Laserfiche WebLink
PART II.C. - TERMINATION OF COVERAGE <br />L. TERMINATION OF COVERAGE WEN CONSTRUCTION IS COMPLETE: ALL PERIATTEE(S) MUST SUBMIT A <br />NOTICE OF TERMINATION (NOT) TO TIMI MPGA ON A FORM PROMOED BY THE COMMISSIONER MINN .LO <br />DAYS AFTER ALL ACTIVITIES TEOMRED FOR FINAL STABILIZATION (SEE PART A,0.) ARE COMPLETE. 711E <br />PENNMITIEE(5)' COVERAGE (NYDER THIS PERMIT TERMINATES At MIDNIGHT ON THE SUINWDN DATE OF <br />INE NOT. <br />Z TERMINATION OF COVERAGE WHEN TAMSM OF OWNERSHIP OCLURR ALL POWirNI(S) MUST <br />SUBMIT A NOT ON A FORM PROVIDED BY THE COMMISSIONER WITHIN 30 DAYS AFTER SELUND OR <br />07HERVAM LEGALLY RANSFERRMG THE ENTIRE SITE INCLUDING PERMIT RESPONSIBILITY FOR ROADS <br />(ESI, STREET SWEEPROW AND STORUWATER INFRASTRUCTURE FINAL CLEAN OUT OR TRANSFERRING <br />PORTIONS OF A STE TO MOTHER PARTY. THE PERMITTE(S' COVERAGE UNDER THIS PERRT <br />TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF THE MDT. <br />3. PERMITEE(S) MAY IEBMINAIE PERMIT COVERAGE PRIOR TO COMPLETION OF ALL OMMMUCUM <br />AC71MTY K ALL OF THE FOLLOWING CONDITIONS ARE MET. AFTER SE PERMIT IS TERMINATED UNDER <br />1ASi0 CONSTR GOON 19 ANY <br />= NOTTCOMPLMMENT ON THE NEW PERMIT COVERAGE MUST BE OBUMAINING PORTIONS OF ANVEID FE <br />THE SUBSEQUENT DEVELOPMENT ITSELF OR AS PART OF THE REMAINING COMMON PLAN OF <br />DEVELOPMENT OR SALE WILL RESULT IN LAND DISTURBING ACTIVITIES OF ONE (1) OR MORE ACRES IN <br />A CONSTRUCRON ACTIVITY HAS CEASED FOR AT LEAST BO DAYS, <br />B. AT LEAST 90 PER IENt BY OF ALL ORIGINALLY PROPOSED CONSTRUCTICN ACTIVITY HAS <br />BEEN COMPLETED AND PERIMANENT COVER ESrAMISIED ON THOSE AREAS <br />G ON AREAS WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE. PERMANENT COVER HAS BEEN <br />ESTABLISHED. <br />0. THE 917E 15 IN COMPLIANCE MTN PART MMU, AND PART IV.ILl AND WHERE APPLICABLE. PART <br />HCG.0 OR PART MOLL <br />4. PERMITTEE(97 MAY TERMINATE COVERAGE UPON APPROVAL BY THE MPCA IF INFORMATION IS <br />SUBMITTED 7d THE MPCA DOCUMENTING THAT TERIJINAROW IS APPROPAIME BECAUSE THE PROJECT RR <br />CANCELED. <br />PART I11.A.3 - TRAINING DOCUMENTATION <br />TRAINING OGCUMENTAIIOR: THE PERMITTEE(S) SHALL DMRE THE RUIVICUALS IDENTIFIED W PART IILF <br />HAVE SEEN TRAINED IN ACCORDANCE WITH TLS PERMIT'S TRAINING REOLAIS. NEMEPTHE PERMIrEE(s) <br />SHALL ENSURE THE TRAINING IS RECORDED IN OR WITH THE SWPPP BEFORE THE START OF <br />CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PADJECT HAVE OM DETERMINED, <br />DOCUMENTATION SHAM INMLME: <br />A NAMES OF THE PERSONNEL ASSOCIATED WTH THIS PROJECT THAT ARE REQUIRED TO BE TRAINED <br />PER PART IIIA(. OF TINS PERMIT. <br />B.DATES OF TRAINING AND NAME OF K51MXTC RM AND ENTITY