Loading...
HomeMy WebLinkAboutCC PACKET 02122008CITY OF ST. ANTHONY VILLAGE CITY COUNCIL MEETING AGENDA February 12, 2008 7:00 p.m. Call to Order. Pledge of Allegiance. Roll Call. Consideration, Discussion, and Possible Action on All of the following items: I. Approval of the February 12, 2008, City Council Meeting Agenda. (action requested.) II. Proclamations and Recognitions. A. Swearing -In of Police Office Elliott Erdman. Mayor Faust (p. 1) B. Recognition of Reserve Officers. Police Chief John Ohl. III. Consent Agenda. These items are considered routine and will be enacted by one motion. There will be no separate discussion of these items unless a Councilmember or citizen so requests, in which event the item will be removed from fire Consent Agenda and placed elsewhere on the agenda. A. Approval of January 22, 2008, Council Meeting Minutes. (pp. 2 - 8) B. Licenses and Permits. (p. 9) C. Claims. (pp. 10 -12) IV. Public Hearing. V. Reports from Commission and Staff. VI. General Business of Council. A. Resolution 08-015; Approving a Cooperative Agreement with Hennepin County for the Construction of Silver Lake Road. Craig Twinem & Peter Lemke, Hennepin County, presenting. (pp. 13 - 41) B. City Engineer Update. Todd Hubmer, WSB & Associates, presenting. (pp. 42 - 43) C. Resolution 08-16; Adopting a Master Partnership Contract between the City of St. Anthony and the Minnesota Department of Transportation. Todd Hubmer, WSB & Associates, presenting. (pp. 44 - 68) VII. Reports from City Manager and Council members. VIII. Community Forum. Individuals may address the City Council about arty item trot included on the regular agenda. Speakers are requested to come to the podinrn, sign their name and address or the foam at the podium, state their name and address for the Clerk's record, and limit their remarks to five minutes. Generally, the City Council will not take official action on items discussed at this tune, but may typically refer tire matter to staff for a future report or direct the matter to be scheduled on air upcoming agenda. IX. Information and Announcements. X. Adjournment. Our Mission is to be a progressive and livable community, a walkable village, which is safe and secure. ZACouncil Meetings12008102122008\agendapg#.doc St. Anthony Police Department 1 I, ELLIOT RICHARD ERDMAN DO SOLEMNLY SWEAR THAT 1 WILL SUPPORT THE CONSTITUTION OF THE UNITED STATES, THE LAWS OF THE STATE OF MINNESOTA AND THE ORDINANCES OF THE CITY OF SAINT ANTI -TONY. ON MY HONOR, I WILL NEVER BETRAY MY BADGE, MY INTEGRITY, MY CHARACTER OR THE PUBLIC TRUST. I FURTHER AFFIRM THAT I WILL FAITHFULLY, JUSTLY AND IMPARTIALLY DISCHARGE MY DUTIES AS A LAW ENFORCEMENT OFFICER IN PROVIDING ASSISTANCE AND SERVICE TO ALL THAT LOOK TO ME FOR HELP TO THE BEST OF MY ABILITY. FEBRUARY 12, 2008 POLICE OFFICER ERDMAN MAYOR CHIEF OF POLICE a 1 CITY OF ST. ANTHONY 2 CITY COUNCIL REGULAR MEETING MINUTES 3 January 22, 2008 4 5 6 CALL TO ORDER 7 8 Mayor Faust called the meeting to order at 7:00 p.m. 9 10 PLEDGE OF ALLEGIANCE 11 12 Mayor Faust invited the Council and audience to join him in the Pledge of Allegiance. 13 14 ROLL CALL 15 16 Present: Mayor Faust; Councilmembers Gray, Roth, Stille, and Thuesen 17 Absent: None 18 Also Present: City Manager Mike Mornson and City Clerk Barbara Suciu 19 20 21 CONSIDERATION, DISCUSSION, AND POSSIBLE ACTION ON ALL OF THE FOLLOWING 22 ITEMS: 23 24 I. APPROVAL OF JANUARY 22, 2008 CITY COUNCIL MEETING AGENDA 25 26 Motion by Councilmember Gray, seconded by Councilmember Stille, to approve the City 27 Council Meeting Agenda of January 8, 2008 as amended. 28 29 Motion carried unanimously (5/0) 30 31 IL PROCLAMATIONS AND RECOGNITIONS. 32 33 A. Recognition of Tom Keith, Principal of St. Anthony High School for receiving the Silver 34 Ranking from U.S. News and World Report 35 36 Mayor Faust presented Mr. Tom Keith, Principal, with the 2008 "America's Best High Schools" 37 Silver Medal Ranking from the US News and World Report. He stated St. Anthony is in the top 38 500 schools in the nation. 39 40 Mr. Keith addressed Council and expressed his gratitude for the support from the community, the 41 school staff, parents, and City staff. 42 43 Mayor Faust pointed out that St. Anthony has a very well rounded curriculum. He stated that 44 without a strong school system, St. Anthony would not be the city it is. 45 46 IIL CONSENT AGENDA. 47 48 A. Approval of January 8, 2008 Council Meeting Minutes 49 B. Consider naavment of claims City Council Regular Meeting Minutes January 22, 2008 Page 2 C. Resolution 08-013; Accepting a donation from Barbara Meier for the St. Anthony Police Department — Citizen's Academy Motion by Councilmember Thuesen, seconded by Councilmember Gray, to approve the Consent Agenda as amended. 7 Motion carried unanimously (5/0) 8 IV. PUBLIC HEARINGS. 9 10 A. Public Hearing regarding the transfer of the Intoxicating Liquor License for Applebee's 11 Resolution 08-014; Approving the transfer of the IntoxicatingLiquor License to 12 Applebee's Restaurants North, LLC. 13 14 Mayor Faust opened the Public Hearing at 7:07 p.m. 15 16 City Manager Mornson presented Resolution 08-014. He stated staff received the necessary 17 documentation for a transfer of the intoxicating liquor license from American Limited 18 Partnership of Minnesota to Applebee's Restaurant North, LLC. He reported the St. Anthony 19 Police Department conducted a background investigation on the appropriate officers and 20 employees of the corporation. He indicated that no items of concern were discovered. City 21 Manager Morrison reported staff would send the information to the State of Minnesota for review 22 after approval of the liquor license. 23 24 Councilmember Stille questioned why the request for transfer was necessary. 25 26 Mr. Dallas Ward, Assistant Manager, replied that all the corporately owned Applebee's were 27 purchased by the I -Hop Corporation, therefore, making the transfer necessary. 28 29 Mayor Faust closed the Public Hearing at 7:10 p.m. 30 31 Motion by Councilmember Stille, seconded by Councilmember Roth, to approve Resolution 08- 32 014, a Resolution approving the transfer of the Intoxicating Liquor License for Applebee's 33 Restaurants North, LLC, DBA Applebee's Restaurant at 2800 — 39°i Avenue. 34 35 Motion carried unanimously (5/0) 36 37 V. REPORTS FROM COUNCIL AND STAFF 38 39 None 40 41 VI. GENERAL POLICY BUSINESS OF THE COUNCIL 42 43 A. Three Rivers Park Update 44 45 Commissioner Rosemary Franzese, Three Rivers Park District, presented a history and an update 46 on Silverwood Park. She reported the entire park would require closing during the construction City Council Regular Meeting Minutes January 22, 2008 Page 3 period beginning June 2, 2008 with an anticipated opening of summer 2009. She stated this $14 million cost is the largest investment in a single project in the 50 year history of the Three Rivers Park District. She introduced key members of the project. 5 Mr. Chris Gear, Three Rivers Park District, provided a project overview on Silverwood Park. He 6 reported the total estimated construction and development costs are at approximately $14 7 million. He stated that about $1 million would be spent on a new maintenance facility, $6.5 8 million on the visitor's center, $4.5 million on general park improvements and miscellaneous 9 items make up the difference. 10 11 Mr. Michael Horn, Three Rivers Park District, provided updates and changes on the buildings 12 and the site plan for Silverwood Park. He displayed drawings and photos of the proposed 13 buildings. 14 15 Mr. Dennis Hahn, Three Rivers Park District, presented the building floor plans and the 16 anticipated uses. 17 18 Mr. Larry Blackstad, Three Rivers Park District, expressed the enthusiasm of everyone involved 19 with this project. He reported Silverwood Park would be operated and maintained by Three 20 Rivers. He reported the park would be fully staffed with recreation, education, public safety, and 21 maintenance personnel. He stated this would be a beautiful asset to St. Anthony. 22 23 Councilmember Thuesen commented that great thought was put into the 'Park. He questioned 24 whether cross-country skiing would be allowed in the park and if the trails would be groomed. 25 26 Mr. Hahn replied that an examination of the park for the ability to provide trails would be needed 27 first. He commented the cross-country skiers have been allowed in the park to date. He 28 explained bike trails, walking trails, and island access would be provided. He stated that the 29 open areas would probably be available for snow shoeing. 30 31 Councilmember Thuesen commented there is a great deal of open green space in the park and 32 questioned whether people would be discouraged from accessing these areas and kept to the 33 trails. 34 35 Mr. Hahn replied they hope to enhance the natural environment with plantings and create off - 36 trail educational experiences. 37 38 Councilmember Thuesen questioned how successful they have been with limiting the removal of 39 trees. 40 41 Mr. Horn replied the current plan calls for very few trees would be removed in the visitor's 42 center area. 43 44 Councilmember Stille questioned whether the visitor's center building would be LEED 45 (Leadership, Energy, Environmental Design( certified. 46 C! 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 City Council Regular Meeting Minutes January 22, 2008 Page 4 Mr. Horn replied they are required to follow state B3 mandates. He stated they are making every effort reduce the environmental impact and increase sustainability as mandated by the state. He stated they have not pursued LEED certification. Councilmember Stille questioned whether the cost stated included the land. Mr. Gierzal replied the acquisition and development costs are about $21 million. Councilmember Roth questioned how many parking spaces there would be. Mr. Horn replied 155 in the main parking area and 68 in the overflow lot. Mayor Faust commented on the 260 seating spaces in the visitor's center. Mr. Hahn replied that was correct for banquet seating. Mayor Faust questioned if there are any restrictions on the use of the visitor's center. Mr. Horn replied beer and wine are allowed; however, there is an ordinance prohibiting hard liquor. Mayor Faust questioned whether the park would be open to the public when the visitor's center is rented for a private event. Mr. Hahn replied the park would be open to the public during regular park hours. Councilmember Roth questioned whether there would be enough parking places when large events occur. Mr. Horn replied the parking needs would be met with the planned parking and also by using adjacent neighborhoods and shuttle vehicles. Commissioner Franzese mentioned Three Rivers is making a tremendous contribution to the quality of the water. She stated they are in the process of an ongoing study for Total Maximum Daily Load (TMDL). Mr. Horn expanded on the TMDL study. Mayor Faust commented that Three Rivers Park is in the Rice Creek Watershed District and most of St. Anthony is in the Middle Mississippi Watershed District. He pointed out that the City is working with Three Rivers Park, the MMWMO, and the Rice Creek Watershed District. He applauded the Park Board and staff for taking the time to do it right the first time rather than meeting artificial dates. He complemented and thanked Commissioner Franzese and Chair Larry Blackstad in that without their help, there would not be a connection to the NE Diagonal Trail. City Council Regular Meeting Minutes January 22, 2008 Page 5 VIL REPORTS FROM CITY MANAGER AND COUNCIL MEMBERS City Manager Mornson reported the City Council Meeting on February 12, 2008 would include the swearing in of Officer Elliot Erdman, the City Engineer's Update, the MNDOT Agreement, and the Hennepin County Agreement. 7 City Manager Mornson reported he would be attending the Civic Engagement Committee 8 Meeting held on January 25, 2008 at the Edina City Hall. 9 City Manager Mornson reported he would be attending a meeting with the Minneapolis Park 10 Staff on January 24, 2008 regarding the Grand Round Program. He indicated lie would report 11 back to Council on this program. 12 13 City Manager Mornson reported staff is working on the written agreements with the St. 14 Anthony -New Brighton School District and the Sports Boosters on snow plowing and 15 maintenance of the ball fields. 16 17 City Manager Mornson reported the Finance Department changed a banking relationship, which 18 resulted in a $14,000 savings. He reported that the Liquor Departments reported a savings of 19 $6,000 on credit cards because of a change in vendors. He indicated this amounts to about 20 $20,000 in savings to the City. 21 22 City Manager Mormon reported that Officer Jeff Spiess received the 2007 Officer of the Year 23 Award from the Traffic Advisory Committee sponsored by the Hennepin County Chiefs of 24 Police Association. He stated Officer Spiess has been a leader in traffic safety for the past 25 several years. He reported that during 2007 Officer Spiess issued over 1,150 citations, made 26 more than 50 DWI arrests, has been active in educating the community through instructing the 27 DARE program, being a certified crime prevention officer and a drug enforcement expert and 28 conducting classes in the citizen's academy. 29 30 City Manager Mornson presented a list of 13 Inter Government Meetings attended by he and his 31 staff during the month of January 2008. He stated these result in great relationships with the 32 City. 33 34 Councilmember Thuesen reported the Vital Aging Council has been quite busy. He stated they 35 completed a project where properties with addresses difficult to see from the road were 36 identified. He reported that Superintendent Rod Thompson met with the Vital Aging Council on 37 issues regarding the senior population of St. Anthony. He reported that four residents of the 38 community were interviewed by the third grade classes of Wilshire Park Elementary. He stated 39 that Mr. Larry Long, in partnership with the West Metro Education Program (WMEP), would 40 put together a history of what these individuals have experienced during their life in St. Anthony. 41 He explained this would be presented to the community on March 6, 2008 at 7:30 p.m. in the St. 42 Anthony High School auditorium. He stressed that this is not a school event; it is a community 43 event. He reported volunteers are needed and encouraged residents to call 706-1202 for more 44 information. 45 0 City Council Regular Meeting Minutes January 22, 2008 Page 6 1 Councilmember Gray reported that on January 9, 2008, he attended the Sports Boosters Meeting 2 where Mr. Gary Goldsmith was elected president. He stated the Boosters are in the process of 3 redefining their support of youth sports. 4 5 Councilmember Gray reported that on January 10-11, 2008, he attended the Strategic Goal 6 Setting session with Council and Staff. 7 8 Councilmember Gray reported attending the Chamber of Commerce meeting on January 15, 9 2008 where Commissioner Stenglein and staff discussed the Silver Lake Road Project. 10 11 Councilmember Roth reported he participated in the League of Minnesota Cities New 12 Councilmember session on January 1849, 2008. He stated he found it very beneficial. 13 14 Councilmember Stille reported attending the Sister Cities Committee Board Meeting on January 15 13, 2008. He commented a Salo, Finland visit in 2008 was discussed. 16 17 Mayor Faust reported attending the January 10-11, 2008 Strategic Goal Setting Session. He 18 stated a report would be forthcoming on March 25, 2008 for adoption and presented to the 19 community. 20 21 Mayor Faust commented that a large group attended the Chamber of Commerce luncheon and 22 discussion on the Silver Lake Road project. He stated that residents were favorably impressed 23 with the project for the most part. He reported another open house would occur in March or April 24 and open to the public. 25 26 Mayor Faust reported that on January 15, 2008 he attended a Middle Mississippi Water 27 Management Plan Workshop to work on a 10 year Watershed Plan. He stated it is quite extensive 28 as it is in cooperation with the other area watershed districts. 29 30 Mayor Faust reported attending the League of Minnesota Cities Board Meeting on January 17, 31 2008 to look at legislative priorities. He stated that water infrastructure funding and drinking and 32 waste water standards requirements were discussed. He asked the Board as to whether any 33 funding that would recognize St. Anthony completed its I & L He reported that this was 34 approved unanimously by the Board and funding would be available. 35 36 Mayor Faust reported the League of Minnesota Cities Board also discussed the Cable Franchise 37 Authority to reflect that authority is left at the local level relative to new technology and fiber 38 optics. He commented that hindrances that do not give local authority were also put on record 39 with the Board. He stated the Board is very sensitive to what the City of St. Anthony is 40 attempting to accomplish. 41 42 Mayor Faust reported attending the League of Minnesota Cities Government Retreat on January 43 18, 2008. 