Laserfiche WebLink
30 <br />25 <br />II <br />I <br />,620 <br />E <br />U <br />u i5 <br />€ 10 <br />A <br />5 <br />0 <br />Centerville Circle Columbus Hugo Lexington Lino Joint <br />Pines Lakes System <br />Peak Day Available Capacity <br />Figure 5.2 Ava liable well capacity and peak day water demands <br />Table 5.1 Available firm well capacity and peak day demand <br />Joint Water Utility Feasibility Study 17 <br />Peak day (mgd) <br />Total well <br />Available firm <br />Excess firm <br />capacity (mgd) <br />capacity (mgd) <br />capacity �rrigd) <br />Centerville <br />08 <br />24 <br />08 <br />00 <br />Circle Pines <br />10 <br />3.2 <br />14 <br />04 <br />Columbus <br />04 <br />35 <br />20 <br />16 <br />Hugo <br />39 <br />78 <br />61 <br />2.2 <br />Lexington <br />14 <br />14 <br />0 0* <br />00 <br />Lino Lakes <br />5_5 <br />Z-9 <br />1-3 <br />0_0 <br />Joint System <br />131 <br />260 <br />234 <br />103 <br />* Lexington maintains <br />reliability in water supply through interconnection with the City of Blaine. <br />Joint Water Utility Feasibility Study 17 <br />