My WebLink
|
Help
|
About
|
Sign Out
Home
2016.04.18 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2016 CC Packets
>
2016.04.18 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2016 4:37:53 PM
Creation date
4/14/2016 4:33:02 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/18/2016
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 10.2 Future studies <br />Study Topics <br />Reason <br />Priority <br />Study 1 <br />Water quality analysis to <br />This may be a deal breaker if mixing waters of <br />High <br />Water Quality <br />define the impacts of mixing <br />differing qualities results in unacceptable <br />Analysis <br />filtered water from Circle Pines <br />impacts <br />with unfiltered water from <br />other communities <br />Specific <br />objective: <br />Consider alternate alignment <br />This grouping includes communities that receive <br />High <br />to capture proximity and <br />filtered water It reduces the likelihood of <br />What is the <br />existing relationships such as <br />unacceptable impacts resulting from mixing <br />correct <br />a group including Blaine. <br />dissimilar water It also leverages cities that <br />combination of <br />Circle Pines and Lexington <br />already share water regularly (Blaine and <br />cities for a joint <br />Consider if Columbus should <br />Lexington) <br />utility <br />be included at all If so when <br />Study 2 <br />Distribution system model of <br />Create a tool needed to perform the study <br />Medium <br />Facility Plan <br />all communities to be joined <br />together <br />Specific <br />Storage facility siting <br />Use of existing storage to benefit growing <br />Medium <br />Objective: <br />communities is a key benefit to joining the <br />Define the <br />utilities together Modeling is needed to make <br />sure the existing facilities can be connected in a <br />remaining <br />way to benefit the growing communities and that <br />technical <br />the minimum amount of future storage is added <br />constraints <br />to reduce costs <br />guiding a Joint <br />Interconnection main sizing <br />This study should be done in conjunction with <br />Medium <br />Utility <br />distribution modeling and storage siting since <br />they all affect each other Storage siting and <br />utilization are both affected by the size of the <br />interconnecting watermain <br />Pressure zone analysis <br />This study is needed to determine if pressure <br />Low <br />reducing valves or pump stations are needed to <br />facilitate interconnecting the communities <br />Well Siting <br />Use of existing wells to benefit growing <br />Medium <br />communities is another key benefit to a joint <br />utility This study would ensure that the supply is <br />available to meet needs while not impacting <br />surface water features of value. <br />Study 3 Financial <br />Infrastructure cost basis <br />Determine the value of existing infrastructure <br />Medium <br />and Governance <br />valuation <br />This will provide a starting point for the purchase <br />Plan <br />price that would be paid by growing cities to <br />developed cities <br />Specific <br />Analyze operational and <br />This study is needed to help define staff needed <br />Medium <br />Objective: <br />staffing costs <br />to operate and maintain a joint utility This would <br />be needed in final rate determinations <br />Define the <br />financial and <br />Rate Analysis <br />Using different financing tools and payback <br />High <br />periods analyze the resulting impacts to rates <br />governance <br />parameters <br />Governance <br />Determine community representation and <br />Medium <br />needed to create <br />governance of the utility <br />a Joint Utility <br />Joint water Utility Feasibility Study 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.