My WebLink
|
Help
|
About
|
Sign Out
Home
2004.08.16 RESO 2004-0064
Hugo
>
City Council
>
City Council Resolutions
>
2004 CC Resolutions
>
2004.08.16 RESO 2004-0064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:16 PM
Creation date
1/13/2015 3:31:44 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
8/16/2004
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2004 - 64 <br />A RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT FOR <br />COUNTY STATE -AID HIGHWAY (CSAH 8), ONEKA PARKWAY, AND FENWAY <br />AVENUE IWROVEMENTS <br />WHEREAS, it is being considered to improve CSAH 8 between State Trunk Highway 61 and the <br />western City limits, Oneka Parkway between CSAH 8 and a point approximately 1650 ft to the <br />north, and Fenway Avenue between CSAH 8 and a point 600 feet to the south. The <br />improvements include the installation of sanitary sewer, water main, storm sewer, storm water <br />ponding, landscaping, street lighting, and paved, urban section roadways. It is the intent to assess <br />the benefited properties for all or a portion of the cost of the improvements, pursuant to <br />Minnesota Statutes, Chapter 429. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCEL OF HUGO, <br />MINNESOTA: <br />1. The petition is hereby referred to WSB & Associates, Inc. and that they are instructed to <br />report to the Council with all convenient speed advising the Council in a preliminary way as to <br />whether the proposed improvement is feasible and as to whether it should best be made as <br />proposed or in connection with some other improvement, and the estimated cost of the <br />improvement as recommended. <br />Council members voting AYE: Haas, Petryk, Puleo, Miron <br />Council members voting NAY: NONE <br />Whereupon said resolution was declared passed and adopted this 16th day of August, 2004. <br />on, Mayor <br />ATTEST: <br />Mary��treager, City Cl <br />WRESOLUTIONS\CSAH 8 PREPARE FEASIBILITY STUDY.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.