44 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 City Council Regular Meeting Minutes January 22, 2008 Page 7 Mayor Faust reported that on January 22, 2008, he and City Manager Mornson met with the Mayors and City Administrators from Falcon Heights and Lauderdale. He stated St. Anthony is committed to this relationship and saw it as becoming stronger. VITT. COMMUNITY FORUM Mayor Faust invited residents to come forward at this time and address the Council on items that are not on the regular agenda. There being none, Mayor Faust continued with the agenda. IX. INFORMATION AND ANNOUNCEMENTS X. MISCELLANEOUS INFORMATIONAL DOCUMENTS None. XI. ADJOURNMENT Mayor Faust adjourned the meeting at 8:00 p.m. Respectfully submitted, Dianna Wise TimeSaver Off Site Secretarial, Inc. ATTEST: City Clerk Mayor Saint Anthony Village DATE: February 12, 2008 Approved: TO: Mayor and Councilmembers FROM: License Clerk ITEM: License and Permits for Approval• General Contractors License: All -Brite Sign, Rogers, MN VSI Construction, Maple Grove, MN Heating & Air Conditioning License: Conditioned Air, Eagan, MN 0 BREMER BANK ST. ANTHONY VILLAGE 10 CHECK REGISTER VENDOR # PAYEE CHECK DATE AMOUNT 8511 AT&T Mobility 5508 1/17/2008 $67.87 220 Anoka County Warrants 5510 1/24/2008 $500.00 9417 High Technology Crime 5511 1/24/2008 $60.00 8242 AFFILIATED COMPUTER SERV 5513 2/13/2008 $383.40 4779 ALCORN BEVERAGE CO, INC 5514 2/13/2008 $1,008.60 8621 ALLIANCE MECHANICAL 5515 2/13/2008 $462.50 9256 ALLIED MEDICAL PRODUCTS 5516 2/13/2008 $2,990.00 9250 AMERICAN MESSAGING 5517 2/13/2008 $157.46 8863 ANTILLA/RYAN 5518 2/13/2008 $22.61 7835 ARCH WIRELESS-METROCALL 5519 2/13/2008 $421.59 8794 ARCTIC GLACIER INC. 5520 2/13/2008 $284.70 7048 BARTON SAND AND GRAVEL 5521 2/13/2008 $546.53 4293 BELLBOY CORP. 5522 2/13/2008 $28,787.68 9060 BLAINE LOCK & SAFE INC. 5523 2/13/2008 $255.66 7168 BOYER FORD TRUCKS, INC. 5524 2/13/2008 $301.74 7253 BRAKE & EQUIPMENT WAREHO 5525 2/13/2008 $336.49 9148 BRW ENTERPRISES 5526 2/13/2008 $261.00 4231 CAPITOL BEVERAGE SALES 5527 2/13/2008 $31,354.80 9028 CAPITOL CITY REGIONAL FI 5528 2/13/2008 $50.00 9100 CAT & FIDDLE BEVERAGE 5529 2/13/2008 $2,918.61 610 CATCO 5530 2/13/2008 $173.48 2380 CENTERPOINT ENERGY 5531 2/13/2008 $1,390.87 4080 CHISAGO LAKES DIST. CO., 5532 2/13/2008 $4,161.71 9056 CITY OF ROSEVILLE 5533 2/13/2008 $2,622.58 4095 COCA COLA BOTTLING COMPA 5534 2/13/2008 $532.15 4107 COMPTON'S COMMERCIAL CLN 5535 2/13/2008 $3,860.63 8602 CROWN TROPHY 5536 2/13/2008 $27.58 8557 DAILEY DATA & ASSOCIATES 5537 2/13/2008 $62.50 4127 DANIMAL DISTRIBUTING INC 5538 2/13/2008 $327.50 9174 DAY DISTRIBUTING CO 5539 2/13/2008 $2,100.00 9560 DEFENSIVE EDGE TRAINING 5540 2/13/2008 $350.00 8437 DIRECTV INC 5541 2/13/2008 $29.77 820 DORSEY & WHITNEY 5542 2/13/2008 $1,114.25 .0141 DRIVER & VEHICLE SERVICE 5543 2/13/2008 $18.25 8411 DRIVER & VEHICLE SERVICE 5544 2/13/2008 $18.25 8697 EXTREME BEVERAGE 5545 2/13/2008 $128.00 9395 FACTORY MOTOR PARTS CO 5546 2/13/2008 $270.98 8153 FILTERFRSH 5547 2/13/2008 $76.97 8359 FLAHERTY'S HAPPY TYME CO 5548 2/13/2008 $448.00 8647 FRATTALLONE'S HARDWARE 5549 2/13/2008 $3.18 1030 G & K SERVICES INC 5550 2/13/2008 $1,252.86 9561 GLOBAL SYNERGY GROUP, LL 5551 2/13/2008 $5,629.37 1180 GOODIN COMPANY 5552 2/13/2008 $124.39 1250 GRAINGER 5553 2/13/2008 $84.32 9102 GRAND PERE WINES, INC 5554 2/13/2008 $1,678.33 4172 GRAPE BEGINNINGS, INC. 5555 2/13/2008 $2,512.65 4175 GRIGGS COOPER & CO INC 5556 2/13/2008 $44,553.56 9248 GTS 5557 2/13/2008 $200.00 7188 H & L MESABI INC 5558 2/13/2008 $1,189.61 1300 HACH COMPANY 5559 2/13/2008 $119.19 BREMER BANK ST. ANTHONY VILLAGE 11 CHECK REGISTER VENDOR # PAYEE CHECK DATE AMOUNT 8342 HENNEPIN COUNTY TREASURE 5560 2/13/2008 $23.17 8987 HENNEPIN COUNTY TREASURE 5561 2/13/2008 $439.93 4207 HOHENSTEIN'S, INC 5562 2/13/2008 $5,860.90 8252 HOME DEPOT CREDIT SERVIC 5563 2/13/2008 $52.93 8013 ICMA 5564 2/13/2008 $220.00 4125 JJ TAYLOR DISTRIBUTING 5565 2/13/2008 $64,472.14 4220 JOHNSON BROTHERS LIQUOR 5566 2/13/2008 $51,515.16 8229 LOFFLER BUSINESS SYSTEMS 5567 2/13/2008 $632.69 9114 M. AMUNDSON LLP 5568 2/13/2008 $1,220.91 2100 MACQUEEN EQUIPMENT CO 5569 2/13/2008 $33.82 2125 MALENICK/JOHN 5570 2/13/2008 $70.37 2130 MAMA 5571 2/13/2008 $54.00 9073 MARCO, INC. 5572 2/13/2008 $277.37 4265 MARK VII SALES INC 5573 2/13/2008 $29,494.83 8263 MCLEOD USA, INC. 5574 2/13/2008 $219.26 9559 METRO CITIES 5575 2/13/2008 $3,232.00 9527 METRO LEAK DETECTION, IN 5576 2/13/2008 $225.00 2240 METROPOLITAN COUNCIL 5577 2/13/2008 $38,938.92 9459 MIDC ENTERPRISES 5578 2/13/2008 $10.12 2280 MIDWEST ASPHALT CORP 5579 2/13/2008 $63.43 9549 MINNESOTA STATE FIRE MAR 5580 2/13/2008 $140.00 5190 MN DEPT NATURAL RESOURCE 5581 2/13/2008 $3,757.14 7356 MOORE-SYKES/KIM 5582 2/13/2008 $180.33 7205 MSSA 5583 2/13/2008 $35.00 9084 MUZAK LLC 5584 2/13/2008 $55.41 7370 MYERS TIRE SUPPLY COMPAN 5585 2/13/2008 $1.74 2505 NARDINI FIRE EQUIP CO 5586 2/13/2008 $105.39 8996 NEEDHAM DISTRIBUTING CO 5587 2/13/2008 $199.25 9222 NEW BRIGHTON FORD 5588 2/13/2008 $22.50 8883 NEW FRANCE WINE COMPANY 5589 2/13/2008 $2,341.34 8764 NFPA 5590 2/13/2008 $150.00 9266 NORTHERN WATER WORKS SUP 5591 2/13/2008 $373.26 9151 NORTHLAND INN 5592 2/13/2008 $4,395.50 45 OFFICE DEPOT 5593 2/13/2008 $1,435.27 7226 OLSON'S PLUMBING 5594 2/13/2008 $2,468.00 1230 ONE CALL CONCEPTS, INC. 5595 2/13/2008 $74.50 8528 PACE ANALYTICAL SERVICES 5596 2/13/2008 $190.00 9275 PAT KERNS WINE MERCHANTS 5597 2/13/2008 $696.33 4354 PAUSTIS & SONS 5598 2/13/2008 $8,540.23 8805 PETTY CASH - BREMER BANK 5599 2/13/2008 $166.06 4360 PHILLIPS WINE & SPIRITS 5600 2/13/2008 $43,217.60 4161 PREMIUM WATERS, INC 5601 2/13/2008 $112.00 9139 PROPERTY KEY, INC. 5602 2/13/2008 $50.00 4385 QUALITY WINE CO 5603 2/13/2008 $44,875.95 4492 QWEST 5604 2/13/2008 $303.33 9356 REGIONS INTERSTATE BILLI 5605 2/13/2008 $30.72 4133 SALUD AMERICA 5606 2/13/2008 $1,789.00 9405 SETS DESIGN, INC. 5607 2/13/2008 $330.50 9127 SIMPLEXGRINNELL 5608 2/13/2008 $606.00 8725 SITARZ/MARK 5609 2/13/2008 $511.97 9402 SOFTWARE HOUSE INTERNATI 5610 2/13/2008 $1,290.78 BREMER BANK ST. ANTHONY VILLAGE CHECK REGISTER VENDOR# PAYEE CHECK DATE AMOUNT 8983 SOULO DESIGN, INC 5611 2/13/2008 $150.00 5238 SPECIALTY RADIO SERVICE 5612 2/13/2008 $428.41 9072 SPECIALTY WINES & BEV. L 5613 2/13/2008 $522.00 9083 ST, ANTHONY RETAIL DEVEL 5614 2/13/2008 $1,648.47 1810 ST. ANTHONY VILLAGE KIWA 5615 2/13/2008 $276.00 3490 STREICHER'S 5616 2/13/2008 $1,560.07 7337 TIMESAVER OFF SITE SECRE 5617 2/13/2008 $882.73 7365 TOLL GAS & WELDING SUPPL 5618 2/13/2008 $36.49 8907 TOUSLEY FORD 5619 2/13/2008 $242.82 3560 TRACY PRINTING 5620 2/13/2008 $359.97 8824 TRI -COUNTY BEVERAGE, INC 5621 2/13/2008 $217.00 9309 TROMBLEY/JOHN 5622 2/13/2008 $442.05 8449 TWIN CITY GARAGE DOOR 5623 2/13/2008 $1,170.73 8859 U.S. BANK 5624 2/13/2008 $220,000.00 7341 U.S. TIRE & EXHAUST 5625 2/13/2008 $3.07 9171 UNIQUE PAVING MATERIAL 5626 2/13/2008 $215.56 8270 UNITED STATES POSTAL SER 5627 2/13/2008 $700.00 8227 VERIZON WIRELESS 5628 2/13/2008 $732.24 9126 VINO SOURCE 5629 2/13/2008 $421.00 4451 VINOCOPIA 5630 2/13/2008 $2,109.71 8316 WINE COMPANY/THE 5631 2/13/2008 $3,019.35 8310 WINE MERCHANTS INC 5632 2/13/2008 $16,556.69 4499 WORLD CLASS WINES, INC. 5633 2/13/2008 $2,843.88 8273 WSB & ASSOCIATES, INC. 5634 2/13/2008 $8,301.00 2680 XCEL ENERGY 5635 2/13/2008 $12,802.04 9076 XCELERATED COMPUTER SOLU 5636 2/13/2008 $185.00 830 ZEE MEDICAL SERVICE 5637 2/13/2008 $87.16 TOTAL $737,647.66 12 A W.SR & Assocmres, r,��, Infrastructure ■ Engineering ■ Planning ■ Construction February 6, 2008 Honorable Mayor, City Council and Staff City of St. Anthony Village 3301 Silver Lake Road NE St. Anthony, MN 55418 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 541.4800 Fax: 763 541-1700 Re: Hennepin County Transportation Agreement No. PW59-10-07 Hennepin County Cost Share Agreement for the Reconstruction of Silver Lake Road Dear Honorable Mayor, City Council, and Staff: Attached please fund Resolution No. 08-015, a Resolution entering into a construction cooperative agreement with Hennepin County for the reconstruction of Silver Lake Road from St. Anthony Boulevard to 37°i Avenue NE. This agreement anticipates the estimated cost for the project to be $8,452,478, with $5,323,733 paid for by Hennepin County and $3,128,745 paid for by the City of St. Anthony. The cost participation numbers presented to the Council in this agreement are currently estimates only. The actual cost of the project will be based on the actual prices for right-of-way acquisition, and the bid prices received for the construction of Silver Lake Road. The cost split currently shown is consistent with our discussions with Hennepin County during the development of preliminary and final plans of Silver Lake Road. The St. Anthony Village portion of costs does include the reconstruction of City water and sanitary sewer systems, which are 100% the responsibility of St. Anthony Village, in the amount of $1,470,000. The City of St. Anthony has and will incur costs associated with the reconstruction of Silver Lake Road for the design of the water and sewer systems by the City Engineer, participation in the public task force, development of specifications for the water and sewer replacement, and support services necessary for the undergrounding of private utilities and the connections at private residents' homes, and communications with residents through the design and construction phases of the project. At this time, we anticipate the total cost to the City of St. Anthony to be approximately $3,500,000 for this project. If you have any questions, I will be available at your February 12 Council meeting, or feel free to call me at 763-287-7182. Sincerely, WSB & Associates, Inc. Todd E. Hubmer, PE City Engineer cc: Jay Hartman, City of St. Anthony Village Roger Larson, City of St. Anthony Village KI1626-18W drain l Docsl L7'R-Guice-020508. doe 13 14 Hennepin County Transportation Department 1600 Prairie Drive 612-596-0300, Phone Medina,MN 55340-5421 763-478-4000, FAX 763-478-4030,TDD www.hennepin.us January 23, 2008 Mr. Michael Morrison City Manager City of St. Anthony 3301 Silver Lake Road St. Anthony, MN 55418 AGREEMENT NO. PW 59-10-07 CSAH 136 (Silver Lake Road); County Project 0524 Dear Mr. Morrison: Submitted for approval are two copies of the above referenced agreement. The agreement outlines maintenance and cost responsibilities for the reconstruction of Silver Lake Road from St. Anthony Boulevard to 37°i Avenue ME - If the agreement is satisfactory, please have both copies signed by the appropriate officials and return them to this office. Also, please return two certified copies of a resolution authorizing these officials to sign the agreement. Upon completion of the remaining signatures by Ilennepin County officials, we will send you one fully executed copy for your files. If you have any questions concerning the agreement, please feel free to contact me at (612) 596 - 0360. Upon approval of the agreement, please call Wayne Loos at (612) 596-0380 to arrange for pick up by Hennepin County. Sinc rel Craig M. Twinem, P.E. Design Division Engineer encl c: Todd Hubmer (WSB) An Equal Opportunity Employer Recycled Poper 15 Agreement No. PW 59-10-07 County Project No. 0524 County State Aid Highway No. 136 City of Saint Anthony County of Hennepin CONSTRUCTION COOPERATIVE AGREEMENT THIS_ AGREEMENT, Made and entered into this day of _ , 2008 by and between the County of Hennepin, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the "County", and the City of Saint Anthony, a body politic and corporate under the laws of the State of Minnesota, hercinafter referred to as the "City". WITNESSETH: WHEREAS, the County and the City have been negotiating to bring about the improvement of that portion of County State Aid Highway No. (CSAR) 136 (Silver Lake Road) from St. Anthony Boulevard to 37°i Avenue N.E. as shown on the County Engineer's plans for County Project No. (C.P.) 0524 which improvements contemplate and includes grading, drainage, bituminous and concrete surfacing, curb and gutter, concrete walk, water main, retaining walls, traffic signal system, landscaping and other related improvements, and which shall hereinafter be referred to as the "Project"; and WHEREAS, the above described Project lies within the corporate limits of the City; and WHEREAS, the County Engineer has heretofore prepared an Engineer's Estimate of quantities and unit prices for the above described. Project in the sum of Six Million Three Hundred Eighty One Thousand Ninety Nine Dollars and No Cents ($6,381,099.00). A copy of said estimate, marked Exhibit "A", is attached hereto and by this reference tirade a pail: hereof, and WHEREAS, the City have indicated its willingness to participate in the construction, engineering and maintenance costs of the Project as detailed herein; and WHEREAS, the construction costs for the Project shallbe comprised of municipal and county state aid funds, county road bonds and local funds; and WHEREAS, the City has requested that the County participate in the costs of the landscaping included in the plans for the Project in accordance with the County's Roadside Enhancement Partnership. Program (REPP); and W M Agreement No. PW 59-10-07 CSAH 136; C.P. 0524 WHEREAS, the County has REPP funds available and has expressed willingness to participate in the construction costs of the landscaping; and WHEREAS, the City has requested that lines and facilities for distribution of electrical energy be relocated underground by Xcel Energy within the limits of the Project; and WHEREAS, the City has requested that the Comity participate in the costs of the aforesaid utility line burial costs in accordance with the County's Roadside Enhancement Partnership Program; and WHEREAS, the Comity has REPP funds available and has expressed willingness to participate in the construction costs of the aforesaid utility line burials; and WHEREAS, the City has requested that street lighting and pedestrian lighting be installed by Xcel Energy within the limits of the Project; and WHEREAS, the City has requested that the County participate in the costs of the aforesaid street lighting and pedestrian lighting installed by Xcel Energy in accordance with the County's Roadside Enhancement Partnership Program; and WHEREAS, the County has REPP funds available and has expressed willingness to participate in the costs of the aforesaid street lightingand pedestrian lighting installed by Xcel Energy; and WHEREAS, it is contemplated that said work be carried out by the parties hereto under the provisions of Minnesota Statutes, Section 162.17, Subdivision 1 and Section 471.59. NOW TIIEREFORE, IT IS HEREBY AGREED: The County will advertise for bids for the work and construction of the Project, receive and open bids pursuant to said advertisement and will enter into a contract with the successful bidder at the unit prices specified in the bid of such bidder, according to law. The contract will include the plans and specifications prepared by the County, which said plans and specifications are also referenced and identified as State Aid Project Number (S.A.P). 27-736-04, and approved by the Minnesota Department of Transportation (Mn/DOT). -2- VVL 17 Agreement No. PW 59-10-07 CSAH 136; C.P. 0524 II The Comity will administer the contract and inspect the construction of all the contract work contemplated herewith. However, the City Engineer shall have the right, as the work progresses, to enter upon the job site to make any inspections deemed necessary and shall cooperate with the County Engineer and staff at their request to the extent necessary, but will have no responsibility for for the supervision of the work. The City agrees that the County may make changes in the plans or in the character of said contract construction which is reasonably necessary to cause said construction to be in all things performed and completed in a satisfactory manner. It is further agreed by the City that the County may enter into any change orders or supplemental agreements with the County's contractor for the performance of any additional construction or construction occasioned by any necessary, advantageous or desirable changes in plans, within the original scope of the Project. Said changes may result in an increase or decrease to the City's cost participation estimated herein. The City shall have the right to review any proposed changes to the plans and specifications as they relate to the City cost participation prior to the work being performed. The City's Engineer or designated representatives shall have the right to approve any change orders or supplemental agreements prepared by the County that affect the City's share of the construction cost. The City further agrees that it will participate in the settlement of any claims from the County's contractor that involve delays attributable to unreasonable delays in approval by the City for plan or specification changes deemed necessary by the County Engineer or staff. 'rhe amount of City participation in any such claims shall be commensurate with the percentage of delay directly attributable to the City's actions. III The City shall reimburse the County for its share of the contracted construction costs for the Project as set forth in the Division of Cost Summary in said Exhibit "A". The respective proportionate shares of the pro -rata pay items included in Exhibit "A" shall remain unchanged throughout the life of this Agreement. It is understood that the estimated amount on Page I of this Agreement and as shown in Exhibit "A" is an estimate of the costs for the contracted construction work on the Project and that the unit prices set forth in the contract with the successful bidder and the final quantities as measured by the County Engineer's designated representatives shall govern in computing the total final contract construction cost for apportioning the cost of the Project according to the provisions herein. It is further understood and agreed that the final quantities as measured by the County Engineer's designated representatives for contract pay items shall be subject to the review by the City Engineer. Agreement No. PW 59-10-07 CSAR 136; C.P. 0524 IV In addition to the aforesaid City's proportionate share of the contracted construction costs for the Project, the City also agrees to reimburse the County for a share of the construction engineering costs for the Project. Said City's share of the construction engineering costs shall be equal to eight (8) percent of the sanitary sewer and water main replacement work included in the Project. The amount of said City's share in the contract engineering costs is estimated in Exhibit "A". It is understood that said City's share shown in Exhibit "A" is an estimate and that the actual City's share of the contract engineering costs will be computed using the total final amount of the City sanitary sewer and water main contract construction costs for the Project. V The City agrees to grant right of way to the County over those lands owned by the City that are a part of the required right of way for said Project. Said right of way shall be granted at no cost to the County. The County or its agents will acquire all additional right of way, permits and/or easements required for the construction of said Project. All costs for all additional right of way, permits and/or easements within the City required for the construction of the Project shall be shared equally between City and County, as set forth in the Division of Cost Summary on sheet I of Exhibit "A". VI The County, at its sole cost and expense, has conducted a Phase 1 Environmental Assessment (BSA) on the Project. In the event a Phase II ESA is required on any parcel, it is hereby understood and agreed that the City shall reimburse the County for fifty (50) percent of all costs incurred by the County for the completion of said future Phase II ESA. If any such Phase II ESA identifies contamination within the new right of way for the Project that must be abated, the County will hire consultants and contractors as necessary to perform the necessary abatement of the roadway right of way and obtain approval of the Minnesota Pollution Control Agency. Any such abatement required may be accomplished under a separate project or may be included in the Project. The County will investigate and exhaust all available options for payment of costs incurred related to the aforereferenced Phase II ESA. This includes, but is not limited to, responsible parties and governmental agencies. The City hereby agree to reimburse the County fifty (50) percent of all costs incurred by the County for the completion of the aforereferenced environmental work performed on parcels associated with this Project for which the County does not receive reimbursement from other sources. 