My WebLink
|
Help
|
About
|
Sign Out
Home
2003.02.18 RESO 2003-0013
Hugo
>
City Council
>
City Council Resolutions
>
2003 CC Resolutions
>
2003.02.18 RESO 2003-0013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:09 PM
Creation date
1/13/2015 4:19:13 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
2/18/2003
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF HUGO <br />RESOLUTION 2003 —13 <br />RESOLUTION IN SUPPORT OF MAIN STREET INTERCHANGE AND ROADWAY <br />IMPROVEMENTS <br />WHEREAS; Frenchman Road/145'" Street in the City of Hugo, Minnesota is Washington County <br />State Aid Highway 8 (CSAR 8); and <br />WHEREAS; upon entering Anoka County CSAH 8 becomes Anoka County State Aid Highway <br />14 (CSAH 14/Main Street) providing a direct connection between the cities of Hugo, Lino Lakes, <br />and Centerville; and <br />WHEREAS; this minor arterial roadway provides access to the primary residential, business, <br />commercial, and recreational areas of Hugo, Lino Lakes, and Centerville; and <br />WHEREAS; the CSAH 14/CSAH 8 corridor has an interchange access to Interstate 35E (1-35E), <br />a route on the National Highway System (NHS); and <br />WHEREAS; the CSAH 14/CSAH 8 corridor will be reconstructed from the 1-35E interchange <br />area to Trunk Highway 61 as a four -lane divided highway; and <br />WHEREAS; CSAH 14 will be reconstructed from 1-35W to 1-35E as a four -lane divided highway; <br />and <br />WHEREAS; the current interchange and bridge are insufficient to meet capacity demands <br />today; and <br />WHEREAS: upon completion of the CSAH 14/CSAH 8 corridor reconstruction the existing <br />bridge will act as a two-lane bottleneck connecting two four -lane divided highways; and <br />WHEREAS; Washington County, in partnership with Anoka County, the City of Hugo, and the <br />City of Lino Lakes have programmed the improvement of CSAH 14/CSAH 8 corridor east of 1- <br />35E in their 2003-2007 Capital Improvement Plans; and <br />WHEREAS; Anoka County, in partnership with the Cities of Lino Lakes and Centerville has <br />programmed the improvement of CSAH 14 corridor west of 1-35E in their 2003-2007 Capital <br />Improvement Plan; and <br />WHEREAS; this interchange provides the only access to the Interstate Highway System within <br />the 6 mile north/south boundary of the City of Hugo; and <br />WHEREAS; the upgrade of this interchange is essential to the economic health and welfare of <br />the City; and <br />WHEREAS; this project will protect and enhance Interstate mobility, <br />NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF HUGO that; the Anoka <br />County Interchange Improvements at 1-35E and Anoka County State Aid Highway 14 be <br />authorized as a High Priority Project (HPP) during Re -Authorization of TEA -21, and <br />BE IT FURTHER RESOLVED, that funds be authorized for the Federal partnership in this <br />project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.