PAOVONG STAINING. <br />G CONTENT OF TRAINING COURSE OR WOMMOP INCLUDING THE NUMBER OF HOURS OF TRAINING <br />PA?T III:R . c'ATs; AMLA. MLN!5 <br />THE PERIITTEE(S) MUST MEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS. <br />SUCH AS A0017IONAL OR MODIFIED SUPS THAT ARE DESIGNED m CORRECT PROBLEMS IDENTFIED GR <br />ADDRESS SITUATIONS WHENEVER: <br />1. THERE IS A CHANGE N DESIGN, CONSIRUCTIQN. OPERATION, MAINTENANCE. WEATHER ON SEASONAL <br />CONDITIOS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE <br />WATERS OR UNDERGROUND WATER& <br />Z INSPECTIONS OR INVESTIGATIONS BY SITE OWNER OR OPERATORS USEPA OR PPCA OFFICALS <br />INDICATE TIE SWPPP IS NOT EFFECTME IN ERJINARN <br />0 OR 9ERS O NTH L THE D G THE DISCHARGEARE <br />OF POLLUTANTS 7D SURFACE WATERS OR UNDERGROUND WATERS CR THAT THE DL7CIARCES ARE <br />CAUSING WATER QUALITY STANDARD DICFIDMICES (M. NUISANCE CONDITIONS AS DEFINED IN MINN. <br />R. 7050.0210. SUBP. 4 <br />S THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF MINWIDNG PDLLUTAN73 IN <br />STORUWATER INEWARM ASSOCIATED WITH CONSMUCBON ACTIVITY, OR THE SWAP IS NOT <br />CONSISTENT WITH THE TERMS AND CONDITIONS OF THIS PERMIT. <br />4, At ANY TIME AFTER PERMIT COVERAGE IS EFFECTIVE, THE RPG MAY oeummuc MAT MITE <br />PROJECYS STORMWATER DISWARGES MAY CAUSE, HAVE REASONABLE POTENTIAL TD CAUSE. OR <br />CONTRIBUTE TO NON -ATTAINMENT OF ANY APPLICABLE WATER QUALITY STANDARD, OR THAT THE <br />SWPPP DOES NOT INCORPORATE THE APPLICABLE RWOREMEN15 IN PART DULL, (IMPAIRED WATERS <br />AND NGLS). F A WATER QUALITY STANDARD CHANCES DURING THE TERM OF THIS PERMIT, THE MPGA <br />WILL MAKE A DETERMINATION AS TO Y&M'DM A MODB7CANCH OF THE SWPPP IS NECESSARY to <br />ADDRESS THE NEW STANDARD. F THE MPCA MAKES SUCH DETERMNATION(S) OR ANY OF THE <br />DETUMNAMNS IN PARTS ILEI. -3., THE MI -CA TILL NOBES) FY THE PERMITTEIN VOTING IN <br />RESPONSE, THE PERM17IEE(S) MUST AMEND THE SWPPP TO AOORESS THE IUENBFIW CONCERNS AND <br />SUBMIT WFORMAMON REOIiESSTwo BY THE MPG. VNICH MAY INCLUDE AN INDIVIDUAL PERMIT <br />APPLICATION, F THE MPCA'S WRITTEN NOTIFICATION REQURES A RESPONSE, FAILURE TO RESPOND <br />WTHIN THE SPECIFIED TIMEFRAME CONS07UIES A PERMIT VIOLATION. <br />PART III.C. - TEMPORARY SEDIMENT BASINS <br />"ONE FIVE (6) OR NGE ACRES OF OISBIRBED SOL DRAW TO A COMMON IOCABOIA THE PERUDTIEE(MUST <br />PROM A TEMPORARY SEDIMENT SON TO PROVIDE ZREAIAIENR 10 THE RWOW BE:WE If LEAVES THE <br />CONSTRUCT" SITE OR FRIERS SURFACE WAYBILL A TEMPORARY SEDIMENT BASH MAY BE CONVERTED TO A <br />PERMANENT BASH AFTER CONSTRUCTION IS COMPLETE, DE IEYPdtARY SAW IS NO LONGER RECORD 1IEN <br />PERMANENT COYER HAS REDUCED THE ACREAGE OF DLSWRBW SOL TO LER