19 Agreement No. PW 59-10-07 CSAH 136; C.P. 0524 VII After an award by the County to the successful bidder on the Project, the County shall invoice the City for ninety five (95) percent of the estimated City share in the contract construction and engineering costs for the Project. Payments shall be made to the County, in the name of the Hennepin County Treasurer, by the City for the full amount due stated on the invoices within forty five (45) days of the invoice date. Said estimated City share shall be based on actual contract unit prices applied to the estimated quantities shown in the plans. In the event the County Engineer or the County's staff determines the need to amend the construction contract with a supplemental agreement or change order which results in an increase in the contract amount for the Project, the City hereby agrees to remit within forty five (45) days of notification by the County of said change an amount equal to ninety five (95) percent of the estimated City share as documented in the supplemental agreement or change order. The remainder of the City's share in the contract construction and engineering costs of the Project, including additional costs resulting from supplemental agreements and change orders, will be due the County upon the completion of the Project and submittal of the County Engineer's final estimate for the Project to the City. Upon final payment to the Project contractor by the County, any amount remaining as a balance in the deposit account will be returned to the City, within 45 days, on a proportionate basis based on the City's initial deposit amount and the City's final proportionate share of the Project costs. Likewise, any amount due the County from the City upon final payment by the County shall be paid by the City as its final payment for the construction costs of the Project within forty five (45) days of receipt of an invoice from the County. VIII The County will supply the traffic signal cabinet, controller and control equipment, video detection equipment, including the emergency vehicle preemption (EVP) cards, (County Supplied Equipment) for the traffic control signal system installed as a part of said Project. The City agrees to reimburse the County for its proportionate share of the costs of the County. Supplied Equipment. Said proportionate share of the County Supplied Equipment shall be equal to the City's proportionate share of the contract signal work. An estimate of the City's share of County Supplied Equipment is incorporated into Exhibit "A". It is further agreed that said estimate of the costs of County Supplied Equipment is an estimate and that the actual costs of equipment as determined by the County Engineer shall govern in computing the total final apportionment of cost participation by the City in the County Supplied Equipment. The County will invoice the City separately for said County Supplied Equipment. 5 W� 20 Agreement No. PW 59-10-07 CSAII 136; C.P. 0524 Payment shall be made to the County by the City for the full amount due on said invoice within forty five (45) days of the invoice date. IX The County, through its Roadside Enhancement Partnership Program (REPP), will participate in a proportionate share of the construction costs for the burial of utilities within the limits of the Project by Xcel Energy. Also the County, through its Roadside Enhancement Partnership Program, will participate in a proportionate share of the construction costs for the installation of pedestrian and street lighting within the limits of the Project by Xcel Energy. It is understood that lines and facilities for local distribution of electrical energy will be relocated underground within the limits of'the Project by Xcel Energy under a separate contract with the City. The County, through REPP, will participate in a proportionate share of the costs to underground said lines and facilities for local distribution of electrical energy. As set forth in the County's Cost Participation Policy the County's proportionate share of the construction costs eligible for this funding source shall be fifty (50) percent, and shall not exceed the amount of $390,000.00 (based on a maximum County contribution of $300,000.00 per centerline mile). Included in Exhibit "A" is the amount of $390,000.00, which represents the County's share of the costs to underground Xcel Energy's facilities. Similarly, it is understood that street and pedestrian lighting will be installed within the limits of the Project by Xcel Energy under a separate contract with the City. The County, through REPP, will participate in a proportionate share of the costs to design and install street and pedestrian lighting. As set forth in the County's Cost Participation Policy the County's proportionate share of the design and construction costs eligible for this funding source shall be fifty (50) percent. Included in Exhibit "A" is the estimated amount of $210,000.00, which represents the County's proportionate share of the costs to install street and pedestrian lighting within the limits of the Project. KI The proportionate shares of the various costs associated with said Project have been identified and set forth in Articles III through IX of this Agreement. All of the aforereferenced costs are included in tabular format in Exhibit "A". As summarized in Exhibit "A", the estimated amount that the County is to pay to the City as a result of this Agreement is $600,000.00, the estimated amount that the City is to pay the County as a result of this Agreement is $3,128,745.00. It is understood and agreed that said payment amounts are estimates and that the actual payment amounts shall be based on actual costs and contract unit prices, as specified elsewhere throughout this Agreement. 6- \i—V1 �_. 21 Agreement No. PW 59-10-07 CSAH 136; C.P. 0524 XI All payments to the City must be postmarked by the date due or a late penalty of one (1) percent per month, or fraction thereof, on the unpaid balance will be charged to the County. The County shall pay the amount due as stated of such amount. Should a disputed amount be resolved in favor of the County, the City shall reimburse the disputed amount plus daily interest thereon calculated from the date such disputed amount was received by the City. Daily interest shall be at the rateof one (1%) percent per month on the disputed amount. All payments to the County must be postmarked by the date due or a late penalty of one (1) percent per month, or fraction thereof, on the unpaid balance will be charged to the City. The City shall pay the amount due as stated on the statement; notwithstanding any dispute of such amount. Should a disputed amount be resolved in favor of the City, the County shall reimburse the disputed amount plus daily interest thereon calculated from the date such disputed amount was received by the County. Daily interest shall be at the rate of one (I%) percent per month on the disputed amount. XII All records kept by the City and the County with respect to the Project shall be subject to examination by the representatives of each party hereto. XIII The County reserves the right not to issue any permits for a period of five (5) years after completion of the Project for any service cuts in the roadway surfacing of the County Highways included in said Project for any installation of underground utilities which would be considered as new work; service cuts shall be allowed for the maintenance and repair of any existing underground utilities. XIV As part of the Project, "No -Parking" signs shall be installed as represented in the plans and the City, at their expense, shall provide the enforcement for the prohibition of on -street parking on those portions of CSAH 136 constructed under this Project recognizing the concurrent jurisdiction of the Sheriff of Hennepin County. Any modification of the above parking restrictions shall not be made without first obtaining a resolution from the Hennepin County Board of Commissioners permitting said modification. It is further agreed that the City shall, at their own expense, remove and replace City -7- \W= 22 Agreement No. PW 59-10-07 CSAH 136; C.P. 0524 owned signs that are within the construction limits of said Project if requested by the County's Project Engineer. XV The City agrees that any municipal license required to perform electrical work within the City shall be issued to the Contractor or the County at no cost to the Contractor or the County. Electrical inspection fees shall not be more than those established by the State Board of Electricity in the most recently recorded Electrical Inspection Fee Schedule. XVI The City shall install, cause the installation of, or perpetuate the existence of an adequate three wire, 120/240 volt, single phase, alternating current electrical power connection to the traffic control signal, flasher and integral street lights included in the Project at the sole cost and expense of the City. Further, the City shall provide the electrical energy for the operation of the said traffic control signal, flasher and integral streetlights at its sole cost and expense. XVII The City shall not revise by addition or deletion, nor alter or adjust any component, part, sequence, or timing of the aforesaid traffic control signal, however, nothing herein shall prohibit prompt, prudent action by properly constituted authorities in situations where a part of such traffic control signals may be directly involved in an emergency. XVIII Upon completion of this Project, the County shall thereafter maintain and repair the traffic control signal system installed as a part of said Project, all at the sole cost and expense of the County. Said maintenance shall include all EVP components. Further, the County, at its expense, shall maintain 110 -volt power to the line side of the fuse in the base of the signal poles for the integral streetlights. The City, at its expense, shall maintain the fuse, the luminary and the wire to the load side of the fuse in the base of the signal poles. The EVP Systems provided for herein shall be installed, operated, maintained or removed in accordance with the following conditions and requirements: Emitter units may be installed and used only on vehicles responding to an emergency as defined in Minnesota Statutes Chapter 169.01, Subdivision 5 and 169.03. The City will provide the County Engineer or his designated representative a list of all such vehicles with emitter units. 8 -W� 23 Agreement No. PW 59-10-07 CSAH 136: C.P. 0524 2. Malfunctions of EVP Systems shall be reported to the County immediately. 3. In the event said EVP Systems or components are, in the opinion of the County, being misused or the conditions set forth herein are violated, and such misuse or violation continues after receipt by the City of written notice thereof from the County, the County shall remove the EVP Systems. Upon removal of the EVP Systems pursuant to this paragraph, the field wiring, cabinet wiring, detector receivers, infrared detector heads, indicator lamps and all other components shall become the property of the County. 4. All timing of said EVP Systems shall be determined by the County. XIX Upon completion of the Project, the City shall thereafter continue to maintain and repair that portion of CSAH 136 reconstructed under the Project, according to the provisions set forth in the agreement which is re -written periodically between the City and the County providing for the maintenance of County owned roadways within the corporate limits of the City. It is understood and agreed that upon completion of any and all improvements proposed herein, all fencing, railings, water distribution system components, sanitary sewer systems, concrete sidewalk, concrete driveway, lighting and all municipal street construction included in said improvement shall be the property of the City and all maintenance, restoration, repair, replacement or other work or services required thereafter shall be performed by the City at no expense to the County. Notwithstanding the maintenance responsibilities of the City as specified in the previous paragraph, it is further understood and agreed that upon completion of any and all improvements proposed herein, all streetscape, landscaping and associated landscaping structures shown in the plans for the Project, shall become the responsibility of the City and all maintenance, restoration, repair, replacement or other work or services required thereafter shall be performed by the City at no expense to the County. It is further understood and agreed that said streetscape, landscaping and associated landscaping structures shall be maintained by the City in accordance with the attached "HENNEPIN COUNTY DEPARTMENT OF PUBLIC WORKS - TRANSPORTATION DIVISION; RECOMMENDED URBAN LANDSCAPE/STREETSCAPE GUIDELINES" (marked Exhibit "B") which by this reference is made a part hereof. It is further understood and agreed that upon completion of the Project, the City, at their sole cost and expense, will perform all routine maintenance on the retaining walls and retaining wall fencing constructed as a part of the Project. In the event, at any time in the future, that the retaining walls constructed as a part of the Project for highway purposes are rehabilitated and/or replaced, the County will be responsible for the costs of rehabilitation and/or replacement of said retaining walls and integral retaining wall fencing. -9- M—L- 24 Agreement No. PW 59-10-07 CSAH 136; C.P. 0524 Upon completion of the Project the County shall, at its own cost and expense, retain ownership and maintenance responsibilities for those portions of the roadway storm sewer drainage system functioning as catch basins and associated lead pipes that are within or between the outermost curb lines of the County roadway as well as those within the radius return limits of intersecting municipal streets. All other components of the roadway storm sewer drainage system, constructed as a part of this Project including but not limited to all trunk lines, drainage structures, ponds, storm water treatment structures, storm interceptors and cross road culverts, shall become the property of the City and shall be maintained by the City. All questions of maintenance responsibilities that may arise shall be jointly resolved by the City Engineer and the County's Operations Division Engineer. It is hereby understood that the County requires an operational clear zone behind the face of curb for storage of snow removed from County roadways. The City hereby agrees that the City shall be responsible for the removal of any snow that may be placed on the sidewalks and/or pedestrian/bicycle paths within the operational clear zone, as a result of the County's snow removal operations on CSAH 136 within the limits of the Project. This paragraph is not intended to confer a benefit upon any third parry and the City's decision to remove snow from the sidewalk and/or paths shall be made by the City in its sole discretion pursuant to its policy on removal of snow and ice from its sidewalks and/or pedestrian/bicycle paths and trails. XX The City agrees to defend, indemnify and hold harmless the County, its officials, officers, agents, volunteers and employees, from any liabilities, claims, causes of action, judgments, damages, losses, costs or expenses, including, reasonable attorneys' fees, resulting directly or indirectly from any act or omission of the City, its contractors, anyone directly or indirectly employed by them, and/or anyone for whose acts and/or omissions they may be liable for related to the ownership, maintenance, existence, restoration, repair or replacement of the afore defined City owned improvements constructed as part of said Project. The City's liability shall be governed by the provisions of Minnesota Statutes, Chapter 466 or other applicable law. The County agrees to defend, indemnify, and hold harmless the City, its officials, officers, agents, volunteers, and employees from any liability, claims, causes of action, judgments, damages, losses, costs, or expenses, including reasonable attorneys' fees, resulting directly or indirectly from any act or omission of the County, its contractors, anyone directly or indirectly employed by them, and/or anyone for whose acts and/or omissions they may be liable related to the ownership, maintenance, existence, restoration, repair or replacement of the afore defined County owned improvements constructed as part of said Project. The County's liability shall be governed by the provisions of Minnesota Statutes, Chapter 466 or other applicable law. -10- \LA— 25 Agreement No. PW 59-10-07 CSAR 136; C.P. 0524 XXI Each party agrees that it will be responsible for its own acts and the results thereof, to the extent authorized by the law, and shall not be responsible for the acts of the other party and the results thereof. The County's and the City's liability is governed by the provisions of Minnesota Statutes, Chapter 466. The County and the City each warrant that they are able to comply with the aforementioned indemnity requirements through an insurance or self-insurance program. XXII It is further agreed that any and all employees of the City and all other persons engaged by the City in the performance of any work or services required or provided for herein to be performed by the City shall not be considered employees of the County, and that any and all claims that may or might arise under the Minnesota Economic Security Law or the Workers' Compensation Act of the State of Minnesota on behalf of said employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of said employees while so engaged on any of the work or services provided to be rendered herein shall in no way be the obligation or responsibility of the County. Also, any and all employees of the County and all other persons engaged by the County in the performance of any work or services required or provided for herein to be performed by the County shall not be considered employees of the City, and that any and all claims that may or might arise under the Minnesota Economic Security L,aw or the Workers' Compensation Act of the State of Minnesota on behalf of said employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of said employees while so engaged on any of the work or services provided to be rendered herein shall in no way be the obligation or responsibility of the City. XXIII In order to coordinate the services of the County with the activities of the City so as to accomplish the purposes of this Agreement, the Ilennepin County Engineer or designated representative shall manage this Agreement on behalf of the County and serve as liaison between the County and the City. In order to coordinate the services of the City with the activities of the County and the City so as to accomplish the purposes of this Agreement, the City Engineer or designated representative shall manage this Agreement on behalf of the City and serve as liaison between the City and the County. -11- 26 Agreement No, PW 59-10-07 CSAH 136; C.P. 0524 XX] V The County Engineer or designated representative will prepare weekly progress reports for the Project as provided in the specifications. Copies of these reports will be furnished to the City upon request. XXv It is understood and agreed that the entire Agreement between the parties is contained herein and that this Agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof. All items referred to in this Agreement are incorporated or attached and are deemed to be part of this Agreement. Any alterations, variations, modifications, or waivers of provisions of this Agreement shall only be valid when they have been reduced to writing as an amendment to this Agreement signed by the parties hereto. XXv] The provisions of Minnesota Statutes 181.59 and of any applicable local ordinance relating to civil rights and discrimination and the Affirmative Action Policy statement of Hennepin County shall be considered a part of this Agreement as though fully set forth herein. (this space left intentionally blank) - 12- jA/ 1- Agreement No, PW 59-10-07 CSAI-I 136; C.P.0524 IN TESTIMONY WHEREOF, The parties hereto have caused this Agreement to be executed by their respective duly authorized officers as of the day and year first above written. CITY OF ST. ANTHONY (Seal) By:_ Mayor Date: And: Manager COUNTY OF HENNEPIN ATTEST: Bv: Deputy/Clerk of the County Board Date: APPROVED AS TO FORM: IN APPROVED AS TO EXECUTION: By: Assistant County Attorney By: Chair of its County Board Date: And: County Administrator 13- Assistant County Administrator, Public Works RECOMMENDED FOR APPROVAL By: Director, Transportation Department and County Engineer —W� 27 DIVISION OF COST SUMMARY HENNEPIN COUNTY PROJECT NO 0524 CSAH 136 (SILVER LAKE ROAD) FROM SAINT ANTHONY BOULEVARD TO 37TH AVENUE NE CONTRACT CONSTRUCTION ROADWAY STORM SEWER SANITARY SEWER AND WATERMAIN REPLACEMENT LANDSCAPING CONTRACT CONSTRUCTION SUBTOTAL ENGINEE=RING CONSTRUCTION(4) COUNTY SUPPLIED EQUIPMENT TRAFFIC SIGNAL EQUIPMENT(3) RIGHT OF WAY PERM. HIGHWAY, WALL, LIGHT, AND TEMP. EASEMENTS UTILITY RELOCATIONS XCEL ENERGY UNDERGROUNDING(1) PEDESTRIAN AND STREET LIGHT INSTALLATION PEDESTRIAN AND STREET LIGHTING(2) PROJECT COST TOTAL = mm 8,452,478 $ 5,323,733 $ 3,128,745 (1) BASED ON XCEL ENERGY ESTIMATE. WITH FUNDING AT THE 50% LEVEL $888,702/2 = $444,351, BUT FUNDING IS CAPPED AT $300,000 PER CENTERLINE MILE. PROJECT HAS 1.3 CENTERLINE MILES. COST AMOUNT SHOWN IS MAXIMUM ALLOWED PER POLICY BASED ON CENTERLINE MILES. (2) XCEL ENERGY OUTDOOR LIGHTING. XCEL ENERGY TO INSTALL VIA A SEPARATE CONTRACT BETWEEN CITY AND XCEL ENERGY. (3) 50% CITY/50% COUNTY. (4) COMPUTED AS 8 PERCENT OF THE SANITARY SEWER AND WATERMAIN REPLACEMENT CONTRACT CONSTRUCTION. (8% X $1,470,959 = $117,677) 0524 Div Cost CSAH 136.xls I Iennepin County Agreement No. PW 59-10-07 Exhibit "A"; Sheet 1 of 5 �� TOTAL ESTIMATED COST HENNEPIN COUNTY SAINT ANTHONY VILLAGE $ 4,504,714 $ 4,005,904 $ 498,811 $ 390,356 $ 390,356 $ - $ 1,470,959 $ 1,470,959 $ 15,070 $ 4,973 $ 10,097 $ 6,381,099 $ 4,401,233 $ 1,979,866 $ 117,677 $ 117,677 $ 45,000 $ 22,500 $ 22,500 $ 600,000 $ 30000 $ 300,000 $ 888,702 $ 390,000 $ 498,702 $ 420,000 $ 210,000 $ 210,000 8,452,478 $ 5,323,733 $ 3,128,745 (1) BASED ON XCEL ENERGY ESTIMATE. WITH FUNDING AT THE 50% LEVEL $888,702/2 = $444,351, BUT FUNDING IS CAPPED AT $300,000 PER CENTERLINE MILE. PROJECT HAS 1.3 CENTERLINE MILES. COST AMOUNT SHOWN IS MAXIMUM ALLOWED PER POLICY BASED ON CENTERLINE MILES. (2) XCEL ENERGY OUTDOOR LIGHTING. XCEL ENERGY TO INSTALL VIA A SEPARATE CONTRACT BETWEEN CITY AND XCEL ENERGY. (3) 50% CITY/50% COUNTY. (4) COMPUTED AS 8 PERCENT OF THE SANITARY SEWER AND WATERMAIN REPLACEMENT CONTRACT CONSTRUCTION. (8% X $1,470,959 = $117,677) 0524 Div Cost CSAH 136.xls I Iennepin County Agreement No. PW 59-10-07 Exhibit "A"; Sheet 1 of 5 �� COUNTY/CITY ACCOUNTS PAYABLE / RECEIVABLE SUMMARY Payable to City by Item County Contract Construction Roadway Storm Sewer Sanitary Sewer & Watermain Landscaping Construction Administration County Supplied Signal Equip. Right of Way Utility Undergrounding $390,000 Pedestrian & Street Lighting" $210,000 TOTALS $600,000 Payable to County by City $498,811 $0 $1,470,959 $10,097 $117,677 $22,500 $300,000 $2,420,044 29 Hennepin County Agreement No. PW 59-10-07 Exhibit "A"; Sheet 2 of 5 �/� gEF F M 30= Hennepin County Agreement No. PW 59-10-07 Exhibit "A; Sheet 3 of 5 �� L §s _ og ------------- :5 `05 _ _ _ o r." o� AA ? _ _ _ _ __ ____ _ _ _____ __ ____ _ _ az u _ U 8 8 8 R 88."888 8688g88A88888888RRg888 8eR 88 £ 888 Y.