My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_60Jul14
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
196x
>
1960
>
CCMin_60Jul14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 4:34:32 PM
Creation date
6/23/2009 8:08:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1173 <br />REGULAR ''LUTING JULY l~, 1960, <br />~,.4eeting was called to order at 7:20 P. id., the following Council '.~~?embers being <br />present: Harold C, Nilsen, P~7ayor; George Shavor, Trustee; Paul Copnini, Trustee; <br />'~?lillis ~"Jarkentien, Trustee and ~`~m. R. Utecht, Clerk. Also present were Frank N. <br />Graham, Village A+ā€˛torney; y"im. E. Olsen, Treasurer; Otto '3onestroo, Sngineer, and <br />Ethel E. y:hite, ?deputy Clerk and Deputy Treasurer. <br />`wilding Shavor moved that the Building Inspector be authorized to grant a <br />Permit building permit for the improvement at the Flameburger at 1533 <br />Flameburger Larpenteur Avenue in accordance with :ketch submit+,,ed subject to <br />his having satisfied himself that the construction is :goner and <br />in accordance ?^rith Village ordinances. Seconded by Coppini and <br />carried. <br />~~2inutes The 'ainutes of the Regular ='~eeting of June 9th were ann_ roved as <br />submitted. <br />The ';?mutes of the Special "~geeting of June 21st were approved as <br />submitted. _ <br />Street 3onestroo submit+.,ed the Estimate covering street work by Armor- <br />vrork Coat Finishing Company in the amount of ~lh,SJ~?~.86 and recommended <br />payment of same. i?e brought out the following points: The tonnage <br />?vent aver considerably. Arona eras rirped up and repaired. The <br />amount of improvement go+ten out of it compensated for the cost. <br />In our meeting vrith the County, ?ve were informed that 1' was taken <br />out of Arona, not 3', ':gut the material eras pit run. The point is <br />vre didn't s?et good base material. °~aterial was never tested. It <br />was approved b~~r the Village Engineer. The bituminous on the edge of <br />Simx~son was about 10'A thick. Pascal and Crawford were Hatched. <br />The vratcr is s+:anding a little bit on Simpson. I think we can correct <br />all these vrater pockets now, ti','e should be able to do the work vrith <br />our own men. we have hourly Writes in vrriting on a little front end <br />loader from .Armor Coat. The loader vrould come from Como Avenue. <br />Vde should consider some type of vvorlcing agreement ?ai+,h them. They <br />come whenever called. <br />tdilsen If we are ~°oing to be successful in street work, ,rre have to have <br />someone vrho has had time to get acquainted with the streets. <br />~onestroo Some of the aggregate has been shot over to the curb line, but a <br />lot is working in. ti`e have about a 3/8" driving surface. <br />1 <br />Shavor I think our streets are in T=~:~ry good shape now. I v~rant to compliment <br />you on them. <br />~3onestroo I think vre got an ~anecially good job. °'e got dol~.ar for do.lar. <br />The inspection time covers our man's time only. r''e ?^yanted full ±.ime <br />inspection, 'out don't feel vre can charge for any more than our man's <br />actual time. It ?s~ould be my recommen~?ation that we don't do anything <br />about the alleys this ,year. <br />Utecht 4ihy don't we forged the alleys this year, and next year, do the same <br />thin; to the alleys. <br />~onestroo I think that vrould be a rood idea. <br />
The URL can be used to link to this page
Your browser does not support the video tag.