
o
Ln
4
O
LO
4
o
Ln
4
0
c0
4
0
U7
U)
o
U)
U)
O
LO
Ln
o
Ln
Ln
O
(D
Ln
O
LO
r
r
LO
t-
O
Ln
o
LO
LO
O
M
LO
r`
0
(D
Ln
O
LO
Ln
r
M
Ln
Ln
r
M
U)
Ln
r
M
Ln
d
N
=
Q
O
N
T
N
T
N
r
N
r
N
T
N
r
N
r
N
T
N
T
N
T
N
T
N
T
N
r
N
r
N
N
N
M
N
CO
N
M
N
M
N
N
N
N
N
W
J
Z
W
a)
U
CO
r
N
CO
"It
LO
W
t-- I
00
O
O
r I
r
r
N
T I
M
r
"t
T
LO
r
M
r
ti
r
M
r
O
T
O
N
r
N
N
N
M
N
It
N
m
23
O
O
d
O
O
O
d,
N
O
O
O
O
O
O
0
N
LO
N
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
w
"4t
a
O
d
O
O
O
v'
O
O
O
N
0
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
N
W
(D
M
6
0
O
tet
4
O
LO
N
N
O
00
0
ti
O
N
O
O
00
O
M
00
O
O
O
O
N
4
-
ti
M
Oi
M
00
N
4
M
O
O
[`
V"
LO
O
4
N
06
LO
O
N
O
O
O
O
t-:
1`
O
M
LO
r
O
O
r
M
0
Ch
O
t7
M
69
�
63
LO
e-
0
00
1-
LCj
't
O
0
ll�
00
06
0
4
W
Ch
O
Ln
0
LCj
t,-
O
00
64
M
63
In
CA
N
0
t-
W
•r-
r
00
LO
M
N
d'•
N
moi'
LO
N
(o
-
M
r
00
O
O
63
64
69
W.
69.
63
M
63
69
64
69
N
64
69
d
M
t-
r
64
(D
63
0
LO
M
643
63
r
63
r
69.
69
O
Kt
0
'qt'
LO
69
.2N6%
L
CL
c6
69
64
63
69
E9
63
O
0
O
NO
w
O
N
O
O
0
LO
O
'd•
O
O
N
to
O
M
O
O
(D
to
LO
M
O
N
M
O
O
o
O
O
O
O
d
t7'
O
O
O
O
O
O
O
O
co
O
O
N
�t
O
O
O
't
O
O
C
O
O
O
O
O
(D
O
O
O
O
N
O
O
O
C)
O
O
O
'It
a
O
O
r
LO
O
O
O
N
O
O
O
�:.
o
L
r
64
O
N
69
LO
O
j'
V:3
O
N
6369
69
O
LO
64
M
64
rt•
d
Ili
M
O
<}•
't
r
69
O
O
Ln
T-
00
N
M
N
64
d•
r
611,
63
Co
'vt
64
LO
LO
aj
O
N
csi
M
N
LO
M
.-
r
64
N
t`
�t
r
t`
O
LO
N
6F3
N
r
O
0
(D
V)
c
O
U
63
64
6 9
N
69
64
M64
r-
•%
63
69.
64
r
64
LO
64
Uco
a
M
w
O
O
O
O
o
O
O
O
O
O
O
v-•
O
O
O
M
W
O
O
O
N
r
O
O
O
O
o
O
O
O
O
LO
(6
0
O
C;
0
O
CJ
a
O
C),
N
OO
0'
o
C)
0
O
O
o
O
LO
N
O
�t
Cy
m
O
O
0
o
O
a
0
00
00
m
t,:
co
O
O
o
O
C;
0
d
O
0
1`
a
0
�
O
CD
O
O
o
O0
O
0)
a
LO
'cr
f-
N
N
O
(D
00
t:
M
o
O
1-
O
O
O
O
6
o
O
4
N
00
06
a
O
6
It
00
h-
LO
O
a
N
U64
'�
a
(D
N
CA
M
64
O
O
r
64
t
EF3
M
64
LO
• -
69
�
M
64
r
0(}
64
LO
M
CA
r
64
CA
64
(o
lq
64
O
00
63
It
M
64
O
00
63
O
N
69
LO
r
64
N t
00
69
64
(o
69
ti
N
a
It
64
Co
N
LO
69
O
M
63
N
CA
r
69
CD
Ln
I-
LO
64
00
CA
69
O
N
64
O
dr
64
co
4
r
W.
M
N
64
h
t`
CD
N
69
co
C5
M
M
64
'�t
O
N
64
0
F -
LO
a
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
a
O
O
O
O
M
M
O
O
O
O
O
O
-t
LO
N
t~
O
O
O
O
O
O
O
O
w
LO
O
d
O
O
a
O
a
O
N
ti
O
Ln
O
O
U)
CV
-
69
O
N
N
69
o
O
O
O
c-
64
LO
64
O
LO
r
64
C)
63
O
O
N
69
LO
6-
Lo
r
64
C)
LO
r
N
64
co
00
O
00
6%
N
N
r
69.
C)
O
O
00
64
CD
O
o
e-
64
O
O
LO
63
N
't
v-
64
C
64
C7
O
M
64
o
m
N
N
(O
00
LO
CD
CV
LO
64
CO
ti
co
69
c-
N
It
63
Cri
69
C)
O
O
CV
69
O
O
O
N
64
It
N
M
�t
r
64
C)
64
CD
a
64
O
N
fit'
O
N
6°3
O
m`
U
n.
09-
a
O
o
0
0
0
0
0
0
o
O
O
o
0
0
0
0
0
0
d
o
0
0
0
0
0
0
0
0
0
0
0
0
C)
O
Lo
a
O
O
(D
00
O
O
O
p
CV
LO
0
O
O
0
O
LO
0
a
LO
0
LO
N
0
LO
-
o
C)
O
a
O
O
o
O
O
o
0
C)
(D
o
O
O
o
a
O
O
o
O
O
0
O
N
0
00
a
0
O
O
0
O
O
O
o
O
O
O
Ln
t`
0
LO
oLqo
LO
N
't
O
N
CA
O
LO
l4t
a
O
O
LO
o
0
O
tt
0
C)
O
O
0
O
00
LO
0
C7
O
M
0
O
M
CV
0
O
O
O
O
V
C
tl
r
C7
63
M
63
N
-
64
N
64
N
69
N
r
64
0
N
69
r
OCT
64
O
r
r
N
E9
a
69
O
Ch
69
O
T-
69
r
N
64
O
(D
E9
N
N
64).
(D
64
t
C
6%
r
w
P-
d
N
64
LO
(D
64
N
W.
r
63
C6
O
qT
64
(
64
N
64
M
63
O
r
69
(D
64
O
M
N
64
to
0
N
E9
LO
r -
64
O
(3
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
a
O
O
O
O
d
o
O
O
O
O
O
O
O
E
:p
O
6
T-
O
6
O
O
O
O
O
O
M
O
O
O
Lq
N
64
O
O
LO
O
LO
63
O
O
r
O
C)
O
O
O
O
O
O
00
o
O
O
O
O
O
O
O
O
O
O
M
O
N6
64
O
O
o
O
o
O
O
o
O
O
LO
O
O
LO
O
LO
69
O
O
O
o
O
O
o
O
O
a
N6
643
O
i`
a
O
a
U)69
W
o
64
N
O
N
r
64
69
r
69
r
69
LO
c-
Eg
O
O
r
69.
63
O
O
(D
W.
r
-
r
69
N
69
d
O
r
V
CN
O
LO
CD
69
N
N
63
LO
N
64
i`
-
r
69
0
c
r
64
64
O
LO
r
69
O
w
D
O
N
M
r
r
"t
M
N
O
OC
N
0
o
N
N
N
M
t--
d'
N
Ln
N
O
N
O
N
�-
�-
Z
�
Z
M
M
M
F-
z
«.
4-1
w
W
w
O
c
F-
S
m
m
m
F-
S
0
U
F-
=
F-
D
a
S=
F-
F-
S
a
S
a
F-
F-
W
F-
S
S
S
�-
F-
F—
r
z
¢
D
C!1
CL
U-
z
U
U
U
"'
z
U
>'
LLL_
w
z_
U
2
w
z
2
U
U
u
z
tL
z
U�
u_
z
w
z
W
is
z
U
U
U
w
z
L L
z
w
2
c
J
Q=
Q
Q
w
J
Q
p
¢
J
Q
Q
J
Q
J
Q
W
Q
W
Q
W
J
.i
C)
=
J
W
J
w
w
0
J
W
J
J
W
W
._1
w
J
J
U3
¢
o
¢
Z
w
F -
LL
w
z
U
a
Q
D
w
S
C=1
w
I
m
U
06
W
w
S
c°
z
0
?
O
U
N
F -
Q
=
(D
o
F-
F -
w
C
o
w
C�
w
w
0
C7
m
m
s
}
w
z
z
U)
Q
U)
>
Q
>
z
O
J
z
w
w
p
U)
CO
Q
w
v
CD
CO
CL
O
!Y
zw
Q
a.
�
H
w
j
a
z
J
�
0
J
tY
�
F}-
F-
Q
�-
m
W
D
tr¢-
o
Z
m
0¢
0
U
o
c
W
Q
0
CJ)
CA
z
Q
0
U)
0¢
C
O
Z-1
0�
w
w
Z
Q
Q
Q
t=
W
a.
°
`r
Q
m
w
J
>-
Q
z
Z
z
z
Cn
°¢'
cn
o
w
p
Z
w
w
w
w
EL -
m
p
-�
w
�¢-
m=
z
w
w
a
C¢n
m
¢
aw
>'
z
Of
COa
Z
?.
Q
<
0
c5
F-
w
0
m
U
z
z
w
z
w
IL
W
J
w
Q
Q
O
w
W
0
O
a•
_j
w
z�
L
W
w
m
CO
Q
0
Q
w
c~n
ai
o
_
0=
C[1
Z
rY
F-
w
tr
a•
f=
U
w
a
W
O
S
p
ce�
W
X
W
J
w
{�}
W
w
Ii
. i
p
�
cn
Q
g
w
W
d
X
W
X
W
Z
¢
w
?�
Z
W
W
O
�
0
Z
F-
u j
F-
a
}}-
W
Z
Q
m
w
W
W
m
OF-
Q
w
�
w
�?
W
CO
m
�-
F-
¢
r
F..
0
>
O
O
L
W
W
(_
oH
0
w<
Q
U
U
m
z
W
o
U
Z
O
r
C7
Z
CL
w
CA.
w
��
w
W
'-1
t-
>-
of
F-
U
>-
Ll
?
�
¢
0�
0
W
0�
�
Of
m
Z
p
F-
U
F-
U
w
>-
OC
w
U
0
¢
CL
Z
w
M
U
Z
U
Q
LL
L-
_¢
0
QLLJ
>
a
F-
W
0
�>>
W
O
O>
Q=¢
0
F�-
w
Z
Z
Z>¢
a
F_
z
F:..
F-
CA
Z_
w
O
F-
Cn
z
F-
Cn
Z
0
Z
w
Z
Z
w
Z
Z
i j
¢
F_-
OW
O
0
!Y
a
0
r
O
a
Q
W
J
Q
F-
J
Z
0
O
}
W
w
J_
Q
Z
Q
0
2
Z
Q
Cl)
Q
0
76
O
O
_Z
Q
Q
m
O
o
Z_
Q
�,
Z
a
T-
U
F-
C!1
Cn
CA
�'
LL'
fi
Cn
r
Cn
U
U
r
to
U
U
LL
U
U¢
U
U
Q
U3
r
p
W
T-
O
"ct
O
N
O
O
N
O
N
O
N
Cl
N
O
LOT-
o
FQ-
r
O
m
O
r
O
r
r
a
N
O
N
O
M
O
M
O
0
r
O
r
O
M
O
M
O
w
�
M
O
N
O
N
O
N
O
M
O
M
O
U
i
r
O
C.)
Ln
(q
O
CD
(D
LO
W
LO
Q
LO
LO
CD
T-
U-)
(Dco
CD
(D
to
r
LO
(D
CD
CD
(o
o
w
co
w
w
to
CR
`-
(D
O
p
E
co
co
v-
LO
M
(D
m4
CD
Co
M
N
Ch
t-
LO
I`
•ti'
O
-t•
O
�7'
O
C6
O
M
O
cli
O
M
O
M
O
M
O
CD
O
to
O
CO
O
O
O
O
O
U-
4
O
M
O
M
O
M
O
M
O
M
O
d
M
Y'
�-
a
N
=
LO
N
LO
N
LO
N
LO
N
LO
N
LO
N
LO
N
LO
N
m
r
N
r
N
r
N
LO
N
LO
N
LO
N
LO
N
LO
N
LO
N
LO
N
LO
N
LO
N
LO
N
LO
N
U
r
N
LO
N
LO
N
LO
N
LO
N
LO
N
z
W
O
N
.w.l
J
F -
Q
z W
z
o
E
(D
LO
CD
N
00
C)
O
_
M
'I
LO
a
1-
CO
m
O
r
N
M
d'
LO
0
S
U
1--
w
m
O
N
FLU -
-j
M
N
N
N 1
N
N I
M
M I
M
(n
M
M
M
M
M
M
M
't
�t
NT
't
't
"*'
(n
d
'a'
tet
LO
tO
w
Q
LO
23
W
tO
O
O
O
O
NDNOO
f:
to
O
O
(R
0
0000
U
O
O
d0•
O
d0'
V-
�t
T-
r
O
"t
1-
O
I-
ui
a
t6
63
N
6F}
N
69
N
6r}
W
63
`Od
69
641kN
6f?
u
r
C
O
U
0
E-.
O
O
69.
00
O
U
a
o
C
C)
•L
�"
O
4
C
�
o
Ln
o
•t"'
N
o
LO
O
r
N
�
N
LLO
vi
V
00
fl-
rn
In
00
1l•
tl)
O
m�
o
O
It
O
0
0
O
e-
N
0
C'')
N
M
Ln
0l
N
O
Ff3
O
O
693
69
69
6H
6/}
1-:
Eg
N
O
L
m
U
uj
N
O
r
N
CoD
O
O
O
O
LOC)
O
O
O
LOC)
•`lx-
O
O
o
O
O
O
LO
O
O
LO
D
LC)
T-
O
r
O
h
O
O
O
M
N
O
O
O
O
O
Ln
LO
T-
f
I'
63
CND
r-
6F}
r-
6/9-
N
Ef}
d
619.
COO
N
69
63
(D
v-
69
(D
O
CO
t-
6g
E
'.r
~
O
w
O
C
U
Ln
0
c
n-
D
�
0
W
C
:D
.o
0
W
Z
J
w
--�
Ci
m
m
J
w
�
J
O
z
a
d
z
Z
+=
J
O
0
J
H
^
z
O
Q
Q
U
?
O
O
z
W
w
w
=
Z
U
w
O
Z
0
Q
J
'
N
�
U
Q
F-
H
z
�
U
w
J
J
Q
Z
Q
o
F'
U
w
J
U
h -
U
z
w
J
p
W
J
U
m
Z
zO
w
J
c
C
z_zo
O
p
°
tom-
Z
W
w
2
=
U
m
WCL
0O
J
w
z
Q
0
0
W
0
ww
Q-
CL
J
O
Z
7:
cW
z
f--
0
M
�-
°
z
¢
Q
w
O
w
o
z
Q
F-
U
U
CD
Q_
Q
Z
N
r
_
o
O
�'
N
v
0
LL
Q
m
U
O
Z
O
Z
co
o
o
CL
`0
r
Z
Z
.�
J
J
Q
Q
µ-
N
CD
w
U
(J
°
ww
w
w
z
z
`
G!
w
_
_
=
W
w
a -
Ca
N
o
U
U
U
J
J
o
0
j
cD
w
0
0
Q
Q
�
W
CD
E
°'
z
W
o_
;�
«°
:�
0
a.
Q
N
t --I
F
E-
I-
k-
F-
o
C;
z
z
0�
w
L j
E
4-
Q I
LO
W
tO
W
104
O
O
O
O
6
O
O
O
0
O
O
O
0
1-
ti
O
O
M
O
O
O
O
O
Ln
O
O
Ld
O
O
O
O
O
6
O
O
�
a
w
Ln
O
O
(p
O
O
O
O
to
ti
Ln
N
r
O
a
Ln
O
0
O
O
o
O
O
O
0
a
N
6
O
0
.4
O
O
1-
a
O
O
O
O
O
O
O
O
O
O
(D
O
O
O
O
O
60
O
O
O
to
ti
O
T-
N
N
U
O
O
CD
N
69.
O
O
6%
O
O
ti?
o
M
69
CO
t7'
C'
().
O
M
M
r
69
tp
M
1-
69).
N
r
r=
69
r--00
W
r
69
M
t`
69
NN
1,•
C,
69
O
(D
6%
CD
M
CD
W.
Ln
N
tD
N
V-
N
M
1-
69
r
M
N
W3
(D
N
O
69
d'
M
00
69
N
r
O
O
N
69
r
M
M
69
N
M
t`
64
t-•
W
Ln
69
Ln
r
CM
69
O
0
(h
69
O
O
69
M
M
a
It'
W
N
r
69
Ln
M
N
69
CO
O
Ln
69
O
to
O
r
NEf3
U
C
d
�
O
C
OO
~
V
O
O
O
O
O
O
O
Ln
r
O
CD
O
O
O
O
O
O
O
O
(A
N
Ln
Cp
O
O
O
00
a
W
O
Ln
Ln
N
O
O
O
O
O
Ln
O
O
M
00
d
M
It
r
O
O
O
O
O
O
O
O
O
O
O
O
O
W
O
O
O
M
M
O
O
C)
O
O
O
O
O
a
69
m
69
w
�-
69
4
r
69
m
69
M
({3
O
00
M
1-•
M
69
r
N
69
1,
M
69
Cp
CO
69
r
69
N
N
6k
h•
Ln
6%
C)A
O
r
O
M
r
M
6%
O
0
O
M
�-
69
(O
r
69
pi
M
69
Ln
r'
69
O
N
O
O
O
d
E9
0
N
N
69
O
Ln
v-
66-
9O
0
U
N
�
69
69
69
69
�
69
Ef3
•C
4)
U_
C
CU
p
0
0
0
0
0
0
0
0
0
0
0
00
0
0
Ln
0
Ln
0
o
0
0
0
0
0
0
0
0
0
0
0
o
o
a
O
o
o
0
0
0q
0
0
0
0
0
o
0
a
0
o
0q
0
0
0
0
0
o
0
O
0
o
0
0
0
U
0
O
O
0
O
Ln
611.11
b1i
0
O
11-
69
161361).
0
O
N
69
0
O
M
64
M
M
T
11-7
o
Lo
o
00
M
N
(D
N
69
r:
CO
1--
69
N
r
Cn
r
69
0
O
0
M
69
0
O
O
693
0
O
t
1z
69
LO
1,-
CO
O
69
o
CD
CO
r
693
0
M
O
M
69
o
O
r
M
r
69
to
N
CO
N
CO
693
0
O
Lo
00
69
o
O
00
1-
E9
o
00
r
69
0
O
O
O
r
69
o
00
00
N
69
LO
1`
N
t_
69
0
O
O
W
69
0
Ln
r
M
69
0
O
W
M
69
0
O
O
N
. r
69
0
N
Ln
N
69
0
O
N
0
Lo
N
-1•-
6969-
0
Ln
M
N
LO
N
r
00
64
Lf)
v-
O
r
v-
NN
(6
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
LO
O
O
O
O
N
(a
E
O
O
O
O
C)
0
O
I;r
O
O
O
N
O
r
693
O
M
693
O
0
r
69
O
Ln
69
Ln
M
69.
Lo
N
69
O
O
O
M
O
O
r
69
O
O
r
69cfi
O
w
r
O
w
69
O
M
613-
O
0
N
69
O
w
(Q
69
O
O
O
r
O
0
N
r
O
0
(9
O
0
O
o
O
N
r
69
O
w
r
6%
O
O
,t
69
a
6
r
699
O
o
N
O
O
O
O
M
69
O
O
r
N
69
O
0
r
Ln
69
N
w
C7
Lf)
69
69
69
M
b9
69
O
69
69
N
64
613
69
`
Q3
C
C
W
U
n
C
r
r
r
O
O
co
m
00
Ln
O
00
to
N
Ln
Lo
N
N
M
N
Ln
r
O
O
r
O
d
ti
In
It
fit'
O
1l-
O
M
M
r
M
Ln
(D
M
O
Ln
M
W
o
w
f* -r
M
O
d'
N
W
M
dT
O
M
r
O
r
N
w
r
r
't}'
00
N
o
O
Ln
t.-
r
Ln
N
(D
r'
z
W
C:
cu
w
>
O
rY
a.
z
w
a
w
w
w
w
F-
u..
z
!-
LL
z
p
y
p
�"
F-
u.
z
F-
LL
z=
0
2}}}
C)
0
p
0
}'
0
}
z
p
>.
z
z
0
J
it
LL
U-
>-
LL=
U
a
_
U
=
U
LL
=
U
>-p
ti
D
J
F-
F-
J
J
a
fn
0
CO
J
J
U
U
U
U
a
Cn
o
F-
a
w
O
F-
o
F-
U'
J
J
J
0
J
W
J
W
W
J
W
W
_!
i
Q
W
J
p
W
U
0
F -
M
Z
p
m
F-
(y_
[Y
=
m
w
M
LL
W
p
p
U)
o
o
M
g
V
g�
Z
Z
j�
Y
C7
Z
p
z
w
v
F-
z
U
\
oo
p
X
g
Q
w
w
w(D
w
p_j
�
z
O
F-
O
w
w
W
w
w
w
a
O
>
v
LO
n.
w
o
U
F-
o
w
p>
w
o¢
w
w
O
F-
O
cr1
p
U
CO
°
~
Q>¢
z
d
w
=
O
0
F--
Q
W
�
z
z
ca
¢
a¢
v-
z
0
0>
O
Z
J
Q
z
O
F~-
p=
Q
Q
m
z
J
F'
¢
z
U)
O
z
O
o
W=
Fw
°-
w
cn
p
O
F-
¢
m
U
`"
U
U
z
W
U
O¢
Of
F-
0
0
W
m
Z.
O
W
z
_
z
w
_
JCO
z
Y
Q
z
w
z
j¢
O
m
(n
Iw
�
2
F✓
z
m
m�
Q
Q
O�
w
w
0
�
O
-0
o
W
z
�
¢
m
CK
U
z
g
p
W
U
Q
U
U
x
p
z
tY
Q
Lc.
