My WebLink
|
Help
|
About
|
Sign Out
Home
2016.04.28 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2016 PC Packets
>
2016.04.28 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 4:35:34 PM
Creation date
4/25/2016 4:29:02 PM
Metadata
Fields
Template:
Commissions
Meeting Date
4/28/2016
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOUNDATION KEY PLAN <br />56ALE- Ile" • ILd' <br />FIRST FLOOR KEY PLAN <br />SCALE. Ile . 11-0 <br />RA: 41F, DE51ONEP ROOF TRV:: SE5 <br />VENT ROOP 150,x. PeR 200 50FT 20% ROOF 50% SOFFIT <br />KICKOUT FLASHING TO EE MISTALLW AS NCWW By ROOFINO CONTRACTOR <br />EXTERIOR MALL FINISHER TO VERIFY THAT KICKOUT FLAMMIG F3 INSTALLED <br />PRIOR TO FPJ1514INO <br />FULL ICE 6 WATER SHIELD AT ROOF PRCNE5 4/12 MD BELOW <br />TRU55 MANVF. TO CALL OFP PLANNMIO _ PE516N WITH ANY OUE57I01,15 DURING LAYOUT <br />WILDER TO RENEW TRU550E515N 6 LAYOUT PRIOR TO OROERIN5 TRV55E6 <br />ROOF PLAN <br />56ALE' Ile • I' -M <br />7rJj4 �� <br />IA` 64 <br />VQ'w� <br />y'. <br />V�a <br />LL: <br />60-aV <br />DRAWN BY: <br />LO <br />COMM. NO. <br />THE WOODLANDS OF MAPLEWOOD 212945 <br />„MEET NO. <br />BIRCH & CHESTNUT III 6 <br />0210" <br />IdY Id'O' <br />17'-S" Id'Idl <br />COP AIR SPA,CP <br />ei <br />4 <br />I�-------------- _ _______________.. <br />-- ---� <br />1 1 <br />J - <br />, I l_, 1 <br />- <br />� <br />r-------------, <br />I I <br />L-------------- <br />iI <br />I <br />I <br />I <br />I I t! I i <br />I I I <br />� <br />II <br />I <br />I <br />I <br />I <br />1 <br />I I I I <br />; i i t <br />O <br />I <br />IL <br />I L <br />I ' <br />I I <br />r--------------- <br />-- <br />, I , I IILJJ--LSd 'I I <br />I <br />I I I I <br />LL <br />I; I II <br />� <br />------------------ <br />' 1--------------------------- <br />;I <br />32�0� 334D" <br />64 <br />FOUNDATION KEY PLAN <br />56ALE- Ile" • ILd' <br />FIRST FLOOR KEY PLAN <br />SCALE. Ile . 11-0 <br />RA: 41F, DE51ONEP ROOF TRV:: SE5 <br />VENT ROOP 150,x. PeR 200 50FT 20% ROOF 50% SOFFIT <br />KICKOUT FLASHING TO EE MISTALLW AS NCWW By ROOFINO CONTRACTOR <br />EXTERIOR MALL FINISHER TO VERIFY THAT KICKOUT FLAMMIG F3 INSTALLED <br />PRIOR TO FPJ1514INO <br />FULL ICE 6 WATER SHIELD AT ROOF PRCNE5 4/12 MD BELOW <br />TRU55 MANVF. TO CALL OFP PLANNMIO _ PE516N WITH ANY OUE57I01,15 DURING LAYOUT <br />WILDER TO RENEW TRU550E515N 6 LAYOUT PRIOR TO OROERIN5 TRV55E6 <br />ROOF PLAN <br />56ALE' Ile • I' -M <br />7rJj4 �� <br />IA` 64 <br />VQ'w� <br />y'. <br />V�a <br />LL: <br />60-aV <br />DRAWN BY: <br />LO <br />COMM. NO. <br />THE WOODLANDS OF MAPLEWOOD 212945 <br />„MEET NO. <br />BIRCH & CHESTNUT III 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.