My WebLink
|
Help
|
About
|
Sign Out
Home
2016.04.28 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2016 PC Packets
>
2016.04.28 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 4:35:34 PM
Creation date
4/25/2016 4:29:02 PM
Metadata
Fields
Template:
Commissions
Meeting Date
4/28/2016
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SPECIFIC INFORMATION <br />PROJECT NAME <br />'ACTOR GARDEN'_' NORTH VILLAGE 7TH ADDITION <br />PROJECT LOCATION <br />ELLICREST AVENUE NORTH AT RDIEMARY WAY, HUDO, MINNESOTA <br />LANTUOE 4i1_r.954 <br />LONGITUDE: -93.019756 <br />P13K),ECT OWNER <br />KETTLER CONSTRUCTION RICH KETTLER <br />2 SOUTHPOINTE COURT <br />ST.PAUL. MN 55727 <br />(651) 462-7884 <br />2S.1[(UCTION ACTLYITILDESCREMON <br />THIS SITE IS THE SEVENTH ADDITION OF THE •'7CTOR GARDENS NORTH <br />VILLAGE- DEVELOPMENT. <br />THE PROPOSED DEVELOPMENT CONSISTS OF TWENTY-SEVEN (27) <br />DETACHED TOWNHOME UNITS AND THREE (3) TWIN HOMES (6 UNITS) WITH <br />NEW PRIVATE STREETS. STORM WATER MANAGEMENT WILL BE PROVIDED '3A <br />ON-STF NURP POND, AND OFF-SITE NIURP POND. <br />THE SITE WAS ROUGH GRADED PER PREVIOUS PLANS FOR THE <br />DEVELOPMENT OF THE SITE. <br />WETLANDS HAVE BEEN DELINEl TED AND ADJUSTED BY WAYNE JACOBSON, <br />JACOBSON EW.11RONMENTAL, IN NOVEMBER 2015, THE PLANS REFLECT THE <br />CURRENT DELINEATION. NO WETLAND IMPACTS ARE PROPOSED WTH THIS <br />PROJECT. <br />SITE AREA BEFORE AFTER <br />COfISTRUCnON CONSTRUCnOH <br />TOTAL -ITE AREA 651 ACRES <br />TOTAL ESTIMATED IUPQRw0U5 0 ACRES 3.12 ACRES <br />VITAL ESTIMATED PERVIOUS I ^ 51 -.CF-S 5.39 ACRES <br />TOTAL DISTURBED AREA <br />6.0 ACRES <br />RECEIVING WATERS WITHIN ONE MILE <br />SITE MAP AND DESIGN CALCULATIONS <br />SEE STORM WATER DRAINAGE REPORT FOR QUANTIFICATION OF STORM WATER <br />MANAGEMENT REQUIREMENTS AND DRAINAGE AREA MAPS, <br />SOLS. SLOPES VEGETATION <br />SOIL TYPE(SV, SEE 'CONSTRUCTION ACTI'ATY DEICRIPTION" FOR LIST OF SOILS <br />TYPES <br />:.LOPE''.` PrOPOSED SLOPES WILL OE GENERALLY MODERATE AND ARE NOT <br />EXPECTED TO EXCEED ?A. <br />'EGETATK)n SEED AND MULCH IS PROPOSED FOR OISTUPBED AREAS <br />PEWRPWSWPPP ('DEW"T <br />ENGINEERING. INC. <br />6776 LAKE DRIVE <br />UNO LAKES MN 55014 <br />(651) 361-E200 <br />PERSON WHO WIII. OVF.RSEF INPFMENTATION OF SWPPP (-CONTRACTOR-) <br />780 <br />PERSON(S) WHO WILL INSPECT ON-SITE ESC MEASURES CNSff.QM "3 <br />TBD <br />TRAINING DOCIIMFNTATION <br />DOCUMENTATION MI ACCOMPANY THE SWPPP INDICATING THAT THE <br />INOIIRDUALS IDENTIFIED IN PART A F. HAVE BEEN TRAINED IN ACCCIDANCE WTH <br />THE REQUIREMENTS OF PART III,F, DOCUMENTATION SHALL INCLUDE: <br />A. NAMESOF THE PERSONNEL ASSOCIATED MTN THIS PROJECT THAT ARE <br />REQUIRED TO BE TRAINED PER PART III.F.1. OF THIS PERMIT. <br />S. DATES OF TRAINING AND NAME OF INSTRUCTOR(S) AND