Q>
m¢¢
w
z
¢-
rr
W
p
W
p
p
w
p
W
p
z
CC
F-
z
w
p
F-
F-
U
w
a
�
a
N
w
O
1=-
C'?
g
F-
p
U
O
U
F-
m
z
0
-
X
w
W
w
9
O
m
w
J
w
F-
a
W
0
Z
cn
D
O
O
U
w
U
w
F-
w
w
w
O
U
Q¢
z
w
w
F-
0
>-
F-
o
>
O
c7
z
z
Z
w
w
w
w
U
0
m
0
a
z
O
p
c7
F-
z
O
F=-
X
¢
0
F-
W>>
�t
M
0
z_
U
F-
w
F-
w
U
F-
W
Q
F--
U
m
Z
w
C�
U
z
n.
c�
Z
w
tL
'
rY
'J
Q
m
W
>>>
z
Z
W
W.
�
�
J
J
2
�
CY
U
Z
W
U
U
Q
j
W
LL
p
T-
cL
�
m
CO
0
2
0
5i
0
m
Q
2
O
m
W
F-
0
C7
U
z
w
w
J
U
Z
z
0
Z
IL
p
F-
W
-
o
w>>
J
¢
w
w
w¢
Q
w
J
o-)
J
w
O
w
O
a
�-
a=
k--
o
o_
U
o
g
W
Q
�_
Z
z
0
N
O
r
w
Q
2
U
O
a
w
cl!
U)
N
U
U
cn
w
U
f�
¢
U
F-
m
p
U
U
FD
U
F-
0
m
U)
Q
f_
0
LL
O
N
O
1�
O
N
o
r
O
to
O
Ln
O
r
r
M
r
r
o
r
O
1�-
O
N
N
M
N
d'
o
'�-
O
�-
O
�-
O
N
O
N
O
�-'
O
r
O
r
O
I`
O
�'
o
N
O
r
O
N
O
N
O
N
O
N
O
Lo
O
z
U
0)
f/)
Ln
r
Ln
r
Ln
r
Ln
N
Ln
4
Ln
4
Ln
4
Lo
fit'
Ln
4
Cp
4
Lo
L()
Ln
Ln
LO
Ln
Ln
Lo
CD
Ln
IN
Ln
r
Lo
1:
Ln
O
Ln
O
Ln
ti
(D
6
L()
c-
Lo
c-
Ln
r
Ln
M
(D
4
(p
M
(D
M
(p
4
Ln
M
CD
M
Lo
LC)
¢
�
p
E
N
O
o
O
O
o
O
O
O
O
O
o
O
O
o
r'
o
Ln
Lo
Ln
O
M
M
M
M
M
0
(D
(D
1l-
1`
[*-
*O
d
=
Q
W
CD
N
r.
N
r
N
r
N
r
NN
r
r
N
r
N
r
N
r
N
r
N
r
N
r
N
e-
N
r
N
N
M
N
M
N
M
N
M
N
In
N
Lo
N
0
N
Ln
N
W
N
Ln
N
0
N
Ln
N
Lo
N
Lo
N
Ln
N
0
N
m
w
J
D
•-1
Z
W
w
2
r
)
=
U1
r
N
M
d'
Ln
CD
t-
CO
CO
eN-
r
r
r
N
N
N
N
N
N
N
N
N
N
M
M
CC
Cn
W
104
26
C)
O
CO
O
0
-f'
O
O
00
•O
o
m
O
O
ti
O
O
4
O
O
M
O
O
(D
N
m
6
O
O
O
O
O
NO
O
O
M
f`
to
O
fl-
6
in
M
00
O
O
N6
O
O
O
O
Nn
O
O
L
O
O
O
O
N
N
O
N
(D
O
O
T
O
O
�
O
O
O
O
O
O
O
r
N
Ln
M
00
O
N
(D
O
O
�
O
O
O
U
U
O
d
N
63
d•
M
r-
63
r-
O
m
r-
y}
O
0D
4
6%
t`
M
m
Ltd
6r;
N
't
Lo
63
N
O
63
N
ti
CD
to
"t
M
r-
(o
63
(D
N
L6
f`Nt
Co
63
O
O
(A
69
[t
M
%
63
O
O
O
r
69
Lo
N
AZt
00
b3
O
V
Ln
•d
6).
M
�f
ti
63
O
ti
CC
63
' d'
O
L(i
r
63
co00
In
O
63
00
O
6
CA
N
69
�
O
N
M
M
Ef?
fl-
O
(Yi
r
63
t`
O
M
r
63
O
O
00
r--
N
69
O
O
06
f-
N
63
O
LO
O
r
N
4%
00
m
N
d00
00
63
et
O
N
M
63
ti
O
M
�-
63
O
O
06
ti
N
63
C7
C
C
U
^L
LL
O
~
C)
O
o
O
0
O
0
OO
0
0
O
0
Om
o
r-
o
o
O
0
o
0
O
0
o
o
O
co
O
0
O
0
O
0
O
o
M
r
O
o
O
0
+`-
cn
C
U
CD
69
N
(0
63
CO
0)
d
00
r
63
ti
CO
(
N
f`
�
r
't
(D
69
CO
r
r
69
'9t
63
Ln
O
o0
69
N
O
N
L
CD
O
O
ti
O
t-
EF}
r
N
N
69
co
r
63
LO
M
'�t
r -:L
r
Ln
co
LO
tt
O
N
69
r
CA
63
T
f`
O
�
O
O
O
0
U
69
69
(D
V+
63
d3
CN
L
U
63
CL
C
J
C
=)
O
O
O
O
o
o
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
o
LO
O
O
O
m
O
O
O
O
O
O
O
O
o
o
O
O
O
O
O
o
O
O
O
O
O
O
O
O
O
m
o
O
O
O
O
O
a)
U
•L
O
O
W
69
O
O
o
M
63
o
O
O
O
a-
69
O
CO
r
N
69
O
O
O
O
M
64
O
o
N
N
69
O
o
CO
63
O
N
4t
M
63
00
(D
r
O
O
M
613
O
O
O
r-
d'
N
69
O
O
o
Ln
CO
6%
t-�
O
M
N
63
Lf)
N
'[t
r
T
69
O
fl-
M
00
O
It
63
O
m
It
CD
64
O
O
m
N
69
O
O
d
M
63
O
O
O
O
r
69
C7
M
0
O
63
O
O
m
O
(•7
N
69
O
M
N
CA
(D
N
63
o
O
O
Ln
r
6}
6
O
O
Ln
r
6}
CO
O
Ln
N
CD
r
69
O
O
Ln
N
O
T
69
Lfi
r
o
r
T
N
69
O
t-
O
00
O
h
69
O
M
N
CA
(D
N
(--9
O
O
O
Ln
r
69
O
O
LO
N
CD
-
69
LL
(L3
LO
O
O
o
O
O
O
O
O
O
O
O
0
0
O
O
O
O
O
O
O
O
o
O
O
O
O
O
O
O
O
a)
ca
O
O
T-
69
O
O
O
M
O
O
O
O
O
C7
M
69
O
O
o
o
oO
C)
O
r
O
O
N
O
CD
w
6F3
O
N
6).
o
O
o
tet•
O
O
O
O
O
O
O
O
o
O
LO
N
O
O
m
N
Lt)
69
O
O
LO
O
O
f,-
O
O
0
N
69
O
tom-
69
O
O
O
O
O
Ln
j
w
c-
63
O
T-
O
co
69-
E
f�
Nt
Ln
(D
69
d}
N
69
r"
61).
6
r
Ln
r
N
to
U
69
63
N
63
ff}
69
r -
a)
a`
w
O
O
N
to
M
ch
E--
N
N
N
O
r
W
M
M
M
W
0
7,
c
w
W
w
=
w
ca
>
>
m
ti
a
.
a
z
Q
CL
Z
>
U)
>
CO
CO
U)
w
Z
Q
()
-t
O
D
m
O
U
Z
U
Z
U
U
Z
Z<_
U
2
2
LL
Z
LL
z
w
0
Z
U
U
U
Z
Z
w
Z
z
J
Q
W
J
J
J
Q
W
Q
W
-j
J
W
J
0
J
J
J
}
J
Q
W
Q
W
Q
W
J
J
U
J
O
U
M
J
Q
Q
LLO
O
J
cn
z
9
Z
m
D
Q
U
O
W
U
W
N
U
Z
ZO
W
U
~
p
J
Z
O
F-
F-
F-
F
r'
O
Z
w
m
~
�
J
Q
O
U_
z
W
oZ$
Q
W
z
O
H
U)
U
W
C�
J
^
U
Z
�
W
�
w
�
W
m
(wn
tr
w
Z
()
^
z
z
cn
Q
z
`,
z
fr
p
U
3.
wCl)
>
w
w
J
`-'
z
>
w
0
F-
O_
z
2
W
U)
ire
~
J
~
Z
w
w
O
CO
_
Q
W
U
t7
o
W=
0
^
>-
z
CL
>-
H
�
J
w
?
-�
tom-
O
U
FQ-
Z
w�
H
(D
o
CO
-i
C
Oz
U
cj�0
p
m
2
2>
W
z
Z
Q
Z
Q
O
w
U)
Z
C
a�
o
�-
p
Z
p
w
w
z
Q
Q
LL
F-
w
w
m
p
>�
O
w
p
(L
0
o
m
<
�-
z
¢
Z
Q
w(L
(n
C�
m
W
CL
t--
w
W
w
0
CD
M
a
�
J
O
z
��
nW
J
*-'
U)
w
a
0
..
m
Q
0-
a
a
>-
m
z
F=
m
z
�,
Q
F-
o
z
(/)
�-
cn
CO
F-
U
z
p
z
F-
w
J
w
z
w
a
o
w
F-
..�
tY
w
tY
F--
O
°-
W
(n
--
z
O
J
-o
n-
�
J
O>
w
z
p
W
cn
X
(A
W
W
fL'
W
m
F
L
Q
O
-
Q
(!)
Z
w
O
LL
m
X
c)
X
o
Z
ff=
W
Z
w
=
W
O
U
p
Z
W
U
Q
Q
W
z
W
(L5
W
2
z
0
w
w�
w
W
--�
U1
W
w
CO
J
O�
Q
w
W
°"
w
O
W
O
Q�
w<
w
_
U)
p
Q
Q
F--
U
CD
vs
W
Q
w
J
m
O
►-
w
m
W
a
Q
►-
U
t-
U-
o
O
a-
F-
F-
LL
cn
W
z
f-
z
Q
p
Q
O
o
L'
w
w
w
¢=
�--
f�
Q
U>
w
a
>-
tr
Q
C7
Z
W
�
F
oo
d
W
z
p
F-
U
W
F-
U
W
W
>-
Cr
�(
U
Q
CL
W
a
F-
cn
cn
tL
0
Z
0
Z
0
0
F-
Z
Z
j
H
�_
U)
W
C7
CO
C0
—
Z
Z
Z
Z�
z
W
H
O
u-
J
p
D
Q
W
z
Q
m
C')
W
F-
W
F-
ww
Q
Q
z=
a
°00
z
cn
z
O
z
OU
z
pU
Z
Q
co
OU
OU
Q
z
f�
Z
Z
Q
Q
co
fY
a'
ui
r
wU
U
(%)
U
W
(Q
O
w
TI-
d
r
O
CA
O
r
O
r
r
r
O
N
O
N
O
M
o
M
O
(D
r
r
O
r"
o
M
O
M
O
O
O
4
O
O
O
U
_
O
_
O
w
U
w
U
w
U
w
w
-~�
Q
'
C)
p
E
Ln
�t
O
Ln
�}
O
(D
d
O
Lf)
M
Cl
(D
M
O
(D
C'7
O
(o
M
O
(D
C'0
O
(D
M
O
Utz
CD
o
m
6
O
co
(D
O
(D
CD
O
m
6
O
p
1L
,
(o
4
O
w
M
o
0
C6
O
tD
C6
O
CD
M
O
CO
vi
o
r-
z
O
co
'r
N
O
Z
(fl
O
O
fn
O
U?
-
(n
1
Q
O
O
i-
fl
CU
r
N
r
N
r
N
Ln
N
LO
N
Ln
N
Ln
N
in
N
LC)
N
Lt)
N
Ln
N
Lt?
N
LO
N
Ln
N
U
r
N
LO
N
Lo
N
m
N
w
N
LO
N
w
O
N
W
N
F -F-
W
J
Q
z
M
CO
"t
Cl)
Ut)
M
W
M
f`
M
M
M
M
CO
O
d
r-
';t
N
�t
M
It
It
d
Ln
7
(D
d
W
=
U
(�1
ti
d
co
d
m
�t
O
Ui]
r
to
N
tf)
W
F-
Q
M
Ln
W
F-
QLo
26
LO o
co N
0 o0
N
co
(10
N
O I-
U �
CL
U
C �+
O
C ~
O
U
C
.aL..
N
C
O
U
a)
v v_
3 L
-a O'
C
J
O
t0
LO
CD
(0
O O
U r.
L
a
0
F—
a)
E
U)
w
to
CD
Q)
C_ 0
C C
w :D
C:
t6
Cf
N
C
O
M
co
� N
c6 �p
O t -
O
y CD U
4)
lL (D O
i r L
O �-
r
O O
O Q1
(0 CL. Cc
V-
C)
O +-
O
U N W
a)
to `
p 0 0
O O
0
Z
E
a)
�q
O
-� z
a� C:
O
.0 co
L
C)
O
c
O
-F-+
U
.0
O
L—
a) _
U
tCS
X
a)
cz
Yj
Cn
�J
cz
.�
4
ice.. ..
U
>+ Z3
� a)
a) 4_.
a? cn
U0
OA
No
» N :r u `S}vr '? 4v x ,$i? .4}`• Yn •: ,J rYnCi Q+v, "'YiY}it
,{nX: K^:l Yf{:, }vn^G n.{+ x,H n,;:N.};,f. •{,n ,,,y:;, uY„},•nW}v "'S.vr a,�v7`22Y).v ,>w \i.a
' '<' � :v }lF2T v•• v. .Y✓i$:i 'ri{:•�.x 4.,rwG$ii vin },a•:;
n'Yvi'64'bivS:•. ,}Yr: niL$:S:}':�.L`}i,
t iNnu .av C• 3:::nuiwi"':3}.}$'$ :. rr2iyn•�•.}Y.v •iG .4`i::'' fin. :':� :a+kv+.h..n. 'nK :. r::: yn:r�wN v Y+ ^.. •.S. n•.h i
. ,2n: n 2' ,fin' '•a-n;+»..x $i,»»'iirMi.•rn•{hw,rxiJi:n�+ , 2,. <: v»:ww{'rr>.{.vC}: M1v{$!_{y.:u;{h.vr.. ,:•. �h Y•v.N:vr v}..
:. ,. r n, m , »... .r+wn{rtii +new+ n• .; C•} 4y•.��a4
b , � 7•.. .vd. Y: .4: .v3. t`S .?{. ,v� }... nY3 �:. ,:A.�,�•...}}: ���'X}�Tv$>!�:+vi:ui'::
h n. .\ .... .. . v.. . { { .. .. • - . +G ... r.,{.:.v ... T� . .. ?v {K ..... n,.: .. .... ...S r"4». nxSCv. n\» .: ..Cnn: n�CCvnw v:.
//��..yy Yi.�":-5l'. .Y•T..., },:.r4 : :n�.a-:m)•::.,w..n n
. J.., .. n ..rl ..$£m.+.w.. �'$..:Y »$n r.?..%C.tun. v+.. J : .:. n.n ... .:.ri'....w .. .{f .•: }. '., ...,:. :. .. iUn hv.v.vv::. F U�:'•
:nx . � x:. r.�: x` n a.,h :.s. r. nr,� rn xv;}n,rr.. ::: , ^£: . y ..ir..�v n a. ,•r+r,.+.: U. R a.. moi•
r . �: , --'rvr •• :,.i4. •ra't • .4s ^: n .?>Y. {.:..,,•::::: n•
.,. , » , » . » , +.++.... , x , .:.: m , r ..n .5s} ..,...,.:::»:,,a:n,.+.a,a,':•: ,.... :.. .. °•L! � n,..,.:»>v::n- •Ja';rs5?.::.,•.a, },$n ., } : , ,. 4•,;nv 4
n:.::. n. r:n., n. r, nr r ... .s r , .. Yrxr x, , r.:. n .r r., r .x a24' r. . h, L:xh x .x •:, .. ,. » n,an,•.n.4»,:. „fr .•,...+ :,�..•:. .4 •L{tir) .. r �:: •{•: Y•. , 4'. T
N h• Nt , }„• yK.Y{r.}•.} 4•.a:•::. k ., .}:fiT:
.' { ..t �.. .fir. fa. `. K:r. .. '...., .. ... :.. ....... .t .. .. .fi' J•,..:n. }..3,.�• }i'4v X � :•t:.a,,.X .r: :}.x:W:.., r,nv... .,
4: : fir. ... ..:. .. .. .. h .. 4Y?. ... T .. , ,. .. ... .. .4.. .r ..... , ... .. .. .wnL'g4.::.:..,,.,S. mhn .r r..2•.....7..:...n...,`2•:$°,}. n.,n,•. nr. 2...... .
,kY:..n:.. x,.+n.., r. n•.£'f.xr ... ..w, :Sn.., ..k:.. ..nn.!Yn .»..'h}»...,..: t�.r.:..v:Y,i:., r.,..n.»..Y nw.n..t'}»..SY'Jc:;�S.,Y"J...:....:..:.:nr...:...:...........,.krl.+..:.,.........v .n.•2'.^...n... .., a.r:....rr.:..r:.C£»..;h.. h+r.•.<,.•.nn.n.:....,.:: .x ., .., ,,, .`vh9Pn. ..... .: .''t 4
i. } ,., . \: �:.. ..h: , x. a \ ,i4.n. ,w4hL.:.: :,h.h .ha a n , C4 }»,.. ..:,..5h.• $`�. wr •a w:..:,.m:: .-.,t2}�'.-%:;:
T :.>.. .,+..w..r 4:». ,An • .•..x:,:.» h :r::::.: ::...+ .. ::» :r , ..:: -: , : .4 . .. , ..a:.. .n.c. fin. .1 .. ..2.. }. ,. .. t.. .
A•»nn .r$ x $r. $n: 2Lrm, ,.. .4 Y-': a}'4^i'M ..:}}{}, :2C:{h}. n4,fi`''-.... .. ,.
Nn, .. :.mr .. .Lfi .:- '4 x. n .,.. n, : » » n.x , u . 4 .. •{» :::.. ::: •,•: •} v.+'h.: - .:�n\".'{• .. ,�. ,�.•:'.�. •
t ....... }....., ... ... .. ...... ........rv. ...... .s rh. F ...n'f:...... , ... ... ...a+n.....{�.. r:...,.:.n,..:n. •.:. z}2,,..�}.,?,-»,:n„-::x,-»
:4 : ..: : rix . nnb�.:..r.. ,:.,..,x::...:.. :,. : � �} {.:. r x { ..{ :'}n,.:.: •.x :.• .}>.
fi2Y,3 T
%3. •}-t••. .. r .. .4 .. r.:. .. .... ... :.. .. .. :... ::.. L nL : wr>,:.:. „x Y. , O^ rhf-•Y.<• a-:,..:.: , x.,}. ,
..rrn,. .n,.w., .nv ,:.QLA,.rx nr ., 4,+ sxx».m. .wwr..,. L:,n. £.»,n. n•,.•£'.:.:n:rr.•r »,. .x, r,:: ..:n n4 ,.. ... ... ...:. .. ...... ... ... n. .. v. :'<2r.•” ,4. . f ,rr. !, ••-r,}}. ••au;;N •}
... .� .. .. !'.. N. .N . ... .. ..}j• ... ..... .. Y .... N. { .. ...,! . S..Y •Aw , �, :. r:.\ iU£S'i`.:r ...:•n:v. .: ..4 h:2 S}.ufi ? .: V.v.,,..:£ }:{;::2C 2�2:.'}+
<k ». nvn: .2'r..n.Y..»r: �rv. ,r .». :., .».v.,. r. +.nY:.., : ...%. .,/ .. r..v.: .:.v, p:$:. :. »n:. »w, ,.n.n h.. ::: :. •. •:» ::: nn•. :w:: :v. n•.•. :: :: .'•: v:•: v{'rj.•uii v:fi•: .4.
. .4{..x:...... .... .. n . r.. ..... r .. ... .. :.. r. .. t .,. .. .:... .sc} , : ,r{!r',:x,..T�s.n:.•.: ;5�,,. , :;•~`-Y.x,�.... , n"a.
.. n,. ,,:n..:.m .:Y. ..v nr?. xn..r w.c... :. ..4mn „n,.::1�. n... .r vh...n.n •+,..:.: ., .,. ,M •, rmnn.n .uu r.:... .rh:.r,1.•$ :. .: .,.,, .r:n.». •::., ::. .: n,• :. .,.:ntx - :$::: .},•`C}:N: ,� t .r.. .. h,•; •::},.;.:L fi..
.r».. . r.......?? ...,.. .... � . hit. ...... .. r...4.. ..... . , ,.. C% .. t ... ....r... CN£.` .. , ..L2.. w'4..: .n4..-:.n,...,Y.:a.,•rFnr . .,;,.?}ta , 3-.,,{S: x.:x•::x•.�;":,., 4 ,. .n.r.,:•i'•:;:
„ jv m....+. ..... v }r...,'.i»...r.:n,. ,t:. ..2v r n. n.$r.. n...,.•.t».xn.v..h....,.4:L2.x.... w .n.» nn!C:.x•.v x .. •: .:;.v xm:. • •: • :. v. :•: •.v. S. : h 'n -:.4•. ^::vv.•.--}:. .
{ .. {•. ,.. ... r .. ..... } h } . .. . . .. .. .. ^ .?}\} •» : 2 v :.,:,(2v .::fn.:, 4w . �., n v. T , \v :.h ..
C . :iwsr
vx.. .rn•» .... J1. .:.. .. :.r :•.:{n.n n ::.v.w ». •wx,. v. n.w.C.,•+:•n+n:.: .uv ,. ..,•.vv , nv ,.,.:r ++, .:/•., ... xn :» .. :4?.
+ v. .\ .. .nt. .1. n- ..:.. ... ./.- K- .+h:. .... K 4, Jr..{ r. ... .. .. '2:'{. ..�n•.,xw .. .'4:5.
i2p•
.. tD,b::..r.nrn,C. r.,»}>f ....: v. J?....r. n+..,$$£ •+.:} .: :.r.£..: rn•:v!h,.:r:.,,rf,.}.,.n»., .+n.. a .xr.n,:n.,.w::,.,.Lv' +.r .}.. x, ..!'` •. •. •:. `•: .:{•5 :• }:f•: n ,4.,•..,.,:,}.},. .a , ,}b, .,';.:•:!{.;,>�;n}:.,
.f5.• . +c 55((�'
4•:y }.\•. ,}. t::�„vn. , ..n4iC:.jh •, 4
... :C .. r5 . ... .. .... l .S .. ... ... ? .. ... :•x,:{:C �f� Yvnu..:nv v: a,aC2 �•i n. �•{..
