Laserfiche WebLink
Resolution 2007-30 <br />Page 5 <br />v. Approval is contingent upon MnDOT approval of the Highway 61 access and <br />future right-of-way dedication. <br />Sidewalks and Trails <br />w. The sidewalk connections to the building must be shown on the plans. <br />x. A trail or sidewalk will be provided in the 120u' Street right-of-way when the <br />street is improved. <br />y. The applicant must provide sidewalks to connect both buildings to 120' Street <br />where a future trail is planned. <br />Drainage/Stormwater Management <br />z. The applicant shall obtain approval of the land development plan by the City, <br />including the proposed wetland impacts and mitigation. <br />aa. The minimum floor elevations shall comply with Section 1175-060.1 of the Hugo <br />Zoning Ordinance. <br />bb. The plans must be revised to include infiltration practices in conformance with <br />City and RCWD standards. The design of ponds/infiltration features will need to <br />be modified to comply with the City's infiltration requirement of storing and <br />infiltrating the 2 -year (2.8 -inch) storm event while also maintaining at least 3 feet <br />of separation between the groundwater table and the bottom of the infiltration <br />system. Modifications to the pond design and dimensions may be necessary to <br />address this issue. <br />cc. The applicant shall reconfigure the pond to minimize the portion within the <br />proposed Highway 61 easement and the applicant shall enter into an <br />encroachment agreement with the City. <br />Miscellaneous <br />dd. The applicant shall comply with all conditions in the City Engineer's letter dated <br />May 17, 2007. <br />9. The applicant must comply with the following, prior to release of the final plat for <br />recording: <br />a. Drainage and utility easements shall be recorded with the final plat for all private <br />drives. <br />