ENTITY <br />PROVIDING TRAINING. <br />C. CONTENT CF TRAINING COUF;E OR WORKJHOP INCLUDING THE NUMBER <br />OF HOURS OF 7RANING. <br />SITE SEQUENCING & ESC NOTES <br />PRICR TO ANY LAND -DISTURBING ACTIVITY, THE CONTRICTOR SH'LL INST'.LL <br />SILT FENCE AS SHOWN ON PLAN. ADDITIONAL SLT FENCE MAY BE NECESSARY <br />IF LOCAL CONDITIONS REQUIRE. LILT FENCE CHALL REMAIN IN-PLACE UNTIL THE <br />FINAL STABILIZATION HAS BEEN ESTABLISHED IN O.CCORD NCE PATH PART IV.G, <br />THE CONTRACTOR SHALL PERFORM SITE GRADING ON AN AREA -BY -AREA CASIO <br />TO MINIMIZE UNST,BIUZED AREAS. AS EACH AREA IS COMPLETED, ALL EXPOSED <br />SOILS MUST HIVE TEMPORARY EROSION CONTROL PROTECTION CR PERMANENT <br />co•.ER WITHIN FOURTEEN (14) DAYS <br />THE CONTRACTOR SHALL PROVIDE ALL SOD, SEED, MULCH AND FERTILIZER WHICH <br />SHALL CONFORM WITH THE FOLLOWING MNDOT CI ECIFICATIONS AS MODIFIED <br />BELOW. <br />ITEM <br />TWE OF <br />SPECIAL <br />IMPAIRED <br />NAME OF WATER BODY <br />WATER BODY <br />WATER <br />WATER <br />ON-SITE POND <br />POND <br />NO <br />ND <br />GFF-;ITE PONDS <br />POND <br />NO <br />NG <br />ON-SITE WETLANDS <br />WETLAND <br />NO <br />NO <br />OFF-SITE WETLANDS <br />WETLAND <br />NO <br />NO <br />CL ARWATER CREEK <br />STREAM <br />NO <br />YES <br />SITE MAP AND DESIGN CALCULATIONS <br />SEE STORM WATER DRAINAGE REPORT FOR QUANTIFICATION OF STORM WATER <br />MANAGEMENT REQUIREMENTS AND DRAINAGE AREA MAPS, <br />SOLS. SLOPES VEGETATION <br />SOIL TYPE(SV, SEE 'CONSTRUCTION ACTI'ATY DEICRIPTION" FOR LIST OF SOILS <br />TYPES <br />:.LOPE''.` PrOPOSED SLOPES WILL OE GENERALLY MODERATE AND ARE NOT <br />EXPECTED TO EXCEED ?A. <br />'EGETATK)n SEED AND MULCH IS PROPOSED FOR OISTUPBED AREAS <br />PEWRPWSWPPP ('DEW"T <br />ENGINEERING. INC. <br />6776 LAKE DRIVE <br />UNO LAKES MN 55014 <br />(651) 361-E200 <br />PERSON WHO WIII. OVF.RSEF INPFMENTATION OF SWPPP (-CONTRACTOR-) <br />780 <br />PERSON(S) WHO WILL INSPECT ON-SITE ESC MEASURES CNSff.QM "3 <br />TBD <br />TRAINING DOCIIMFNTATION <br />DOCUMENTATION MI ACCOMPANY THE SWPPP INDICATING THAT THE <br />INOIIRDUALS IDENTIFIED IN PART A F. HAVE BEEN TRAINED IN ACCCIDANCE WTH <br />THE REQUIREMENTS OF PART III,F, DOCUMENTATION SHALL INCLUDE: <br />A. NAMESOF THE PERSONNEL ASSOCIATED MTN THIS PROJECT THAT ARE <br />REQUIRED TO BE TRAINED PER PART III.F.1. OF THIS PERMIT. <br />S. DATES OF TRAINING AND NAME OF INSTRUCTOR(S) AND ENTITY <br />PROVIDING TRAINING. <br />C. CONTENT CF TRAINING COUF;E OR WORKJHOP INCLUDING THE NUMBER <br />OF HOURS OF 7RANING. <br />SITE SEQUENCING & ESC NOTES <br />PRICR TO ANY LAND -DISTURBING ACTIVITY, THE CONTRICTOR SH'LL INST'.LL <br />SILT FENCE AS SHOWN ON PLAN. ADDITIONAL SLT FENCE MAY BE NECESSARY <br />IF LOCAL CONDITIONS REQUIRE. LILT FENCE CHALL REMAIN IN-PLACE UNTIL THE <br />FINAL STABILIZATION