'vY•^• iir .\•.,'•r'w:n,vY�"' ,.v?n'�t
r.. „ r..,,»..... .mn• „ n,}Km',n,. �$.n,• nr.«4f n.nrz.,.. »7,:a,•.:r .......:..n....,+:..5.i:.:. � :::•+.:»r , rv» ,/r:r:..».. r :n {: k. .... .. .. .. .. •• •: •:;.:,c: . N ...fi : :•4H•...: T} , . ,2+., }..... ».2,
..,rr w .. v .. /{. ..C..... .t ..... .... .. r .. ?. 4 . S ... n � .....K {... h .. .. : itis .:) :v �::: •. .r •.: , n q :. C-::tis-$:L::.:v:... C.:4}:•}'C.!v}$:•iv?.
r
:..r..+r .N,.....:,n>+rtrn, .r £w. nn Y. .: .�:.o >? :. •: .n •. - •:. }}x- •;Y. .:: rn4 �%-} . '\n . { .
v
v,.v.»: ,:-.•.}..h ., h•••, ..... Lrnn n. r ,• :+r+,n. .nn:.::x...vv. :1:... {. ,... Y•}r.. v:: ::. : 3i
: h. .. } . v '�'. .:. ... .. .. .. r .Y' ... .. .. :- } .:} w•, ::: .. xx� :kn4Y:an ,.: Yv�••:•' � :. •:vnn}hn.. n
D � B ,�•' L T.. : 4h4 t'•:�S-.. } ,} vxnY{,
aiTv:i!�{: n..r. w: ?.;?.ny,;:pn• ...... v:.`.n: �n.. v .: •v. :. v. ... .. {.
.. :. .. ln:.. ..... I ..... h .. :. .. .. %i. CEN. ..... .. } ...... A .. ..... ... ..... .?. .T.: .... .. n.... }. ..$ n. Uln %24 'l. .. ,�}. .. �:-h:,+.0 v„nvv....:
: 6 v ..,.. ....,,nn.... r.: .n..,. ,. r , .. .n :n.:. l'} ..vn..n;- ..:.•:: n,•x::4}:::.:
r'x .4w.... .:: r. ». n .nx :...ss.fxn ... n..a .::...,.. ,+n ,., ., r. ...:+....:.4».n,.+.:.nr. ,:. ,ti:.•. n4 .zx .... �s.....»......., ,,,..n.......�•............:.......:..w,r..,....,.+n.».. n....x.....:nr...rnxn. , ;�., x .. ..,.... � �. .4
. , r .. .S .. .. r .,.. .... .... .,r. .. v. .vvr:vn. .v , ...... ..4 v..:. .., :au-U-iCn. ..vn .,'}+. •. '}n
{4 : : 4 r :».:n..nuv r.,.♦ n.n .nv:n rr+,.v}:xvYr .Cv. .,.w.v. , , r ., {• n: ..♦ .v., ,n an,..., nv. n .,h : w•xw.w.uv,}vu•{xp:}::n•: n,•
Ci ,H»»� v$t.:/ $n,}».+.: ,..,Fi... xr vv. ,r... 4... � J..m : nr a: nw.0 wnn:}».. %' r.... �.. :.vr.2wx:n. b...,x }n...:.4r .... n,. r,.2: n.n , .. .:... »..::»n...Am ,. x.»r ..... »... ... ?.... {n*'. `t {,.K..:.. .. r:3 .C.. U}.. .:,t ..f•.....<•v3'N• v.>}}:+:
.k. ..�{, . .. .h., ...... .. ... ..?.4..f ..... .rr� :. ... Y. ...... ..../ .2.tr. .r. .... ,......t... .. t .a "K..4. ..t 5 , ,vh . L...Y..:,r!>:n . L.r..... 24.a. ..a.n.. .r'
2w
X.:v........i,,,r.•.r.x»..n, ........n •:f.a,v ,.n.G. .. .$. .. ..•:... 4?2'. ,,n4 .5:'•?$£n .: x::.. ..{Y£., .nr..... n.,, .r,..n .,r...n.. .,.,,,.:Tr .r.:.,.:, ••:: •n .. .w:ry •nx ,.:•n:.,•.,Y.x,•nnr: .:: ,•.n.:n......,n: ., ,rx :r x..,r .:Y•
, .... , .....\. J. . . ./ ✓• . . .. v ... } .. .SU :. : :... �, .. ... . .: ..... .,,Lv»... .Y.v 4 4.CivD r ''.'T 'n•,:{.5i
fi.r 4: rnvn fi,. wnS2 rfxx.C..2 h'A, \'.; •i�C$+iSn.
.. :v:. :.:.wnL: n•,uu:v»:: Uvnn•.:,:•.. .Yn:. .. .... £F�.m: ,.J nC•+:Jn•• v'r.• ••r •.J•:: .. :n...w vF.xnY.• .. xxf:.• •n,v.., nnv:.:. ,, :. � •v}r x vn:r.,u n.....A xvw .. ,nv:x.. ..:nn. v.-u:,�Y, ..2.4 '%\ .,{. ' .{..
x x. :. r:hr.v. •v .. 4Y•:• •}'}Y -..n .n yr ..nv.
.Y. .. 1 ..... ,:.:.. v JF. .: .. .. : M.... ., } .. .. r... Y .. ... ..n. ... •i:, .. .`u"vvnv ... vvA r•+.,� r4:f::v£?v,...:'•:2:'ti
. � . a'l .. Y {. •+ -}•n n n xv. -: }rn.: r:?,k n n nx ..,} .: }.'.};.%.yfin- 4 •}:..
v?�4 .sn+ ...» n•+rr.n,..:..n:..:..+...,.:.. +: .4» ,.+., :: w a , ,?:: .. ,r xn, :. ,. ...£ •�!' n ., .r:�5:r. ,n..rnr ... 4,.vi x. n »..,, x,.. },.,..,gin .. L •,5..: . a.,x.. + n•,. �Y 4...,: n........rn ,: a„'3s�: .....}} ,-
1.onv»v.%x».•k:,n4»».:m�•sx..o,..mrf,•:,tw..,,..r:ssatx::>,r„rvY:3�n4ar£ar£,.,.tw}.,tw+,af•�.x••:.rs+.sr:zx�:z:,swnan.,nn.».,r:xN+:x,x,�fi,,,r.<xn:.>.Y„m},:,•.•mnarlh,4,2�•,.,wrs•:.,�•+n,:2sr'xx<„xxw:. 4x•,.w.,-,r<:.whw ���.:ass!t�:Yfirw.•3;r:4+:,:tri,�4z`>v~h�:';�`.�.:o,::x,.n4:»ac,?c„rrrrn.:,h`an,•k+n.L,.,,•,n.fa,x.a`YrY}£�.}x,i,�,.na,saaaw.:w:.4r,}�.»,h..se4...xn•:�c2oinn{;�t},{xrrz.�,a,.n,.x4.:wwn.,,,w{�;;•"a.�::,n..,•»n�s:nr.,..
PROJECT:
Foss Road Lift Station
LOCATION:
St, Anthony Village, MN
WSB PROJECT NO.:
1626-13
Bids Opened: Wednesday, September 27, 2006 at 10:00 a.m.
Bid Security Add. No. 1 Add. No. 2
Contractor (5%) Recd. Recd. Grand Total Bid
1 Jay Brothers X X ...
2 Park Construction X X $11555,047.67
i{{4:{•:i:?:?ii?{U??-i}:i?C{.:?•J}:•X{vj???�C{{'?.�..:{??r}:$S:$n::•}'r'.{:S'^:v'•'?•}}:t 3:{v
•�iv:?v<���ri; ��y4v} :���:,•';�y: $:-. Vii.:• :i}�' :: ::
-S:S':,•nv.?: ::2�$r }::2:;•t:2:�2Y<
3 Landwehr Construction, Inc. x X
I hereby certify that this is a true and correct tabulation of the bids as received on September 27, 2006.
"Tv Denotes a corrected figure.
Kevin Newman, PE
28 K:101626-131AdminlConstruction Admin11626-13 Bid Tab Summary
WSB
& Associates Inc. Infrastructure I Engineering I Planning 1 Construction
October 3, 2006
Honorable Mayor, City Council & Staff
City of St. Anthony
3301 Silver Lake Road
St. Anthony, MN 55418-1699
Re: 2007 Sidewalk and Street Lighting Improvement Feasibility Report
WSB Project No. 1626-23
Dear Honorable Mayor, City Council and Staff:
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
We are pleased to present to you the attached 2007 Sidewalk and Street Lighting Improvement
Feasibility Report for the following streets:
1. Highcrest Drive from 37th Avenue to 3 3 rd Avenue.
2. Old Highway 8 from 3 3 rd Avenue to 29th Avenue.
Also attached for your consideration is a resolution accepting the Feasibility Study and authorizing
preparation of final Plans and Specifications.
We would be happy to discuss this report with you at your convenience. We will be available to
answer your questions at your October 10, 2006, Council Meeting, or you may call me at (763) 287-
7182.
Sincerely,
WSB &Associates, Inc.
Todd E. Hubmer, PE
City Engineer
Attachments
lh
Minneapolis I St. Cloud
Equal Opportu6iEmployer K:101626-23IFeasILTR-Izmcc-100206.doc
2007 Sidewalk and S-treet
LI 9 hti 9 Im p-roveme t Project
WSB Project No. 1626-23
�
Preparedfor,
ai
EL
701 Xenia Avenue South, Suite 300A
Minneapolis, MN 55416 7631-541-4800
rePpared bIT
WSB
& Associates, Inc.
FEASIBILITY REPORT
CITY OF ST. ANTHONY
2007 SIDEWALK AND STREET LIGHTING
IMPROVEMENT PROJECT
CITY OF ST. ANTHONY, MINNESOTA
October 2, 2006
Prepared by:
WSB & Associates, Inc.
701 Xenia Avenue South, Suite 300
Minneapolis, MN 55416
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-23
CERTIFICATION
I hereby certify that this plan, specification or report was prepared by me or under my
direct supervision and that I am a duly licensed professional engineer under the laws of
the State of Minnesota.
Todd E. Hubmer, P.E.
Date: October 2, 2006
Quality Assurance /Quality Control:
hnPY. Hardy, P.E.
Date: October 2, 2006
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-23
Lie. No. 24043
Lie. No. 41499
TABLE OF CONTENTS
TITLE SHEET
LETTER OF TRANSMITTAL
CERTIFICATION SHEET
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY ............... :................................. ...................................... 1
2. INTRODUCTION..................................................................................................... 2
2.1. Authorization............................:........................................................................... 2
2.2. S cope ........................................................ .............:............................................. 2
2.3. Data Available ....... ..................................... :.......................................... .............. 2
2.4. Project Location.................................................................................................. 2
2.5. Project History.................................................................................................... 2
3. EXISTING CONDITIONS....................................................................................... .
4. PROPOSED IMPROVEMENTS.............................................................................. 3
4.1. Permits and Approvals........................................................................................ 4
4.2. Detour Routes..................................................................................................... 4
5. FINANCING..............................................................................................................4
5.1. Opinion of Probable Construction Cost.............................................................. 4
5.2. Funding Sources.................................................................................................. 4
6. PROJECT SCHEDULE............................................................................................. 5
7. FEASIBILITY AND RECOMMENDATION.......................................................... 6
APPENDICES
Appendix A — Figures
Appendix B — Cost Table
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-23
1, EXECUTIVE SUMMARY
This project has been entitled the 2007 Sidewalk and Street Lighting Improvement
Project. It provides for the construction of proposed concrete sidewalk and street lighting
along the west side of Highcrest Road from 37 th Avenue NE (County Road D) south to
Old Highway 8 and continuing the sidewalk along the northwest side of Old Highway 8
� y
from Highcrest Road to the cutoff to County Road 88. The proposed sidewalk will cross
Old County Highway 8 to the southeast side and continue south to join the existing
sidewalk along the north side of 291h Avenue NE. Street lighting will be placed along
both sides of Old Highway 8.
A total estimated project cost is approximately $679,640. Funding for the project may
come from the City's street and utility construction funds and Municipal State Aid Funds.
The project construction can be completed, including all restoration items, in 2007.
This project is feasible, necessary, and cost effective from an engineering standpoint and
should be constructed as proposed herein.
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-23
PAGE I
2. INTRODUCTION
2.1. Authorization
On June 27, 2006, the St. Anthony City Council authorized the preparation of an
engineering Feasibility Report for the 2007 Sidewalk and Street Lighting Improvement
Project. This project was authorized under City of St. Anthony Resolution 06-058.
2.2. Scope
This project provides for the construction of proposed concrete sidewalk and street
lighting along the west side of Highcrest Road from 37h Avenue NE (County Road D)
south to Old Highway 8 and continuing the sidewalk along the northwest side of Old
Highway 8 from Highcrest Road to the cutoff to County Road 88. The proposed
sidewalk will cross Old County Highway 8 to the southeast side and continue south to
join the existing sidewalk along the north side of 291h Avenue NE. Street lighting will be
placed along both sides of Old Highway 8 in this area.
2.3. Data Available
Information and materials used in the preparation of this report include the following:
City of St. Anthony Record Drawings
City of St. Anthony Topographic Maps
Interviews and discussion with property owners and School District representatives
Field observations of area
2.4. ProjectLocation
TheJ ro' ect is located in the northeast side of the Cit of St. Anthony.
p Y- Highcrest Road is Y
the city limit between the City of Saint Anthony and the City of Roseville.
The project area is identified on Figure 1 in Appendix A of this report.
2.5. Project History
This project was initiated through the City's Comprehensive Plan. In the Comprehensive
Plan, the City of St. Anthony expressed its desire to become a more "walkable
community," where pedestrians can safely travel -by foot around the City. Both residents
and School District representatives have requested that a sidewalk be placed along
Highcrest Road and Old Highway 8 from 33rd Avenue to 29th Avenue.
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WS13 PROJECT NO. 1626-23 PAGE 2
On June 27, 2006, the St. Anthony City Council authorized the preparation of an
engineering feasibility report for the 2007 Sidewalk and Street Lighting Improvement
Proj ect.
3. EXISTING CONDITIONS
Highcrest Road has existing concrete curb and gutter along the entire length of the project
area.' Most of the existing boulevard area is about 8 feet to 10 feet wide with various
street and traffic control signs. There are several yards with shrubbery and other
plantings, particularly near the ends of their driveways. The Wilshire Elementary School
is located on the southwest corner of the intersection of 37 1h Avenue NE and Highcrest
Road has a wide, open yard area. There is a 750 -foot long section of Old Highway 8 at
the south end of the project area that does not have concrete curb and gutter along either
side of the roadway. There is a wide, shallow to moderately deep swale with culverts
under driveways along the :northwest .side that drain to culverts under the roadway t0 the
southeast.
4.1 Proposed Improvements
The proposed improvements consist of placement of 5 -foot and 6 -foot wide concrete
sidewalk along the west side of Highcrest Road and the north side of Old Highway 8.
There will be about 600 linear feet of 5 -foot wide sidewalk with a boulevard between 37th
Avenue NE and 3 6thAvenue NE along the school property. The sidewalk will then
become 6 -feet wide starting immediately behind the back of the existing concrete curb
south of 36th Avenue NE to the intersection with 33rd Avenue NE. There are too many
existing trees, fences, slopes and other obstructions in this area to provide a boulevard
and a 5 -foot wide sidewalk.
South of 33rd Avenue NE we are proposing a 5 -foot wide sidewalk with a boulevard
along the northwest . side of Old Highway 8 southeast to the intersection with the cutoff to
County Road 88. The sidewalk will cross Old Highway 8 after the cutoff road and will
transition to a 6 -foot wide sidewalk along proposed concrete curb and gutter to be placed
along the existing edge of road southwest to and around the existing cul-de-sac at the end
Rankin Road and will connect to the existing sidewalk along 29th Avenue N.E.
Street lights will be placed along the west -side of Highcrest Road at all intersections and
will be spaced about 200 -feet apart between intersections. Street lights will be spaced
about 150 -feet apart on a staggered pattern along both sides of Old Highway No. 8 and at
intersections.
The project area is shown on .figure 1 and the typical section is shown on .figure 2 in
Appendix A.
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-23
.PAGE 3
After the subgrade excavation is completed for the sidewalk, a geotextile fabric will be
placed to separate the existing underlying soft materials from the granular materials. One
foot of select granular material or "sand cushion" will be placed on the geotextile fabric
to provide a firm base for the 4.0 -inches of concrete pavement.
4.1. Permits and Approvals
Construction of the sidewalks and lighting will disturb over one acre and will require a
National Pollution Discharge Elimination Systems (NPDES) General Storm Water
Permit (MNR 100001), which must be obtained by the City of Saint Anthony from the
Minnesota Pollution Control Agency (MPGA).
4.2. Detour Routes
The project will not require significant excavation in the existing boulevard area.
However, a supply of significant volumes of select granular base and concrete pavement
materials will be required. This effort will increase loaded truck traffic on the streets
adjacent to the construction area. Detours are not expected to be required to direct traffic
around the construction zones. The City will need to notify users of the increased truck
and construction activity. In order to accommodate the property owners along the
excavated boulevards and driveway areas, temporary parking on the adjacent streets may
be necessary during the periods of time when vehicle access is not possible.
5. FINANCING
5.1. Opinion of Probable Construction Cost
A detailed breakdown of the Opinion of Probable Cost for the project is included in
Appendix B. The Opinion of Probable Cost incorporated the average construction costs
experienced during 2005 and 2006, and includes a 15% contingency factor.
Administrative costs are projected at 25% of the construction cost and include
engineering, legal, financing and other administrative costs. The total estimated project
cost is $679,640.
5.2. Funding Sources
The total project cost is projected to be approximately $679,640. Funding for the project
will come from the City's Street and Utility Reconstruction Funds and Municipal State
Aid Funds.
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-23
PAGE 4
6. PROJECT SCHEDULE
The proposed schedule for this improvement is as follows
Task Completion Date
1. Order Feasibility Report ................................................................................. June 27, 2006
2. Accept Feasibility Report and order plans and
specifications.........................................................................................October 10, 2006
3. Hold neighborhood meeting........................................................................November 2006
4. Approve plans and specifications and
order Advertisement for Bids............................................................November 28, 2006
5. Receive bids................................................................................................ December, 2006
6. Award bid....................................................................................................... February 2007
7. Begin construction................................................................................................ May 2007
8. Final completion of construction.................................................................November 2007
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-23
PAGE 5
7. FEASIBILITY AND RECOMMENDATION
p
Project costs are anticipated to be approximately $679,640, which includes the placement
of proposed concrete sidewalk and street lighting along the west side of Highcrest Road
from 3 7th Avenue NE (County Road D) south to Old Highway No. 8 and new concrete
sidewalk along the north side of Old Highway No. 8 from Highcrest road to join the
existingsidewalk along the north side of 29th Avenue NE. Street lighting will be placed
g
along both sides of Old Highway No. 8 in this area.
Due to the desire of the City of St. Anthony to become a more "walkable .community"
this project is both feasible and necessary from an engineering standpoint. The
construction of sidewalks and street lighting will improve the "walkability" and safety for
pedestrians in this area.
Based on our analysis and data presented, the proposed project is feasible, necessary and
cost effective from an engineering standpoint. We recommend construction of the
proposed concrete sidewalk and street lighting as detailed in this report.
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CIN OF ST. ANTHONY
WSB PROJECT NO. 1626-23
PAGE 6
6
APPENDIX A
FIGURES
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CIN OF ST. ANTHONY
WSB PROJECT NO. 1626-23
TYPICAL SIDEWALK SECTIONS
PROPOSED B618
CURB & GUTTER
7M MIN.
,.
�+ �;! r`IL•�'+�I�`- t`i` �1� r`%•�•-•tel' f`� �4' t`� � �
SEE SECTION BELOW
2'
6'
MIN.
0
4-01�I AX 1111112 /o --�.
EXISTING CONCRETE
CURB & GUTTER
SEE SECTION BELOW
EXISTING CONCRETE
2' 5' 5'
CURB &GUTTER
MIN.
. �� � - - y Illhli(1111(llllllhlll�llllh(llllllllli)
L
TSEE SECTION BELOW
qCRETE SIDEWALK
MN U LAR MATERIAL
�`� . EXTILE FABRIC (Mn/DOT 3733, TYPE u)
A �1`701 XeniaAvenue South, Suite 300
Typical Section WSB Project No. 1626-23 Date: September 2006
Minneapolis, MN 55416
WSB www.wsbeng.com 2007 Sidewalk and Street Lighting
do Associates, Inc. Improvements for the City of F I g u re 2
PLANNING ONSTFax UCTI>o St. Anthony Village, Minnesota
\ INFRASTRUCTURE � ENGINEERING, PLANNING � CONSTRUCTION
K:\01626-23\Feas\fig-02.dgn
04
44,
-Y kkzg��
Legend
'n
R
Wl
Ut
Proposed Street Lights Ilk
El�
W 0.1..
L\
UN
%
E
111111 Sidewalk
�Ac Boom
WAS A 1 s"J", not
g
lgjtm�
-"6
"W'
1517Tz, MPs
AW W
ZIN
"zM, z MW
Pon
ft
E%
m
All
A*
RX
-.M \�R
V
ISO` SAL""
g,
A
0,
17
mm
g
a
ikgflg\
31
N% &MMI -MM
i I W
gq- ;gm M
0, - kllm
SOP
A
kn WIA
py
I&I
'�g 'y'.
g zggq
� WE
0 %0 0k,
_N
W,
.........
Ull 10. -map -
m
'N'
I all
NIRK,
3A
maw
"�;rNI"', Al
M,
LOWIR
'TomNN -
4 IND
W:
J Ay
-mump
X, sup.
INA
MK"� 0
k
moo -
IONIC
lEft k,.,
4
V
"k
U, W
All N
61.
DRA Zt�
RIK
MooE'4
K
k",
I rul,
"INK
R
mp agm
CH
k
A
moo
W Isom p K"ma
MR
W&O 3 .1w
K
1 -11 Ulli v '160 Z�
oil
W
MR1
a
k
ENE
lisp "MV
ggk�'
W
0
R,
gg'-
IMP, '�%'7&
T"
'070
rT
ERE
I'M
'KA"
g\
MINK
Nk a Ty
?111
"'A
INK,
W.
I qW. IN
A.
W.
-M
.. P ' , � 1� W
K
00011 -
Lu
Z W -V
\
�Nv
'4
Ng\
LU
u
&
65
V.
M
lip
CPU,
'g
I mk* �"'\
Rill
:'ZNVIPY.�`R
URAI
21
Associaten, Inc.
