My WebLink
|
Help
|
About
|
Sign Out
Home
2013.04.25 PC Minutes
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Minutes
>
2013 PC Minutes
>
2013.04.25 PC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 2:39:04 PM
Creation date
2/20/2015 10:30:47 AM
Metadata
Fields
Template:
Commissions
Meeting Date
4/25/2013
Document Type
Minutes
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Minutes — April 25, 2013 <br />Page 2 <br />Knauss asked why the trash enclosure is positioned on the front side of the building, and how far <br />is the rooftop mechanical equipment setback. <br />Ann responded in saying that the trash enclosure is positioned on the front side of the building <br />because it will be accessed in the front, and the rooftop mechanical equipment will be set back <br />approximately 20 feet from the front elevation. <br />Arcand asked why the church will not be accessed off of Everton Avenue. <br />Ann responded in saying that the access will be off of Rosemary Way because of the layout of <br />the building and parking. <br />Lessard asked what the traffic impact will be once the church is constructed. <br />Ann responded in saying that there will be minimal traffic impact because of the off peak hours <br />of the church and daycare operations. <br />Chairman Gwynn opened the Public Hearing. <br />Richard Meath (15128 Everton Ave N), John Udstuen (15190 Everton Ave N), and Arnie <br />Triemert (15220 Everton Ave N) stated their concerns for the stormwater drainage, dust control, <br />lighting, any accesses north of 149th Street, and traffic that may be generated from this project. <br />Ann responded in saying that the stormwater drainage plans show no impact to the north. There <br />will not be any entrances accessed north of 149th Street, and most traffic will be directed toward <br />Rosemary Way and south of it on Everton Avenue. The lights on the building and in the parking <br />lot will be white and on a timer so that they will not be shining throughout the night. <br />Dave, representative from DJ Kranz, responded in saying that his company will be building the <br />church and will ensure that the dust situation be maintained and controlled on a daily basis. <br />Bryan Bear stated that staff will keep in eye on the dust control during the construction process. <br />John Udstuen stated that he wanted to see the stormwater drainage that occurs on the site. <br />Rachel Juba presented to John the flow of the stormwater as it relates to the site. She stated that <br />all of the drainage will be directed south. <br />John Udstuen stated that he would like to have further discussion with the City Engineer and <br />project engineer to understand the stormwater drainage on the site. <br />Chairman Gwynn closed the Public Hearing. <br />Chairman Gwynn asked for the Commission feedback. <br />Rosenquist suggested that the applicants use low -profile rooftop mechanical equipment to <br />
The URL can be used to link to this page
Your browser does not support the video tag.