My WebLink
|
Help
|
About
|
Sign Out
Home
2016.02.25 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2016 PC Packets
>
2016.02.25 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 12:42:41 PM
Creation date
2/25/2016 12:39:57 PM
Metadata
Fields
Template:
Commissions
Meeting Date
2/25/2016
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'j <br />L Building a legacy—your legacy. <br />February 18, 2016 <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Site Plan and Final Plat Review <br />Growing Generations Daycare — Frenchman Place 3rd Addition <br />WSB Project No. 1904-86 <br />Dear Ms. Juba: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have completed our review for the Growing Generations Daycare Site Plan and Final Plat Review. <br />The following information was received for review: <br />■ Growing Generations Site Improvement Plans, dated February 9, 2016 <br />■ Growing Generations Stormwater Management Plan Letter and Plan, dated February 9, 2016 <br />■ Frenchman Place 3rd Addition Final Plat, dated January 7, 2016 <br />Based on the review of the site plan, we offer the following comments related to the application: <br />Plat <br />1. The plat is consistent with the preliminary plat. <br />2. There are two wetlands on the site, one of which is proposed to be filled. A drainage and utility <br />easement will be necessary over the remaining wetland. <br />Roadway/Utilities <br />1. Access to the property will be from the existing private roadway constructed with the Frenchman <br />Place 2nd Addition. The location of the driveway, as shown, is reasonable. <br />2. Utility services will be connected to the public sanitary sewer and water located within a utility <br />easement in the private roadway. <br />Stormwater Management <br />1. The pond receiving the stormwater from the site was constructed with the Frenchman Place 2nd <br />Addition, and was sized to accommodate drainage from the site. We are working with the <br />applicant's engineer on remaining design elements before issuing a stormwater permit. <br />Equal Opportunity Employer <br />wsbeng.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.