$8$ 83A _.8e RR8 8088 s F= -- -- - -- 6 3 'p 8 8 8888 888888.8 88888888888 A A88g$88888 888 88 S 8888888 888.97 888 8888 A9�w.�ARAaR� s 8 8 8888 8AA888�88A8R8888888Rg88888g8888 S88 8,., 8 8888888 R8A988 AR8 8.888 $R:. :. -GOX'YSgSF�.�S'_fr W R 8pSm8g-. r. s ttixtitw S'n S'r . ` j`°g 3.55 :s�.�s:i si : of 'g P 4l'%GCMi C `-399a<g<<� ° W3d i3 °. sF' FLoE"q�E�oo2oz83`$u�p�E33hh=' YSYY515� S'S'S Y SYS��¢> - ma U ¢p¢�p sS4 2 : 2 iiii °z sx8zR -- w- 3�y � 33p -- t$ ___ _ CN�x5�8 ' 565 'arc 0565 rcz4£rc2rc WFx zi.. 3¢rc sKz& R GAA ARF 488« 8 ASRRSxB $dRR x8388$888 dRRx88R CC5 R.;" R9n���R 848 8 98r "SfVR� 30= Hennepin County Agreement No. PW 59-10-07 Exhibit "A; Sheet 3 of 5 �� L og s �a =g wi i 8 8 5888 8868.&8 Sfl AA84888888A84888 8 88 r3 _ _ _ r _ _ _ xa_ _ C� a g R S48R 8 Ry g _ _ _ 86SAE$ 48 8 x _ in__ _ __ __ s t "o HRA888 eH�BH= ., Rx aw 4 e oz "aa cF= 8.88848 8 $ 8 888A4888 8RR8888'»RSS88 �.�x�� 8688S888RA84888885 $bR8888.8888 8 $8 8 9A888 4 8 8 BgSRRR8R888,8,gq888A8:i ��,pBSpRA pK 6.8 g`"pBA�Fg 848883 8 g8qFp8 p R? x 9}t4 e CCB°CC C tCCCCVtt =__ �VCttt =� :::x VVtC- Ct V I: CC �u� �Z>�uua � i w RARI;RR as o S x8p:: � _ws � rc Fct rc YU.003< `u o9�,F �iE3Zi#ii-�� � �5a o„N'Lw,w 7N00:'G«°et `33 w°c�YYYis3ip rco«8$$� 333 b bt� _n 'iifl 1' Kbbb bi- obuh F', bbb�"� fifiUU qo `��+ 6;p38T 4 « „5$GsPPG R RRRRRRRRRRR RG GyGi--S _ _ __ rcaiz33 _ -- 3K •?33333 - ?&S�a.hAtl'pd8 4 4?A A 31 Hennepin County Agreement No. PW 59-10-07 Exhibit "A”; Sheet 4 of 5 \/\) l 32' ^�u Hennepin County Agreement No. PW 59-10-07 Exhibit'W'; Sheet 5 of 5 a og a � �w �e _ s 8 rs :3 z' z' <3 z" r" -- - $ p Ua & -s, i oNTp .. a8S8 8 R R PgRB AA E x888 8d,q. 88$85888$$ g -- — -- - a % �aR8 8 § y§Ap8 8$$ M88p8 R85 $Sg38R88g4 .. a - a�88 8.8$88ap$$$$ 7 s Via- x "04 w ° 6 LLS _$- iaan rco°rcoY^ °o nz_ �a w w _�sw �"w n55'.' $�w¢ gag gnqbb4n44u �.a A.e ss¢ 0q�q"a waa =a'a Si,gd6�" g�g yy 32' ^�u Hennepin County Agreement No. PW 59-10-07 Exhibit'W'; Sheet 5 of 5 R' f DEPARTMENT OF PUBLIC WORKS TRANSPORTATION DIVISION RECOMMENDED URBAN LANDSCAPE/ STREETSCAPE GUIDELINES ansportation Division Engineer Revision No. 0 Date 04/03/95 APRIL, 1995 33 Hennepin County Agreement No, PW 59-10-07 Exhibit "B'; Sheet 1 of 8 \pj April 3, 1995 TABLE OF CONTENTS 34• Paqe INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . 1 RECOMMENDED GUIDELINE CRITERIA . . . . . . . . . 1 ° Boulevard . . . . . . . . . . . . . . . . . . . . . . . . . 1 • Crosswalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 ® Curb . . . Irrigation . . . . . . 2 Landscaping/Streetscaoina , , , , . Z ° Medians . . . Operational Clear Zone . . . . . . . . . . . . . . . . . . 3 ° Right of Way . . . . . . . . . . . . . . . . . . . . . . . . . . 3 ° Sidewalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Signals, Signing and Other Traffic Control Devices . . . . . . . . 4 • Snow Storage . . . . . . . . . . . . . . . . . . . . . . . . 4 • Street Lighting . . . . . . . . . . . . . . . . . . . . . . . . 4 Trees . . 5 Utilities . . , PERMITS . . . . . . 5 FIGURE I . . . . . Hennepin County Agreement No. PW 59-10-07 «' Exhibit "B"; Sheet 2 of 8 w April 3, 1995 HENNEPIN COUNTY DEPARTMENT OF PUBLIC WORKS TRANSPORTATION DIVISION RECOMMENDED URBAN LANDSCAPE/STREETSCAPE GUIDELINES APRIL, 1995 INTRODUCTION Hennepin County Department of Public Works' Transportation Division (Division) has as a delegated function and responsibility to maintain a system of roadways that provide transportation for residents of the County in a safe, efficient manner. Year around safety requires adequate sight distances and a minimum operational clear zone that can also accommodate snow storage. The Division has prepared this Recommended Urban Landscape/Streetscape Guidelines (Guidelines) to more consistently and thoroughly respond to questions about urban landscape/ streets cape design practices. All landscape/streetscape plans must be prepared and signed in accordance with the Board of Architecture, Engineering, Land Surveying, Landscape Architecture and Interior Design. The City Engineer shall also approve and sign the title or cover sheet for those landscape/streetscape plans. The City Engineer must also evaluate sight distances along the project and assure the Division,.in a report, that sight distances are adequate. The placement of obstacles or fixed objects, such as structures, trees, etc., within Hennepin County's right of way shall be cause for the Municipality to assume legal liability and additional maintenance responsibility through a Cooperative Agreement. RECOMMENDED GUIDELINE CRITERIA The following is an alphabetical listing of the Division's recommended guidelines for land scape/streetscape design. The criteria listed is not all inclusive or necessarily complete. Requests for more clarification should be addressed to the Division Engineer or his/her designee. Figure 1 at the end of this document contains a summarization of the recommended operational clear zone guidelines. ► Boulevard The Division prefers a low maintenance boulevard. Snow and ice control methods may prevent the survival of some desired vegetation. The . Municipality has the responsibility for mowing and the maintenance of facilities behind the curb. - i - 35 Hennepin County Agreement No. PW 59-10-07 Exhibit "B".; Sheet 3 of 8 W �- April 3, 1995 • Crosswalks Crosswalks shall conform to the Minnesota Manual on Uniform Traffic Control Devices (MMUTCD). The County's standard crosswalk is a block type pattern, painted white, on top of bituminous or concrete pavement. Municipalities have the responsi- bility to maintain pavement crosswalk markings, after the initial painting. Non-standard crosswalk surfaces (such as decorative brick, colored aggregate, etc.) shall require prior approval by the Division. Municipalities shall have the responsibility to install and maintain any crosswalk surface, as well as the abutting material, if the crosswalk surface is not consistent with the road surface. The municipality shall also indemnify the County for the use of a non-standard crosswalk surface. Curb Curb design must conform to Hennepin County's Standard Design and the State Aid manual. Curb and pedestrian ramps must comply with the Americans With Disabilities Act (ADA). • rrriaation Water from irrigation systems shall not flow or spray onto the traveled . roadway or onto any County owned structures such as traffic signal components and signage. Concrete gutters shall collect excess water from irrigation systems and not allow water to flow across roadways (gutter in). Effects of subgrade saturation shall be addressed when irrigation systems are proposed. Provisions, such as perforated pipe, shall be included for the pickup and disposal of irrigation water. The Division will not allow an open cut for installation or maintenance of irrigation piping within three years of construction, so consideration should be given to installing irrigation piping within a sleeve for roadway crossings. Maintenance and repair of the irrigation system is the responsibility of the owner. • Landscaping/Streets caping Roadway geometrics and driver sight distances shall be considered when installing landscape items. A report indicating adequate sight distances have been maintained is required for all access points along the project. The report should consider all elements obstructing a driver's vision such as trees, shrubs, plantings/planters, .structures, etc. Any loose landscaping material, such as bark, must have an adequate means of containment that will prevent the material from spilling onto the roadway or sidewalk. The Municipality shall be responsible for maintaining such material, if installed, and for removing the material from the roadway or sidewalk if the material spills onto those surfaces. Loose landscape rock is not permitted within Hennepin County's right of way because of problems caused during mowing, etc. -2- 36 1-lennepin County Agreement No. PW 59-10-07 Exhibit "B"; Sheet 4 of 8 W April 3, 1995 37 . The Municipality or owner has the responsibility to trim all plantings and to maintain visibility. Hennepin County's responsibility for landscape/streetscape restoration, after any County activity, shall be limited to top soil, sod or seed. Restoration of specialty landscape/streetscape items, sidewalks and plantings shall be the responsibility of others. The Division prefers traffic control signage to be located behind the sidewalk. Landscape/streetscape should not obstruct the view of signage. Landscape/streetscape should make allowances for placement or future expansion of utilities within the right of way. Traffic control during maintenance of landscaping shall comply with MMUTCD for traffic control. • Medians The Division can supply typical design standards for raised and depressed medians. Median drainage is a concern of the Division and should be discussed with the Division's Design Section. The Division's guideline does not allow planting trees within the median unless there is the minimum operational clear zone for the posted speed limit (see Operational Clear Zone). Plantings, including raised planting beds, in medians shall not be higher than 3 feet from the bottom of the curb gutter line, however, sight lines must still be checked. Plantings should be kept as far back from the face of curb as possible to minimize disturbance due to snow plowing (see also Irrigation). If the Municipality proceeds with placing plantings within Hennepin County right of way, then the Municipality has the responsibility to trim plantings to maintain sight lines. • Operational clear Zone To facilitate the safe operation and maintenance of a roadway facility, an operational clear zone is required. Encroachment into the operational clear zone causes safety and maintenance concerns. The Division standard provides an operational clear zone of 6 feet from the face of curb where posted speeds are 35 miles per hour (MPH) or less. For speeds greater than 35 MPH to 45 MPH, the Division standard provides a 10 foot operational clear zone. The required operational clear zone for speeds over 45 MPH shall be analyzed on an individual basis by the Division (see Figure 1). • Right of Wav Streetscape/landscape items within the County's right of for the public and owned by the Municipality. Hennepin allow private enhancements within the County's right of -3 way are reserved. County does not way. I Hennepin County Agreement No. PW 59-10-07 Exhibit "B"; Sheet 5 of 8 \Aj �_ April 3, 1995 • Sidewalks. The Division recommends a sidewalk with a minimum 5 foot width and prefers the sidewalk be placed 6 feet from the face of curb to accommodate snow storage. 9 Signals. Signing and Other Traffic Control Devices All traffic control devices must comply with MMUTCD. For urban cross sections, the Division recommends traffic signs be placed at least 6 feet from the face of curb to the edge of sign. Sign placement is preferred behind the sidewalk. The location of utilities should be considered with regard to future sign placement. In areas where there is no sidewalk, clearance to the signage should be at least 6 feet from the curb or edge of shoulder to allow for snow storage and/or future sidewalk(see Snow Storage). Lands cape/street scape should not obstruct the view of signage.. Traffic signals shall have the Division's other color scheme requires prior review require the Municipality to maintain the Division. Lead based paint shall not be current Mn/DOT specifications. i Snow Storage standard type and color. Any and approval by the Division and paint system at no cost to the used. Paint must comply with The Division requires minimum operational clear zones for snow storage along the -side of the road based on the posted speed limit. The requirement of an operational clear zone for snow storage,allows the Division .to.efficiently clear roads of snow and help maintain the road's traffic carrying capacity. Inadequate snow storage will reduce lane widths., adversely affect traffic handling capacity of the road and prevent trucks from using the partially blocked traffic lane. Roads that are not cleared of snow along the curb to the storm drain can also cause drainage problems when the snow melts. The Division may require that the Municipality obtain an easement if there is inadequate snow storage available within the right of way as a result of landscape/streetscape structure placement. In areas where landscape/streetscape structures cause inadequateroom to store snow off the road, the Municipality will be required to either move or haul away the snow (see Introduction for legal liability and maintenance requirements). C Street Lighting Street lighting must be functional and meet appropriate standards for illumination. Special consideration should b� given to eliminating glare and shadows. Questions on lighting should b. rererred to the Division's Design Section. -4- ME Hennepin County Agreement No, PW 59-10-07 Exhibit "B'; Sheet 6 of 8 VIi April 3, 1995 ® Trees Trees, in general, can obstruct the view of.signs and signals. Prior to the placement of any tree, sight lines should be evaluated that includes consideration for fully mature trees and their canopies. The Division standard does not sanction the planting of trees on County right of way within the operational clear zone (see Operational Clear Zone). Planting coniferous trees is discouraged within Hennepin. County's right of way. Tree grates in sidewalks or paved areas, unless properly installed and maintained, can be a hazard to pedestrians, people with disabilities, and snow removal operations, etc. The Municipality assumes all liability for the placement of any tree grates or other obstacles within the County's right of way. Irrigation, if deemed necessary, should be limited to a trickle type system (see Irrigation). The Division does not contribute to the replacement of any streetscape/landscape alteration as a result of any highway maintenance, modification or utility work.. • Utilities Underground utilities that do not extend above the surface may be placed within the County's operational clear zone. Above ground utilities, however, should be placed outside the County's operational clear zone. PERMITS The Division's Permit Office shall be informed of all construction or maintenance work within the County's road right of way. Traffic Control and time of work must be approved by the Division prior to beginning any work. (Example: Parking in a traffic lane during rush hour is not allowed.) -5- 39 �I-Iennepin County Agreement No, PW 59-10-0-7 Exhibit "B"; Sheet 7 of 8 w �— FIGURE 1 HENNEPIN COUNTY DEPARTMENT OF PUBLIC WORKS TRANSPORTATION DIVISION RECOMMENDED LANDSCAPE / STREETSCAPE GUIDELINES TYPICAL ROADWAY CROSS SECTION PLACEMENT OF TREES, TRAFFIC LANE MINIMUM_ UTILITIES,_FIXED OBJECTS. ETC. 2' GUTTER OPERATIONAL CLEAR ZONE „ AND SNOW STORAGE RECOMMENDED PLACEMENT OF SIGNS F-- BOULEVARD FACE OF CURB POSTED SPEED LIMIT MINIMUM OPERATIONAL CLEAR ZONE 35 M.P.H. OR LESS 6 FOOT (FROM THE FACE OF CURB) GREATER THAN 35 M.P.H. TO 45 M.P.H. 10 FOOT (FROM THE FACE OF CURB) GREATER THAN 45 M.P.H. ANALYZED ON AN INDIVIDUAL BASIS BY THE DIVISION. APRIL 1995 6 Hennepin County Agreement No. PW 59-10-07 Exhibit "B'; Sheet 8 of 8 \A,/ L CITY OF ST. ANTHONY RESOLUTION 08-015 A RESOLUTION AUTHORIZING THE CTTY OF ST. ANTHONY TO ENTER A CONSTRUCTION COOPERATIVE AGREEMENT WITH HENNEPIN COUNTY FOR THE RECONSTRUCTION OF SILVER LAKE ROAD WHEREAS, Hennepin County has prepared final plans and specifications for the reconstruction of Silver Lake Road between St. Anthony Boulevard and 37"' Avenue NE: WHEREAS, Hennepin County has prepared Agreement No. PW 59-10-07 for County Project No. 136, WHEREAS, This agreement estimates the total cost of the project to be $8,452,478, with the City of St. Anthony contributing $3,128,745, WH]REAS, These costs will be revised to reflect the actual bid and construction costs for Silver Lake Road. NOW, THEREFORE, BE 1T RESOLVED, by the City Council of the City of St. Anthony: Authorizes City staff to enter into Agreement No. 59-10-07 with Hennepin County for the reconstruction of Silver Lake Road between St. Anthony Boulevard and 37t" Avenue. 2. The City Council approves the final layout and design of Silver Lake Road as prepared by Hennepin County for construction in 2008. Adopted this 12"' day of February, 2008. ATTEST: City Clerk Reviewed for administration: Mayor City Manager k11626-18L1dnrirdResohrtioslRBS 08-015doe 41 A WJB & Associatet, Lm. February 6, 2008 Infrastructure n Engineering ■ Planning n Construction Honorable Mayor, City Council, and Staff City of St. Anthony Village 3301 Silver Lake Road NE St. Anthony, MN 55418 Re: Engineer's Update Dear Honorable Mayor, City Council and Staff: 42 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 541-4800 Fax: 763 541.1700 This letter is intended to provide you with an update on various engineering projects currently underway within the City of St. Anthony. Please find outlined below the current projects and the status of each: 2007 Street Reconstruction Project The 2007 Sheet Reconstruction Project reached substantial completion in the fall of 2007. The contractor will return this spring to complete any unfinished business and to address all punch list items, including bad sod, settlements in yards, and to place a second lift of asphalt on city streets. We can anticipate the second lift of asphalt to occur sometime after May 15. 