My WebLink
|
Help
|
About
|
Sign Out
Home
1998.09.08 CC Minutes
Hugo
>
City Council
>
City Council Minutes
>
1998 CC Minutes
>
1998.09.08 CC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 1:45:40 PM
Creation date
2/18/2015 3:18:38 PM
Metadata
Fields
Template:
City Council
Document Type
Minutes
Meeting Date
9/8/1998
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council meeting of September 8, 1998 <br />Page 10 <br />Goiffon made motion, Barnes seconded, to recess the meeting at 11:00 p.m. until September 9, 1998, <br />at 9:00 a.m. <br />All aye. Motion Carried. <br />The City Council meeting was reconvened at 9:00 a.m. on September 9, 1998. <br />PRESENT: Arcand, Barnes, Goiffon, Leroux, Kiron <br />City Administrator, Robert Museus <br />City Attorney, Greg Galler <br />City Engineer, Tom Angus <br />City Clerk, Mary Ann Creager <br />FENWAY AVENUE EVIPROVEMENTS <br />The Mayor requested Council discussion of the improvement of Fenway Avenue, north of 140th <br />Street. It was his opinion that, in order to divert Bald Eagle Industrial traffic from the "downtown' <br />area, Fenway Avenue should be extended north to CR8. Fenway Avenue construction standards <br />should be upgraded to meet those of Fenway Boulevard. <br />Leroux made motion, Goiffon seconded, that the City upgrade the construction standards for Fenway <br />Avenue to meet those of Fenway Boulevard. <br />It was suggested that an appraiser be retained to determine what impact upgrading Fenway Avenue <br />would have on assessments. <br />Miron made motion, Leroux seconded, to amend the motion to include increasing the watermain from <br />8" to 12". <br />Vote on AMENDMENT: All aye. Motion Carried. <br />Vote on ORIGINAL MOTION: All aye. Motion Carried. <br />It was determined that a bike path should be included in the Fenway Avenue project. <br />Miron made motion, Leroux seconded, directing the City Engineer to prepare a feasibility report for <br />the extension of Fenway Avenue to CR8. <br />All aye. Motion Carried. <br />Barnes made motion, Goiffon seconded, to hire an appraiser to provide a low-cost analysis to <br />determine if previous Fenway Avenue assessment is affected by change to Fenway Avenue project. <br />All aye. Motion Carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.