HAS BEEN ESTABLISHED IN O.CCORD NCE PATH PART IV.G, <br />THE CONTRACTOR SHALL PERFORM SITE GRADING ON AN AREA -BY -AREA CASIO <br />TO MINIMIZE UNST,BIUZED AREAS. AS EACH AREA IS COMPLETED, ALL EXPOSED <br />SOILS MUST HIVE TEMPORARY EROSION CONTROL PROTECTION CR PERMANENT <br />co•.ER WITHIN FOURTEEN (14) DAYS <br />THE CONTRACTOR SHALL PROVIDE ALL SOD, SEED, MULCH AND FERTILIZER WHICH <br />SHALL CONFORM WITH THE FOLLOWING MNDOT CI ECIFICATIONS AS MODIFIED <br />BELOW. <br />ITEM <br />MNDOT SPECIFICATION/NOTES <br />SOD <br />3E'6 <br />SEED " <br />3678 <br />• FOR TURF ESTABLISHMENT <br />COMMERCIAL TURF <br />MNOOT MI.: 25-131 (220 LBS/AORE) <br />RESIDENTIAL TURF <br />MNDOT MIX 25-151 (120 LBS/ACRE) <br />TEMPORARY FALL COVER <br />MNDOT MIX 21--112 (ICO LBS/ACRE) <br />SPRING/SUMMER <br />MNDOT MIX 21-111 (100 LBS/ACRE) <br />SOIL -BUILDING COVER <br />WNDOT MIX 21-113 (110 LBS/ACRE) <br />1-2 YEARS CO.IER <br />MNOOT MIX _2-111 (30.5 LS5/ACRE) <br />2-5 YEARS COVER <br />MNDOT MIX 22-112 (40 LBS �ACAE) <br />MULCH <br />3302 (TYPE 1 - DISC .`NCHORED) <br />FERTILIZER <br />3881 <br />WOOD FIBER BLANKET <br />3888 CATEGORY 2 <br />• MOW A MINIMUM OF: <br />RESIDENTIAL TURF - ONCE PER 2 WEEKS <br />COMMERCIAL TURF _ ONCE PER 4 WEEKS <br />'• SEEDED AREAS -HALL BE EITLIER MULCHED OR CO.EREO BY FIBROUS <br />BLANKETS TO PROTECT SEEDS AND LIMIT EROSION. <br />TEMPORARY OR PERMANENT MULCH MUST BE UNIFORMLY APPLIED BY <br />MECHANICAL OR HYDRAULIC uE'NL AND STABILIZED BY DISC -ANCHORING OR <br />USE OF HYDRAULIC SOIL STABILIZERS <br />ALL FECSION AND SED]RENT CONTROL MEASURES SHOWN ON THE PLANS OR <br />IMPLEMENTED IN THE FIELD SHALL BE W ACCORDANCE WITH THE CITY AND <br />NPDES PHASE II PERMIT REQUIREMENTS, AND THE MPCA'S "PROTECTING WATER <br />QUALITY IN URBAN AREAS BEST MANAGEMENT PRACTICES FOR MINNESOTA." <br />THE CONTRACTOR SHALL PAY SPECIAL ATTENTION TO ALL ADJACENT PROPERTY <br />UNES AND MAKE SURE THE EROSION CONTROL PRA^hCES NPLACE ]N THOSE <br />ARE 'S <br />PREVENT MIGRATION OF SEDIMENT ONTO ADJACENT PROPERTIES <br />THE CONTRACTOR SHALL MAINTAIN SILT FENCE, INCLUDING THE REMOVAL OF <br />ACCUMULATED SEDIMENT, THROUGH COMPLETION OF BUILDING CONSTRUCTION. <br />SILT FENCE TO BE REMOVED ONLY AFTER COMPLETION OF BUILDING <br />CONSTRUCTION AND UPON ESTABLISHMENT OF VEGETATION. <br />THE CONTRACTCR SHALL PROVIDE WOOD FIBER BLANKET FOR `-LL AREAS OF <br />CONCENTRATED FLOW AND FOR ALL SLOPES 11 OR GREATER. <br />PROTECT ALL STORM W'TER MANAGEMENT FACILITIES FROM CONSTRUCTION <br />RUN-OFF. CONTRACTOR TO INSTALL AND CONSTRUCT SAID FACILITIES ONCE <br />OTE HAS BEEN STABILIZED. <br />IF ANY SLOPES APPEAR TO BE FAILING, THE CONTRACTOR SHALL PROVIDE <br />ADDITIONAL SILT FENCE, 81GROLLS AND EROSION CONTROL BLANKET AS NEEDED <br />THE CONTRACTOR SHALL FINAL GRADE S54ALE AREAS UPON