2. Automated Water Meter Replacement Program This project is nearing completion. There are only a handful of meters left to be installed within the City of St. Anthony Village and the remainder of those are special locations requiring specialized meters. Since our last update, the City can now read more than 2,100 meters, and we anticipate the remainder of the meters to be read within the next month and a half. Any meters which are not read within the next month and a half will require either replacement of the transmitter or relocating the transmitter at the individual homes to improve its transmission. We will continue to track the progress of this program and report to the Council. 3. Silver Lake Road We anticipate the City and County to hold an open house in March or early April. 'Phis open house will discuss the design, schedule and access issues associated with reconstructing Silver Lake Road. 4. Water Reuse Project The water reuse project is currently in final design and we estimate construction to begin in May of 2008, concurrent with the Silver Lake Road project. FIWPWINILo,AWa(et*Ref'Oa!'CesIIdNGR Updale020508.doe Engineer's Update February 6, 2008 Page 2 If you have any questions, I will be available at your February 12 Council meeting, or feel free to call me at 763-287-7182. Sincerely, WSB & Associates, Ine. Todd E. Hubmer, PE FIWPWIMLori1Wa1er ResovtnesUYNGR Update 020508.doe Fj1 A WSB Infrastructure ■ Engineering n Planning n Construction December 28, 2007 The Honorable Mayor, City Council, and Staff City of St. Anthony Village 3301 Silver Lake Road NE St. Anthony, MN 55418 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 5414800 Fax: 763 541-1700 Re: Master Partnership Contract Between the City of St. Anthony and the Minnesota Department of Transportation Dear Honorable Mayor, City Council and Staff: Attached please find a Resolution for your consideration adopting a Master Partnership Contract between the City of St. Anthony and the Minnesota Department of Transportation. The existing contract between the City of St. Anthony and the Minnesota Department of Transportation will expire on December 31, 2007. The attached contract is anticipated to cover a 5 -year period and would allow the City of St. Anthony to request services under an agreement with Mn/DOT as services are needed. We recommend the City of St. Anthony adopt the following Resolution in anticipation that some of the services provided by Mn/DOT will be needed by the City within the next 5 years. If you have any questions, please feel free to call me at 763-287-7182. Sincerely, WSB & Associates, bee. Todd E. IIubmer, PE City Engineer Enclosure cc: Mike Morrison, City of St. Anthony Jay Hartman, City of St. Anthony lh K\1626-22\Admin\Resolutions\LTR-lino-122807.doc 001 45 MODOT Contract Number CPMS Contract No. STATE OF MINNESOTA AND CITY Or ST. ANTHONY MAS`i ER PARTNERSHIP CONTRACT This master contract is between the State of Minnesota, acting through its Commissioner of Transportation hereinafter referred to as the "State and the City of ST. ANTHONY acting through it's City Council, hereinafter referred to as the "Local Government". Recitals 1. Tile parties are authorized to enter into this agreement pursuant to Minnesota Statutes §§15.061, 471.59 and 174.02. 2. Minnesota Statutes Section 161.20, subdivision 2 authorizes the Commissioner of Transportation to make arrangements with mid cooperate with any governmental authority for the purposes of constructing, maintaining and improving the trunk highway system. 3. Each party to this Contract is a "road authority" as defined by Minnesota Statutes §160.02 (subd. 25). 4. Minnesota Statutes Section 161.39, subdivision L authorizes a road authority to perform work for another road authority. Such work may include providing technical and engineering advice, assistance and supervision, surveying, preparing plans for the construction or reconstruction of roadways, and performing roadway maintenance. 5. Minnesota Statues §174.02 (subd. 6) authorizes the Commissioner of Transportation to enter into agreements with other governmental entities for research and experimentation; for sharing facilities, equipment, staff, data, or other means of providing transportation -related services; or for other cooperative programs that promote efficiencies in providing governmental services, or that further development of innovation in transportation for the benefit of the citizens of Minnesota. 6. Each party wishes to occasionally procure services from the other patty, which the parties agree will enhance the efficiency of delivering governmental services at all levels. This Master Partnership Contract provides a framework for the efficient handling of such requests. This Master Partnership Contract contains terms generally governing the relationship between the parties hereto. When specific services are requested, the parties will (unless otherwise specified herein) enter into a "Work Order" contracts. 7. Subsequent to the execution of this Master Partnership Contract, the parties may (but are not required to) enter into "Work Order" contracts. These will Work Orders will specify the work to be done, timelines for completion, and compensation to be paid for the specific work. 8. The parties are entering into this Master Partnership Contract to establish terms that will govern all of the Work Orders subsequently issued under the authority of this Contract. Master Contract 1 Term of Master Contract 1.1 Effective Date: This contract will be effective on the date last signed by the Local Government, and all State officials as required under Minn. Stat. § 16C.05, subd. 2. A party must not accept work under this Contract until it is fully executed. 1.2 Expiration Date. This Contract will expire five years after its effective date. 10/312007 M CFMS Contract No. T -Number 1.3 Work Order Contracts. A work order contract must be negotiated and executed (by both the State and the Local Government) for each particular engagement. The work order contract will specify the detailed scope of work and deliverables for that engagement. A party must not begin work under a work order until such work order is fully executed. The terms of this Master Partnership Contract will apply to all work orders issued hereunder, unless specifically varied in the work order. The Local Government understand that this Master Contract is not a guarantee of any payments or work order assignments, and that payments will only be issued for work actually performed under fully -executed work orders. 1.4 Survival of Terms. The following clauses survive the expiration or cancellation of this master contract and all work order contracts: 11. Liability; 12. State Audits; 13. Government Data Practices and Intellectual Property; 16. Publicity and Endorsement; 17. Governing Law, Jurisdiction, and Venue; and 21. Data Disclosure. 1.5 Exhibits. A sample work order contracts is attached and incorporatedinto this contract as Exhibit A. 2 Scope of WorlJDeliverables 2.1 A party may request the other party to perform any of the following services tinder individual work order contracts. 2.11 Professional and Technical Services. A party may provide professional and technical services upon the request of the other party. As defined by Minnesota Statutes § 16C.08 (subd. 1) professional/technical services "means services that are intellectual in character, including consultation, analysis, evaluation, prediction, planning, programming, or recommendation; and result in the production of a report or complction of a task". Professional and technical services do not include providing supplies or materials except as incidental to performing such services. Professional and technical services include (by way of example and without limitation) engineering services, surveying, foundation recommendations and reports, environmental documentation, right-of-way assistance (such as performing appraisals or providing relocation assistance, but excluding the exercise of the power of eminent domain), geometric layouts, final construction plans, graphic presentations, public relations, and facilitating open houses. A party will normally provide such services with its own personnel, however, a party's professional/technical services may also include hiring and managing outside consultants to perform work. 2.1.2 Routine Roadway Maintenance A party may provide routine roadway maintenance upon the request of the other party. Routine roadway maintenance services may include, but are not limited to; lane or edge striping, pavement message painting, sign repair, guardrail repair, carcass removal, or equipment repair. Routine maintenance does not include roadway reconstruction. All services must be performed by an employee with sufficient skills, training, expertise or certification to perform such work, and work must be supervised by a qualified employee of the party performing the work. 2.1.3 Construction Administration. A party may administer roadway construction projects upon the request. of the other party. Roadway construction includes (by way of example and without limitation) the construction, reconstruction, or rehabilitation of mainline, shoulder, median, pedestrian or bicycle pathway, lighting and signal systems, pavement mill and overlays, seal coating, guardrail installation, and channelization. These services may be performed by the providing party's own forces, or the providing party may administer outside contracts for such work. Construction administration may include letting and awarding construction contracts for such work (including state projects" to be completed in conjunction with local projects). All contract administration services must be performed by an employee with sufficient skills, training, expertise or certification to perform such work. 2.2 When a need is identified, the State and the Local Government will discuss the proposed work and the resources needed to perform the work. If a party desires to perform such work, the parties will negotiate the specific and detailed work tasks and cost. The State will then prepare a work order contract. Generally, a work order contract will be limited to one specific project/engagement, although "on call" work orders may be prepared for certain. tat3n007 MufDOT Contract Number____ CFMS Contract No. types of services, especially for "routine roadway maintenance" items as identified section 2.1.2. The work order will also identify specific deliverables required, and timeframes for completing work. A work order must be fully executed by tite parties prior to work being commenced. The Local Government will not be paid for work performed prior to authorization by the State. 3 Responsibilities of the Providing Party The party requesting the work will be referred to as the "Requesting Party" and the party performing the work will be referred to as the "Providing Party". Each work order will set forth particular requirements for that project/engagement. 3.1 Terms Applicable to ALL Work Orders. The terms in this section 3.1 will apply to ALL work orders. 3.1.1 . Each work order will identify an Authorized Representative for each party. Each party's authorized representative is responsible for administering the work order, and has the authority to make any decisions regarding the work, and to give and receive any notices required or permitted under this Master Contract or the work. order. 3.1.2 The Providing Party will furnish and assign a publicly employed licensed engineer (Project Engineer), to be in responsible charge of the project(s) and to supervise and direct the work to be performed under each work order. For services not requiring an engineer, the Providing Party will furnish and assign anotherrespmrsible employee to be in charge of the project. The services of the Providing Party under a work order may not be otherwise assigned, sublet, or transferred unless approved in writing by the Requesting Party's authorized representative. This written consent will in no way relieve the Providing Party from its primary responsibility for the work. 3.1.3 If the Local Government is the Providing Party, the Project Engineer may request in writing specific engineering and/or technical services from the State, pursuant to Minnesota Statutes Section 161.39. Such set -vices may be covered by other technical service agreements. If the State furnishes the services requested, the Local Government will promptly pay the State to reimburse the state trunk highway fund for the fall cost and expense of furnishing such services. The costs and expenses will include the current State labor additives and overhead rates, subject to adjustment based on actual direct costs that have been verified by audit. 3.1.4 Only the receipt of a fully executed work order contract authorizes the Providing Party to begin work on a project. Any and all effort, expenses, or actions taken by the Providing Party before the work order contract is fully executed is considered unauthorized and undertaken at the risk of non-payment. 3. 1.5 In connection with the performance of this contract and any work orders issued hereunder, the Providing Agency will comply with all applicable Federal and State laws and regulations. When the Providing Party is authorized or permitted to award contracts in connection with any work order, the Providing Party will require and cause its contractors and subcontractors to comply with all Federal and State laws and regulations. 3.2 Additional Terms for Routine Roadway Maintenance. The terms of section 3.1 and this section 3.2 will apply to all work orders for routine roadway maintenance. 3.2.1 Unless otherwise provided for by agreement or work order, the Providing Party must obtain all permits and sanctions that may be required for the proper and lawful performance of the work. 10/3/2007 47 CP'MS Contract No. T -Number 3.2.2 The Providing Party must perform maintenance in accordance with MnDOT maintenance manuals, policies and operations. 3.2.3 The Providing Party must use State -approved materials, including (byway of example and without limitation), sign posts, sign sheeting, and de-icing and anti -icing chemicals. 3.3 Additional Terms for• Constraction Adnunistration. The terms of section 3.1 and this section 3.3 will apply to all work orders for construction administration. 3.3.1 Contract(s) must be awarded to the lowest responsible bidder in accordance with state law. 3.3.2 Contractor(s) must be required to post payment and performance bonds in an amount equal to the contract amount. The Providing Party will take all necessary action to make claims against such bonds in the event of any default by the contractor. 3.3.3 Contractor(s) must be required to perform work in accordance with the latest edition of the Minnesota Department of Transportation Standard Specifications for Construction. 3.3.4 For work performed on State right-of-way, contractor(s) must be required to indemnify and hold the State harmless against any loss incurred with respect to the performance of the contracted work, and must be required to provide evidence of insurance coverage commensurate with project risk. 3.3.5 Contractor(s) must pay prevailing wages pursuant to state law. 3.3.6 Contractor(s) must comply with all applicable Pederal,.and State laws, ordinances and regulations, including but not limited to applicable human rights/anti-discrimination laws and laws concerning the participation of Disadvantaged Business Enterprises in federally -assisted contracts. 3.3.7 The Providing Party may approve minor changes to the Requesting Party's portion of the project work if such changes do not increase the Requesting Party's cost obligation under the applicable work order. 3.3.8 The Providing Party will not approve any contractor claims for additional compensation without the Requesting Party's written approval; and the execution of a proper amendment to the applicable work order when necessary. The Local Government will tender the processing and defense of any such claims to the State upon the State's request. 3.3.9 The Local Government must.coordinate all trunk highway work affecting any utilities with the State's Utilities Office. 3.3.10 The Providing Party must coordinate all necessary detours with the Requesting Party. 4. Responsibilities of the Requesting Party 4.1 After authorizing the Providing Party to begin work, the Requesting Party will furnish any data or material in its possession relating to the project that may be of use to the Providing Party in performing the work. 4.2 All such data furnished to the Providing Party will remain the property of the Requesting Party and will be promptly returned upon the Requesting Party's request or upon the expiration or termination of this contract (subject to data retention requirements of the Minnesota Government Data Practices Act and other applicable law). 10/3/2007 Mn/DOT Contract Plumber _ C17MS Contract No. 4.3 The Providing Party will analyze all such data furnished by the Requesting Party. If the Providing Party finds any such data to be incorrect or incomplete, the Providing Party will bring the facts to the attention of the Requesting Party before proceeding with the part of the project affected. The Providing Party will investigate the matter, and if it finds that such data is incorrect or incomplete, it will promptly determine a method for furnishing corrected data. Delay in furnishing data will not be considered justification for an adjustment in compensation. 4.4 The.State will provide to the Local Government copies of any Trunk Highway fund clauses to be included in the bid solicitation and will provide any required Trunk Highway fund provisions to be included in the Proposal for Highway Construction, that are different froth those required for State Aid construction. 4.5 The Requesting Party will perform final reviews and/or inspections of its portion of the project work. If the work is found to have been completed in accordance with the work order contract, the Requesting Party will promptly release any remaining funds due the Providing Party for the Project(s). 4.6 The work order contracts may include additional responsibilities to be completed by the Requesting Party. 5 Time In the performance of project work under a work order contract, time is of the essence. 6 Consideration and Payment , 6.1 Consideration, The Requesting Party will pay the Providing Party as specified in the work order. 6.2 State's Maximrnn Obligation. The total compensation to be paid by the State to the Local Govemntent under . allwork order contracts issued pursuant to this Master Contract will not exceed $1 million. 6.3 Travel Expenses. It is anticipated that all travel expenses will be included in the base cost of the Providing Party's services, and unless otherwise specifically set forth in all applicable work order, the Providing Party will not be separately reimbursed for travel and subsistence expenses incurred by the Providing Party in performing any work order contract. hu those cases where the State agrees to reimburse travel expenses, such expenses will be reimbursed in the same manner and in no greater amount than provided in tine current "Mn/DOT Travel Regulations" a copy of which is on file with and available from the MuIDOT District Office. The Local Government will not be reimbursed for travel and subsistence expenses incurred outside of Minnesota unless it has received the State's prior written approval for such travel. 