My WebLink
|
Help
|
About
|
Sign Out
Home
2008.03.17 RESO 2008-0009
Hugo
>
City Council
>
City Council Resolutions
>
2008 CC Resolutions
>
2008.03.17 RESO 2008-0009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:33 PM
Creation date
1/12/2015 1:50:35 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
3/17/2008
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Sewer and water service replacements between the sewer main and the property line <br />shall be assessed on a per service basis at one hundred percent (100%) of the City's <br />expenses for such services. <br />G. Sanitary Sewer and Water Main Trunks <br />1. The assessment for trunk usage is based on area. The full cost of the trunk system <br />shall be assessed equally over the benefited area at a determined rate per unit. <br />H. Storm Sewer <br />1. For new developments or improvements petitioned for by benefiting properties not <br />included in the Capital Improvements Plan, one hundred percent (100%) of the storm <br />sewer costs shall be assessed to all parcels within the development, or the assessment <br />shall be the fee required to be paid by the City's Stormwater Trunk and Ponding Fee <br />Ordinance. <br />2. For improvements to existing storm sewer systems, the assessment rates as outlined <br />in the Roadway Reconstruction/Rehabilitation section, shall include the storm -sewer <br />improvements. <br />6. Assessable Costs <br />The amounts included in the costs assessable under this policy shall include the following: <br />A. Contract Costs: Amount paid to contractors for constructing the improvements. <br />B. Construction Interest: The costs of financing during the period between the date when <br />the first payment is made to the contractor exceeding any amount placed in escrow <br />pursuant to the development agreement and the date the assessment roll is approved by <br />the City Council. <br />C. Expenses: Costs incurred by the City in addition to the contract costs, including <br />engineering, legal, advertising, finance charges, administration, easements/right-of-way, <br />permit fees, and the assessment process. <br />D. Project Cost total cost of the improvement): Total of contract costs, interest, and <br />expenses. <br />7. Roadway Reconstruction/Rehabilitation Assessment Rates <br />A. Single -Family Residential/Duplexes <br />1. Residential Roadways: Single -Family residential and duplex rates are typically based <br />on an average 80 -foot wide lot in the urban area and up to 300 -foot wide lot in the <br />rural area. The assessments shall be levied on a unit basis rather than a front -footage <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.