2007 Street LighOm"provements
`� , ` �: �\ .\ �a\\ . S� a. \\. ?pro \ :"\ c\ \ u_ •'::i\ \�, \` \' �:� \
a��
\\ \. \. \, \\,\`\\ ate. \v\.:\ \\���i \.�I�� \` :\ \. \\ L. \� \ \�\h� \ .U`•.,., ,\�`
,
>
.: ,u ,:\u \ :.a.. ,, ,,. ... =Jnr ....... .. .. \. ,.. .. \ \ \ .... \ <:: ., ,.. ....... ,, ...• � \ \�. \�. �t \.p �' a`\ \\,
,:.•::.,.,, .\' ` .\:: a:,�„-,.,. ,.. , ,., �:, �:\\ � Vii,.. t.. hp\.J: ",.,,N '.: f;:`•,\r: a\.\\ a. '\. ,\ � \ \♦�
I[Legend Proposed Street Lights IMXW Sidewalk
... \..,. \\�� :. \. ..� \, ,. .:,.... .:: \.,.....:.... ,. .\ate ,.,.:.,.:. <..\l �\ � ..\...
.... ,..\:,. ..., , ..,......,.: , � �: ate\
\
a
\� v iliirx�a .
\ \ \\ "C` '... \�\ w\,\ \. \� \\\\�\♦ \w\ as \�\ ,:\,�\ \\ \\\\� 3 \;
Figure'4
St. Anthony, MN
F."Of
300 Feet
s
2007 SIDEWALK AND STREET LIGHTING IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-23
SUBTOTAL SCHEDULE A - PROPOSED IMPROVEMENTS - HIGHCREST ROAD $2309717.50
+ 15% CONTINGENCIES $34,608.00
SUBTOTAL SCHEDULE A - PROPOSED IMPROVEMENTS $2651325.50
+ 25% ADMINISTRATIVE, LEGAL, ETC. $665330.00
TOTAL SCHEDULE A - PROPOSED IMPROVEMENTS - HIGHCREST ROAD $331,660.00
OPINION OF PROBABLE COST
HIGHCREST ROAD AND OLD HIGHWAY 8 SIDEWALK & STREET
LIGHTING
CITY PROJECT
NO.
PROJECT NO. 1626-23
ST ANTHONY,
MN
10/3/2006
St Anthony Village
3301 Silver Lake Road NE
St Anthony, MN
Estimated �
Estimated
No.
Mat. No.
Item �
Units
Qty
Unit Price
Total Price
SCHEDULE A - PROPOSED IMPROVEMENTS - HIGHCREST ROAD
1
2021.501
MOBILIZATION
LUMP SUM
1
$4,500.00
$4,500.00
2
2101.603
CLEARING AND GRUBBING - HEDGE
LIN FT
90
$10.00
$900.00
3
2104.501
REMOVE CURB AND GUTTER
LIN FT
90
$2.00
$180.00
4
2564.602
SALVAGE AND REINSTALL SIGN
EACH
23
$100.00
$2,300.00
5
2105.501
COMMON EXCAVATION
CU YD
825
$10.00
$8,250.00
6
2105.522
SELECT GRANULAR, BORROW (CV) (P)
CU YD
550
$11.00
$6,050.00
7
2105.604
GEOTEXTILE FABRIC TYPE V
SQ YD
1625
$1.50
$2,437.50
8
2411.617
MODULAR BLOCK RETAINING WALL
SQ FT
915
$40.00
$36,600.00
9
2521.501
4" CONCRETE WALK
SQ FT
14600
$3.00
$43,800.00
10
2531.501
CONCRETE CURB & GUTTER DESIGN B618
LIN FT
90
$10.00
$900.00
11
2531.602
PEDESTRIAN CURB RAMP
EACH
6
$400.00
$2,400.00
12
2540.602
SALVAGE AND REINSTALL MAIL BOX
EACH
20
$150.00
$31000.00
13
2545.509
CONDUIT SYSTEM (LIGHTING)
LUMP SUM
1
$151000.00
$15,000.00
14
2545.602
LIGHT STANDARD
EACH
18
$5,000.00
$90,000.00
15
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$3,750.00
$31750.00
16
2573.502
SILT FENCE, TYPE HEAVY DUTY (ORANGE)
LIN FT
50
$5.00
$250.00
17
2573.602
INLET PROTECTION
EACH
8
$350.00
$2,800.00
18
2575.505
SODDING, TYPE LAWN (INCL. TOPSOIL & FERT.)
SQ YD
1700
$3.00
$5,100.00
19
2104.601
CLEAN UP
LUMP SUM
1
$1,250.00
$1,250.00
20
2505.601
UTILITY COORDINATION
LUMP SUM
1
$1,250.00
$15,250.00
SUBTOTAL SCHEDULE A - PROPOSED IMPROVEMENTS - HIGHCREST ROAD $2309717.50
+ 15% CONTINGENCIES $34,608.00
SUBTOTAL SCHEDULE A - PROPOSED IMPROVEMENTS $2651325.50
+ 25% ADMINISTRATIVE, LEGAL, ETC. $665330.00
TOTAL SCHEDULE A - PROPOSED IMPROVEMENTS - HIGHCREST ROAD $331,660.00
OPINION -OF PROBABLE COST
HIGHCREST ROAD AND OLD HIGHWAY 8 SIDEWALK & STREET LIGHTING
CITY PROJECT NO.
PROJECT NO. 1626-23
ST ANTHONY, MN
10/3/2006
St Anthony Village
3301 Silver Lake Road NE
St Anthony, MN
No.
Mat. No.
Item
Units
Qty
Estimated
Unit Price
Estimated
Total Price
SCHEDULE B - PROPOSED IMPROVEMENTS - OLD HIGHWAY 8
1
2021.501
MOBILIZATION
LUMP SUM
1
$4,750.00
$4,750.00
2
2101.511
CLEARING AND GRUBBING - SHRUB
EACH
10
$325.00
$3,250.00
3
2104.501
REMOVE CURB AND GUTTER
LIN FT
60
$2.00
$120.00
4
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
205
$3.00
$615.00
5
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
1230
$4.00
$43920.00
6
2564.602
SALVAGE AND REINSTALL SIGN
EACH
23
$100.00
$2,300.00
7
2105.501
COMMON EXCAVATION
CU YD
815
$10.00
$8,150.00
8
2105.522
SELECT GRANULAR BORROW (CV) (P)
CU YD
1835
$11.00
$20,185.00
9
2105.604
GEOTEXTILE FABRIC TYPE V
SQ YD
1835
$1.50
$2,752.50
10
2521.501
4" CONCRETE WALK
SQ FT
16500
$3.00
$491500.00
11
2531.501
CONCRETE CURB & GUTTER DESIGN B618
LIN FT
1300
$10.00
$13,000.00
12
2531.602
PEDESTRIAN CURB RAMP
EACH
6
$400.00
$27400.00
13
2545.509
CONDUIT SYSTEM (LIGHTING)
LUMP SUM
1
$13500.00
$1,500.00
14
.2545.602
LIGHT STANDARD
EACH
22
$5,000.00
$110,000.00
15
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$3,750.00
$3,750.00
16
2564.618
ZEBRA CROSSWALK WHITE-EPDXY
SQ FT
96
$5.00
$480.00
17
2573.502
SILT FENCE, TYPE HEAVY DUTY (ORANGE)
LIN FT
950
$5.00
$4,750.00
18
2573.602
INLET PROTECTION
EACH
2
$350.00
$700.00
19
2575.505
SODDING, TYPE LAWN (INCL. TOPSOIL & FERT.)
SQ YD
2150
$3.00
$6,450.00
20
2104.601
CLEAN UP
LUMP SUM
1
$12250.00
$1,250.00
21
2505.601
UTILITY COORDINATION
LUMP SUM
1
$1,250.00
$1,250.00
SUBTOTAL SCHEDULE B - PROPOSED IMPROVEMENTS - OLD HIGHWAY 8 $242,072.50
+ 15% CONTINGENCIES $36,311.00
SUBTOTAL SCHEDULE A - PROPOSED IMPROVEMENTS $278,383.50
+ 25% ADMINISTRATIVE, LEGAL, ETC. $69,600.00
TOTAL SCHEDULE B - PROPOSED IMPROVEMENTS - OLD HIGHWAY 8 $3475980.00
CITY OF ST. ANTHONY
RESOLUTION 06-076
A RESOLUTION RECEIVING REPORT AND
ORDERING PLANS AND SPECIFICATIONS
WHEREAS, pursuant to resolution of the Council adopted June 27, 2006, a report was
prepared by WSB & Associates, Inc. with reference to sidewalk and street light
improvements of:
1. Highcrest Drive from 37 th Avenue to 3 3 rd Avenue
2. Old Highway 8 from 3 3 rd Avenue to 29th Avenue
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost effective, and feasible.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of St. Anthony
that:
1) The Council will consider the sidewalk and street light improvements of such streets in
accordance with the report at an estimated total cost of the improvement of $679,640.
2) WSB & Associates, Inc. is hereby designated as the engineer for this improvement.
They shall prepare plans for making such improvement.
Adopted this day of
ATTEST:
City Clerk
Reviewed for administration:
Mayor
, 2006.
City Manager
30 K. 101626-231ResolutionslResolution 06-076.doc
M,,R AJVV
I Associates, Inc. Infrastructure I Engineering I Planning I Construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
October 3, 2006 Tel: 763-541-4800
Fax: 763-541-1700
Honorable Mayor, City Council & Staff
City of St. Anthony
3301 Silver Lake Road
St. Anthony, MN 55418-1699
Re: 2007 Street Reconstruction Feasibility Report
WSB Project No. 1626-22
Dear Honorable Mayor, City Council and Staff.-
We
taff:
We are pleased to present to you the attached 2007 Street and Utility Improvements Feasibility
Report for the reconstruction of the following streets:
1. Pahl Avenue from Roosevelt Street NE to Wilson Street
2. 27th Avenue NE from Stinson Boulevard to Coolidge Street
3. Roosevelt Street NE from 27th Avenue NE to the alley north of Pahl Avenue
4. The alley north of Pahl Avenue from Roosevelt Street NE to Wilson Street
5. The alley south of Pahl Avenue from Roosevelt Street NE to Wilson Street
6. The alley south of 27th Avenue NE from Stinson Boulevard to Wilson Street
7. 39th Avenue from Silver Lake Road to Fordham Drive
8. The replacement and enlargement of the sanitary sewer main from the intersection of
39 th Avenue and Fordham Drive east to Chandler Drive and north in Chandler Drive
to Foss Road
Also attached for your consideration is a resolution accepting the Feasibility Study and authorizing
preparation of final Plans and Specifications.
We would be happy to discuss this report with you at your convenience. We will be available to
answer your questions at your October 10, 2006, Council Meeting, or you may call me at (763) 287-
7182.
Sincerely,
WSB & Associates, Inc.
Todd E. Hubmer, PE
City Engineer
Attachments
lh
Minneapolis I11St. Cloud
Equal Opportu�lty Employer K:101626-2214dnzinlDocsILTR-hmcc-100206.doc
WSB Project No. 1626-22
n
Prepared by:
701 Xenia Avenue South Suite 300
1
Minneapolis, MN 55416 763-541-4800 & Associates, Inc.
:are] m1wk a
CITY OF ST. ANTHONY
2007 STREET AND UTILITY IMPROVEMENT PROJECT
CITY OF T. ANTHONY, MINNESOTA
October 2, 20-06
Prepared by:
WS13 & Associates, Inc.
701 Xenia Avenue South, Suite 300
Minneapolis, MN 55416
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22
CERTIFICATION
I hereby certify that this plan, specification or report was prepared by me or under my
direct supervision and that I am a duly licensed professional engineer under the laws of
the State of Minnesota.
Todd E. Hubmer, P.E.
Date: October 2, 2006
Quality Assurance /Quality Control:
hn)Z. Hardy, P.E.
Date: October 2, 2006
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WS B PROJECT NO. 1626-22
Lic. No. 24043
Lic, No. 41499
TABLE OF CONTENTS
TITLE SHEET
LETTER OF TRANSMITTAL
CERTIFICATION SHEET
TABLE OF CONTENTS
1.
EXECUTIVE SUMMARY................................................................................................ 1
2.
INTRODUCTION ..............................4..6.66,,.66.6.4....4..6..4.1.44..6.94..64,....4...4...4.6„ 6„ 6..6.......6..44►.
2
2.1. Authorization..........................................................................................................
2
2.2. Scope............................................................................................................1..........2
2.3. Data Available........................................................................................................
2
2.4. Project Location......................................................................................................
2
2.5. Project History ........... ...................... 6.......................................................................
3
3.
EXISTING CONDITIONS.................................................................................................
3
3.1. Sanitary Sewer........................................................................................................
3
3.2. Watermaln...............................................................................................................
3
3.3. Storm Sewer............................................................................................................
4
3.4. Streets......................................................................................................................
4
4.
PROPOSED IMPROVEMENTS........................................................................................
4
4.1. Sanitary Sewer ........................................................................................................
4
4.2. Watermain .......... ..1....6,04......4.,.60.644......640:409....,.,6.,,,.6.....,.....9..6.6.,444...46.16,.14......64..469.5
4.3. Storm Sewer.......................................:..................................................................a.
5
.4. Street .......... ...............................................................................16.6..9,4.4...............1...
6
4.5. Permits and Approvals............................................................................................ 6
4.6. Detour Routes ...................... ................................. .................................................. 7
5.
FINANCING.......................................................................................................................7
5.1. Opinion of Probable Construction Cost.......................................6.......................... 7
5.2. Funding Sources...................................................................................................... 7
6.
PROJECT SCHEDULE .......1111.1 6 6 0., 4 4 9 4 00.00000 , 4 4.0 0 .. ,. 0 4 9 .. 4 0.00606 0 9.0.0.0 4 Go 4 assesses ... 1111. , .......... 6 4 4 6 9446.. 9
7.
FEASIBILITY AND RECOMMENDATION.................................................................
10
APPENDICES
Appendix A — Figures
Appendix B -- Cost Tables
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22
1. EXECUTIVE SUMMARY
This project has been entitled the 2007 Street and Utility Improvement Project. It
provides for the street and utility reconstruction of 39th Avenue from Silver Lake Road to
Fordham Drive; Pahl Avenue from Roosevelt Street NE to Wilson Street; 27th Avenue
NE from Stinson Boulevard to Coolidge Street; Roosevelt Street NE from 27th Avenue
NE to the alley north of Pahl Avenue; the alley north of Pahl Avenue from. Roosevelt
Street NE to Wilson Street; the alley south of Pahl Avenue from Roosevelt Street NE to
Wilson Street and the alley south of 27th Avenue NE from Stinson Boulevard to Wilson
Street. The project also provides for the replacement and enlargement of the sanitary
sewer main from the intersection of 39th Avenue and Fordham Drive east to Chandler
Drive and north on Chandler -Drive to Foss Road.
This Feasibility Report outlines the proposed reconstruction of approximately 4,465 feet
of 30 -foot urban section streets, approximately 545 feet of 22 -foot urban section street
complete with bituminous paving and concrete curb and gutter, and approximately 2,725
feet of 12 -foot wide bituminous paved alleys. Also proposed is the replacement of
approximately 4,400 feet of watermain, approximately 89 water services, 5,000 feet of
sanitary sewer main, and approximately 89 sanitary sewer services. An additional 735
feet of sanitary sewer main will be burst in-place and replaced with new, larger pipe. The
installation of new storm mains and several new storm sewer catch basins are also
proposed.
A total estimated project cost is approximately $2.9 million. Funding for the project will
come from the City's street reconstruction funds, storm water utility fund, TIF funds,
water and sanitary sewer utility funds, and special assessments.
The project reconstruction can be completed, including the first lift of bituminous and all
- restoration items, in 2007. The final lift of bituminous is proposed to be installed in June
of 2048.
This project is feasible, necessary, and cost effective from an engineering standpoint and
should be constructed as proposed herein.
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22
PAGE 1
2. INTRODUCTION
2.1. Authorization
On August 8, 2006, the St. Anthony City Council authorized the preparation of an
engineering Feasibility Report for the 2007 Street and Utility Improvement Project. This
project was authorized under City of St. Anthony Resolution 06-068.
2.2. Scope
This project provides for the street and utility reconstruction of 3 9th Avenue from Silver
Lake Road to Fordham Drive; Pahl Avenue from Roosevelt Street NE to Wilson Street;
27th Avenue NE from Stinson Boulevard to Coolidge Street; Roosevelt Street NE from.
h
27 tAvenue NE to the alley north of Pahl Avenue; the alley north of Pahl Avenue from
Roosevelt Street NE to Wilson Street; the alley south of Pahl Avenue from Roosevelt
Street NE to Wilson Street and the alley south of 27th Avenue NE from Stinson
Boulevard to Wilson Street. The project also provides for the replacement and
enlargement of the sanitary sewer main from the intersection of 39th Avenue and
Fordham Drive east to Chandler Drive and north in Chandler Drive to Foss Road.
In summary, street, sanitary sewer, watermain, and storm sewer improvements are all
proposed as part of this project.
2.3. Data Available
Information and materials used in the preparation of this report include the following:
City of St. Anthony Record Drawings
City of St. Anthony Topographic Maps
Field observations of area
Televising reports of the sanitary sewer system
2.4. Project Location
Most of the project is located in the southwest portion of the City of St. Anthony. The
remaining section is located in the northeast portion of the City. The project includes the
following streets and alleys:
Pahl Avenue from Roosevelt Street NE to Wilson Street
27th Avenue NE from Stinson Boulevard to Coolidge Street
• Roosevelt Street NE from 27th Avenue NE to the alley north of Pahl Avenue
• The alley north of Pahl Avenue from Roosevelt Street NE to Wilson Street
• The alley south of Pahl Avenue from Roosevelt Street NE to Wilson Street
J
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22 PAGE 2
The alley south of 27th Avenue NE from Stinson Boulevard to Wilson Street
• 3 91h Avenue from Silver Lake Road to Fordham Drive
• The replacement and enlargement of the sanitary sewer main from the intersection
of 3 91h Avenue and Fordham Drive east to Chandler Drive and north in Chandler
Drive to Foss Road
The project area is identified on Figures 1, 2, and 3 in Appendix A of this report.
2.5. Project History
This project was initiated through the recognition of the following conditions in the
project area:
• Deterioration of street conditions
• Re -occurring watermain breaks in the project limits
• Sanitary sewer system back-ups into adjacent homes
• Streets, sanitary sewer, watermain lines are over 50 years old and are exhibiting
deterioration problems
As a result, the City Council provided funding in the 2007 budget for street and utility
improvements. On August 8, 2006, the St. Anthony City Council authorized the
preparation of an engineering feasibility report for the 2007 Street and Utility
Improvement Project.
• t •
3.1. Sanitary Sewer
The majority of the sanitary sewer system in the project area consists of 8 -inch, 9 -inch,
and 10 -inch diameter vitrified clay pipe (VCP) installed in the 1950s. The joint sealing
material in use at that time was typically an oakum and bituminous material. Internal
inspections with a specially designed television camera have found the structural
condition of pipe to vary between fair and poor with numerous offset joints, cracked
segments, dips with solids deposition, and some root intrusion and mineral deposits at
joints.
3.2. Watermain
The existing water distribution mains in the project area were installed in the 1950s and
consist of 6 -inch and 8 -inch cast iron pipe (CIP). The service connections are expected to
have lead "goosenecks" and galvanized or copper service lines to the individual homes.
In general, the system has provided good service, but main breaks are becoming more
likely as the pipes approach 60 years of service. In addition, the lead goosenecks may be
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22
PAGE 3
a source of lead in the residential water supply and the cast iron pipes are probably
heavily corroded and possibly leaking.
3.3. Storm Sewer
There is an existing 18 -inch reinforced concrete pipe (RCP) storm line on 39th Avenue
NE running from Penrod Lane to Shamrock Drive. A 24 -inch RCP storm main joins the
system from the south and a 15 -inch RCP joins the system from the north at Shamrock
Drive. The main in 3 9th Avenue NE becomes a 3 0 -inch RCP at that point and continues
east to Fordham Drive. It then turns southeast under the railroad to Chandler..
There is very limited storm sewer in the southern section of this project. The alley south
of 27th Avenue NE has a 15 -inch reinforced concrete pipe (RCP) storm line which drains
an existing low point approximately one-third of the way in from the west end. Twenty-
seventh (27th) Avenue NE and Pahl Avenue each only have existing catch basins at their
east ends at the intersection with Wilson Street. There is no existing storm sewer in
either of the other alleys.
3.4. Streets
Thirty-ninth (39th) Avenue, Pahl Avenue, and 27th Avenue NE are generally 30 -foot wide
streets with concrete curb and gutter. Roosevelt Street is generally a 22 -foot wide street
with concrete curb and gutter. The alleys are all 12 -feet wide bituminous pavement with
no concrete curb or gutter. No borings have been taken for these streets, but other soil
borings on adjacent streets indicate that there is approximately 5 inches of bituminous
over 2.5 feet of silty sand fill. Soil borings have been ordered and will be included in the
Appendix if available at the time this report is completed.
a
4. PROPOSED IMPROVEMENTI
4.1. Sanitary Sewer
The existing 8 -inch and 9 -inch VCP will be reconstructed with 12 -inch PVC, including
the replacement of sanitary sewer services in:
3 9th Avenue from Silver Lake Road to Fordham Drive
The existing 9 -inch VCP will be reconstructed with 8 -inch PVC, including the
replacement of sanitary sewer services in:
The alley north of Pahl Avenue between Roosevelt Street NE and Wilson Street
The alley south of Pahl Avenue between Roosevelt Street NE and Wilson Street
The alley south of 27th Avenue NE between Stinson Boulevard and Wilson Street
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22
PAGE 4
The existing 15 -inch VCP will be pipe burst and replaced with 18 -inch HDPE and the
sanitary sewer services will be replaced in:
Chandler Drive from the Foss Road Lift Station south approximately 735 feet
There are no existing sanitary sewer lines located within Roosevelt Street NE, Pahl
Avenue, and 27th Avenue NE. The properties located on these streets are either served by
adjacent streets or alleys.
The proposed sanitary sewer improvements are shown on .figures 4 and S in
Appendix A.
The existing watermains will be entirely or partially exposed by the excavation required
for the sanitary sewer improvements in 39th Avenue NE. The road surface and gutters, as
part of road reconstruction, will be completely removed. The excavation for the other
utilities and street reconstruction provides a timely opportunity for improvements to the
water distribution system before significant problems are experienced.-
The
xperienced:
The existing watermains will be partially exposed by the excavation required for the
storm sewer improvements in 27th Avenue NE. The road surface and gutters will be
completely removed as part of road reconstruction on 27th Avenue NE, Pahl Avenue and
Roosevelt Street. The excavation for the other utilities and the subgrade excavation
required for the street reconstruction provides a timely opportunity for improvements to
the water distribution system before significant problems are experienced.
