My WebLink
|
Help
|
About
|
Sign Out
Home
2009.10.12 CC Minutes - Neighborhood Meeting
Hugo
>
City Council
>
City Council Minutes
>
2009 CC Minutes
>
2009.10.12 CC Minutes - Neighborhood Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 1:46:10 PM
Creation date
10/1/2014 3:35:34 PM
Metadata
Fields
Template:
City Council
Document Type
Minutes
Meeting Date
10/12/2009
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF HUGO <br />MINUTES FOR NEIGHBORHOOD MEETING <br />MONDAY, OCTOBER 12, 2009 <br />6:30 P.M. AND 7:00 P.M. <br />HUGO CITY HALL ONEKA ROOM <br />6:30 P.M. Meeting <br />Acting Mayor Becky Petryk called the meeting to order at 6:35 p.m. <br />Present: Klein, Petryk, Weidt <br />Absent: Haas, Miron <br />Also present: City Engineer Jay Kennedy and Senior Engineer Technician Steve Duff <br />A meeting was held to allow residents within the newly completed 2009 street <br />reconstruction area around the Hugo Elementary School to discuss their experience with <br />the recently completed project. There were no residents who attended. <br />Klein made motion, Weidt seconded, to adjourn at 6:40 p.m. <br />All Ayes. Motion carried. <br />7:00 P.M. Meeting <br />Acting Mayor Becky Petryk called the meeting called to order at 7:05 p.m. <br />Present: Klein, Petryk, Weidt, Miron at 7:30 p.m. <br />Absent: Haas <br />Also present: City Engineer Jay Kennedy and Senior Engineer Technician Steve Duff <br />A meeting was held to gather input from residents living in the neighborhood located at <br />the northeast corner of TH61 and CSAH 8 (Egg Lake Road) for a potential 2010 street <br />reconstruction project. <br />There were 8 property owners represented at the meeting. Jay's presentation provided <br />background on the project selection, project funding, cost to residents, and time line for <br />the project. Jay and Steve answered residents questions and concerns regarding the <br />proposed project. The overall group consensus was to proceed with the process of a <br />possible street and utility reconstruction for 2010. <br />Weidt made motion, Klein seconded, to adjourn at 8:15 p.m. <br />All Ayes. Motion carried. <br />Respectfully Submitted, <br />Steve Duff <br />Senior Engineering Technician <br />
The URL can be used to link to this page
Your browser does not support the video tag.