My WebLink
|
Help
|
About
|
Sign Out
Home
2006.12.18 RESO 2006-0074
Hugo
>
City Council
>
City Council Resolutions
>
2006 CC Resolutions
>
2006.12.18 RESO 2006-0074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:28 PM
Creation date
1/13/2015 2:48:25 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
12/18/2006
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2006-74 <br />Page 2 <br />6. Exterior lighting shall be consistent throughout the development. All lighting shall be <br />shielded to prevent glare and light trespass, as required by Section 1195-410 of the <br />ordinance. <br />7. The development shall comply with the architectural and landscape standards as <br />indicated in the Declaration of Covenants, Conditions, Restrictions, and Easements <br />dated November 29, 2006, as may be amended. <br />8. A community well and septic system shall be allowed on site for the 39 single family <br />homes. The community well and septic system shall comply with all the <br />requirements of the City Engineer, the Minnesota Department of Health and the <br />Minnesota Pollution Control Agency. <br />9. The following conditions shall be met prior to release of the Final Plat for recording: <br />a. The applicant shall comply with all conditions in the City Engineer's letter <br />dated November 29, 2006. <br />b. A minimum of two parking stalls shall be provided for each lot. Garage and <br />driveway parking shall count towards this requirement. <br />c. The plat shall comply with the City's street naming system, except as otherwise <br />approved by the City Council. <br />d. The City's Public Works Department must review and approve the final <br />landscape details for any plantings within the City right-of-ways. <br />e. The developer or the HOA shall enter into a License Agreement with the City <br />to allow the HOA to plant and maintain the proposed landscaping within the <br />City right-of-way. <br />f. The applicant shall revise either the landscape plan or the water and wastewater <br />treatment system plan to show the planting details (i.e. location, species, size, <br />and quantity of plant materials) for the vertical flow wetland within the <br />community septic area. The proposed plantings must comply with the <br />community well and wastewater system management plan prepared by NAWE <br />received October 23, 2006. <br />g. The landscape plan shall be revised to provide evergreen seedlings at the <br />perimeter of the site. <br />h. The development shall comply with the Fire Chief's requirements regarding fire <br />flow calculations, the location of fire hydrants, fire department connections, and <br />fire lane signage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.