My WebLink
|
Help
|
About
|
Sign Out
Home
2010.02.01 RESO 2010-0004
Hugo
>
City Council
>
City Council Resolutions
>
2010 CC Resolutions
>
2010.02.01 RESO 2010-0004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:39 PM
Creation date
1/12/2015 11:26:35 AM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2010 - 4 <br />A RESOLUTION ORDERING IMPROVEMENT, AND ORDERING THE PREPARATION OF PLANS <br />AND SPECIFICATIONS FOR THE SOUTH EGG LAKE AREA ROADWAY, DRAINAGE, AND <br />UTILITY IMPROVEMENTS <br />WHEREAS, a Resolution adopted by the City Council on October 12, 2009, called for the City's consultant <br />City Engineer to prepare a feasibility study related to the proposed South Egg Lake Area <br />roadway, drainage, and utility improvements. The nature of the improvements include complete <br />roadway reconstruction, storm drainage, sanitary sewer and watermain repair, and appurtenant <br />work; and <br />WHEREAS, such feasibility report was received by the City Council at the January 4, 2010, regular City Council <br />meeting; and <br />WHEREAS, a motion of the City Council adopted on January 4, 2010 fixed a date for a Public Hearing on the <br />proposed improvements to be held on February 1, 2010; and <br />WHEREAS, ten days' mailed notice and two weeks' published notice of the hearing was given, and the <br />hearing was held thereon on the 1St day of February, 2010, at which time all persons desiring to <br />be heard were given an opportunity to be heard thereon. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF HUGO, MINNESOTA: <br />1. Such improvements are necessary, cost-effective, and feasible as detailed in the feasibility report. <br />2. Such improvement is hereby ordered as outlined in the feasibility report adopted the 4t" day of January, <br />2010. <br />3. WSB & Associates is hereby designated as the engineer for this improvement. The engineer shall prepare <br />plans and specifications for the making of such improvement. <br />Whereupon said resolution was moved for adoption by Council member Weidt and duly seconded by <br />Council member Haas. <br />Council members voting AYE: Petryk, Weidt, Klein, Haas, Miron <br />Council members voting NAY: None <br />Whereupon said resolution was declared passed and adopted this 1St day of February, 2010 <br />Fran iron, Mayor <br />ATTEST: <br />Michele Lindau, City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.