THAN FIVE (3) ACRES DURING A A <br />COMMON LUXAWK THE PERITEE(S) 15/ARE ENCOURAGED, BUT NOT ODIUM TO (STALL TEMPORARY SEDIMENT <br />BASINS WHERE APPROPRIATE IN AREAS WIN STEEP SLOPES ON HRJTLY DWOBUE SOLS EVEN 1F LESS THAN FIVE (5) <br />ACRES GRANS TO ONE AEA THE BASINS MUST BE DE900 AS CONSTRUCTED ACCORDING TO THE FOLLOWING <br />1. THE BANS M LUST PROVOE UNE STORAGE FOR A CALCULATED VOLUME OF RUNOFF FROM A TWO-1EAR, 24-NOLIR <br />STORM FROM EACH ACRE GRAWED 10 NNE BASIN. CmVT THAT IN NO GSE SHALL THE BASIN PROVIDE LESS THAN <br />IJ61111) CUBIC FEET OF ULE 310RACE TNA EACH ADE DROWNED RBE SASH. <br />2. WHERE THE CU OU11CI1 R PMT MCI. HAS NOT BEEN PERFORMS A TEMPORARY SEDIMENT BASIN PROVIDING <br />JADO WBC FEET OF LIVE STORAGE PER ACRE GRAINED TO THE BASIN SHALL E PROVIDED FOR BE EWWIE <br />DRAINAGE AREA OF TUE TEMPORARY BASK <br />1 TEMPORARY BASIN OUTLETS MUST BE DE900 TO PREVENT SHOT-CRCULIM AND THE DISCHARGE O <br />FLOATING DENS NE BASH MUST BE DESO ED WITH THE ABOM TO ALLOW COMPLETE BASIN CRA111DDMN FOR <br />MAINTENANCE ACTIVIIES, AND WST INCLUDE A STABILIZED EIMERCDICY OVERFLOW TO PREVENT FAILURE OF PDO <br />INTEGRITY THE OURET STRICTURE MUST BE DESIGNED To WNOAw WATER FROM INC SMFACE IN ORDER R <br />MINIMIZE THE MSDMM O POLLUTANTS EXCEPT THAT ONE USE OF A SURFACE 11117IORAWAL YEWRISM FOR <br />DISCHARGE CE BE BASIN MAY BE TEMPORARILY SUSPENDED DURMC FROM CONDITIONS. ENERGY DISSIPATION MUST <br />BE PROMED FOR THE BASH OUTLET PART HMBS.)< <br />4, SMIMNT BASINS MUST BE STUA OUTSIDE d: RICE WANDS AND ANY BUFFER ZONE ACQUIRED UNDER <br />APPENDIX AGS, AHO MAST BE DESIGNED TO AWO CRAMxG TIMM FROM WEEAN05 OOESS THE MPACT TO ONE <br />IME7LAIC IS N COMPLIANCE WN HE REOWUMENTS OF APPENDIX A, PART M <br />& ?HE TEMPORARY BASINS MUST BE CpL41RIICTED AND MADE OPERATIONAL PRIOR R 10 OR MORE ACRES OF <br />DISTUEM SM. DRAINING TO A COMMON LOCATION. <br />L WETS A TEMPORARY SEDIMENT BAST MEETING THE REODREMNTR OF INS PART 15 WEASISIZ EQUIVALENT <br />SEDYENT CIIIROLS 9L1i AS SMAUDR 9OL F BA9N5 AND/OR SEDIMENT RAPS SILT FERITCS VEGETATIVE <br />BUFFER S17RPSA GR ARY MPROPRAATE CaM81 ION OF MEAyptEs ARE REQUIRED FOR ALL COW -SLOPE <br />MINDANES OF THE COSiMRCAOR AREA AND FOR SBE -SLOPE BOUNDARIES AS DICTATED BY MMMOUAL SITE <br />CONDITIONS IN OEMOMM WHETTER 1NSTAUJW A SEDIMENT SM S INFEASIBLE THE PERMT1EE[5} MUST <br />CONSIDER RISJC SAFETY AND YAY (bWEOER FACTORS SACH AR SIE SOLS. ROPE. AND AVAILABLE AREA ON 97E <br />THIS OEIERMNAVI QF IFFA.9BRM7Y ANSf E OOCIMF/MTED IN INE SWPPP PATE PART BAS. <br />PART III,E - RECORD RETENTION <br />THE SWPPP (ORIGINAL OR DOPES) INCLUDING, ALL CHANGES 7O IT. AND NSPECDCHS AND <br />MAINTENANCE RECORDS MUST Be KEPT AT THE SIE