My WebLink
|
Help
|
About
|
Sign Out
Home
2002.09.03 RESO 2002-0046
Hugo
>
City Council
>
City Council Resolutions
>
2002 CC Resolutions
>
2002.09.03 RESO 2002-0046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:07 PM
Creation date
1/13/2015 4:42:09 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
9/3/2002
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. How Particular Improvements Will Be Assessed: <br />A. Public Street ImDrovements (Not Indudim Mmor Maintenance). <br />1. For improvements to existing public streets, roadways or alleys, including <br />sidewalks, curb and gutter, fifty percent (50%) of the project costs shall be <br />assessed against the owners of parcels adjacent to the improved street, roadway <br />or alley. <br />2. For new developments or properties petitioning for improvements not in the <br />Capital Improvements Plan, one hundred percent (100%) of the project costs <br />shall be assessed to all parcels within the development. <br />3. Minor maintenance (for which no assessment will be charged) includes <br />sealcoating and bit uninous milling and overlays, pothole patching and crack <br />sealing. <br />4. All street improvements will be assessed on a front footage basis with one <br />hundred percent (100%) of the frontage being improved subject to assessment. <br />(or all street improvements will be assessed on a unit basis). <br />5. Properties adjacent to local streets being reconstructed will be given the <br />option of having their driveways reconstructed at contract unit prices. <br />Residents will be notified of this program at informational meetings for each <br />street project. N a resident participates in this program, staff will coordinate <br />construction with the contractor and will measure the quantities of pavement <br />installed. The cost of driveway reconstruction will be added to the assessment <br />for the subject property. <br />6. When a corner lot has frontage on two (2) local streets, it will be charged <br />thirty-seven percent (37%) of the front footage charge to the front side, and <br />thirteen percent (13%) for the side. <br />Land Use Types % of Cost <br />Retail/COmmerciaUlndustrial <br />100% <br />Non-ProfidTax exempt <br />75% <br />Multi Family Residential <br />75% <br />Single-Family/Duplex <br />50% <br />B. Ptivate Street Improvements. <br />1. Unless otherwise specified by the City, the developer or owners of lands <br />adjoining private streets shall undertake and pay for improvements to private <br />streets and appurtenances according to City specifications. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.