The proposed watermain improvements consist of replacing the existing 6 -inch cast iron
mains on 39th Avenue NE, Roosevelt Street, Pahl Avenue and 27th Avenue NE with new
8 -inch ductile iron pipe (DIP) main. This will, improve delivery of potable water and fire
flow volume at reasonable pressure and head loss.
Replacement of the service taps and lines may improve the water quality by reducing the
potential for lead to enter the system and possibly increase the pressure by providing a
clean service pipe.
The proposed water system improvements are shown on Figures 6 and 7 in Appendix A.
4.3. Storm Sewer
The proposed storm sewer improvements include replacing the existing storm sewer on
39 th Avenue NE running from Penrod Lane to the railroad crossing at Fordham Drive
with the addition of new catch basins at each intersection.
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WS B PROJECT N O. 1626-22
PAGE 5
The proposed storm sewer improvements also include the placement of new catch basins
in the alley north of Pahl Avenue, in Pahl Avenue, and in the alley between Pahl Avenue
and 27th Avenue NE to minimize the depth of flow in the alleys and the gutter line along
with minimizing the bypass flow out on to Wilson Street from the street and alleys. The
storm sewer in 27th Avenue NE will be extended east to Stinson Boulevard to minimize
flow from the street out on to Stinson Boulevard. New catch basins will be placed in
Roosevelt Street and at the intersection with 27th Avenue NE. This storm sewer system
will be extended east to connect to the existing main in Wilson Street.
The proposed storm sewer improvements are shown on Figures 8 and 9 in Appendix A.
,4. Street
The reconstruction of the existing streets and alleys is intended to improve the design
strength of the pavement system and provide a street surface with an extended life for the
City of St. Anthony. The existing street and alley widths will be maintained in the new
street sections to minimize impacts on the existing driveways, boulevards, and
landscaping. The proposed street reconstruction areas are shown on Figures I and 2 and
the typical section is shown on Figure 10 in Appendix A.
After the subgrade excavation is completed in the streets, a geotextile fabric will be
placed to separate the existing underlying soft materials from the granular materials. One
foot of select granular material or "sand cushion" will be placed on the geotextile fabric
to provide a firm base for the six inches of Class 5 aggregate base and 3.5 -inches of
bituminous pavement. The alley section will be similar, but will only have 3.0 -inches of
bituminous pavement.
4.5. Permits and Approvals
Reconstruction of the roadways will disturb over one acre and will require a National
Pollution Discharge Elimination Systems (NPDES) General Storm Water Permit (MNR
10000 1) that must be obtained by the City of St. Anthony from the Minnesota Pollution
Control Agency (MPGA).
The reconstruction of the existing sanitary sewers mains will require permits from the
Minnesota Pollution Control Agency (MPGA) and the Metropolitan Council
Environmental Services, and the reconstruction of the existing watermains will require a
permit from the Minnesota Department of Health.
The reconstruction of 39th Avenue may require a permit from the RCWD. This may
require storm water treatment for the runoff from 39 th Avenue. The need for the permit
will be determined during final design.
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WS13 PROJECT NO. 1626-22
PAGE 6
4.6. Detour Routes
The -pro' ect will require significant excavation and disposal of unacceptable material
from the existing street area and a supply of significant volumes of select granular base,
aggregate base, and bituminous pavement materials. This effort will require closing the
roads under construction and increasing loaded truck traffic on the streets adjacent to the
construction area. Adequately signed detours will'be identified to direct traffic around
the construction zones and notify users of the increased truck and construction activity.
In order to accommodate the property owners along the excavated roads, temporary
parking on the adjacent streets may be necessary during the periods of time when vehicle
access is not possible.
5.1. Opinion of Probable Construction Cost
Detailed breakdowns of the Cost Opinion for the various construction areas are included
in Appendix B. The opinion of cost incorporated the construction costs experienced
during 2005 and 2006 and includes a 15% contingency factor. Administrative costs are
projected at 25% of the construction cost and include engineering, legal, financing, and
other administrative costs. A -summary of the project costs is as follows:
Street Reconstruction
Sanitary Sewer Improvements
Watermain Improvement
Storm Sewer Improvements
Total
5.2.FundingSources
$1,419,590
$599,380
$540,750
$375,260
$2,9349980
The total project cost is projected to be approximately $2.9 million. Funding for the
project will come from the City's Street and Utility Reconstruction Funds (Public
Improvement Bonds), Storm Water Utility, Water and Sanitary Sewer Utilities, Tax
Increment Funds (TIF), and Special Assessments to benefiting properties.
The City's policy for street assessment is based on front footage along improved roads.
The property owner is assessed 35% of total street and local drainage construction costs.
Each property owner that receives a new water service will be assessed a flat rate per
service hookup to the new watermain.
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22
PAGE 7
2007 Street & Utility Reconstruction Project
City of Saint Anthony Village, Minnesota
Opinion of Probable Cost
Project Costs and Proposed Funding Sources
Total Street Reconstruction
$1,419,590
Total Sanitary Sewer Improvements
$599,380
Total Watermain Improvements
$5403750
Total Storm Sewer Improvement
$375,260
Grand Total Proposed Improvements
$2,934,980
2007 STREET AND UTILITY RECONSTRUCTION
City of Saint Anthony Village, Minnesota
Project Costs and Proposed Funding Sources
Proposed Improvements
Funding Sources
Total
Assessable City
Street Reconstruction
$4963857 $922,734
$1,419,590
Sanitary Sewer Improvements
$0 $599,380
$599,380
Watermain Improvements *
$35,600 $505,150
$5401750
Storm Sewer Improvements
$131,341 $243,919
$375,260
Total **
$663,798 $2,271,183
$2,934,980
* Watermain is assessed at $400 per connection. This project contains 89 connections.
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22 PAGE 8
6. PROJECT SCHEDULE
The proposed schedule for this improvement is as follows:
Task Completion to
I. Order Feasibility Report..:...................................................................... August 8, 2006
2. Accept Feasibility Report and order plans and
specifications..........................................L........................................October 10, 2006
3. Hold neighborhood meeting..................................................................November 2006
4. Approve plans and specifications and
order Advertisement for Bids ......................................................November 28, 2006
5. Receive bids, compute assessments...................................................... December, 2006
6. Approve three resolutions on improvement hearing and
special assessments........................................................................... January 9, 2007
7. Hold public hearing for .project and assessments, award bid and
call for bond sales......................................................................... February 13, 2007
8. Award sale of bonds..................................................................................... March 2007
9. Begin construction.......................................................................................... May 2007
10. Substantial completion of construction ......................................................October 2007
11. Certify assessments to a county auditor ...................................................... August 2007
12. Final completion of construction.............................................,.....................1 June 2008
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22
PAGE 9
7. FEASIBILITY AND RECOMMENDATION
Project costs are anticipated to be approximately $2.9 million, which includes the total
street and utility reconstruction of 39th Avenue NE, Roosevelt Street NE, Pahl Avenue
27th Avenue NE, and the three alleys from just north of Pahl Avenue to just south of 27th
Avenue NE.
Due to the poor structural condition of portions of the sanitary sewer mains, the
deterioration of the existing storm sewer catch basins, watermains, and street sections,
this project is both feasible and necessary from an engineering standpoint. The location
and condition of the existing utilities, the available street right-of-way, the existing soils
conditions, and the need to provide utility service to all of the properties in the project
area, other methods of improving the utility systems, and the roadway are not feasible or
cost effective.
Based on our analysis and data presented, the proposed project is feasible, necessary, and
cost effective from an engineering standpoint. We recommend reconstruction of the
sanitary sewer, reconstruction of the watermain, replacement and extension of the storm
water collection system, and the reconstruction of streets and alleys as detailed in this
report.
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22
PAGE 10
APPENDIX A
FIGURES
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WSB PROJECT NO. 1626-22
2007 Street &` Utility Improvemei
WINE
t
Sm
�j X�fflNWMM,,�
,\N� � WO
'J
--01111111� W
no
M
N
'A"
W\
N "MOR
.\ \. "REM M
ma " g-111 I:Ae
m, �111 147n
m
52hka'.
x \\\4 qgk
aMR, I I I- �z I�Z, N,
IN
sm I PRI,
a
IMIR
\\s,....\
\ \.ab\ \\\.\. \\\� -. \�\\ \ I
N A
1 \, \ \ \,\`\ .�.\\ . \:...\ . \ \. mak\ ..\ .; .� ` \ .
N NVI'MEM"IN
oommmmmm"
a.,
NN
NININM
x
RM
a
N,
2.
IN
E
M
N
N
WR
VRZ
I -T
m;
'A
WN
gg
M
NIN �3
A
M
A RHMM!, PON,
I HIM
On Fir" ka,
411
N f
03
7,75\7 WK14
MI
R
RE
Ilk
\m
g
ui
A,
DREM mumm, tv
M
51 KIIIIII
5
R
mimma i\
H
J.
--ga MR. L
a
ivilll
ME
"Pi
As;
71
L , IN
Na"
t.
NO
-k-', M -i
N
\ 611
R
'0
w n,
WOM ON i a �
m
A
V,
11 EM051",
IN
R
MN
ME,
R
w gp"
x,
no X M
man \m@, M
`Ofall
M KI
'RR h
Nlk,� 41,
mggg
IN,
km\'�
W -Mm ,
oax,
N , z�a a
NO'\
IMP
�\ I m
ev IMal
61
X
1100,
"Ma
"WIN
4
MQZ,�
1 LP 1.111
MN 'aa
M,
w A
HaMINHWOM,
MW
M,
EMENIM,
momm,
n \9
\\\:.\
Ak k
pgIKER111,11,
gg,
I WWAXIR
VIII,
W
Offilffi,
py,\
N \
MI-
gg�
\1 01 t
I
IIIN
IN
VN� SM
� N
W -k.
01
MIMKON"
i -, Lwwv-,
NONE
a
WN
41�1,
W&
A IM
�������1URMAM
Figure 2 StreetReC011StPUCtl0i1 150 300 Feet
St. Anthony,MN'
11 I
11
20017:Street & UtilityI :''Improvements 11
•. a.
I I
, I
"M �
MMIE
\� ,\
l!""T"T ___1-111111 101 0\10-
�11 '001
\ {"\ •a, j\ `
��i.��,\3:\\O:�\:J�\�?:)�2, '\\�\\�\
I \ \\�� \\ \,i.J\\\\ a.\' \.. \\ \Air)\. r3 i\ r,,j
\ \�..
V \..
t
X \
\ 1.. \
\\.
\ \
It \:WWI
\
\ ..
\ ..,
\ a
,a \� -\\\\ \�
\ \ \
S \.
\ \ \
\ � - \
\ \ \.:
• - \ \ \ \ Q\\\� \ \
\:\ms's\,'\,� \'�\ \ \��\ \\ �,, ;; \\\r\\\\\`2A\�11+.k,\�`":"�� \\� \�)ix.Y,4,i.
-11
89 s
.\. \,,. a: 1 : , \\. \,
\\
\
\ \ 11 \.. \ .
^S \a -11,
",
" ,
� �
. \ \ \,... \ ' , , .\ \ -
a\` ,.y: \. R. \\, L\ \ «:< \\\aa ;,fix; \�\�
\ � A \\ \\ I 1_1 - ` \ �. \ " .
\a 0-.. \W"RDI\ :\
\ \
\\ \\� \: \\\ \ \ 0x%' \ \� \\\�\ \\w
\\mm
\\ \ \ j\\,.,, \'l \ \\ -:
�\�'��,r2'' \ \\
\ \.L\\ \a.", \\ .h �\ �\ �.,
I\k
',
s.
1 { �'
.\\. :\ L\ a. ♦ '.R -moi
a\
IM aH
\.
\ a
\ „�
\
Y Z
i\
cg \'
\.,
\ \ l� \.� C \ „ \ �::
\
\ : bl "..�r ,
f .\
11 I'll
\N \
ioi \.\ J \\ "\\ Z11
\.\\\ y
\ \AN .\
a \\
\\ �\ \
mll T I ,
0\>., ,,,Y. \\ ,\ \\\. \\\\
I \
\\\
,\\k� o,
� )0 -�"
'� '-"',
- "� ' x, �'
.a\ \ \\
�� 4,
\. \ \
"�\ \ , - -,L'i�, ��:
I K.
`��
'*�' I
\... \
'� ft '�' -', " M h �-"'.""� ��""\
\..
11
�" I . , " \
"�"
'N4 '1<
Q u
" g
� 11111 "�'T
lJC
' \"
♦ \
a AW '1 -111 11�1. .",� 11 "WhAw ME I .;'
\11-
�� , I "'� `k\� "I'M111TRZ--l",��1 ,"I'l- '.�� ", " 11
.. ,
- ,11 n 1� ,
� :1 I �' �\' �""A , -""�'n 1", � ,,,, \12
'7
� � I I � ,, " k'�
, '�
',_ � '� ' "'i, "' �'141� 1 1 1 - I'll, �
r, — It\ I I I" �k
',
- -
� ,
" ,
Z.I ',','�� \ \r�. .� '�Z'� - .1-" \'\ i, I
\�� . \1 \.\. \.\\\", r�". � \- ��\ ::,"".,' '�"'� - �: \\\ \
,� "`�'R\
�14
" �\'�
- &
\"� �' � _4'4_0�
"I, "R",
N, I,.,- '��',,
�X% �
,I',, \ "
� j"\
I I �
- A
.Us q
'21 v
1* MN "
\\
I , ' 11 r -I\",- -, "'.' _.'_ , %1'
� l\1\\\-
\ \ w u :
I �:' � I
, 0% z � ' 1. 9R ��� &
c - --
0 w ,
� �""' -"'
11
I ,I"!
I � '
iiti7?6 It ,
,CA, in,
" ,
� �. , g:�q —1''PI 11-1
\ \ ` \`
\� �\`��
\\ \ \ 4 a \ \ \\\�\!a'\� ,\\\ \\\\
\ \
\ ' \ \ \\ \`� \ \ \\ \\\\
\ �\ \ �\ \ \ \ Z �\ \� \a
\ �vw..w\ \ \ \ ,I I\, f a \\\\\\\ \�\
11
a. '\ \ \ \ \J �\a\ \ \ \�a 3�
a� \\lam\ \ o-\\ \ \ ' \� \ `\\\\\\\\u\\ \ice\\,O\\\\\\ \ \E�� \\\\ �\
' \yam. l:` \ ?� \ \ \\\\ \1 I \ s� ���-;�. \ \`-.
a \\ \ \ : \\\ \\\\
\ \: FF��
�: .c; " '� f _�
\ \\\� : O \3c \ \\\ '' \s \\ \\\\s `\
ecJ\T� �� \\ \, 7C \\\'\ i :t \\\O\\� \\\
11
\\ \\ \., ' t\\ \\�:\ \\ \ \ \\ \ .
\ \ \\ , \+R\ 3 \ \\ \ C \ \ \� \�\'ll \ MM" 2�< \I
\ a \\ j
\ \\\\\\ \\� \\\\:. \\ „*\w v�\\lig\ �\, 10. \io `fa cJ .o
'\ \�\�„^""'\ \\ \�\�\\ \ �\ \\\\ \`iia\ a �\\\\\\ �NN `�
\ s \\ \ \ \ \ \\\�\\\ \ \\ \ \ \
\ s a \\ \ as \ �\ \ \\` \\ \\ ;\� \\' `
2 \ \ \ \ \'
ai \ \\\ , \ \ \� £ \ \A44 \�\ \ \\ \\\ate ��\ `
\� \«M- a\\\\ \ \\�.. �\ \ \\\�\ \� \y\ �\\\\ \
i \ \\ \.
\\ \
\ \: \ ♦ >r \ \ \\ �\��\Z\\\\ \.. \\\\ �\, \\ \ \\\ \ \ �:\
\ ♦" \ C \a: c \ \ \\ \\\ \\\ \\\\ \ \\ 'Ni' \\ ti
�ilf♦ \ \\ \ \ , ' \ \ p 1 �\\\ \\\\\\ \\\\\v: q\��� �\ \
\ \ \�` \ \ \ \ 1� a\\\\ \\\\\\\\\"`\\\�` \ a\\\ \\;
I am
u \ \ \ - a \`�' \\\\\\\ `\ \
\ \\\ \ \ \ \\\\\\\ \\�\��\\\\LV \\
M \ \\' ' Q J\\ `� w \ \\\\` \ \ \Q\\\\\\\\ \\ \ \ \ \\�
\�\\��\,. \ \ \\i� \ \\ \\\\ \\�\ \ \ JJ\\ \�\\\�\
\ \ �\1 \ " \ \ \ \ L.' \ \x a�
\ , i* \u \ \\ \ \ '\\\\\\\ \ b'K'1\1
\ \� \ \\\\'
\\'RR\\' �.\ \ �, i\ .\ \\ \�\ WAR-1
\ \ ♦.: \ \ : \\.
�\ \\ \ \\\ \\ \ \ \\\\ \\ \ \ \-
\\ \ i v \ \ \\ \\ \�\\".�\\\\\\ `CL \ \\111111111111111 111111 ilillilli
\ \\ \ �� \� \ \\\ \ \\ , \\ \\\ \\\
y\ \��\ �\ '• \ \\�\ \\\` \�\\\\\ \�\ \� \ \ �\\\
\\ \ \ C \\\ \ \\' : \ \ \ \\� \\�\\
\\ K.'\i d -\ \ \ \ \\\ \\ \ \\ \
\Z t \ \ L\ `\ �� \\ \ \� \ 1\,' ,0�� �\\\\\\\ \
\ \ _ \\ \\ \ \ i ' \\\ \\ \\
\ \ \ � \\\ \\ Qa \\\ \ \ \0
\\ \\ \\\ \\ \ \ \ \\ \ e , \ \ \ \
�\ \ \ \ \' \ \ \ \ \ \\a 3 -
\ \.. \ \� \ \ C \ \. \\ \ \ \ \\\ \ \\\ \' \ \
\ \ \
\ \ -
\\ \. \ \.
\ \ \
\ \ \ \\ \
\ \
\ \
\ \41 \
\ a
'\
\ \
\ \ \ \
\.
\,,:
\ \\
\:a \\
\ \\ <. K. ,
\
\
\ \ \\
\,
\
�\
\. \,
\ \
\:, \
\ " `\
\\ \
\ \
.\\,� \,.
\
a
\ \
Un
\
\
\. \
\, \\
\:
a v ?y aar. A
yL
vv.
\\\
11
\ \\ \
\\ L. \ \
\ a \ \ \
. \ \
\\ .\ \
\ \ \ \\\
\ \ \ \
\\ .\
' \'
\ r
\ \ \ \ \ \`
\ \
\ \
v ry v v
\ \ \
\ \ \. >
\»
\ \
a. � r
\ \ \
\ \ \,
v A vv '
�': v v
�.
vv y vv
\r
\\, \ ,\ \\: \ \ h \ \
, \� _ .�
\.
.\
\,
.. \
, \ \
\.
a
v
y, �
a \
r \ \: ` \\ \. \ \\\ . \
\ \
\ \Ell
\ \ \.
\\
�11\ \ \
T-111",
\ \ \ \\\
111 \\\\\\\ \'
\\11
��
Figure 4
St. Anthony, MN
A \�\\
A
y\ \\\\
\\ \\\�
-i'
\ x b r,
x:
\\ ♦ \\\ I ltn �N'�'Z'- \ \ ow z
f R -
0111% ,\ D i \ \\� '`\� a
\.\
\ WN
\ \ \ \
i \ €€ \, �C\ \� \ \ \� ?
\ j ♦ f \ \ \ \ \\\\\
\ \.. \ \ L ,,,,}�31
EI \'Q\ \\ 'M\\\i�
� 'I'm " i - �
\\ c I " 11 I , \"'.
\ a \ \ . \\a
HIP ,\ \\ \.
t.
\P \ \
\ \\ \ \
\.
\ a \ \\ r
\ \\ \ \
ow"\ \ \ \
\ \\ \ \\ a
\ \ \
r \ \
\ \ \ \ \ \\\\ \\ \Q \ \ \
S u. \ & \ \ �. \ i \ e \ \ \ Q1 \
\aa �> 9. A \
y�A a) v tri\\ a a 811 ,.
„i
.<.:.. : ,
\\ �C` \ a.. \ \ \\ \r \ \ 1
J \
\\
\. \.. �,
\ y�
,,3 \
a \\ \ \ "\ '. . \ \.,,
\: \ ��` �•\ H,
.` . ,� \. \
\ y \ +,
l a
\l 1 7
4 \ \ \
\ \MANAS
I '11\\ ak ,,\ h\ ,\ \ \ o a \ \\ .\
\\t",>\y \\:' \ # \
. 0: \
u \- \.
\ �.
\\�`�
,\Ml� \ \„ \.
\.
Q1, i ,\. #
\ \
\,.\\ \ \ \ \�� \\\ ,. \, \,
\; \ \. � \\\
\� \ i ,. \
\ \\
,\\. \\ . �.
\ Z \ . \
\ \% \� \
\,,� \i 1, \.. \ \\ vim., \ \ \. F 1, Nota..
\, ,01 <. <* a \, a \ \, \... \ \\ \J . k \-., \.
\ .\ \. \
\. \'. , \
,`,� \� \ \ r \\,
i \ \ 3�\y \\..\ a' .\\.
\ '': \ \
\\ -\. \
\ \ �\
\: a
3 \\ \
1 I
\ \,
l\ \\ \ \
. \\
\ \\ \., v \
0
\\
\ \
\ �`\ \ •\
C \.
\ '
\ a: \y
:. \.
Q. .\, ,...,, , ... .\ ,\\.. .."4\,
\ \ w
1 a
7 A11.11,\ \
�\ ^ \c`\\\ a \\tib \ ,. :;
'101\11 01. \ a\\
N'\_11
\ :i .I \ \ \. \. \\
14 a,'' a i � ""IL"\ wt
'a\\\ �.ININ
I '15\; \'
a\w m ,.s e ,' \\\
�\
Z
.<, \\\ `
�\
\, r
,�4 1 f'\
f\
\
5
\, \zIs h \ \\\ \ \ \�. \V-11 I 11
,,a\ Jli
\ �- \, \\ <
\ \. „\ \,
a\, \`
�\ \.
a.'
\ >.
\\ \
,NV�ffi�.� >, .
�\\.\\ F \`
a " f
,,, -'j�' /
`�0
'11- '711� f 1
�111
11\
1-11
`��\\\\\\\���\ \\\``\�\\\a\\t(\\\\ \ \\\' 1.\\ �\ \ f
H z \i\\� \ \ \ \\ \\ \
t "I '� I _- mn - "
\\� \` �\ a� \\\ is
I �\ � � � " , I "�
\_
\U
\ 11 -\ \\\\c O \' C�\� N 'T' -�'\\\\\, a\\\
Jzz ?, at Pi -AW
�\ a \r r f \ i \ wx \ \\ a,
IMMUNE, \\��\ \ \ \ \ \\\ \
\\ \ . \
a
qm
�1
i '' i E!, \�to na\"i�`\\\ \\\\\` \ \ \
_4
\\ \� i \`\\ �` \ \\tikS
`� \\, ,
A a �\ `\\\ \\ .
