My WebLink
|
Help
|
About
|
Sign Out
Home
2015.01.22 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2015 PC Packets
>
2015.01.22 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 11:03:40 AM
Creation date
2/20/2015 12:08:44 PM
Metadata
Fields
Template:
Commissions
Meeting Date
1/22/2015
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ma,NTdESpT��o Minnesota Department of Transportation <br />Q Metropolitan District <br />r Waters Edge Building <br />OF 1900 1500 County Road B2 West <br />Roseville, MN 55113 <br />September 26, 2014 <br />Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue <br />Hugo, MN 55038 <br />SUBJECT: O'Reilly Auto Parts <br />Mn/DOT Review # S14-045 <br />NE Corner of US 61 (Forrest Blvd.) and 147th St. N. <br />Hugo, Washington County <br />Control Section 8206 <br />Dear Ms. Juba: <br />Thank you for the opportunity to review the site plan for O'Reilly Auto parts. MnDOT <br />has reviewed the plan and has the following comments. We Iook forward to working with <br />the City as development progresses. <br />Design <br />Make sure to provide a minimum of a 4' wide accessible route with 1.5% cross slope <br />between the existing pedestrian curb ramp at the TH 61 and 147th corner and the new <br />sidewalk connection. It appears that the space between the curb and signal pole is tight. If <br />you have any questions regarding these design comments please direct them to Nancy <br />Jacobson at 651-234-7647, Nancy.L.Jacobson(c�r�,state.mn.us. <br />Drainage <br />Based on the plans that were submitted no drainage permit is required at this time. If <br />plans change from submitted information, MnDOT Water Resources will need to re- <br />review the information and a permit may be required at that time if MnDOT right of way <br />drainage is adversely affected. If you have any questions regarding these drainage <br />comments please contact Bryce Fossand at 651234-7529, B ce.fossand state.mn.us. <br />Review Submittal Options: <br />Mn/DOT's goal is to complete the review of plans within 30 days. Submittals sent in <br />electronically can usually be turned around faster. There are four submittal options. <br />Please submit either: <br />1. One (1) electronic pdf version of the plans. Mn/DOT can accept the plans via <br />e-mail at metrodevreviews.dot@state.mn.us provided that each separate e- <br />mail is under 20 megabytes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.