6.4 Payment. 6.4.1 Generally. The Requesting Party will pay the Providing Party as specified in the applicable work order, and will make prompt payment in accordance with Minnesota law. 6.4.2 Payment by the Local Government. The Local Government will make payment to the order of the Commissioner of Transportation. IMPOR'T'ANT NOTE: PAYMENT MUST REFERENCE THE "MN/DOT CONTRACT NUMBER" SHOWN ON THE FACE PAGE OF TRIS CONTRACT. Remit payment to the address below: Mn/DOT Attn: Cash Accounting RE: Mn/DOT Contract Number (see note above) Mail Stop 215 395 John Ireland Blvd St. Paul, MN 55155 10/3/2007 ME ME CPMS Contract No, T -Number 6.4.3 Payment by the State. 6.4.3.1 Generally. The State will promptly pay the Local Government after the Local Government presents an itemized invoice for the services actually performed and the State's Authorized Representative accepts the invoiced services. Invoices must be submitted as specified in the applicable work order, but no more frequently than monthly. 6.4.3,2 Relainage for Professional and Technical Services. For work orders for professional and technical services, as required by Minn. Stat. § 16C.08, subd. 5(b), no more than 90 percent of the amount due under any work order contract may be paid until the final product of the work order contract has been reviewed by the State's authorized representative. The balance due will be paid when the State's authorized representative determines that the Local Government has satisfactorily fulfilled all the terms of the work order contract. 7 Conditions of payment All work performed by the Providing Party under a work order contract must be performed to. the Requesting Party's satisfaction, as determined at the sole and reasonable discretion of the Requesting Party's Authorized Representative and in accordance with all applicable federal and state laws, rules, and regulations. The Providing Party will not receive payment for work found by the State to be unsatisfactory or performed in violation of federal or state law. Local Government's Authorized Representative and Project Manager; Authority to Execute Work Order Contracts 8.1 The Local Government's Authorized Representative for administering this master contract is the Local Government's Engineer, and the Engineer has the responsibility to monitor the Local Government's performance. The Local Government's Authorized Representative is also authorized to execute work order contracts on behalf of the Local Government without approval of each proposed work order contract by its governing body. 8.2 The Local Government's Project Manager will be identified in each work order contract. 9 State's Authorized Representative and Project Manager 9.1 The State's Authorized Representative for this master contract is the District State Aid Engineer, who has the responsibility to monitor the State's performance. 9,2 The State's Project Manager will be identified in each work order contract. 10 Assignment, Amendments, Waiver, and Contract Complete 10.1 Assignment Neither patty may assign or transfer any rights or obligations under this Master Contract or any work order contract without the prior consent of the other and a fully executed Assignment Agreement, executed and approved by the same parties who executed and approved this Master Contract, or their successors in office. 10.2 Amendinertts. Any amendment to this master contract or any work order contract trust be in writing and will not be effective until it has been executed and approved by the same parties who executed and approved the original contract, or their successors in office. 10.3 Waiver. If a party fails to enforce any provision of this master contract or any work order contract, that failure does not waive the provision or the party's right to subsequently enforce it. 10/32007 51 Mn/DOT Contract Number CPMS Contract No. 10.4 Contract Complete, This master contract and any work order contract contain all negotiations and agreements between the State and the Local Government. No other understanding regarding this master contract or any work order contract issued hereunder, whether written or oral, may be used to bind either party. 11 Liability Each party will be responsible for its own acts and omissions to the extent provided by law. The Local Government's liability is governed by Minnesota Statutes chapter 466 and other applicable law. The State's liability is governed by Minnesota Statutes section 3.736 and other applicable law. This clause will not be construed to bar any legal remedies aparty may have for the other patty's failure to fulfill its obligationsunder this master contract or any work order contract. Neither party agrees to assume any environmental liability on behalf of the other party. A Providing Patty under any work order is acting only as a "Contractor" to the Requesting Party, as the term "Contractor" is defined in Minnesota Statutes § l 1513.03 (subd. 10), and is entitled to the protections afforded to a "Contractor" by the Minnesota Environmental Response and Liability Act. 12 State Audits Under Minn. Stat. § 16C.05, subd. 5, the party's books, records, documents, and accounting procedures and practices relevant to any work order contract are subject to examination by the patties and by the State Auditor or Legislative Auditor, as appropriate, for a minimum of six years from the end of this Master Contract. 13 Government Data Practices and Intellectual Property 13.1. Government Data Practices. The Local Government and State must comply with the Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, as it applies to all data provided by the State under this Master Contract and any work order contact, and as it applies to all data created, collected, received, stored, used, maintained, or, disseminated by the Local Government under this Master Contract and any work order contract. 'file civil remedies of Minn. Stat. § 13.08 apply to the release of the data referred to in this clause by either the Local Government or the State. 13.2. lnteltectual Property /tights 13.2.1 latellectual Property Rights. The Requesting Patty will own all rights, title, and interest in all of the intellectual property rights, including copyrights,.patents, trade secrets, trademarks, and service marks in the Works and Documents created and paid for under work order contracts. Works means all inventions, improvements, discoveries (whether or not patentable), databases, computer programs, reports, notes, studies, photographs, negatives, designs, drawings, specifications, materials, tapes, and disks conceived, reduced to practice, created or originated by the Providing Party, its employees, agents, and subcontractors, either individually orjointly with others in the performance of this master contract or any work order contract. Works includes "Documents." Documents are the originals of any databases, computer programs, reports, notes, studies, photographs, negatives, designs, drawings, specifications, materials, tapes, disks, or other materials, whether in tangible or electronic forms, prepared by the Providing Party; its employees, agents, or contractors, in the performance of a work order contract. The Documents will be the exclusive Property of the Requesting Party and all such Documents must be immediately returned to the Requesting Party by the Providing Party upon completion or cancellation of the work order contract. To the extent possible, those Works eligible for copyright protection under the United States Copyright Act wilt be deemed to be "works made for hire." The Providing Party Government assigns all right, title, and interest it may have in the Works and the Documents to the Requesting Party. The Providing Party must, at the request of the Requesting Patty, execute all papers and perform all other acts necessuy to transfer or record the Requesting Party's ownership interest in the Works and Documents. Notwithstanding the foregoing, the Requesting Patty grants 10/3/2007 CFMS Contract No. T -Number the Providing Patty an irrevocable and royalty -free license to use such intellectual for its own non- commercial purposes, including dissemination to political subdivisions of the state of Minnesota and to transportation -related agencies such as the American Association of State Highway and Transportation Officials, 13.2.2 Obligations with Respect to Intellectual Property. 13.2.2.1 Notification. Whenever any invention, improvement, or discovery (whether or not patentable) is made or conceived for the first time or actually or constructively reduced to practice by the Providing Party, including its employees and subcontractors, in the performance of the work order contract, the Providing Party will immediately give the Requesting Party's Authorized Representative written notice thereof, and must promptly furnish the Authorized Representative with complete information and/or disclosure thereon. 13.2.2.2 Representation. The Providing Party must perform all acts, and take all steps necessary to ensure that all intellectual property rights in the Works and Documents are the sole property of the Requesting Party, and that neither Providing Party nor its employees, agents or contractors retain any interest in and to the Works and Documents. 14 Affirmative Action The State intends to carry out its responsibility for requiring affirmative action by its Contractors, pursuant to Minnesota Statutes §363A.36. Pursuant to that Statute, the Local Government is encouraged to prepare and implement an affirmative action plan for the employment'of minority persons, women, and the qualified disabled, and submit such plan to the Commissioner of the Minnesota Department of Human Rights_ In addition, when the Local Government lets a contract for the performance of work under a work order issued pursuant to this Master Contract, it must include the following in the bid or proposal solicitation and any contracts awarded as a result thereof: 14.1 Covered Conti -acts and Contractors. If the Contract exceeds $100,000 and the Contractor employed more than 40 full-time employees on a single working day during the previous 12 months in Minnesota or in the state where it has its principle place of business; then the Contractor must comply with the requirements of Minn. Stat. § 363A.36 and Minn. R. Parts 5000.3400-5000.3600. A Contractor covered by Minn. Stat. § 363A.36 because it employed more than 40 full-time employees in another state and does not have a certificate of compliance, must certify that it is in compliance with federal affirmative action requirements. 14.2 Minn. Stat. § 363.073. Minn. Stat. §.363A.36 requires the Contractor to have an affirmative action plan for the employment of minority persons, women, and qualified disabled individuals approved by the Minnesota Commissioner of Flumau Rights ("Commissioner") as indicated by a certificate of compliance. Time law addresses suspension or revocation of a certificate of compliance and contract consequences in that event. A contract awarded without a certificate of compliance may be voided. 14.3 Minn. K. Parts 5000.3400-5000.3600. 14.3.1 General. Minn. R. Parts 5000.3400-5000.3600 implement Minn. Stat. § 363A.36. These rules include, but are not limited to, criteria for contents, approval, and implementation of affirmative action plans; procedures for issuing certificates of compliance and criteria for' determining a contractor's compliance status; procedures for addressing deficiencies, sanctions, and notice and hearing; annual compliance reports; procedures for compliance review; and contract consequences for non-compliance. The specific criteria for approval or rejection of an affirmative action plan are contained in various provisions of Minn. R. Parts 5000.3400-5000.3600 including, but not limited to, parts 5000.3420-5000.3500 and 5000.3552-5000.3559. 14.3.1.2 Disabled Workers. The Contractor must comply with the following affirmative action requirements for disabled workers: (1) Tile Contractor must not discriminate against any employee or applicant for employment because of physical or mental disability in regard to any position for which the employee or applicant for 10/3/2007 52 CFMS Contract No. 1' -Number employment is qualified. The Contractor agrees, to take affirmative action to employ, advance in employment, and otherwise treat qualified disabled persons without discrimination based upon their physical or mental disability in all employment practices such as the following: employment, upgrading, demotion or transfer, recruitment, advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. (2) The Contractor agrees to comply with the rules and relevant orders of the Minnesota Department of Human Rights issued pursuant to the Minnesota Human Rights Act. (3) In the event of the Contractor's noncompliance with.the requirements of this clausei actions for noncompliance may be taken in accordance with Minnesota Statutes Section 363A.36, and the rules and relevant orders of the Minnesota Department of Human Rights issued pursuant to the Minnesota Human Rights Act. (4) The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices in a form to be prescribed by the conunissioner of the Minnesota Department of Human Rights. Such notices must state the Contractor's obligation under the law to take affirmative action to employ and advance in employment qualified disabled employees and applicants for employment, and the rights of applicants and employees. (5) The Contractor must notify cacti labor union or representative of workers with which it has a collective bargaining agreement or other contract understanding, that the Contractor is bound by the terms of Minnesota Statutes Section 363A.36, of the Minnesota Human Rights Act and is committed to take affirmative action to employ and advance in employment physically and mentally disabled persons. 14.3.2 Consequences. The consequences for the Contractor's failure to implement its affirmative action plan or make a.good faith effort to do so include, but are not limited to, suspension or revocation of a certificate of compliance by the Commissioner, refusal by the Commissioner to approve subsequent plans, and termination of all or pati of this contract by the Commissioner or the State. 14.3.3 Certification. The Contractor hereby certifies that it is in compliance with the requirements of Minn. Stat. § 363.073 and Minn. R. Parts 5000.3400-5000.3600 and is aware of the consequences for nonc6mpliance. 15 'Workers' Compensation Each party will be responsible for its own employees for any workers compensation claims. This Master Contract, and any work orders issued hereunder, are not intended to constitute an interchange of government employees under Minnesota Statutes § 15.53. To the extent that this Master Contract, or any work order issued hereunder, is determined to be subject to Minnesota Statutes § 15.53, such statute will control to the extent of any conflict between the Contract and the statute. 16 Publicity 16.1 Publicity. Any publicity regarding the subject matter of a work order contract where the State is the Requesting Party must identify the State as the sponsoring" agency and must not be released without prior written approval from the State's Authorized Representative. For purposes of this provision, publicity includes notices, informational pamphlets, press releases, research, reports, signs, and similar public notices prepared by or for the Local Government individually or jointly with others, or any subcontractors, with respect to the program, publications, or services provided resulting from a work order contract. 162 Data Practices Act. Section 16.1 is not intended to override the Local Government's responsibilities under the Minnesota Government Data Practices Act. 1013/2007 53 54 CFMS Contract No. T -Number 17 Governing Law, Jurisdiction, mid Venne Minnesota law, without regard to its choice -of -law provisions, governs this master contract and all work order contracts. Venue for all legal proceedings out of this master contract or any work order contracts, or the breach of any such contracts, must be in the appropriate state or federal court with competent jurisdiction in Ramsey County, Minnesota. 18 Prompt Payment; Payment to Subcontractors Tile parties must make prompt payment of their obligations in accordance with applicable law. As required by Minn. Stat. § 16A.1245, when the Local Government lets a contract for work pursuant to any work order, the Local Government must require its contractor to pay all subcontractors, less any retainage, within 10 calendar days of the prime contractor's receipt of payment from the Local Government for undisputed services provided by the subcontractor(s) and must pay interest at the rate of one and one-half percent per month orally part of a month to the subcontractor(s) on any undisputed amount not paid on time to the subcontractor(s). 19 Minn, Stat. § 181.59 The Local Government will comply with the provisions of Minn. Stat. § 181.59 which requires: Every contract for or on behalf of the state of Minnesota, or any county, city, town, township, school, school district, or any other district in the state, for materials, supplies, or construction sliall contain provisions by which the Contractor agrees: (1) That, in the hiring of common or skilled labor for the performance of any work under any contract, or any subcontract, no contractor, material supplier, or vendor, shall, by reason of race, creed, or color, discriminate against the person or persons who are citizens of the United States or resident aliens who are qualified and available to perform the work to which the employment relates; (2) That no contractor, material supplier, or vendor, shall, in any manner, discriminate against, or intimidate, or prevent the employment of any person or persons identified in clause (1) of this section, or on being hired, prevent, or conspire to prevent, the person or persons from the performance of work under any contract on account of, race, creed, or color; (3) That a violation of this section is a misdemeanor; and (4) That this contract may be canceled or terminated by the state, county, city, town, school board, or any other person authorized to grant the contracts for employment, and all money due, or to become due under tate contract, may be forfeited for a second or any subsequent violation of the terms or conditions of this contract. 20 Termination 20.1 Termination by the State for Convenience. The State or commissioner of Administration ay cancel this Master Contract and any work order contracts at any time, with or without cause, upon 30d I ays written notice to the Local Government. Upon termination, the Local Government and the State will be entitled to payment, determined on a pro rata basis, for services satisfactorily performed. 20.2 Termination by the Local Government for Convenience. The.Local Government may cancel this Master Contract and any work order contracts at any time, with or without cause, upon 30 days written notice to the State. Upon termination, the Local Government and the State will be entitled to payment, determined on a pro rata basis, for services satisfactorily performed. 