My WebLink
|
Help
|
About
|
Sign Out
Home
2014.02.03 RESO 2014-03
Hugo
>
City Council
>
City Council Resolutions
>
2014 CC Resolutions
>
2014.02.03 RESO 2014-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:51 PM
Creation date
1/8/2015 1:03:45 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
2/3/2014
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2014-3 <br />Page 2 <br />7. The preliminary phasing plan is generally approved. <br />a. Phase 1 shall include: <br />i. A maximum of 130 senior housing units. <br />ii. Finale Avenue between 145`x' Street and 146th Street shall be <br />reconstructed as an urban section roadway to a width of 26 feet <br />with the first layer of bituminous prior to the issuance of a <br />Certificate of Occupancy for the 1 st building, <br />iii. A 50 foot wide roadway easement shall be dedicated for the <br />realignment of Finale Avenue from just south of Upper 146th Street <br />to 147th Street, as shown on the plan. <br />iv. A 60 foot wide roadway easement shall be dedicated for the <br />extension of 147th Street from its current terminus to Oneka <br />Parkway, as shown on the plan. <br />v. The 1.76 acres (Outlot A) shall be dedicated to the City to satisfy <br />77% of the parkland dedication requirement. <br />b. Phase 2 shall include <br />i. A maximum of 165 apartment units. <br />ii. The entire length of 147th Street to Oneka Parkway shall be <br />constructed with the first layer of bituminous prior to issuance of a <br />Certificate of Occupancy for the 1 st building. The developer shall <br />be responsible for 65% of the total project costs, subject to City <br />Council review and approval at the time of site plan approval. <br />iii. The entire length of the Finale Avenue realignment through the <br />project shall be constructed with the first layer of bituminous prior <br />to the issuance of a Certificate of Occupancy for the 1 st building. <br />iv. The remaining 23% to satisfy park dedication requirements shall <br />be paid. <br />8. The developer shall submit final site plans, building elevations, street improvement <br />plans, utility plans, grading and drainage plans, landscaping plans, lighting and <br />signage plans along with the required land use applications for each phase of the <br />development. <br />