My WebLink
|
Help
|
About
|
Sign Out
Home
2000.06.12 CC Minutes - Workshop
Hugo
>
City Council
>
City Council Minutes
>
2000 CC Minutes
>
2000.06.12 CC Minutes - Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 1:45:45 PM
Creation date
2/17/2015 4:22:30 PM
Metadata
Fields
Template:
City Council
Document Type
Minutes
Meeting Date
5/12/2000
Meeting Type
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES FOR THE COUNCIL WORKSHOP OF JUNE 12, 2000 <br />Mayor Walter Stoltzman called to Council to order at 5:43 pm. <br />PRESENT: Barnes, Leroux, Petryk Stoltzman <br />City Administrator, Michael Ericson <br />ABSENT: Chuck Haas <br />The Council interviewed five architectural firms, and they made presentations with feasibility <br />studies for a new City Hall. The five firms included: Wold Architects; Leonard Parker <br />Associates; Ankeny Kell Architects; WAI Continuum; and Bonestroo Rosene Anderlik & <br />Associates. <br />After discussion, the Council unanimously selected BRA&Associates to prepare a feasibility <br />study for a new City Hall, at a cost of $8,700. <br />After the interviews, the Council then discussed the proposed improvements in the Peloquin <br />Industrial Park. City Engineer, Dave Mitchell, Assistant City Engineer, Tom Tabler, and City <br />Finance Director, Ron Otkin, were present for this discussion. <br />Leroux made motion, Petryk seconded, to adjourn at 10:13 pm. <br />All aye. Motion Carried. <br />Respectfully submitted, <br />Michael A. Ericson <br />City Administrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.