\ \ \ x \ \ a\\',
0 \ \ \, \� �\%.
\ \ �\ x \\a \ \\ \ \
, D
\ - \•o v \ \ \\ �` \ ,\ \
x \ \ \ \ \ u
\ x+ \ \ c \ \ , \ \ .
\ L C�'' \ \ \. \ \ , \ \
\ \\ \ \\ \ \\ \
'�'
\ \ \\ \ \ \
v v v v v A v v v A\\
v A �v y' \
v v
vy v
v \
v<
v
v
1 v
v
v �.,
A v
\, v`
'A-vvv v
�v' v,y A v vv v
vA v v
a
\ \ a. \
\..
�\
\ \
\. \ \ \
\ \ \
\ A
a. v
c
v '� s y �-
� \r
\ \.
\.
\ \v
v,�
\v
�, \. \
\ \ \
\. \ \ ,
a a. �\
\. \, \ ,
v A
,
\ \\ \ \ > \ \
\ \
\ . ,. \ \
\\
, \ � � .\
\ \ \
�\ \ \
)e Q \
\ \ \ \ \ \
\\ .-\ \ \ \\\ a\ fi t\� .e? \ \\. \\\. ,\\.. \..
\� \ .\.
:y , \ , f \ ��� \ \\ �\ ,\ \ \ \\; \ \\\�
ate\\ \. "\` \ \ , \ \ \\ \ \
s
\ \ \.. \
\ r
o..\\
\ a\
\ \, an I\
�r
\ �, . \
„\., \
\\, \ ,
\,
\ \.
\.
\ \,
ME
0 I-
"' ,150 300 Feet
Sanitary Sewer I 1I 1, . ' j'I ,IA I I 1I� 'I'Ila, '1�'I �, I,I � ' I I� ' I � II " . I -I"1'
1� I""1 . I ,', ,, I ''I I , II I � -II I �'� �I: � I � ., '��
: ' � I '
, II, I, - II'� �"'
I
i -
2007 Street & Utility rmprovelent,sl
.......... ....
�U'
11011 K
101
VP��n
"
NSA
A \q
"g,
�A WA
-,aFW
4,
R
m
,�Legend
IMM
\' N:
vO
nw� m
0
N,
Is'
R
7'
Sanitary Manholes _0
W
aw
RIZA
N
Needs Improvem*ents W,
*10"RO
a.
` =61"NIZ
m
m- LIV2 0 �
91mmmalwarn
\g
W
'Wk
W
W
%&\\
4
m
'Fw T
;Q-2 EIN
V"t
gg
C
aw
141 LIN112-21
. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5
Sanitary Sewer
St. AnthonyMN
150 300 Feet
'S
IN q,
RWI
1 11101010
\g
W
'Wk
W
W
%&\\
4
m
'Fw T
;Q-2 EIN
V"t
gg
C
aw
141 LIN112-21
. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5
Sanitary Sewer
St. AnthonyMN
150 300 Feet
11 I
11
20017:Street & UtilityI :''Improvements 11
•. a.
I I
, I
"M �
MMIE
\� ,\
l!""T"T ___1-111111 101 0\10-
�11 '001
\ {"\ •a, j\ `
��i.��,\3:\\O:�\:J�\�?:)�2, '\\�\\�\
I \ \\�� \\ \,i.J\\\\ a.\' \.. \\ \Air)\. r3 i\ r,,j
\ \�..
V \..
t
X \
\ 1.. \
\\.
\ \
It \:WWI
\
\ ..
\ ..,
\ a
,a \� -\\\\ \�
\ \ \
S \.
\ \ \
\ � - \
\ \ \.:
• - \ \ \ \ Q\\\� \ \
\:\ms's\,'\,� \'�\ \ \��\ \\ �,, ;; \\\r\\\\\`2A\�11+.k,\�`":"�� \\� \�)ix.Y,4,i.
-11
89 s
.\. \,,. a: 1 : , \\. \,
\\
\
\ \ 11 \.. \ .
^S \a -11,
",
" ,
� �
. \ \ \,... \ ' , , .\ \ -
a\` ,.y: \. R. \\, L\ \ «:< \\\aa ;,fix; \�\�
\ � A \\ \\ I 1_1 - ` \ �. \ " .
\a 0-.. \W"RDI\ :\
\ \
\\ \\� \: \\\ \ \ 0x%' \ \� \\\�\ \\w
\\mm
\\ \ \ j\\,.,, \'l \ \\ -:
�\�'��,r2'' \ \\
\ \.L\\ \a.", \\ .h �\ �\ �.,
I\k
',
s.
1 { �'
.\\. :\ L\ a. ♦ '.R -moi
a\
IM aH
\.
\ a
\ „�
\
Y Z
i\
cg \'
\.,
\ \ l� \.� C \ „ \ �::
\
\ : bl "..�r ,
f .\
11 I'll
\N \
ioi \.\ J \\ "\\ Z11
\.\\\ y
\ \AN .\
a \\
\\ �\ \
mll T I ,
0\>., ,,,Y. \\ ,\ \\\. \\\\
I \
\\\
,\\k� o,
� )0 -�"
'� '-"',
- "� ' x, �'
.a\ \ \\
�� 4,
\. \ \
"�\ \ , - -,L'i�, ��:
I K.
`��
'*�' I
\... \
'� ft '�' -', " M h �-"'.""� ��""\
\..
11
�" I . , " \
"�"
'N4 '1<
Q u
" g
� 11111 "�'T
lJC
' \"
♦ \
a AW '1 -111 11�1. .",� 11 "WhAw ME I .;'
\11-
�� , I "'� `k\� "I'M111TRZ--l",��1 ,"I'l- '.�� ", " 11
.. ,
- ,11 n 1� ,
� :1 I �' �\' �""A , -""�'n 1", � ,,,, \12
'7
� � I I � ,, " k'�
, '�
',_ � '� ' "'i, "' �'141� 1 1 1 - I'll, �
r, — It\ I I I" �k
',
- -
� ,
" ,
Z.I ',','�� \ \r�. .� '�Z'� - .1-" \'\ i, I
\�� . \1 \.\. \.\\\", r�". � \- ��\ ::,"".,' '�"'� - �: \\\ \
,� "`�'R\
�14
" �\'�
- &
\"� �' � _4'4_0�
"I, "R",
N, I,.,- '��',,
�X% �
,I',, \ "
� j"\
I I �
- A
.Us q
'21 v
1* MN "
\\
I , ' 11 r -I\",- -, "'.' _.'_ , %1'
� l\1\\\-
\ \ w u :
I �:' � I
, 0% z � ' 1. 9R ��� &
c - --
0 w ,
� �""' -"'
11
I ,I"!
I � '
iiti7?6 It ,
,CA, in,
" ,
� �. , g:�q —1''PI 11-1
\ \ ` \`
\� �\`��
\\ \ \ 4 a \ \ \\\�\!a'\� ,\\\ \\\\
\ \
\ ' \ \ \\ \`� \ \ \\ \\\\
\ �\ \ �\ \ \ \ Z �\ \� \a
\ �vw..w\ \ \ \ ,I I\, f a \\\\\\\ \�\
11
a. '\ \ \ \ \J �\a\ \ \ \�a 3�
a� \\lam\ \ o-\\ \ \ ' \� \ `\\\\\\\\u\\ \ice\\,O\\\\\\ \ \E�� \\\\ �\
' \yam. l:` \ ?� \ \ \\\\ \1 I \ s� ���-;�. \ \`-.
a \\ \ \ : \\\ \\\\
\ \: FF��
�: .c; " '� f _�
\ \\\� : O \3c \ \\\ '' \s \\ \\\\s `\
ecJ\T� �� \\ \, 7C \\\'\ i :t \\\O\\� \\\
11
\\ \\ \., ' t\\ \\�:\ \\ \ \ \\ \ .
\ \ \\ , \+R\ 3 \ \\ \ C \ \ \� \�\'ll \ MM" 2�< \I
\ a \\ j
\ \\\\\\ \\� \\\\:. \\ „*\w v�\\lig\ �\, 10. \io `fa cJ .o
'\ \�\�„^""'\ \\ \�\�\\ \ �\ \\\\ \`iia\ a �\\\\\\ �NN `�
\ s \\ \ \ \ \ \\\�\\\ \ \\ \ \ \
\ s a \\ \ as \ �\ \ \\` \\ \\ ;\� \\' `
2 \ \ \ \ \'
ai \ \\\ , \ \ \� £ \ \A44 \�\ \ \\ \\\ate ��\ `
\� \«M- a\\\\ \ \\�.. �\ \ \\\�\ \� \y\ �\\\\ \
i \ \\ \.
\\ \
\ \: \ ♦ >r \ \ \\ �\��\Z\\\\ \.. \\\\ �\, \\ \ \\\ \ \ �:\
\ ♦" \ C \a: c \ \ \\ \\\ \\\ \\\\ \ \\ 'Ni' \\ ti
�ilf♦ \ \\ \ \ , ' \ \ p 1 �\\\ \\\\\\ \\\\\v: q\��� �\ \
\ \ \�` \ \ \ \ 1� a\\\\ \\\\\\\\\"`\\\�` \ a\\\ \\;
I am
u \ \ \ - a \`�' \\\\\\\ `\ \
\ \\\ \ \ \ \\\\\\\ \\�\��\\\\LV \\
M \ \\' ' Q J\\ `� w \ \\\\` \ \ \Q\\\\\\\\ \\ \ \ \ \\�
\�\\��\,. \ \ \\i� \ \\ \\\\ \\�\ \ \ JJ\\ \�\\\�\
\ \ �\1 \ " \ \ \ \ L.' \ \x a�
\ , i* \u \ \\ \ \ '\\\\\\\ \ b'K'1\1
\ \� \ \\\\'
\\'RR\\' �.\ \ �, i\ .\ \\ \�\ WAR-1
\ \ ♦.: \ \ : \\.
�\ \\ \ \\\ \\ \ \ \\\\ \\ \ \ \-
\\ \ i v \ \ \\ \\ \�\\".�\\\\\\ `CL \ \\111111111111111 111111 ilillilli
\ \\ \ �� \� \ \\\ \ \\ , \\ \\\ \\\
y\ \��\ �\ '• \ \\�\ \\\` \�\\\\\ \�\ \� \ \ �\\\
\\ \ \ C \\\ \ \\' : \ \ \ \\� \\�\\
\\ K.'\i d -\ \ \ \ \\\ \\ \ \\ \
\Z t \ \ L\ `\ �� \\ \ \� \ 1\,' ,0�� �\\\\\\\ \
\ \ _ \\ \\ \ \ i ' \\\ \\ \\
\ \ \ � \\\ \\ Qa \\\ \ \ \0
\\ \\ \\\ \\ \ \ \ \\ \ e , \ \ \ \
�\ \ \ \ \' \ \ \ \ \ \\a 3 -
\ \.. \ \� \ \ C \ \. \\ \ \ \ \\\ \ \\\ \' \ \
\ \ \
\ \ -
\\ \. \ \.
\ \ \
\ \ \ \\ \
\ \
\ \
\ \41 \
\ a
'\
\ \
\ \ \ \
\.
\,,:
\ \\
\:a \\
\ \\ <. K. ,
\
\
\ \ \\
\,
\
�\
\. \,
\ \
\:, \
\ " `\
\\ \
\ \
.\\,� \,.
\
a
\ \
Un
\
\
\. \
\, \\
\:
a v ?y aar. A
yL
vv.
\\\
11
\ \\ \
\\ L. \ \
\ a \ \ \
. \ \
\\ .\ \
\ \ \ \\\
\ \ \ \
\\ .\
' \'
\ r
\ \ \ \ \ \`
\ \
\ \
v ry v v
\ \ \
\ \ \. >
\»
\ \
a. � r
\ \ \
\ \ \,
v A vv '
�': v v
�.
vv y vv
\r
\\, \ ,\ \\: \ \ h \ \
, \� _ .�
\.
.\
\,
.. \
, \ \
\.
a
v
y, �
a \
r \ \: ` \\ \. \ \\\ . \
\ \
\ \Ell
\ \ \.
\\
�11\ \ \
T-111",
\ \ \ \\\
111 \\\\\\\ \'
\\11
��
Figure 4
St. Anthony, MN
A \�\\
A
y\ \\\\
\\ \\\�
-i'
\ x b r,
x:
\\ ♦ \\\ I ltn �N'�'Z'- \ \ ow z
f R -
0111% ,\ D i \ \\� '`\� a
\.\
\ WN
\ \ \ \
i \ €€ \, �C\ \� \ \ \� ?
\ j ♦ f \ \ \ \ \\\\\
\ \.. \ \ L ,,,,}�31
EI \'Q\ \\ 'M\\\i�
� 'I'm " i - �
\\ c I " 11 I , \"'.
\ a \ \ . \\a
HIP ,\ \\ \.
t.
\P \ \
\ \\ \ \
\.
\ a \ \\ r
\ \\ \ \
ow"\ \ \ \
\ \\ \ \\ a
\ \ \
r \ \
\ \ \ \ \ \\\\ \\ \Q \ \ \
S u. \ & \ \ �. \ i \ e \ \ \ Q1 \
\aa �> 9. A \
y�A a) v tri\\ a a 811 ,.
„i
.<.:.. : ,
\\ �C` \ a.. \ \ \\ \r \ \ 1
J \
\\
\. \.. �,
\ y�
,,3 \
a \\ \ \ "\ '. . \ \.,,
\: \ ��` �•\ H,
.` . ,� \. \
\ y \ +,
l a
\l 1 7
4 \ \ \
\ \MANAS
I '11\\ ak ,,\ h\ ,\ \ \ o a \ \\ .\
\\t",>\y \\:' \ # \
. 0: \
u \- \.
\ �.
\\�`�
,\Ml� \ \„ \.
\.
Q1, i ,\. #
\ \
\,.\\ \ \ \ \�� \\\ ,. \, \,
\; \ \. � \\\
\� \ i ,. \
\ \\
,\\. \\ . �.
\ Z \ . \
\ \% \� \
\,,� \i 1, \.. \ \\ vim., \ \ \. F 1, Nota..
\, ,01 <. <* a \, a \ \, \... \ \\ \J . k \-., \.
\ .\ \. \
\. \'. , \
,`,� \� \ \ r \\,
i \ \ 3�\y \\..\ a' .\\.
\ '': \ \
\\ -\. \
\ \ �\
\: a
3 \\ \
1 I
\ \,
l\ \\ \ \
. \\
\ \\ \., v \
0
\\
\ \
\ �`\ \ •\
C \.
\ '
\ a: \y
:. \.
Q. .\, ,...,, , ... .\ ,\\.. .."4\,
\ \ w
1 a
7 A11.11,\ \
�\ ^ \c`\\\ a \\tib \ ,. :;
'101\11 01. \ a\\
N'\_11
\ :i .I \ \ \. \. \\
14 a,'' a i � ""IL"\ wt
'a\\\ �.ININ
I '15\; \'
a\w m ,.s e ,' \\\
�\
Z
.<, \\\ `
�\
\, r
,�4 1 f'\
f\
\
5
\, \zIs h \ \\\ \ \ \�. \V-11 I 11
,,a\ Jli
\ �- \, \\ <
\ \. „\ \,
a\, \`
�\ \.
a.'
\ >.
\\ \
,NV�ffi�.� >, .
�\\.\\ F \`
a " f
,,, -'j�' /
`�0
'11- '711� f 1
�111
11\
1-11
`��\\\\\\\���\ \\\``\�\\\a\\t(\\\\ \ \\\' 1.\\ �\ \ f
H z \i\\� \ \ \ \\ \\ \
t "I '� I _- mn - "
\\� \` �\ a� \\\ is
I �\ � � � " , I "�
\_
\U
\ 11 -\ \\\\c O \' C�\� N 'T' -�'\\\\\, a\\\
Jzz ?, at Pi -AW
�\ a \r r f \ i \ wx \ \\ a,
IMMUNE, \\��\ \ \ \ \ \\\ \
\\ \ . \
a
qm
�1
i '' i E!, \�to na\"i�`\\\ \\\\\` \ \ \
_4
\\ \� i \`\\ �` \ \\tikS
`� \\, ,
A a �\ `\\\ \\ .
\ \ \ x \ \ a\\',
0 \ \ \, \� �\%.
\ \ �\ x \\a \ \\ \ \
, D
\ - \•o v \ \ \\ �` \ ,\ \
x \ \ \ \ \ u
\ x+ \ \ c \ \ , \ \ .
\ L C�'' \ \ \. \ \ , \ \
\ \\ \ \\ \ \\ \
'�'
\ \ \\ \ \ \
v v v v v A v v v A\\
v A �v y' \
v v
vy v
v \
v<
v
v
1 v
v
v �.,
A v
\, v`
'A-vvv v
�v' v,y A v vv v
vA v v
a
\ \ a. \
\..
�\
\ \
\. \ \ \
\ \ \
\ A
a. v
c
v '� s y �-
� \r
\ \.
\.
\ \v
v,�
\v
�, \. \
\ \ \
\. \ \ ,
a a. �\
\. \, \ ,
v A
,
\ \\ \ \ > \ \
\ \
\ . ,. \ \
\\
, \ � � .\
\ \ \
�\ \ \
)e Q \
\ \ \ \ \ \
\\ .-\ \ \ \\\ a\ fi t\� .e? \ \\. \\\. ,\\.. \..
\� \ .\.
:y , \ , f \ ��� \ \\ �\ ,\ \ \ \\; \ \\\�
ate\\ \. "\` \ \ , \ \ \\ \ \
s
\ \ \.. \
\ r
o..\\
\ a\
\ \, an I\
�r
\ �, . \
„\., \
\\, \ ,
\,
\ \.
\.
\ \,
ME
0 I-
"' ,150 300 Feet
Sanitary Sewer I 1I 1, . ' j'I ,IA I I 1I� 'I'Ila, '1�'I �, I,I � ' I I� ' I � II " . I -I"1'
1� I""1 . I ,', ,, I ''I I , II I � -II I �'� �I: � I � ., '��
: ' � I '
, II, I, - II'� �"'
I
i -
2007 Street & Utility rmprovelent,sl
.......... ....
�U'
11011 K
101
VP��n
"
NSA
A \q
"g,
�A WA
-,aFW
4,
R
m
,�Legend
IMM
\' N:
vO
nw� m
0
N,
Is'
R
7'
Sanitary Manholes _0
W
aw
RIZA
N
Needs Improvem*ents W,
*10"RO
a.
` =61"NIZ
m
m- LIV2 0 �
91mmmalwarn
\g
W
'Wk
W
W
%&\\
4
m
'Fw T
;Q-2 EIN
V"t
gg
C
aw
141 LIN112-21
. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5
Sanitary Sewer
St. AnthonyMN
150 300 Feet
'S
IN q,
RWI
1 11101010
\g
W
'Wk
W
W
%&\\
4
m
'Fw T
;Q-2 EIN
V"t
gg
C
aw
141 LIN112-21
. . . . . . . . . . . . . . . . . . . . . . . . .
Figure 5
Sanitary Sewer
St. AnthonyMN
150 300 Feet
wreet, uti i ity, i
. . . . . . . . . . . .
Figure 6
St. Anthony; A
rauements
MR
me
nil
15k M -I",
Ogg
kow
al
im
0
"MM
zoo
............
ZgM
m
N
"
cmi61 •� am,
11
M
-0-
M,
on
kx-
'W"
�M
-W
IIN N
s -t
W
P
21.4nol, gam
MW
NNAM WN
\Q\
--two
MER,
A -M m -
B 1011,91
0,
b
h
MIN
R
'e F
r Na
`\\\`\\\`
\\g
g g
Ak "T Oz
SR
HNIft,
its
5
m
N11 "XI I I X
�4
t
x a
too.,
A
I, "Z
MW
gy
f
44 01
11 IM k,
a
Z x,
xm,
q
0%\
V,
. . . . .. . . . . . . . . . .
0 150 300 Feel
3EAEN-
N 2I
Figure.7
St. Anthony,",
I
, -
Steeet Ut I Hit rovements
U I 111M
M: Alk,
M Wim"
MCI
1A
la"160,
Kol
IMM In q,
77
Lf
1,01 11,031
"m y
I M
I MR,
M
101
IRA 5, zll,
dill,
Al
ma
E, JR All,
m
a
-------------
k
00
g<
A
'o -w4" 01,
&I WAS
IMMM,
I INIVR
'M 3 1 IRM
,Wl
la
Ina
R
............
lk
17
W
'M "I
MAIN
a A
M
20, H "M
x \wt m MA mill A -
K 114,
lWa\\1
A ggm�jsa
Of INP
�VPN
lo'-om FT.-
SAW A
150
Q
Waterman
2007'S
0
4`\
bg'
NUNN
\y��l'ao u
'J "IN
Is]
W,
R&I
'W
N,
T
R
\71
N R
IN
'NO
M ON
t
AP
gR' Na" Q
W1140415,1
igure,,.8
t. Anthony MW"'
DYA
7
'M
SKIN
Rli
a'\ "K
M K,
416-
R
\\ \\\\\
\ \\,, \\.\ M:
'AZ
W W W0111
INS
g \gwg�v
a
11XV
NOIN
� � \ �T\\\ \ ��A
ffin
W
0 -150 300 Flee
Legend
Storm Structures
FN
Catch
Basin
0
Manhole
Storm
Sewer
15"
18"
21
2007'S
0
4`\
bg'
NUNN
\y��l'ao u
'J "IN
Is]
W,
R&I
'W
N,
T
R
\71
N R
IN
'NO
M ON
t
AP
gR' Na" Q
W1140415,1
igure,,.8
t. Anthony MW"'
DYA
7
'M
SKIN
Rli
a'\ "K
M K,
416-
R
\\ \\\\\
\ \\,, \\.\ M:
'AZ
W W W0111
INS
g \gwg�v
a
11XV
NOIN
� � \ �T\\\ \ ��A
ffin
W
0 -150 300 Flee
TYPICAL STREET SECTION
CL
15' B - B i,- 15' B - B -�
.19- ?_n e/ I / n c/ Fi
618 CURB & GUTTER
ZJ!D ( U I I UM I NUUS 1 AUK UUA I
2" - TYPE 31 BITUMINOUS BASE COURSE
6" CLASS 5 AGGREGATE (100.% CRUSHED ROCK)
1' GRANULAR MATERIAL
GEOTEXTILE FABRIC (MN/DOT 37339 TYPE V)
DRAIN TILE
(TYPICAL)
BOTH SIDES
=
Typical701 Xenia Avenue South, Suite 300 Section WSB Project Na. 1626-22 Date: September 2006
Minneapolis, MN 55416
WSB' www_wsbeng.com 2007 Street & Utility Improvements
& Associates, Inc. for the City of Figure 10
763NING oo-ONSTFax -;iUCTI10 St. Anthony Village Minnesota
\ INFRASTRUCTURE � ENGINEERING, PLANNING � CONSTRUCTION �
K:\01626-22\Feas1b1lity\f ig-10.dgn
•
2007 STREET AND UTILITY IMPROVEMENT PROJECT
FEASIBILITY REPORT
CITY OF ST. ANTHONY
WS B PROJECT N O. 1626-22
OPINION OF PROBABLE COSTS
2007 STREET AND UTILITY RECONSTRUCTION
CITY PROJECT NO.
