My WebLink
|
Help
|
About
|
Sign Out
Home
2014.02.13 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2014 PC Packets
>
2014.02.13 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 11:05:04 AM
Creation date
2/20/2015 12:25:12 PM
Metadata
Fields
Template:
Commissions
Meeting Date
2/13/2014
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />WSB <br />Asw1r� engineering • planning - environmental • construction 701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763541-1700 <br />February 5, 2014 <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Preliminary Plat Review <br />Fox Meadows Development <br />WSB Project No. 1904-57 <br />Dear Ms. Juba: <br />We have re,%dewed the preliminary plat submittal and drainage analysis for the above -referenced project. <br />In particular, we have reviewed the following plans related to this particular request: <br />Fox Meadows Preliminary Plat, Grading Plan, and Utility Plan dated October 25, 2013 and <br />revised February 4, 2014. <br />Preliminary Fox Meadows Development Hydrologic Model. <br />Based on the review of the preliminary plans and models, we offer the following comments related to this <br />application: <br />Preliminary Plat <br />1. The plans include a 20 -foot wide access easement to allow for access to the storm water pond that is <br />shown on the east edge of the plat, as well as sufficient drainage and utility easements to allow for <br />access to the rear -yard drainage systems. <br />Gradine. Drainase, and Wetlands <br />1. The storm water management plans are consistent with the storm water permit requirements, and <br />include the following: <br />Storm water management pond within the southeast corner of the site to meet the rate control and <br />primary (NURP) treatment requirements <br />• Infiltration and biofiltration areas to meet the site infiltration (volume control) requirements <br />The City's goals and policies related to water resource management are to "Reduce, Reuse, and <br />Replenish" when it comes to the use of drinking water as well as the management of storm water. <br />The vision behind the policy is to minimize the volume of drinking water used for irrigation, as well <br />as to provide cost-effective, regional means to infiltrate water to protect downstream water bodies. <br />St. Cloud • Minneapolis • St. Paul <br />Equal Opportunity Employer <br />wsbeng.com <br />n_,01 904-5 70' ldx, :),,, crx-r ° � � wusra-i ..� .r,..._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.