20.3 Termination for Instcfficient funding. Tile State may immediately terminate this Master Contract.and any work order contract if it does not obtain funding from the Minnesota legislature or other funding source; or if funding.cannot be continued at a level sufficient to allow for the payment of the services covered here. Termination must be by written or fax notice to the Local Government. The State is not obligated to pay for any services that are provided after notice and effective date of termination. However, the Local Government will be entitled to payment, determined on a pro rata basis, for services satisfactorily performed 10/3/2001 - 10 CPMS Contract No. T -Number to the extent that funds are available. Tile State will not be assessed any penalty if the master contract or work order is terminated because of the decision of the Minnesota legislature or other finding source, not to appropriate funds. The State must provide the Local Government notice of the lack of funding within a reasonable time of the State's receiving that notice. 21 Data Disclosure Under Minn. Stat. § 270.66, and other applicable law, the Local Government consents to disclosure of its federal employer tax identification number, and/or Minnesota tax identificatioin number, already provided to the State, to federal and state tax agencies and state personnel involved in the payment of state obligations. These identification numbers may be used in the enforcement of federal and state tax laws which could result in action requiring the Local Government to file state tax returns and pay delinquent state tax liabilities, if any. 22 Defense of Claims and Lawsuits If any lawsuit or claim is filed by a third patty (including but not limited to the Local Government's contractors and subedutractors), arising out of trunk highway work performed pursuant to a valid work order issued under this Master Contract, the Local Government will, at the discretion of and upon the request of the State, tender the defense of such claims to the State or allow the State to participate in the defense of such claims . The Local Government will, however, be solely responsible for defending any lawsuit or claim, or any portion thereof, when the claim or cause of action asserted is based on its own acts of omissions in performing or supervising the work. The Local Government will not purport to represent the State in any litigation, settlement, or alternative dispute resolution process. 'file State will not be responsible for any judgment entered against the Local Government, and will not be bound by the terms of any settlement entered into by the Local Government except with the written approval of the Attorney General and the Commissioner of Transportation and pursuant to applicable law. 23 Additional Provisions 23.1 Foreign Outsourcing. If the Local Government lets a contract for professional/technical or other services pursuant to any work order, the Local Government will require proposing vendors/bidders to disclose where work will be performed, and will use the extent to which services will be. perforated in the United States as a factor in determining the "best value" in awarding any such contract. It is the State's policy that state fronds spent on contracts rettuain in the United States to the maximum extent possible. [the balance of this page has intentionally been left blank] 1013/2007 55 56 LOCAL GOVERNMENT The Local Government certifies that the appropriate person(s) haveexec tted the contract on behalf of the Local Government as required by applicable articles or bylaws. By: --A -- Title: I Vt �A1/� ✓ --+---------------- CIMS Contract No. T -Number COMMISSIONER OF TRANSPORTATION By: (will] delegated authority) ---- Date: COMMISSIONER OF ADMINISTRATION As delegatul to Materials Management Division By: Date: MnfDOT Contract Management As to from & execution 13y: _ 10!3/2007 12 Mn/DOT Agreement No. _Work Order 01 57 STATE OF MINNESOTA WORK ORDER UNDER MASTER PARTNERSHIP CONTRACT State Project ('SP): Project Identification: Services provided by State CFMS Contract No. ----.NA ❑Payable by State _® Receivable by State Trunk Highway (TI1)r This Work Order Contract is issued under the authority of State of Minnesota, Department of Transportation (Mn/DOT) Master Partnership Contract No. listed above between the state of Minnesota acting through its Commissioner of Transportation ("State") and City of St. Anthony, a political subdivision of the State of Minnesota ("Local Government") and is subject to all applicable provisions and covenants of that Agreement which are incorporated herein by reference. Work Order Contract Article 1 Term of Work Order,Contract; Incorporation of Exhibits: 1.1 Effective date: This Work Order Contract will be effective on the date that all, required signatures are obtained by State, pursuant to Minnesota Statutes Section 16C.05, subdivision 2. The Providing Agency must not begin work under this Contract until ALL required signatures have been obtained and the Providing Agency has been notified in writing to begin such work by the Requesting Agency's Authorized Representative. 1.2 Expiration date: This Work Order Contract will expire on November 30, 2012, or when all obligations have been satisfactorily fulfilled, which ever occurs first.. 1.3 Exhibits: Exhibits A through B are attached and incorporated into this Work Order Contract. Article 2 Nature of Work-, Remtestirre vld Providing Party' 2.1 The box(es) checked below indicate the nature of the work to be performed. See Section 2.1 of the Master Partnership Contract for applicable definitions. ® Routine Roadway Maintenance (See Exhibit B) ® Professional And Technical Services (See Exhibit B) ❑ Construction Administration 2.2 The boxes checked below show which party is the "Requesting Party" and which party is the "Providing Party". 2.2.1 The Requesting Party is ❑ State ® Local Government 2.2.2 The Providing Party is ®State ❑ Local Government Article 3 Scone of Work: 3.1 The Providing Party will perform services under this Work Order summarized generally as follows: (Rev 09/26/07) Mn/DOT Agreement No_` _Work Order_ tl 58 The State will provide transportation -related routine roadway maintenance and/or professional/technical services to the Local Government. Examples of services are shown on Exhibit B. Article 4 Deliverables by the Providing Party 4.1 Upon receipt of a written request form the Local Government, the State will evaluate the request and promptly inform the Local Government if the State will perforin the work, either as submitted or with modifications. if accepting the work, the State will identify a project manager for lite work to be performed. Any work assignment accepted by tire State pursuant to this contract is subject to all teens and conditions of this contract. 4.2 After the State accepts a work assignment, the State will promptly perform the work in a professional manner and in accordance with generally accepted government standards. If the Local Government deems that the work is not proceeding in a satisfactory manner, the Local Government will bring such concerns to the State's Project Manager in charge of the particular project. The Parties will endeavor to resolve any disputes concerning work under this contract in the "lost informal and cost-effective spanner reasonably available. Article 5 Itctns provided or completed by the Requesting Party 5.1 The Local Govermnent will submit a brief written request for any services to the State. The request may be in the form of a letter or memorandum and may be transmitted by fax or email- A request may be made via telephone, but will not be considered accepted unless acknowledged in writing by the State. The request must include sufficient detail on the scope of rte work to be performed to afford the State the opportunity to assess the resources necessary to accomplish the work and develop a cost estimate. Article 6 Consideration of Pavnleut• 6.1 Payment Baris..'rhe State may, at its option, charge the Local Government on either a lump -sum or aetual.cost basis for performance of the work. 6.2 Actual Cost Basis. Unless a lump sum or other payment arrangement is agreed upon, all work performed by the State will be billed on an actual cost basis_ For work performed upon an actual cost basis, the State will provide a report showing the actual cost of the services per by the State under this contract. 'rhe State's "Actual Cost" will consist of all of the following elements: (1) The actual cost of any materials provided by the State; and (2) Travel expenses reasonably and necessarily incurred by Elie State in the performance of the work. Such travel expenses will be subject to the limitations contained in the "Minnesota Department of Transportation Travel Regulations in effect at the time the work is performed; and (3) Labor costs incurred by the State in performance of the work. Such labor costs will consist of: (a) The actual hourly wage or salary of State personnel for time pent working on the project; and (b) Labor and overhead additive, at a rate to be determined annually by tite appropriate State FinanciallAccounting Officer. Labor additive will include fringe benefits, holiday and vacation pay, and applicable workers compensation and:payroll tax expenses. (4) Equipment costs ineurted.by the State in the performance of the work. Such cost will consist of (a) The hourly rental rate of the equipment; and (b) Fuel and other direct operational costs not included in the equipment rental rate. Articlel' Terrns of Payment• 7.1 The State will invoice the Local Government upon completion of.tile services, or at regular intervals trot more than once monthly as agreed upon by the parties. 712 The Local Government will promptly pay the invoice(s) submitted by the State. Payment must be remitted to the address below: Minnesota Department of Transportation Attn: Cash Accounting (Rev 09/26/07) _ 2 _ Mn/DOT Agreement No.' Work Order„ 01 59 RE: MnIDOT invoice number (include the MODOT invoice number) Mail stop 215 395 John Ireland Blvd St. Paul, MN 55155 IMPORTANT: THE REMITTANCE MUST INCLUDE THE "Mn/DOT INVOICE NUMBER." Article 8 T ocal Government's Project Manager: 8.1 The Local Government 's Project Manager for this Work Order is the Local Government's Engineer for technical matters. The Local Government's Project Manager for this Work Order is responsible for overseeing the Local Government's fulfillment of its obligations under this Work Order, reviewing and approving invoices, resolving disputes related to this Work Order; and for giving or receiving any notices required or permitted by this Work Order. Article 9 State's Project Manua 9.1 The State's Project Manager, for this Work Order is the District Engineer. The Suite's Project Manager is responsible for overseeing the State's fulfillment of its obligations under this Work Order, reviewing and approving invoices, resolving disputes related to this Work Order, and for giving or receiving any notices required or permitted by this Work Order. Article 10 Termination I0.1 TerntUratiali liy the State. The Local Government, the State or the Commissioner of Administration may cancel this Work Order at any time, with or without cause, upon 30 days' written notice to the other Party., Upon termination, the Providing Party will be entitled to payment, determined on a pro rata basis, for services satisfactorily performed. 10.2 Teraninatimt for Insufficient-Futuling. If the State is the Requesting Party, The State may immediately terminate this Work Order if it does not obtain funding from the Minnesota Legislature, or other funding source; or if funding cannot be continued at a level sufficient to allow for the payment of the.services covered here. Termination must be by written or fax notice to the Local Government. The State is not obligated to pay for any services that are provided after notice and effective date of termination. However, the Local Government will be entitled to payment, determined on a pro rata basis, for services satisfactorily performed to the extent that funds are available. Tile State will not be assessed any penalty if the Work Order is terminated because of the decision of the Minnesota Legislature, or other funding source, not to appropriate funds. The State must provide the Local Government notice of the lack of funding within a reasonable time of the State's receiving that notice. Article 11 Additional Provisions 11.1 Tine parties intend that the services provided under this contract will not be construed as an interchange of employees subject to Minnesota Statutes § 15.5 1, et .seq. If the provision of the services under this contract is deemed to be subject to Minnesota Statutes § 15151, et. seq., and any provision in this contract is determined to conflict with such statute, then the statute will control to the extent of any such conflict. (Rev 09126107) - 3 - Mn/DOT Agreement No. Work Order 01 _ 6 0 I,OCAL GOVERNMENT COMMISSIONER OF TRANSPORTATION The Local Government certifies that the appropriate person(s) have executed the contract on behalf of the Local Government as required by applicable articles, bylaws, resolutions, or. By: ordinances.' Title: District Engineer Date:._ Title:����_ ---- Date: COMMISSIONER OF ADMINISTRATION (Rev 09/16/01) _ - - Q - Mn/DOT Agreement No .._--_Work Order 01 61 EXHIBIT A —STANDARD TERMS STANDARD TERMS FOR ROUTINE ROADWAY MAINTENANCE 1. The Providing Party will perforin routine maintenance in accordance with the specifications and guidelines in the current "MuIDOT Maintenance Manual" 2. Unless otherwise provided in this Work Order, the Providing Party is not required to perform extraordinary maintenance or reconstruction. The Providing Party should notify the Requesting Party immediately if if becomes aware of any maintenance, not covered by this Work Order, that should be addressed immediately to prevent the risk of serious injury to the public. 3. The Providing Palsy will perform traffic control in accordance with Minnesota Manual on Uniform Traffic Control Devices, STANDARD TERMS FOR PROMSIONAL 'AND TECHNICAL SI&RVICES The Providing Party will prepare all documents in accordance with Minnesota law, applicable Federal laws and regulations, and geometric design standards for trunk highway plans as described in the current versions of MnIDOT Manuals, available through the Mn/DOT State Aid Division of on the MnIDOT website, www.dot.state.inn.us 2. The Providing Party will, as applicable in developing plans, include the standard specifications from the latest edition of Mit/DOT Standard Specifications for Construction, and, all amendments thereto. The Providing Party will furnish the personnel, services, supplies, and equipment necessary to properly perform, supervise, and document the work for the project(s). The services of the Providing Party to be performed hereunder may not be assigned, sublet, or transferred unless approved in writing by Mn/DOT. This written consent will in no way relieve the Local Government from its primary responsibility for performance of the work. (Rev 09/26/07) - 5 - Mn/DOT Agreement No.—_ Work Order 01 ( 2 Exhibit B - Available Services Following are examples of services available from Mn/DOT pursuant to this agreement. Other services may be available upon request. Note that this agreement cannot be used for the construction of joint facilities, nor does it replace the "Municipal Agreement" process for cooperative construction programs. Maintenance • Pavement striping Ilridge Construclia✓Mairnendnce services including: • Bridge load ratings • Bridge inspections • Hydraulic data system support/management Standards, Research and Governance services including: • Bridge standards and specifications development • Bridge research • Bridge construction, maintenance and hydraulic training Bridge Cousa uction and Maintenance services including: • Construction planning and programming • Construction support • Steel fabrication services • Maintenance assistance Bridge Design services including: • Preliminary bridge studies and plans • Final bridge designs and plans • Bridge construction estimating • Hydraulic structure recommendations • Consultant management Land Management • Appraisal services • Legal services • .Eminentdomain support • Legal descriptions • Geodetic surveying • Photogrametric mapping • Platting • Direet purchase Electronic Communications • Glectronic.and telecommunications system design, installation and maintenance services Materials • Pavement condition data • Materials testing • Box culvert inspection • Pre -stress beams for county and city bridges (Rev 09/26/07) - 6 - 63 From: Rick Kjonaas 1" ?i, q To: CEAM@listsstate.mn.us � �. r, �,,ry! Date: 10/2/2007 3:36:24 PM Subject: partnership agreements -revised ( n 5 2007 (please disregard earlier) �hVs�Cad A 58i4+�ri! I j City Engineers, Looking back on the past years, Mn/DOT and the local agencies have shared many partnerships for a variety of services, such as lab services, providing materials, and maintenance related activities. Some of these partnerships were formed, often without a formalized contract, by using a partnership agreement. Many of original partnership agreements were written to expire after 5 years, which ends in November. A new Master Partnership Agreement has been written to replace the old partnership and master agreements and will have a future life of 5 years. This Master Partnership Agreement will be supplemented with project specific work orders and are reciprocal, used for when you provide services or when Mn/DOT provides services. Every work type can be used with this process when state funds are used. The scope of services for each work order are developed in the districts with the project managers or District State Aid Engineers you have established relationships with and are simple to put in place. We strongly encourage every city to execute the Master Partnership Agreement even if you currently think you have no need for an agreement at this time. When an idea develops to share services between the two agencies, having the Master Partnership Agreement in place will save time because it is required before any work order can be approved. Work orders are simple to execute any time during the 5 -year life of the Master Partnership Agreement. For example, if you intend to use the Mn/DOT lab services for your projects, you will need to have the Master Partnership Agreement executed. Since this is one of the most common uses, we have prepared the first receivable work order (W01) for you to request and pay for.Mn/DOT services. The Master Partnership Agreement together with W01 will replace the expiring Partnership Agreements. Attached is a letter from Mn/DOT Division Directors outlining the program, the generic new Master Partnership Agreement and a sample resolution required for the signature approval. In addition to the Master Agreement, a generic work order (W01) intended for when you to pay for any Mn/DOT service and a generic work order to be use for all other work types negotiated between you and the district offices. The generic work order is designed to be used in both ways, Mn/DOT providing the services or the local agency providing the services. SALT will provide you agency specific master agreements, resolutions and work order one (W01) at the prescreening meetings for your convenience and ready for you to take to your councils for approval. This email is for your information. We hope that many of these documents will be adopted by the end of the year. Questions can be directed to me or brought to the prescreening meeting. Thanks in advance for helping to make this agreement process a success. Richard D. Kjohaas Deputy State Aid Engineer 651-366-3802 CC: DSAE ONLY; Prescott, Mary yw,q v %liairesot<i tlepnremcu.f of'C`rAll sportsrtinn r 1 a 395 John Ireland Blvd. St. Paul, MN 55155 September 28, 2007 To: City Engineers County Engineers Local Units of Government From: Julie Skallman; Division Direct State Aid for Local Transportation Richard Arnebeck, Director Engineering Services Division Robert Winter, Director.. Operations Division Subject: Mn/DOT Partnership Agreement We are pleased to announce the continuation of "Master" Partnership Agreements between Mn/DOT and counties, cities, and other political subdivisions. The first round of Master Partnership Agreements was signed in November 2002, and expires at the end of their maximum five-year term as provided by state law. Attached to this memo are agreement templates that will be used for anew five-year term. This agreement emphasizes our continuing efforts to partner with cities, counties, and other political subdivisions to deliver transportation -related services in the most efficient and effective manner possible. The agreement ensures services we provide you will continue to be available in the future. Minnesota Statutes § 174.02 authorizes Mn/DOT to enter into "partnership" agreements, and allows Mn/DOT districts and offices to receive reimbursement for the services they provide directly into their District accounts. Previously, you signed two different Master Partnership Agreements.. One agreement provided a mechanism for Mn/DOT to pay you, while the other agreement provided a mechanism for Mn/DOT to receive payment from you. This updated agreement combines both of those elements into a single document. Once signed, this next generation Master Partnership Agreement will replace those two prior agreements. Any work in progress under a. prior agreement will continue under that prior agreement until the work is finalized or the new agreement is executed. The first work order agreement is being customized to replace the old partnership agreements and should be executed along with the "new" Master Partnership Agreement. 