STABILIZATION CF <br />UP57REAM AREAS. <br />UPON GRADING COMPLETION THE CONTRACTOR SHALL PROVIDE NATIVE TOPSOIL <br />SEED, AND MULCH ANCHORED WITH A CTRAIGHT SIT DISC WITHIN 48 HOURS CF <br />FINAL GRADINC, <br />EXCESS SOIL SHOULD BE TREATED LIKE OTHER EXPOSED SOL AND STABILIZED <br />WITHIN 72 HOURS, ANY SOIL STOCKPILES ARE TO HAVE :TILT FENCE PLACED ON <br />DOWNSTREAM SIDES AND SHALL NOT BE PLACED IN SURFACE WATERS. <br />ADJACENT STREETS SHALL BE KEPT CLEAN OF CONSTRUCTION MATERIALS, DIRT, <br />AND OTHER UNDESIRABLE MATERIALS. WHEN MATERIALS OR DEERIS HAVE <br />WASHED/FLOWED ONTO ADJACENT STREETS, IT IS THE CONTRACTOR -S <br />HE_�FON51BILITY TO SWEEP/SCRAPE STCEETS S NECESSARY OR AS DIRECTED BY <br />THE CITY. <br />MAP OF SURFACE WATERS <br />1lA# I F <br />A l <br />CLEARWATER CRUX IS AN IMPAIRED WATER. <br />ASSESSMENTUNIT: 01 <br />070206-519 <br />IMPARMENTS: AQUATIC MACROINVERTEBRATE BIOASSESSMENTS; <br />FISHES BIOASSECSMENTS <br />C.1 DURING CONSTRUCTION <br />A. ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT <br />N NO CASE LATER THAN `:E'EN (-) DAYS AFTER THE CONSTRUCTION ACP iTY IN THAT PORTION OF <br />THE 517E HAS TEMPORARILY OR PERMANENTLY CEASED. <br />B. TEMPOTARY SEDIMENT BASIN REQUIREMENTS DESCRIFED IN PART III.9.1-5 MUST BE USED FOR <br />COMMON DRAINAGE LOCATIONS THAT SERVE AN ATEA WTH FIVE (5) OR MORE ACRES DISTVRRFD AT <br />ONE TIME <br />C2 POST CONSTRUCTION. <br />THE WATER QUALITY VOLUME THAT MUST BE TREATED BY THE PROJECT PERMANENT STORMWATER <br />MANAGEMENT SYSTEM DESCRIBED IN PART III.C. SHALL BE ONE (1) INCH OF RUNOFF FROM THE NEW <br />1MPERVIOUS SURFACES CREATED BY THE PROJECT. WHERE SITE CONDITIONS ALLOW, AT LEAST )i INCH <br />OF WATER QUALITY VOLUME MUST BE INFILTRATED. `EL PART III.C.2 FOR MORE INFORMATION ON <br />INFILTRATION DESIGN AND APPROPRIATE'ITE CONDITIONS IF IT IS DETERMINED THAT SITE CONGITIONs <br />ARE NOT APPROPRIATE FOR INFILTRATION (E.G. LACI( OF 3 FT. OF SEPARATION TO=EA.ANALLY <br />SATURATED GROUND WATER, PROXIMITY TO BEDROCK, CONTAMINATED SOILS) THE REASONS :HOULD BE <br />DOCUMENTED IN THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR THE PROJECT. <br />INFILTRATION IS NOT REWIRED IN HYDROLOGIC SOIL GROUP D SOILS. <br />DRAYVN IVY: OESIGN BY: <br />C.M. C.W.P. <br />CHCK13 BY:PROJ. NO, <br />C.W.P. 15-4588 <br />ORIGIN NL DATE: <br />FEBRUARY 10. 21316 <br />O� F <br />J <br />= p a <br />r�i Vel <br />e =leo <br />WG <br />PREPARED FOR: <br />KETTLER <br />CONSTRUCTION <br />STIE PLANNING <br />6 ENGINEERING <br />PLOWE <br />EN111INEENIN6, INC. <br />6776 LANE DRIVE <br />SURE 1111 <br />LINO LANES, MN 55014 <br />RHONE: (851)931$119 <br />FAX (661) 361-5701 <br />STORM WATER POLLUTION PREVENTION PLAN <br />VICTOR GARDENS NORTH VILLAGE 7TH ADDITION C52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.