PROJECT NO. 1626-22
ST ANTHONY, MN
10/2/2006
St Anthony Village
3301 Silver Lake Road NE
St Anthony, MN
Estimated Estimated
No. Mat. No. Item Units Qty Unit Price Total Price
SCHEDULE A - SURFACE IMPROVEMENTS
1
2021.501
MOBILIZATION
LUMP SUM
1
$40,000.00
$40,000.00
2
2031.501
FIELD OFFICE TYPE D -MODIFIED
EACH
1
$7,500.00
$7,500.00
3
2104.502
CLEARING
TREE
2
$150.00
$300.00
4
2101.507
GRUBBING
TREE
2
$150.00
$300.00
5
2101.511
CLEARING AND GRUBBING - SHRUB
EACH
5
$100.00
$500.00
6
2104.501
REMOVE CURB AND GUTTER
LIN FT
8050
$1.75
$14,087.50
7
2104.503
REMOVE CONCRETE SIDEWALK
SQ FT
5300
$1.50
$7,950.00
8
2104.505
REMOVE CONCRETE DRIVEWAY PAVEMENT
SQ YD
800
$9.50
$7,600.00
9
2104.505
REMOVE CONCRETE PAVEMENT
SQ YD
4410
$7.00
$30,870.00
10
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
13370
$2.75
$36,767.50
11
2104.511
SAWING CONCRETE PAVEMENT (FULL DEPTH)
LIN FT
1050
$4.00
$4,200.00
12
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
1520
$3.50
$5,320.00
13
2104.523
SALVAGE SIGN
EACH
45
$25.00
$1,125.00
14
2564.602
SALVAGE AND REINSTALL TYPE D SIGN
EACH
10
$100.00
$11000.00
15
2105.501
COMMON EXCAVATION
CU YD
50
$15.00
$750.00
16
2105.507
SUBGRADE EXCAVATION
CU YD
6000
$12.50
$75,000.00
17
2105.522
SELECT GRANULAR BORROW (CV) (P)
CU YD
5150
$15.00
$77,250.00
18
2105.604
GEOTEXTILE FABRIC TYPE V
SQ YD
15410
$1.50
$23,115.00
19
2105.609
CRUSHED ROCK 3" MINUS (ROAD SUPPORT)
TON
100
$15.00
$1,500.00
20
2211.501
AGGREGATE BASE CLASS 5 (100% CRUSHED)
TON
5300
$13.00
$68,900.00
21
2350.501
TYPE LV 3 WEARING COURSE MIXTURE (B)
TON
1100
$60.00
$66,000.00
22
2350.502
TYPE LV 3 NON WEARING COURSE MIXTURE (B)
TON
1500
$58.00
$87,000.00
23
2350.503
TYPE LV 3 WEARING COURSE MIXTURE FOR DRIVEWAYS
SQ YD
500
$25.00
$12,500.00
24
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
500
$3.00
$1,500.00
25
2411.604
CONCRETE STEPS
SQ YD
170
$300.00
$51,000.00
26
2502.541
6" PERF PE PIPE DRAIN
LIN FT
8050
$9.00
$72,450.00
27
2503.603
6" PE X 4" PVC PIPE TEE
EACH
89
$50.00
$4,450.00
28
2503.603
4" PVC PIPE SEWER SDR 35
LIN FT
1335
$15.00
$20,025.00
29
2521.501
4" CONCRETE WALK
SQ FT
3800
$4.00
$15,200.00
30
2531.501
CONCRETE CURB & GUTTER DESIGN B618
LIN FT
8050
$10.00
$80,500.00
31
2531.507-
6" CONCRETE DRIVEWAY PAVEMENT
SQ YD
500
$60.00
$301,000.00
32
2531.602
PEDESTRIAN CURB RAMP
EACH
3
$450.00
$1,350.00
33
2540.602
SAVAGE AND REINSTALL MAIL BOX
EACH
25
$200.00
$5,000.00
34
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$20,000.00
$20,000.00
35
2564.533
FURNISH SIGN PANELS TYPE C
SQ FT
225
$30.00
$6,750.00
36
2564.533
FURNISH SIGN PANELS TYPE D
SQ FT
50
$40.00
$2,000.00
37
2564.602
FURNISH SIGN POSTS
EACH
65
$125.00
$8,125.00
38
2564.602
PAVEMENT MESSAGE (SCHOOL XING) PAINT
EACH
2
$450.00
$900.00
39
2564.602
PAVEMENT MESSAGE (SCHOOL XING) EPDXY
EACH
2
$1,250.00
$2,500.00
K:\01626-22\Quantity\Feasibility\2007
Feasibility
Estimated Estimated
No. Mat. No. Item Units Qty Unit Price Total Price
SCHEDULE A - SURFACE IMPROVEMENTS
40
2564.618
ZEBRA CROSSWALK WHITE -PAINT
SQ FF
144
$3.00
$432.00
41
2564.618
ZEBRA CROSSWALK WHITE-EPDXY
SQ FT
144
$5.00.
$720.00
42
2573.502
SILT FENCE, TYPE HEAVY DUTY (ORANGE)
LIN Fr
.100
$5.00
$500.00
43
2573.602
INLET PROTECTION
EACH
31
$350.00
$10,850.00
44
2575.505
' SODDING, TYPE LAWN (INCL. TOPSOIL & FERT.)
SQ YD
19000
$3.75
$71,250.00
45
2104.601
CLEAN UP
LUMP SUM
1
$10,000.00
$10,000.00
46
2505.601
UTILITY COORDINATION
LUMP SUM
1
$21500.00
$2,500.00
SUBTOTAL SCHEDULE A - SURFACE IMPROVEMENTS $9879537.00
+ 15% CONTINGENCIES $148,131.00
SUBTOTAL SCHEDULE A - SURFACE IMPROVEMENTS $191359668.00
+ 25% ADMINISTRATIVE, LEGAL, ETC. $2839920.00
TOTAL SCHEDULE A - SURFACE IMPROVEMENTS $1,4199590.00
K:\01626-22\Quantity\Feasibility\2007 Feasibility
OPINION OF PROBABLE COSTS
PROJECT NO. 1626-22
CITY PROJECT NO.
PROJECT NO-. 1626-06
ST ANTHONY, MN
10/2/2006
St Anthony Village
3301 Silver Lake Road NE
St Anthony, MN
KA01 626-22\Quantity\Feasibility\2007 Feasibility
Estimated
Estimated
No.
Mat. N®.
ItemUnits
Qty
Unit Price
Total Price
SCHEDULE B - SANITARY SEWER IMPROVEMENTS
47
2104.501
REMOVE SEWER PIPE (SANITARY)
LIN FT
1160
$4.00
$4>640.00
48
2104.509
REMOVE SANITARY SEWER SERVICE
EACH
89
$75.00
$6,675.00
49
2104.509
REMOVE MANHOLE (SANITARY)
EACH
15
$350.00
$5,250.00
50
2451.602
GRANULAR FOUNDATION AND/OR BEDDING
CU YD
50
$15.00
$750.00
51
2503.523
SALVAGE CASTING ASSEMBLY
EACH
17
$125.00
$2,125.00
52
2503.601
SANITARY SEWER BYPASS PUMPING
LUMP SUM
1
$5,000.00
$55000.00
53
.2503.602
CONNECT TO EXISTING SANITARY SEWER
EACH
9
$750.00
$6,750.00
54
2503.602
RECONNECT TO EXISTING SANITARY SEWER SERVICE EACH
89
$275.00
$24,475.00
55
2503.602
CHIMNEY SEALS
EACH
19
$175.00
$3,325.00
56
2503,602
1 "X611 PVC WYE
EACH
67
$125.00
$8,375.00
57,
2503.602
121IX611 PVC WYE
EACH
20
$225.00
$4,500.00
58
2503.602
181IX611 PVC WYE
EACH
2
$500.00
$1.'000.00
59
2503.603
6" PVC PIPE SEWER - SDR 26
LIN FT
900
$20.00
$18,000.00
60
2503.603.
8" PVC PIPE SEWER - SDR 35
LIN FT
2650
$28.00
$74)200.00
61
2503.603
12" PVC PIPE SEWER - SDR 26
LIN FT
1450
$60.00
$87,000.00
62
2503.603
18 11 HDPE PIPE SEWER (PIPE BURSTING)
LIN FT
735
$150.00
$110,250.00
63
2503.603
TELEVISE SANITARY SEWER
LIN FT
5735
$2.00
$113470.00
64
2506.516
CASTING ASSEMBLY
EACH
17
$400.00
$6,800.00
65
2506.602
CONNECT INTO EXISTING MANHOLE
EACH
1
$500.00
.$500.00
66
2506.603
CONST 4811 DIA SAN SEWER MANHOLE
LIN FT
205
$175.00
$35,875.00
SUBTOTAL SCHEDULE B - SANITARY SEWER IMPROVEMENTS
$4169960.00
+ 15% CONTINGENCIES
$629544.00
TOTAL SCHEDULE B - SANITARY SEWER IMPROVEMENTS
$4799504.00
+ 25% ADMINISTRATIVE, LEGAL, ETC.
$1199880.00
TOTAL SCHEDULE B - SANITARY SEWER IMPROVEMENTS
$5999380.00
KA01 626-22\Quantity\Feasibility\2007 Feasibility
OPINION OF PROBABLE COSTS
PROJECT NO. 1626-22
CITY PROJECT NO.
PROJECT NO. 1626-06
ST ANTHONY, MN
10/2/2006
St Anthony Village
3301. Silver Lake Road NE '
St Anthony, MN
No. Mat. No. Item Units Qty Estimated Estimated
it
Un Price Total Price
SCHEDULE C - WATERMAIN IMPROVEMENTS
67
2104.501
REMOVE WATER MAIN
LIN FT
4700
$7.00
$322900.00
68
2104.509
REMOVE VALVE & BOX
EACH
14
$125.00
$1,750.00
69
2104.509
REMOVE WATER SERVICE AND CURB BOX
EACH
89
$100.00
$8,900.00
70
2104.523
SALVAGE HYDRANT & VALVE
EACH
9
$400.00
$3,600.00
71
2451.602
GRANULAR FOUNDATION AND/OR BEDDING
CU YD
20
$15.00
$300.00
72
2504.601
TEMPORARY WATER SERVICE
LUMP SUM
1
$52000.00
$5,000.00
73
2504.602
RECONNECT WATER SERVICE
EACH
89
$250.00
$221250.00
74
2504.602
CONNECT TO EXISTING WATER MAIN
EACH
9
$750.00
$6,750.00
75
2504.602
HYDRANT
EACH
10
$22100.00
$21,000.00
76
2504.602
1" CORPORATION STOP
EACH
89
$75.00
$61675.00
77
2504.602
6" GATE VALVE AND BOX
EACH
10
$700.00
$7,000.00
78
2504.602
8" GATE VALVE AND BOX
EACH
16
$900.00
$14,400.00
79
2504.602
1" CURB STOP & BOX
EACH
89
$175.00
$15,575.00
80
2504.603
1" TYPE K COPPER PIPE
LIN FT
3300
$19.00
$62,700.00
81
2504.603
6" WATER MAIN, D.I.P., CL 52 W/POLY WRAP
LIN FT
130
$32.50
$4,225.00
82
2504.603
8" WATER MAIN, D.I.P., CL 52 W/POLY WRAP
LIN FT
4400
$35.00
$154,000.00
83
2504.604
4" POLYSTYRENE INSULATION
SQ YD
30
$30.00
$900.00
84
2504.608
DUCTILE IRON FITTINGS
POUND
3300
$2.50
$81P250.00
SUBTOTAL SCHEDULE C - WATERMAIN IMPROVEMENTS
$376J75.00
+ 15% CONTINGENCIES $56,426.00
1 SUBTOTAL SCHEDULE C - WATERMAIN IMPROVEMENTS $432,601.00
+ 25% ADMINISTRATIVE, LEGAL, ETC. $108915.
TOTAL SCHEDULE C - WATERMAIN IMPROVEMENTS $540j50.00
OPINION OF PROBABLE COSTS
PROJECT NO. 1626-22
CITY PROJECT NO.
PROJECT NO. 1626-06
ST ANTHONY, MN
10/2/2006
St Anthony Village
3301 Silver Lake Road NE
St Anthony, MN
No.
Mat. No.
Item
SCHEDULE D - STORM SEWER IMPROVEMENTS
Units
Qty
Estimated
Unift Price
Estimated
Total Price
85
2104.501
REMOVE SEWER PIPE (STORM)
LIN FT
2000
$10.00
$20,000.00
86
2104.509
REMOVE MAN -HOLE OR CATCH BASIN
EACH
19
$350.00
$6,650.00
87
2451.602
GRANULAR FOUNDATION AND/OR BEDDING
TON
50
$15.00
$750.00
88
2503,541
1511 RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
2500
$30.00
$75.,000.00
89
2503.541
1811 RC PIPE SEWER DESIGN 3006 CLASS IH
LIN FT
1100
$33.00
$36.,300.00
90
2503.541
21" RC PIPE SEWER DESIGN 3 006 CLASS III
LIN FT
300
$35.00
$10.,500.00
91
2503.541
2411 RC PIPE SEWER DESIGN 3006 CLASS M
LIN FT
80
$40.00
$3,200.00
92
2503.541
3011 RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
400
$60.00
$24p0.00
93
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
LIN FT
160
$250.00
$40,000.00
94
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020
LIN FT
30
$300.00
$9,000.00
95
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1
EACH
15
$1,200.00
$18,000.00
96
2506.602
CONNECT INTO EXISTING DRAINAGE STRUCTURE
EACH
5
$1,000.00
$5,000.00
97
2506.602
CONNECT INTO EXISTING STORM SEWER
EACH
.2
$750.00
$15,500.00
98
2506.602
CASTING ASSEMBLY (MANHOLE) .
EACH
9
$350.00
$3,150.00
99
2506.602
CASTING ASSEMBLY (CATCHBASIN)
EACH
16
$500.00
$8.%000.00
SUBTOTAL SCHEDULE D - STORM SEWER IMPROVEMENTS
$261,050.00
+ 15% CONTINGENCIES
$399158.00
SUBTOTAL SCHEDULE D - STORM SEWER IMPROVEMENTS $300,208.00
+ 25% ADMINISTRATIVE, LEGAL, ETC. $759050.00
TOTAL SCHEDULE D - STORM SEWER IMPROVEMENTS $3759260.00
TOTAL PROJECT COST $29934,980.00
CITY OF ST. ANTHONY
RESOLUTION 06-077
A RESOLUTION RECEIVING REPORT AND
ORDERING PLANS AND SPECIFICATIONS
WHEREAS, pursuant to resolution of the Council adopted August 8, 2006, a report was
prepared by WSB & Associates, Inc. with reference to the improvement of:
1. Pahl Avenue from Roosevelt Street NE to Wilson Street
2. 27th Avenue NE from Stinson Boulevard to Coolidge Street
3. Roosevelt Street NE from 27th Avenue NE to the alley north of Pahl Avenue
4. The alley north of Pahl Avenue from Roosevelt Street NE to Wilson Street
5. The alley south of Pahl Avenue from Roosevelt Street NE to Wilson Street
6. The alley south of 27th Avenue NE from Stinson Boulevard to Wilson Street
7. 39 th Avenue from Silver Lake Road to Fordham Drive
8. The replacement and enlargement of the sanitary sewer main from the
intersection of 39 th Avenue and Fordham Drive east to Chandler Drive and
north in Chandler Drive to Foss Road
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost effective, and feasible.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of St. Anthony that:
1) The Council will consider the improvement of such streets in accordance with the report
at an estimated total cost of the improvement of $2,935,000.
2) WSB &Associates, Inc. is hereby designated as the engineer for this improvement. They
shall prepare plans for making such improvement.
Adopted this day of
ATTEST:
City Clerk
Reviewed for administration:
Mayor
. 2006.
City Manager
32 K. 101626-22L4dminiResolutionsl.Resolution 06-077.doc
111
c�Associates, Inc. Infrastructure Engineering Planning Construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
October 3, 2006 Tel: 763-541-4800
Fax: 763-541-1700
Honorable Mayor and City Council
City of St. Anthony
3301 Silver Lake Road NE
St. Anthony, MN 55418-1699
Re: 2006 Automated Water Meter Improvements and Appurtenant Work
City of St. Anthony, MN
WSB Project No. 1626-14
Dear Mayor and Council Members:
Bids were received for the above -referenced project on Monday, October 2, 2006, and were opened
and read aloud. A total of three bids were received. The bids were checked for mathematical
accuracy and tabulated. The Engineer's Estimate for Final Base Automated Meter Reading
(FBAMR) was $614,640.00, and for Drive By Automated Meter Reader (DBAMR) it was
$604,640.00. Please find enclosed the bid tabulation indicating the low bidder as National
Waterworks, Inc., of Eden Prairie, Minnesota, in the amount of $588,681.28 for FBAMR and
$595,836.59 for DBAMR.
We recommend that the City Council consider these bids and award a contract to National
Waterworks, Inc. for the FBAMR, in the amount of $588,681.28, based on the results of the bids
received.
Sincerely,
WSB & Associates, Inc.
Todd E. Hubmer, PE.
City Engineer
Enclosure
cc: National Waterworks, Inc.
lh
Minneapolis3 St. Cloud
Equal 0 p p o rtu R I . � jMlpyAdn in 1 Construction Administration iLTR RECMMDTN-hmcc-100306. doc
CITY OF ST. ANTHONY
RESOLUTION 06-078
A RESOLUTION AWARDING A BID FOR 2006 AUTOMATED
WATER METER IMPROVEMENTS AND APPURTENANT WORD
WHEREAS, pursuant to an advertisement for bids for the improvement as shown on the plan for
the above -referenced project, bids were received, opened and tabulated according to
law, and the following bids were received complying with the advertisement:
Contractor FBAMR DBAMR
1. National Waterworks, Inc. $588,681.28 $595,836.59
2. Northern Water Works Supply, Inc. $9667308.31 $7311426.35
3. Hydro Metering & Technology, Inc. $17142,427.52 $5937425.19
WHEREAS, it appears that National Waterworks, Inc. of Eden Prairie, NIN is the lowest
responsible bidder.
NOW, THEREFORE, BE IT RESOLVED, of the City Council of the City of St. Anthony:
1. That the Mayor and City Manager are hereby authorized and directed to enter into a contract
with National Waterworks, Inc. in the amount of $588,681.28 in the name of the City of St.
Anthony, Minnesota for the improvement outlined in the above -referenced project according to
the plans and specifications, therefore, approved by the City Council and on file in the office of
the City Clerk.
2. The Engineer, WSB & Associates, Inc., is hereby authorized and directed to return forthwith to
all bidders the deposits made with their bids, except that the deposits of the successful bidder
and the next two lowest bidders shall be retained until a contract has been signed.
Adopted this day of
ATTEST:
City Clerk
Reviewed for administration:
2006.
Mayor
City Manager
A#1626-144dminTesolutlonsIRES 06-078 - Awarding Bid forAutomated Water Meters-100306.doc
d:.... r...... .r .,t:: .,•r.:. n>za..n: .r. v.:,. :..t..:l.:..a,..3:+C ..S :r. L..B � ... B .. ... ..#### .. .. .... .. .,t .t ..sn•:. ,ti ..fi,»} t 4#::. t . .. 4...a -..:.t.:..,
T , .x.. r. .. ......r.}.. .. .,. ...t. .. .. ..t.r.. ..{ ..fr ... ::r. ,:. ..t .l,�.LT3nN ..n� ..M.A .t J'' �• 4}•'+'' �. .•..�, ,
. ..h a,:......1.n.. �r�� y�4` n..... n 4 :...t-.., }.. n .r ...... .. . v.r ....... , ..n .. .. n�l� nn\.Y .v4.{tiv~Y• i• v 4'y
..t .. : ,. ..l,.:.r�.'. a:... n3:...... .. , •:+:n.....:R.4..., ..,r ..••io:.:.. .. Zi.. v.:.a..: :.4Y.a'r•. ::.J ,,. :•r:• .:: wF.0
PROJECT:
2006 Automated Water Meter Improvements and Appurtenant Work
City of St. Anthony Village, MN
LOCATION:
St. Anthony Village, MN
WSB PROJECT NO.:
1626-14
Bids Opened: Monday, October 2, 2006 at 2:00 p.m.
Bid Security Add. No. I
Contractor (5%) Rec'd. FBAMR DBAMR
1 National Waterworks, Inc. x x $588,681.28 $595,836.59
2 Northern Water Works Supply, Inc. x x $966,308.31 $731)426.35
3 Hydro Metering & Technology, Inc. x x $1)142,427.52 $593)425.19
Engineer's Opinion of Cost
$614,640.00 $604)640.00
I hereby certify that this is a true and correct tabulat�'on of the bids as received on October 2, 2006.
Denotes a corrected figure.
Todd E. Hubmer, P.E., City Engineer
35 K.101626-144dminlConstruction Administration11626-14 Bid Tab Summary
01.626-14 - Bid Tabulation
1:41• :h�,���k'���FN!k .�r
WSB
Sid Tabulation
Project Name: STAN - 200,6 Automated Water Contract No.:
Meter
Client: St Anthony Village Project No.: 01626-14
Bid Opening: 10/2/2006 2:00:00 PM Owner: Minneapolis
Tuesday, October 03, 2006
10/312006
36 1 of 4
Project: 01626-14 - STAN - 2006 Automated Water Meter
Engineers Estimate
National Waterworks, Inc.
