Laserfiche WebLink
Resolution 2014 - <br />Page 2 <br />8. The landscaping planned for the development shall be installed all at the same time <br />during each phase. The developers shall take proper precautions to protect the trees as <br />the homes are being built. <br />9. The following conditions shall be met prior to approval of a Final Plat: <br />a. The applicant must submit a wetland replacement plan to the City of Hugo for <br />review and approval. <br />b. The applicant must obtain all necessary wetland permits from the City of Hugo. <br />c. The development shall comply with the Fire Chief's requirements regarding fire <br />flow calculations, the location of fire hydrants, fire department connections, and <br />fire lane signage. <br />d. The plat shall comply with the City's street naming system, except as otherwise <br />approved by the City Council. <br />e. The applicant shall comply with all conditions in the City Engineer's letter dated <br />February 5, 2014. <br />10. The following conditions shall be met prior to release of the final plat for filing: <br />a. Park dedication shall be cash in lieu of dedication and shall be required for the 57 <br />new lots created by this plat, subject to the park dedication fees in place at the <br />time of filing. If the development is completed in phases, the park dedication will <br />be for the number of lots being created at that time. <br />b. The developer shall enter into a development agreement for each phase of <br />development, shall agree to complete all improvements, and pay all fees as <br />required by the agreement. <br />c. The applicant shall pay their portion of the costs for the Beaver Ponds lift station. <br />11. The following conditions shall be met prior to issuance of building permits: <br />a. The existing temporary cul-de-sacs on Fondant Avenue and Foxhill Avenue in <br />Beaver Ponds South shall be removed and the roads should be extended into the <br />development. The developer shall restore the area of the temporary cul-de-sacs. <br />b. A 8 -foot bituminous trail shall be provided along the west side of Fondant <br />Avenue as shown on the plans. The trail shall be constructed by and paid for by <br />the developer with this plat. <br />