My WebLink
|
Help
|
About
|
Sign Out
Home
2010.11.01 RESO 2010-0054
Hugo
>
City Council
>
City Council Resolutions
>
2010 CC Resolutions
>
2010.11.01 RESO 2010-0054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:42 PM
Creation date
1/12/2015 11:29:45 AM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2010 - 54 <br />A RESOLUTION ORDERING IMPROVEMENT, AND ORDERING THE PREPARATION OF PLANS <br />AND SPECIFICATIONS FOR THE SOUTH ETHAN AVENUE ROADWAY, DRAINAGE, AND <br />UTILITY IMPROVEMENTS <br />WHEREAS, a Resolution adopted by the City Council on July 6, 2010, called for the City's consultant City <br />Engineer to prepare a feasibility study related to the proposed South Ethan Avenue roadway, <br />drainage, and utility improvements. The nature of the improvements include complete roadway <br />reconstruction, storm drainage, sanitary sewer and watermain installation, and appurtenant work; <br />and <br />WHEREAS, such feasibility report was received by the City Council at the October 4, 2010, regular City Council <br />meeting; and <br />WHEREAS, a motion of the City Council adopted on October 4, 2010 fixed a date for a Public Hearing on the <br />proposed improvements to be held on November 1, 2010; and <br />WHEREAS, ten days' mailed notice and two weeks' published notice of the hearin* wasgiven, and the <br />hearing was held thereon on the I" day of November, 2010, at which time all persons desiring to <br />be heard were given an opportunity to be heard thereon. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF HUGO, MINNESOTA: <br />1. Such improvements are necessary, cost-effective, and feasible as detailed in the feasibility report. <br />2. Such improvement is hereby ordered as outlined in the feasibility report adopted the 0 day of October, <br />2010. <br />3. WSB & Associates is hereby designated as the engineer for this improvement. The engineer shall prepare <br />plans and specifications for the making of such improvement. <br />Whereupon said resolution was moved for adoption by Council member Petryk and duly seconded by <br />Council member Weidt. <br />Council members voting AYE: Klein, Petryk, Haas, Weidt, Miron <br />Council members voting NAY: None <br />Whereupon said resolution was declared passed and adopted this I" day of November, 2010 <br />i <br />ATT <br />EST: <br />Michele Lindau, City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.