Item No. Item
Units
Quantity Unit Price
JTotal Price
Unit Price
Total Price
SCHEDULE A - AUTOMATED WATER METER REPLACEMENT
1
92194
FIELD PROGRAMMER
LUMP SUM
1
$2,000.00
$2,000.00
$5,900.00
$5,900.00
2
92195
ANCILLARY EQUIPMENT
LUMP SUM
1
$3,000.00
$3,000.00
$0.00
$0.00
3
92196
REPEATERS FOR METER TRANSMISSION
LUMP SUM
1
$3,000.00
$3,000.00
$0.00
$0.00
4
92197
BASE STATION COLLECTOR
LUMP SUM
1
$2,000.00
$2,000.00
$0.00
$0.00
5
92200
NETWORK INTERFACE COMPUTER
LUMP SUM
1
$3,000.00
$3,000.00
$0.00
$0.00
6
92208
NETWORK INTERFACE COMPUTER SOFTWARE
LUMP SUM
1
$4,000.00
$4,000.00
$0.00
$0.00
7
92209
NETWORK BACKHAUL
LUMP SUM
1
$2,000.00
$2,000.00
$0.00
$0.00
8
92206
ANNUAL SUPPORT
YEARS
20
$2,500.00
$50,000.00
$0.00
$0.00
9
92207
TRAINING
HOURS
32
$100.00
$3,200.00
$0.00
$0.00
10
92210
5/8" RESIDENTIAL AUTOMATED WATER METER AND INSPECTION
EACH
1728
$220.00
$380,160.00
$233.67
$403,781.76
11
92211
3/4" AUTOMATED RESIDENTIAL WATER METER AND INSPECTION
EACH
432
$240.00
$103,680.00
$262.06
$113,209.92
12
92224
1" AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
150
$280.00
$42,000.00
$284.88
$42,732.00
13
92213
1 1/2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION EACH
30
$320.00
$9,600.00
$417.76
$12,532.80
14
92216
2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
20
$350.00
$7,000.00
$526.24
$10,524.80
Total SCHEDULE A - AUTOMATED WATER METER REPLACEMENT:
$614,640.001
$588,681.28
ALTERNATE 1 - DRIVE BY AUTOMATED METER READER SYSTEM
15
92220
HANDHELD METER READING DEVICE
LUMP SLIM
1
$2,000.00
$2,000.00
$8,328.04
$8,328.04
16
92221
DRIVE BY READING SYSTEM
LUMP SUM
1
$3,000.00
$3,000.00
$14,117.65
$14,117.65
17
92222
SOFTWARE TO INTERFACE WITH CITY
LUMP SUM
1
$4,000.00
$4,000.00
$0.00
$0.00
18
92206
ANNUAL SUPPORT
YEARS
20
$2,500.00
$50,000.00
$1,636.781
$32,735.62
19
92207
TRAINING
HOURS
32
$100.00
$3,200.00
$0.00
$0.00
20
92210
5/8" RESIDENTIAL AUTOMATED WATER METER AND INSPECTION
EACH
1728
$220.00
$380,160.00
$215.82
$372,936.96
21
92211
3/4" AUTOMATED RESIDENTIAL WATER METER AND INSPECTION
EACH
432
$240.00
$103,680.00
$244.21
$105,498.72
L22
92224
1" AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
150L
$280.001
$42,000.0
$$267.03
$40,054.50
36 1 of 4
01626-14 - Bid Tabulation. Tuesday, October 03, 2006
Project: 01626-14 - STAN - 2006 Automated Water Meter
Engineers Estimate
National Waterworks, Inc.
Item No. Item Units Quantity
Unit Price Total Price
Unit Price Total Price
23 92213 1 1/2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION EACH 30
$320.00 $9,600.00
$399.91 $11,997.30
24 92216 2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION EACH 20
$350.00 $7,000.00
$508.39 $10,167.80
Total ALTERNATE 1 -.DRIVE BY AUTOMATED METER READER SYSTEM:
1 $604,640.00
$595,836.59
Total SCHEDULE A - AUTOMATED WATER METER REPLACEMENT:
$614,640.00
$588,681.28
Total ALTERNATE 1 - DRIVE BY AUTOMATED METER READER SYSTEM:
$604,640.00
$595,836.59
37 2of4
01626-14 - Bid Tabulation
Tuesday, October 03, 2006
38 3 of 4
Project: 01626-14 - STAN - 2006 Automated Water Meter
1
Engineers Estimate
Northern Water Works
Supply, Inc.
Item No.
Item
Units
Quantity Unit Price Total Price
Unit Price -J
Total Price
SCHEDULE A - AUTOMATED WATER METER REPLACEMENT
1
92194
FIELD PROGRAMMER
LUMP SUM
1 $2,000.00
$2,000.00
$2,629.22
$2,629.22
2
92195
ANCILLARY EQUIPMENT
LUMP SUM
1 $3,000.00
$3,000.00
$0.00
$0.00
3
92196
REPEATERS FOR METER TRANSMISSION
LUMP SUM
1 $3,000.00
$3,000.00
$0.00
$0.00
4
92197
BASE STATION COLLECTOR
LUMP SUM
1 $2,000.00
$2,000.00
$7,423.59
$7,423.59
5
92200
NETWORK INTERFACE COMPUTER
LUMP SUM
1 $3,000.00
$3,000.00
$9,984.38
$9,984.38
6
92208
NETWORK INTERFACE COMPUTER SOFTWARE
LUMP SUM
1 $4,000.00
$4,000.00 $13,312.50
$13,312.50
7
92209
NETWORK BACKHAUL
LUMP SUM
1 $2,000.00
$2,000.00
$33.28
$33.28
8
92206
ANNUAL SUPPORT
YEARS
20 $2,500.00
$50,000.00
$2,662.50
$53,250.00
9
92207
TRAINING
HOURS
32 $100.00
$3,200.00
$4,750.00
$152,000.00
10
92210
5/8" RESIDENTIAL AUTOMATED WATER METER AND INSPECTION
EACH
1728 $220.00
$380,160.00
$288.62
$498,735.36
11
92211
3/4" AUTOMATED RESIDENTIAL WATER METER AND INSPECTION
EACH
432 $240.00
$103,680.00
$329.89
$142,512.48
12
92224
1" AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
150 $280.00
$42,000.00
$383.14
$57,471.00
13
92213
1 1/2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION EACH
30 $320.00
$9,600.00
$529.61
$15,888.30
14 192216
2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
20 $350.00
$7,000.00
$653.41
$13,068.20
Total SCHEDULE A - AUTOMATED WATER METER REPLACEMENT:
$614,640.00
$966,308.31
ALTERNATE 1 - DRIVE BY AUTOMATED METER READER SYSTEM
15
92220
HANDHELD METER READING DEVICE
LUMP SUM
1 $2,000.00
$2,000.00
$5,591.25
$5,591.25
16
92221
DRIVE BY READING SYSTEM
LUMP SUM
1 $3,000.00
$3,000.00 $13,312.50
$13,312.50
17
92222
SOFTWARE TO INTERFACE WITH CITY
LUMP SUM
1 $4,000.00
$4,000.00
$2,196.56
$2,196.56
18
92206
ANNUAL SUPPORT
YEARS
20 $2,500.00
$50,000.00
$1,856.30
$37,126.00
19
92207
TRAINING
HOURS
32 $100.00
$3,200.00
$1,500.00
$48,000.00
20
92210
5/8" RESIDENTIAL AUTOMATED WATER METER AND INSPECTION
EACH
1728 $220.00
$380,160.00
$240.69
$415,912.32
21
92211
3/4" AUTOMATED RESIDENTIAL WATER METER AND INSPECTION
EACH
432 $240.00
$103,680.00
$298.36
$128,891.52
22
92224
1"AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
150 $280.00
$42,000.00
$350.95
$52,642.50
23
92213
.1 1/2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION EACH
30 $320.00
$9,600.00
$505.51
$15,165.30
24
92216
2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
20 $350.00
$7,000.00
$629.42
$12,588.40
Total ALTERNATE 1 - DRIVE BY AUTOMATED METER READER SYSTEM:
$604,640.00
1 $731,426.35
Total SCHEDULE A - AUTOMATED WATER METER REPLACEMENT:
$614,640.00
$966,308.31
Total ALTERNATE 1 - DRIVE BY AUTOMATED METER READER SYSTEM:
$604,640.00
$731,426.35
38 3 of 4
01626-14 - Bid Tabulation
Tuesday, October 03, 2006
I hereby certify that this is an exact r production of bids received.
Certified By: Registration No. 7W iQ
Date: roc
39 4of4
Project: 01626-14 - STAN - 2006 Automated Water Meter
Engineers Estimate
Hydro Metering &
Technology, Inc.
Item No. Item
Units
Quantity Unit Pricel Total Price
Unit Price .Total
Price
SCHEDULE A - AUTOMATED WATER METER REPLACEMENT
1
92194
FIELD PROGRAMMER
LUMP SUM
1 $2,000.00
$2,000.00
$2,396.25
$2,396.25
2
92195
ANCILLARY EQUIPMENT
LUMP SUM
1 $3,000.00
$3,000.00
$6,656.25
$6,656.25
3
92196
REPEATERS FOR METER TRANSMISSION
LUMP SUM
1 $3,000.00
$3,000.00 $18,637.50
$18,637.50
4
92197
BASE STATION COLLECTOR
LUMP SUM
1 $2,000.00
$2,000.00
$9,318.75
$9,318.75
5
92200
NETWORK INTERFACE COMPUTER
LUMP SUM
1 $3,000.00
$3,000.00
.$0.00
$0.00
6
92208
NETWORK INTERFACE COMPUTER SOFTWARE
LUMP SUM
1 $4,000.00
$4,0.00.00
$0.00
$0.00
7
92209
NETWORK BACKHAUL
LUMP SUM
1 $2,000.00
$2,000.00
$7,607.15
$7,607.15
8
92206
ANNUAL SUPPORT
YEARS
20 $2,500.00
$50,000.00 $11,310.30
$226,206.00
9
92207
TRAINING
HOURS
32 $100.00
$3,200.00
$500.00
$16,000.00
10
92210
5/8" RESIDENTIAL AUTOMATED WATER METER AND INSPECTION
EACH
1728 $220.00
$380,160.00
$335.40
$579,571.20
11
92211
3/4" AUTOMATED RESIDENTIAL WATER METER AND INSPECTION
EACH
432 $240.00
$103,680.00
$361.96
$156,366.72
12
92224
1" AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
150 $280.00
$42,000.00
$361.96
$54,294.00
13
92213
1 1/2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION EACH
30 $320.00
$9,600.00
$923.49
$27,704.70
14
192216
12- AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
20 $350.00
$7,000.00
$1,883.45
$37,669.00
Total SCHEDULE.A - AUTOMATED WATER METER REPLACEMENT:
$614,640.00
$1,142,427.52
ALTERNATE 1 - DRIVE BY AUTOMATED METER READER SYSTEM
15
92220
HANDHELD METER READING DEVICE
LUMP SUM
1 $2,000.00
$2,000.00
$7,987.50
$7,987.50
16
92221
DRIVE BY READING SYSTEM
LUMP SUM
1 $3,000.00
$3,000.00 $24,628.13
$24,628.13
17
92222
SOFTWARE TO INTERFACE WITH CITY
LUMP SUM
1 $4,000.00
$4,000.00
$0.00
$0.00
18
92206
ANNUAL SUPPORT
YEARS
20 $2,500.00
$50,000.00
$0.00
$0.00
19
92207
TRAINING
HOURS
32 $100.00
$3,200.00
$0.00
$0.00
20
92210
5/8" RESIDENTIAL AUTOMATED WATER METER AND INSPECTION
EACH
1728 $220.00
$380,160.00
$212.34
$366,923.52
21
92211
3/4" AUTOMATED RESIDENTIAL WATER METER AND INSPECTION
EACH
432 $240.00
$103,680.00
$236.57
$102,198.24
22
92224
1" AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
150 $280.00
$42,000.00
$236.57
- $35,485.50
23
92213
1 1/2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION EACH
30 $320.00
$9,600.00
$736.11
$22,083.30
24
192216
2" AUTOMATED COMMERCIAL WATER METER AND INSPECTION
EACH
20 $350.00
$7,000.00
$1,705.95
$34,119.00
Total ALTERNATE 1 - DRIVE BY AUTOMATED METER READER SYSTEM:
$6040640.00
$593,425.19
Total SCHEDULE A - AUTOMATED WATER METER REPLACEMENT:
$614,640.00
$1,142,427.52
Total ALTERNATE 1 - DRIVE BY AUTOMATED METER READER SYSTEM:
$604,640.00
$593,425.19
I hereby certify that this is an exact r production of bids received.
Certified By: Registration No. 7W iQ
Date: roc
39 4of4
October 2006
Monthly Planner
2
3
5
6
8
9
10
11
12
13
14
HOLIDAY
Council
Meeting
115
16
7
18
20
.21
Candidate's
Planning
Corner Plan
Forum
Commission
Task Farce
Meeting 6.30
p.m.
22
23
24
25
26
27
28
Council
Meeting
30
31
Sep 2006 Nov 2006
Joint Meeting
S M T W T F S S M T W T F
with School
Board
1 2 1 2 3 4
3 4 5 6 7 8 9 5 6 7 8 9 10 11
10 11 12 13 14 15 16 12 13 14 15 16 17 19
17 18 19 20 21 22 23 19 20 21 22 23 24 25
24252627282930 26 27 28 29 30
Creator for Windows on 10/4/2006
Printed by Calendar
Monthly Planner
UT
Oct 2006 Dec 20062
S M T W T F S S M 'T W T F S
1 2 3 4 5 6 7 1 2
8 9 10 11 12 13 14 3 4 5 6 7 8 9
15 16 17 18 19 20 21 10 11 12 13 14 15, 16
22 23 24 25 26 27 28 17 18 19 20 21 22 23
29 30 31 24 25 26 27 28 29 30,
31
6
7
8
9
10
11
GENERAL
HOLIDAY
ELECTION
1 12
13
14
15
16
17
18
Council
Meeting
:19
20
21
22
23
24
25
Planning
Commission
26
27
28
29
30
Council
Meeting
Printed by Calendar
Creator for Windows
on 10/4/2006
FUTURE COUNCIL AGENDA ITEMS
as of October 4, 2006
Meeting
Date
Meeting
Type
Staff
Items/Issues
October 24
Regular
Planning Commission Issues from October 17
Ordinance Amendment -Electronic Gasoline Signs
Fire Chief
Vital Aging Council Recognition
Police Chief
Police Reserve Recognition
Citizen's Academy Graduation
City Manager
Health Savings Account
Three Rivers Park
Update on Silverwood Park
City Manager
Ramsey County Score Grant
City Manager
Manufactured Home Park Ordinance -Second Reading
October 30
Joint Meeting
Joint Meeting with School Board
November 14
Regular
Ehlers &Assoc.
Tax Exempt Financing Authorization
City Manager
Manufactured Home Park Ordinance -Final Reading
Ehlers &Assoc.
Amendment to Development Agreement - SLV
Ehlers &Assoc.
Deed exchange for Don's Car Wash
Ehlers &Assoc.
Update on Phase 11 from Len Pratt
Ordinance Amendment -Electronic Gasoline Signs
second reading
Community Services Levy
November 28
Regular
Planning Commission Issues from November 21
Asst. City Manager
Comprehensive Plan
City Engineer
Authorize Plan and Specifications for 2007 Street Project
Highcrest Sidewalk and Foss Road Lift Station
City Engineer
Authorize a feasibility study plan for filter replacement for
Water Filtration
Ordinance Amendment -Electronic Gasoline Signs
final reading
December 4
Special
City Manager/
Finance Director
Truth In Taxation Hearing
December 11
Regular
Finance Director
Adopt 2007 Levy
December 26
Regular
Planning Commission Issues from December 19
... r i m
n 7�0
m O O
� v v
Cl) n
v M m
m
0000 0000
m
C o 0
m Ol o)
,Gq69 -60�
Cn CW37 O CD
C3� A•
0 --I 00
0o N
0 O O
-69
cn
co
W
coO
6
O
0
O
-P
W
O
6
O
IN
00
00
00
0
O
Co -"L
00
00
00
4
0
CD
On
C �
O M �
-i —
�'�' O
O -1
X37 CD
CD
40
N
cr) tD
00 '
O
00
O
co
ol
N
N �
c0 -
p
ME
-69
O
OP �
C) c
O "'o O
-69 �
� W
O O
J Ul N
N
o co o
Do o O
.s}
N -I
�
cn
N
N
Ui
cD --4
r--t-�-
-fes
> C/) (Do
N)
cn
c
D
cn -11N
— m =''
'-1
v — v --I
0 o
cn cn CD
o
{�
O
oo
�I
-01
�`�
N
�
op
cr.�
W
O
o
00
o cn
-1
6 o
° �-
--�
0
000
p
0
-m
X�
,p
o
-'
Z
(°-
�1
co
-4
O
o
N
O
0
O
0
c�
0
O
O
z
z
X�(nCD
0
Z
O
o
a�
s
ncn (
o
CDCD
�
CD
o
�
cn
40
N
cr) tD
00 '
O
00
O
co
ol
N
N �
c0 -
p
ME
-69
O
OP �
C) c
O "'o O
-69 �
� W
O O
J Ul N
N
o co o
Do o O
-69
N 4
0o c
ONO i
00 c
O c
O c
Ul
f} N C4
N O
D 00 cfl
:) O C� O
O c O
.s}
N -I
�
cn
N
N
Ui
cD --4
N
-fes
co O
N)
00
NWP
W
cn -11N
O O
'-1
O
0 o
cs�
o
{�
O
N -P
�I
-I�
O
N
O
N
W
O
�
00
0
6 o
cn
O
0
000
O
0
0
-69
N 4
0o c
ONO i
00 c
O c
O c
Ul
f} N C4
N O
D 00 cfl
:) O C� O
O c O
00 o O
(0 {c}
.s}
N -I
00 O
cn
C.0
N
Ui
cD --4
N
-fes
co O
N)
00
NWP
60
O
O O
'-1
O
00 o O
(0 {c}
.s}
N -I
00 O
cn
N -P
N
Ui
N W
N
Cfl
co O
W
00
pW
W
O
O O
-P
O
OO 0 O
-Gq
-69
co
00 O
00
O CO
N
cn
O
00
co O
-4
O O
W O
W
O
W
N
0 o
cs�
o
00 0 O
O O o O
� N �
co W cn �
co W
O 000
C) O C
O O C
N
00 W C
W Cfl
CD CD :
O
Do 4 t=
O o
N W �
m 000
4 O .
�
O j
O O
O O
N W
�
00 O
-�
O CO
N
-P cfl
N 00
co O
-4
O O
W O
O O o O
� N �
co W cn �
co W
O 000
C) O C
O O C
N
00 W C
W Cfl
CD CD :
O
Do 4 t=
O o
N W �
m 000
4 O .
�
O j
O O
O O
n n
n 16Z
v
cn
D r.+
D D
3
3 =
�
-r =.
z O
ID
v
V"
4A
{fl
to
{-A
{fl
n0
W
N
�
{�
Cr
O
{f3
(D
-I�
O
-�
-P
CCD
O
M
0 2)
�
CO -P
O
-' C37
O
�l
�) (1)CD
CD
(D
0 o
O
co W
0
O
��
-P
�1
co
-4
O
O
O
O O
O
O O
O
O
O
O
O O
O
O O
O
O
O
n n
n 16Z
v
cn
D r.+
D D
3
3 =
�
-r =.
z O
ID
v
(
c
C)D
CD
:3
00
��cn
C
--F,
<
,..t.
(D
(n �
tn
(D
rn
'�
O
<
�-
O `�' D
—
<
—�
-�
=
G)
c°
(n
<(D�..
°m
o'
°o
�'
D � __q
0
N
0
Q
�. ..
o
m
(n
O
..
m
cn
0
°
C)
0
�.
°-
cn
rn
O
E
D
z
(D
(D
O
1
c�
c�
CD
Wp.
�Wp.
cD
w
���
-� C
0
O
CO
tO
N
O)
N -� W
N -Ir
O
00
N
00
°p
cn
O
00r
00
0 0
O7
�
N
CO
n
_•
CO
(31
(0
W
(0
O Ul
C�
W
GJ
00
CD
Sy
N
00 -P O
O O
< Cl)
CD
-0
co
cC)
v
(n
Q
CD
> (n
c�
,�,
O �.
C --h
°
n
�- (n CSD
_0
m
��
(n o cn
o.
rn
o
O
0
cn
3
o
o
�
:3
0-
0
cn
0
0
>
cn
0
O
rn
-p
<
0
(D
m
O
cn
N<<
OWo
-69 -69CO
W W
OD
-�
W
-�
cn
00
CY)
o
-I
-_I
�
Ul
O
(P
O -, (D
N CD
a1
Cfl
O O Ul
�l
7C'
�l
Cfl
�l
O7
C31
-p
47 �I -fes
�1
CD
N
W
N
cn
00
-4
00 01 0
(O
ET
0
CD
N
v
CD
0
1
CD
0)
U)
CD
4A
N
406
O
O
4A
o < o ca �. c
CT CD w
rn CD — cr
� O m Ut w Ut O W 0 0 0 m -P
O O -co Ut N OOOOOW.P --4
Ut -IP M -P O O O W CO O -P 00 .p 0 X
O O 0 ;P N W " 00 �! CO �! 0 CD CD
O 000 O 0OC)C700C)0
O O O O O 0 0 0 0 0 0 0 0
C31 W 0 Cn m 00 0 Ut 0 0 0 N N �.
�D
O " O �l Ut �l -P " " Cat (D 00 N 't
N .p Ut -06 (P 0 -N w Cn O N W
-� W N -N N (C) Ut -P O Ut 0o Cn 0 (D Sv
O O O O O 66 0 6660 0 '7
O O O O 0 0 0 0 0 0 0 0 0 CD
4A -69 �fl -i9 ffl
m
K)
000 -P NOOom�N"{�0
O O 00 00 Cn 00 (C) m W -A Ut 00 Cn
0) 0 O -A � N --J Ut 0 4N. --A N -, N
-� -L 00 O N 00 0 O 00 -A. -4 N -�
O O O O 0 0 0 0 0 0 0 0 0
O O O O O 0 0 0 0 0 0 0 0
S9
-69
-P N N N) -09 �
O N CO Ut W �I �I -� N
., Al -t
co {.9 {n -69 0) -P Ut � N (oN CO 0 X
Nr00000
O O O -0, -A.U1 'tel Ut W Ut -1 M.
O 666 00000000
O 00000000
69 cn
-.x kn {69 -69 {69 -69
O � � � � ffl " -69 to
N (D M M M " (n M-4
iD N :p.
-P f�Efl{69 OON�OCO -NM n r-
0 O O O O -P O --v -, W �1 W" M 0
O 6666 00000000 X
O O O O O 0 0 0 0 0 0 0 0
6A {A {�9 {� ffl ff3 �i9 ffl {A
O 0 N M �I � N 'p
W W W W W W O Ut W N N O O -�
W W W W W W O 0 000 W cl) 0
N N N N N N Ut -� W .41 N N (P ,.i..
N
N) N) N N-PW�IO"000N
O
0000 0 0 0 0 0 0 0 0
O O O O 0 0 0 0 0 0 0 0 0
E
0
-t
�D
IA'64fflfJ9ERE,Rffl{�R (D '{
v
.p cn y W 00 CA M -4 cD p
VP CO L" C)thN(n000
(O -1 O C) O 4�k O .p
P 00 W W 00 :A► P -! jW
O O O O O O O O N
00000000�D
a
CL
CD
CL