65 Mn/DOT Partnership Agreement September 28, 2007 Page 2 In developing this new generation of Master Partnership Agreements, our intent is to have a simple process in place for standard fee for service agreements. With this in mind, the Master Partnership Agreement attached reflects the following changes: • This agreement can be used to both make and receive payments. e The confusing "Path" designations from dre prior Mn/DOT—payable agreement have been eliminated — the services have been given a descriptive title rather than a generic "path" letter. • The services are defined as "Professional and Technical Services", "Routine Maintenance", and "Contract Administration". • There is now a single work order template, replacing the three previous work order templates, which were specific to the "path" selected. • The legal "boilerplate" is mostly unchanged; it has just been adjusted to be reciprocal (i.e. to reflect that Mn/DOT may be either the payer or payee). • The "standard" requirements applicable to each type of service have mostly been moved from the master contract to the work order. The agreement writer may customize or supplement these requirements as necessary for the specific project. This will insure that the most vital technical information related to each project is contained in the work order. • The goal is to have maximum flexibility. For example, two different types of services can now be covered under a single work order. The new partnership agreement is intended to include all the services that may be provided by Mn/DOT or your organization without the need for many separate agreements. The Office Director and/or District Engineer, as well as the local governmental agency, will have the authority to use it at their discretion. Mn/DOT's Finance Division will be responsible for ensuring monies are documented and appropriate budgets reimbursed. This Master Contract will need to be approved by your local board/council (see attached sample resolution), and must be sinned by at least one local official with the authority to sign contracts. We do not require signatures to be notarized. Please return three copies of the signed agreement along with a copy of the County Board or City Council resolution to: Jan Ekem, 395 John Ireland Blvd. M.S. 700, St. Paul, Minnesota 55155. When the State has fully executed the agreement, you will receive one original for your files. When the agreement is fully executed and you want to request a service: 1. Contact the District State Aid Engineer. Iie/she will direct your request to a Mn/DOT project manager. 2. Identify a project manager from your jurisdiction. Include his/her name, phone, address, and email with your request. 3. Work with Mn/DOT's project manager to verify the service, rate, timeframe, and any other specifies necessary. Mn/DOT will generate a work order to document the agreed-upon work. 4. Schedule the work. 5.. Mn/.DOT will invoice your jurisdiction quarterly. M. M&DOT Partnership Agreement September 28, 2007 Page 3 6. Upon receipt of invoice, promptly remit payment to the address below. Include the Mn/DOT Contract Number found in the upper right comer of the agreement. Make check payable to Commissioner of Transportation and submit it to: Minnesota Department of Transportation, Attn: Cash Accounting, RE Mn/DOT Contract Number 395 John Ireland Blvd., MS 215, St. Paul, MN 55155 We look forward to continuing our partnership to deliver the best products and services in the most efficient manner for the citizens of Minnesota. Attachments Cc: Carol Molnau Lisa Freese Tim Henkel Scott Peterson Kevin Gray Mary Prescott Rick Kjonaas Jim Cownie District Engineers Office Directors 67 CITY OF ST. ANTHONY VILLAGE RESOLUTION 08-016 A RESOLUTION ADOPTING A MASTER PARTNERSHIP CONTRACT BETWEEN THE CITY OF ST. ANTHONY AND THE MINNESOTA DEPARTMENT OF TRANSPOWFATION WHEREAS, The Minnesota Department of Transportation (MN/DOT) wishes to cooperate closely with local units of government to coordinate the deliver of transportation services and maximize the efficient deliver of such services at all levels of government; and WHERAS, Mn/DOT and local governments are authorized by Minnesota Statutes sections 471.59, 174.02, and 161.20, to undertake collaborative efforts for the design, construction, maintenance, and operation of state and local roads; and WHEREAS, The parties wish to be able to respond quickly and efficiently to such opportunities for collaboration, and have determined that having the ability to write "work orders" against a master contractor would provide the greatest speed and flexibility in responding to identified needs. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of St. Anthony: That the City of St. Anthony enter into a Master Partnership Contract with the Minnesota Department of Transportation, a copy of which is before the City Council. 2. That the proper City officers are authorized to execute such contract, and any amendments thereto. 3. That the proper City officers are authorized to negotiate work order contracts pursuant to the Master Contract, which work order contracts may provide for payment to or from MN/DOT, and that the proper City officers may execute such work order contracts on behalf of the City without further approval by the City Council. IaC.OI??Ccil./eeklllgs�200810212200MRI,S08-016-ndo�nion fAMDOTAM,w Cmm.a 6, Adopted this ff" day of Februar , 2008. ATTEST': City Clerk Reviewed for administration: Mayor City Manager FUTURE COUNCIL AGENDA ITEMS Meeting Meeting as of Februa 6, 2008 Date Type Staff Items/Issues February 26 March 10 Special 5:30 p.m. JOINT MEETING WITH THE PARKS COMMISSION Department Head Annual Resorts March 11 Liquor Finance Public Works Ehlers Resolution Calling for Public Hearing on issuance of Bonds and on Street Reconstruction Plan for Silver Lake Road March 18 Special 5:30 p.m. JOINT MEETING WITH THE PLANNING COMMISSION Johnson Controls Worksession Key Financial Strategies Silver Lake Village Development Snow Plowing March 25 Planning Commission items from March 18 Department Head Annual Reports Fire Police Richard Fursman Presentation of 2008 Goals Asst. City Manager Sign Ordinance - 1st reading Fire Chief Housing Code Ordinance - 1st reading Fire Code Ordinance - 1st reading Public Hearing on Issuance of Bonds and on Street Reconstruction April 8 Ehlers Plan and adopts Resolution giving preliminary approval for their issuance and approving Street Reconstruction Plan by unanimous vote for Silver Lake Road. April 22 Planning Commission items from April 15 City Manager Finance Director Public Hearing on 2009 Budget Asst. City Manager Sign Ordinance - 2nd reading Fire Chief Housing Code Ordinance - 2nd reading Fire Code Ordinance - 2nd reading April 29 Special 5:15 p.m. Joint Meeting with School Board 6:30 p.m. Council worksession - Capital Equipment Budget May 13 Police Chief Graduate Citizen Academy Ehlers Resolution Approving Offers for Bonds and Adopts Resolution Approving the Sale of Bonds May 27 Planning Commission items from May 20 Tautges, Redpath Audit Presentation Asst. City Manager Sign Ordinance - 3rd reading Fire Chief Housing Code Ordinance - 3rd reading Fire Code Ordinance - 3rd reading February 2008 Monthly Planner rrintea oy uvenaar creator for vvinaows on ubrruua Mar 2008 1 2 Jan 2008 S M T W T F S S M TW T F S 1 2 3 4 5 1 6 7 8 9 10 11 12 2 3 4 5 6 7 8 13 14 15 16 17 18 19 9 10 11 12 13 14 15 20 21 22 23 24 25 26 16 17 18 19 20 21 22 27 28 29 30 31 23 24 25 26 27 28 29 34) 31 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Council Meeting 7 pm 17 18 19 20 21 22 23 HOLIDAY Joint Meeting with Planning Commission 5:30 Planning Commission meeting 7 pm 24 25 26 27 28 29 City Council Meeting 7 pm rrintea oy uvenaar creator for vvinaows on ubrruua March 2005 Monthly Planner ------------ Saturday Feb 2008 Apr 2008 1 S M T W T F S S M T W T F S 1 2 1 2 3 4 5 3 4 5 6 7 8 9 6 7 8 9 10 11 12 10 11 12 13 14 15 16 13 14 15 16 17 18 19 17 18 19 20 21 22 23 20 21 22 23 24 25 26 24 25 26 27 28 29 27 28 29 30 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Joint Meeting Council Meeting with Parks 7 pm Commission 16 17 18 19 20 21 22 Joint Meeting HOLIDAY with Planning Commission 5:30 Planning Commission meeting 7 pm 23 24 25 26 27 28 29 City Council Meeting 7 pm 30 31 rrinteo oy taienoar kreator Tor vvinoows on ubtauuu T N A W 0 O a z 0 T --1 0 EA A 0 r Cl) Efl H3 O 30 D(na A o m °i _ m Z D m D m O N O w= w n � m Ao.WP o M o 0 cn p A co M m 0 0 0 0 000 -o o 0 D 0 0 0 0 m m 0 m m m m N O Oo m a o' X o. m ° m o 0 .o `° 0 -Di -4 z m j S m m m �* m 0 z x w m m z a 0 a y X N N O (n N Cn W y 3 m m m m a m m V W CD O Adi A A�N O> A O N Ui N O N A co p J N DO O O m p O O O J 0 0 0 p p p p a o 0 o a o 0 0 0 0 0 0 T N A W 0 O a m O 0 O o w m m CD 00 o w CD 0 N a W N 0 0 V O 0 N N z 0 D Q ❑. N EA A 41 Efl H3 0) p A O W 0)� 0 J O N O J v .NP0 J Ao.WP O OA cn p A co M m 0 0 0 0 000 {' 000 0 000 0 0 0 0 m O 0 O o w m m CD 00 o w CD 0 N a W N 0 0 V O 0 N N z 0 D Q ❑. (D a E o v a A m W o N (D _. m L w G N N O c n m 3 m < m 53 (D (D O N j -{ O `Z a a n o N A N O N p (D U3 O coo O_ O E a V O N m o D � r r w (D m ET to (D in e» w m W W W N N N N > O W N li) W [fl _ M ° O N V W N W O1 O --4 J O A A (O N K) N N W O (P O W 0 O W � C) (O W W A O (P ' (O (D (D O O A W (P W M O n < O O 0 Ey M < m o m a rN D =, D (a N ° ((D N (D t0 O a a (D (D O (D N N (p O < (O N < N. (D O 3 N w < < m c v ^ G)`o o. N C 3 N = N N 2 (D w a co m a D ° m (D ° � w o � N N W<< v� O W m (° Ut 0) N �A A J �-. O m r W O co (O W O O J W O 01 d) 63 W co O W N w 0 O A W 0 Oi O) W 0 (Jt<D O) W J (P co o 2 O Z O m c � D 3 T m m o o m c c do v m m d 0 < m m d O W A V m j N V N INO N cOp O JC A W N O A O.0 Ut W N V O O O O 0 0 0 0 0 0 0 0 O O O O 0 0 0 0 0 0 0 0 W N N 4i N Vf j W (/3 N A V (P w Io mmrn NIT W V��^ 001 -J 0 + � IOT A O -N+ r OW J W m N N 0000 0 0 0 0 0 0 0 0 F 0 0 0000000000 � WWWWWW�� O W cp W A O (n N N J A N 01 D7 A W O W W N N O O mW <JW V V W V N A W J t0 � 47 W 0 0 0 0 0 0 0 0 0 0 0 0 O O O O 0 0 0 0 0 0 0 0 N � O � O � J � n= N T O C N p m z w DD � c o m o m c c_ c a d 0 w m m E 9 N O" A N (U N n m w N N to N N N W j NV3 EA Ui (A 4i N (/ W N OON N AW W O) V (P ONN W wAQ7 JI�3 0o A 01 N OD7 W AAOJn F O O O O 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 0 0 W A N m O o wwJ co ITowlornow W A O r O 0 O W W N J Ut O Q7 N A 00 0 0 0 0 0 0 0 0 0 0 N d O O O O 8000 O 0 0 0 0 0 0 0 0 � l0 OJ A W O7A W NN(TO W AN W A W N Ja JlJ .p <a (per JaO� A N N (0 O W N t0 O A t0 A O) V A w O� W (nOAIO (O ip O O 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O 0 0 0 0 0 0 0 0 A N d to lfl M bl tll 41 fA fA bl fFl N { V t0 N N O N W N N V ry � i0 m V la W !J W V IJ O+ N n A W A t0 tp N O] OI (p V N OJ � V N W tD OJ V fT ID W W {p � O O O O O O O O O O O O N O O O O O O O O O O O O N c C Q CL INVESTMENT PORTFOLIO: 12/31/07 dIM GENERAL Iniclos Dute DID-- Malu�as $5]],000 GC COMMERCIAL PAPER _ URI% 4026% 09 0321/06 $219.000 HE COMMERCIAL PAPER 4. 10/18/07 02/15106 $220.000 GE COMMERCIAL PAPER 4.542% 1121/07 04/15108 DAINRAUSCHER.--GENERAL FED HOME LOAN BANK MED TERM NOTE $200.000 FNMA MEDIUM TERM NOTE GNA4A POOL 23364 9.00% 09/0106 09/15,06 GNMA POOL 23356 900% 11/0120 11/15108 $100,000 STATE BANK INDIA -CHICAGO, IL CID 5.150% 09114/07 03114/00 MZHOO WASHINGTON MUTUAL BANK NEVADA CID S.IDO% 10117/07 01/17108 $100.000 BANK OF BARODAY NEW YORK CID 5.150% 10/12107 02112/08 $100,000 UNITED CENTRAL BANK GARLAND CID 5.OD0% 10/11107 0420/06 $25000 COLONIAL BANK MONTGOMERY AL C/O 4650% 1128,07 0520/00 $10400 COUNTRYWIDE BANK ALEXANDRIA VA CID 4750% 1128107 0526108 $100000 ETRADE BANK ARLINGTON VA CA 4.700% 1120107 05130108 $623000 GENERAL ELECTRIC COMM PAPER 4548% 12113/07 04111/00 $103000 GENERAL ELECTRIC COMM PAPER 4428% 1220107 03719/00 $100.000 FNMA MEDIUM TERM NOTE 6.00% 0726/02 072522 S10D OO FNMA MEDIUM TERM NOTE 500% 0324/04 0410120 S10DOOD FEDERAL HONE LOAN MORTGAGE 6.0091° 6.00% 1125/05 11/1520 $100.00 FNMA MEDIUM TERM NOTE 6.207% 11/18105 102]25 $100.000 FNMA MEDIUM TERM NOTE 6207% 11/18105 102725 40A ARMY, WATER. FILTRATION $ 100000 FEDERAL HOME LOAN MORTGAGE 500°G 0426/04 0423/14 S t0O0DO FEDERAL NATIONAL MORTGAGE AS50CIATIONISTERUP 4.00-7.00% 09/15/04 09115116 5100, 000 FEDERAL NATIONAL MORTGAGEASSOOIATIONISTEP-UP 5007,00% 09716/04 09/16/16 $200, 000 FEDERAL NATIONAL MORTGAGE CORP 500% 01/20105 10/10/13 5130000 FEDERAL HOME LOAN BANK 5.50% 01/31705 06112719 $ 100000 FEDERAL HOME LOAN BANK STEPUP 450200% 0228105 02117717 5100.000 FEDERAL HOME LOAN BANK - STEPUP 4.125�750'L 05/02,05 10/07716 $ 170,000 FEDERAL HOME LOAN BANK 550%. 1105/O8 112622 S 75000 COWLITZ BANK LONGVIEW � CID 5.20041 03115/07 03115/10 $ 930, 000 FED HOME LOAN MTG ZERO COUPON 6050°% 02111/05 0623/33 RAIN RAUSCHER.-HONEYWELL $100000 LASGLLEBANK-ZERO COUPON BOND 625% 02/19103 02/1923 $100000 STANDARD FEDERAL - ZERO COUPON BOND 625% 02/19/03 0271023 $100000 LASCLLE BANK ZERO COUPON BOND 6.10% 03130/05 0313025 $100,000 STANDARD FEDERAL -ZERO COUPON BOND 6.10% 0320/05 03130125 $ 95,000 CITIZENS NATIONAL BANK CID 5750% 0623/07 0720/11 526,000 REPUBLIC BANK LOUISVILLE KY CID 4.950% 12105/07 03/00/08 $15.000 FEOERAL HONE LOAN MORTGAGE 550% 03115/04 12115/15 SI00000 FEDERAL HOME LOAN MORTGAGE 500% 0423/04 07/09118 5100000 FEDERAL HOME LOAN MORTGAGE 504% 0423104 061,6/18 $100.000 FED NATIONAL MORTGAGE ASSOCIATION fi00% 0727704 02/1224 $100.000 FEDERAL HOME LOAN MORTGAGE 6.00% 11/05705 11108/30 S 950DD FEDERAL HOME LOAN MORTGAGE 625% 02107/06 1211521 $ 12,000 FEDERAL HOME LOAN MORTGAGE 6.25% 02107/06 1211521 510000 FED NATIONAL MORTGAGE ASSOCIATION 6.265% 03/07/06 0210626 $1000DO FED NATIONAL MORTGAGE ASSOCIATION 6.265% 03,07/06 0210626 550.000 FEDERAL HOME LOAN MORTGAGE 6.10% 022707 01/1522 RAIN RANCHER -(HRA) $200,000- FNMA 0334 P/O $10000- FHLMC MEDIUM TERM NOTE - STEP UP $1750DD- FNMACOUPON- 5.520% $200,000 FNMACOUPON- STEPUP $100,00-BANCOI$ANTANDER -STEP UP $90.000-FNMA-STEPUP 4.50%-550% 6,00% 0924/02 4600% 112VW 5.30% 02114107 5.50% 06114/07 5.50°% 0]/1010] 410% 1120/07 5976% 1022/02 6.00% 1125/02 500% 03/10/04 500% oanOm4 5.54% 03/19104 565% 11/17/04 5.65% 0120105 5.125 SIoMUP 04MI105 533% 06/14/05 4250-635% 0622705 4.250% 0826/05 4.75% 0829/05 525% 09/01/05 5.33'4 1100105 5225% 10,11/05 724% 04202) 4.00 050'% 03/18/04 5520% 03130104 4.00-8.00°% 03101/04 5.110% 08,17105 450-550% 10105107 09/15/18 0221/08 05/14,08 1VI4/12 1129/12 05/30100 102227 10222] 09/12/13 03/19/14 03/11/19 1028/19 1028119 03/3021 0225115 04/13/15 06/09/08 10/19/10 02/17/15 04/04/13 11/19/12 032523 04/12/19 04/12/19 02/10/12 02/1INI mro1n0 TOTALBOOKVALUE $563,659.20 $215.55440 $216,074,22 _995.......9 5995287900 $122.16 $1]544 S1oo.00O00 $4],000.00 $1000DOD0 $100.000.00 $25.00000 $100,00000 510000000 $613,82]15 $101.09380 $100000.00 5100.00000 S1oo.ODO o0 $100,000.00 $10000000 $1,788,018 35 $10000000 $100,00000 510000000 s20SAD0oo $130,00000 $100,000.00 $10000000 $17000000 $1]1,4]240 $1.246.473,40 $29.170 OD $29,1]000 $30041.97 $3004197 $95,00000 $26.00000 $15,000.00 $94.25000 $94.625.00 $100,000.00 $100.000 00 595000 00 $12000.00 $99.82241 $99,62241 $49.904.30 $999,926.14 $199.477,00 520].5850 $60,00000 5100,000 00 $50,000,00 $10400000 $20000000 $100,00000 520000000 $20,OODOO $50.00800 $100,00800 $1 OO.00D00 $100.000.00 $200,000,00 5100.125 00 S10D,000.00 $100,000,00 $100.00000 598.000.00 $199.90185 05 $2.665.09065 54,]7667 $100.00000 $175.000.00 $20DO0000 $100,060 oD $90.000.00 $669,]]60] $8,364.57551 TIme1/152008 MONTHLY INVESTMENT REPORT DEC 20ONNVESTI DEANWITTER $520.000 MERRILL LYNCH ZERO COUPON BOND $210,00 GE COMMERCIAL PAPER 560000 DISCOVER BANK GREENWOOD CID $100,000 MIOFIRST BANK OKLAHOMA CID $50,000 BANCO SANTANDER CID $100.000 NATIONAL BANK SOUTH CAROLINA $200,000 FED HOME LOAN BANK MED TERM NOTE $100.000 FED HOME LOAN BANK MED TERM NOTE $200.000 FNMA MEDIUM TERM NOTE $200,000 PUMP MEDIUM TERM NOTE $S40U0 FNMA ME01UM TERM NOTE $100.000 FED NATIONAL MORTGAGE ASSOCIATION $IDD 000 FED NATIONAL MORTGAGE ASSOCIATION $100,000 FED NATIONAL MORTGAGE ASSOCIATION $200.000 FED NATIONAL MORTGAGE ASSOCIATION $100,000 FED NATIONAL MORTGAGE ASSOCIATION $100,000 FED HOME LOAN BANK 5100,000 FED HOME LOAN BANK $100,000 FED HOME LOAN BANK $90.000 FED NATIONAL MORTGAGE ASSOCIATION $199.904 FED HOME LOAN BANK MED TERM NOTE RAIN RANCHER -(HRA) $200,000- FNMA 0334 P/O $10000- FHLMC MEDIUM TERM NOTE - STEP UP $1750DD- FNMACOUPON- 5.520% $200,000 FNMACOUPON- STEPUP $100,00-BANCOI$ANTANDER -STEP UP $90.000-FNMA-STEPUP 4.50%-550% 6,00% 0924/02 4600% 112VW 5.30% 02114107 5.50% 06114/07 5.50°% 0]/1010] 410% 1120/07 5976% 1022/02 6.00% 1125/02 500% 03/10/04 500% oanOm4 5.54% 03/19104 565% 11/17/04 5.65% 0120105 5.125 SIoMUP 04MI105 533% 06/14/05 4250-635% 0622705 4.250% 0826/05 4.75% 0829/05 525% 09/01/05 5.33'4 1100105 5225% 10,11/05 724% 04202) 4.00 050'% 03/18/04 5520% 03130104 4.00-8.00°% 03101/04 5.110% 08,17105 450-550% 10105107 09/15/18 0221/08 05/14,08 1VI4/12 1129/12 05/30100 102227 10222] 09/12/13 03/19/14 03/11/19 1028/19 1028119 03/3021 0225115 04/13/15 06/09/08 10/19/10 02/17/15 04/04/13 11/19/12 032523 04/12/19 04/12/19 02/10/12 02/1INI mro1n0 TOTALBOOKVALUE $563,659.20 $215.55440 $216,074,22 _995.......9 5995287900 $122.16 $1]544 S1oo.00O00 $4],000.00 $1000DOD0 $100.000.00 $25.00000 $100,00000 510000000 $613,82]15 $101.09380 $100000.00 5100.00000 S1oo.ODO o0 $100,000.00 $10000000 $1,788,018 35 $10000000 $100,00000 510000000 s20SAD0oo $130,00000 $100,000.00 $10000000 $17000000 $1]1,4]240 $1.246.473,40 $29.170 OD $29,1]000 $30041.97 $3004197 $95,00000 $26.00000 $15,000.00 $94.25000 $94.625.00 $100,000.00 $100.000 00 595000 00 $12000.00 $99.82241 $99,62241 $49.904.30 $999,926.14 $199.477,00 520].5850 $60,00000 5100,000 00 $50,000,00 $10400000 $20000000 $100,00000 520000000 $20,OODOO $50.00800 $100,00800 $1 OO.00D00 $100.000.00 $200,000,00 5100.125 00 S10D,000.00 $100,000,00 $100.00000 598.000.00 $199.90185 05 $2.665.09065 54,]7667 $100.00000 $175.000.00 $20DO0000 $100,060 oD $90.000.00 $669,]]60] $8,364.57551 TIme1/152008 MONTHLY INVESTMENT REPORT DEC 20ONNVESTI