DURING CONSTRUCTION BY THE PERMTIEES) <br />WHO HAS/HAAE OPERATIONAL CONTROL F THAT PORION OF THE STE. THE SWPPP CAN E KEPT IN <br />OTHER THE FTE1.D OFFICE OR W M ON-33TE VEHICLE DURNG NORMAL WORKING HOURS, <br />ALL OWNER(S) MUST KEEP THE FOLLOWING RECORDS ON FILE FOR THREE (3) (EARS AFTER SUBNTIAL <br />OF THE NBT AS OATUNED IN PART ILC. 7145 DOES NOT INCLUDE ANY RECORDS AFTER SUBMITTAL OF <br />THE NOT. <br />1. THE FILL SMVP <br />Z ANY OTHER STONWAIER RELATED PERMITS REWMIED FOR RE PROJECT <br />3. RECORDS OF ALL INSPECTION AND MAINTENANCE CDNOUMEO DURING CONSTRUCTION (PART IVE. <br />NSPECDOES AND MAINTENANCE) <br />PART III.E - RECORD RETENTION (CONT) <br />& ALL PERMANENT OPERATION AND MAINTENANCE ACREEYENTS THAT HAVE BEEN IMPLEMENTED. <br />INCLUDING ALL RIGHT-OF-WAY, CNRACTS COVENANTS AND OMEN BINDING RETIREMENTS <br />REGARDING PER WINTENANCE AND <br />5. ALL REOWREO CALWLATIOiS FOR DESIGN OF THE TEUPORMe AND PERMANENT STORUWATER <br />MANAGEMENT SYSTEM <br />PART III.F, - TRAINING REQUIREMENTS <br />THE PE%WTTECM SHALL TRAINED IN ACCORDANCE MIN THIS PERMIRE THE T'S TRAINING AWANDJEWIMO INDIVIDUALS B7gR,E0 IN THIS PART HAVE BEEN <br />1, WHO MOIST BE TRAINED; <br />A IN IVIOUAL(S) PREPARING THE SWPPP FOR THE PROJECT <br />L WCIVIDUALM DYERSUING WPLEMBVTAlN1N Of. REMSM AND AMENDING TIME SWPPP AND <br />MMOL PERFORMING WSPECRONS AS REQUIRED IN PART N.E ONE OF THESE INONMDUAL(S} <br />MUST Be VAILABLE FOR AN ONSITE INSPECTION WTHW 72 HOURS UPON REDLIEST BY TFE PPCA <br />C. WGMDUALCSI PERFORMNG OR SUPERVLgNC THE NSTAL ATION. MAINTENANCE AND REPAIR OF <br />IMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MOIST BE TRAINED W THESE JOB OUTIES. <br />2. TRAINING CONTENT THE CONTENT AND EMT OF DRAWING MIST BE COMMENSURATE MTN THE <br />INOIMWIL'S JOB DUTIR AND RESPONSIBILITIES WITH REGAD TO ACTIVITIES COVERED TINDER THIS <br />PERMIT FOR 1HE PROJECT. AT (FAST ONE INDIVIDUAL PRESENT ON THE PU MMED PROJECT STE (OR <br />AVAILABLE TO THE PROJECT STE IN 72 HOURS) MUST Be TRAINED IN THE JOB CITIES DESCRIBED W <br />PART W.F.1.B. AND PMT U.F.1.C. <br />3. THE PERMITTEES) SHALL ENSURE THAT INC WIVRIUALS ARE TRADED BY LOCAL, STATE, FEDERAL <br />AGENCIES. PROFESSIONAL ORGANIZATIONS. OR OTHER ENTITIES WITH EXPERTISE IN SROSON <br />PREVENTION, SEDIMENT CONTROL, PERMANENT STCRMWATEA MANAGEMENT AND THE MINNESOTA <br />NPOES/SOS CO(SEAUCRCN STORUWATER PERMIT. AN UPDATE RURM"-TRAMMING MUST BE <br />ATTENDED EVERY THREE (3) YEARS STARTING THREE (3) YEARS FROM THE ISSUANCE DATE OF THIS <br />PERMIT. <br />W.B. EROSION PREVENTION PRACTICES <br />1. THE PUMTEE(S) MUST PLAN FOR AND IMPLEMENT APPROPRIATE SUPS SUCH AS CONSTRUCTION <br />PHASING, VEGETATIVE WINTER STRIPS. HOR2MTAL SLOPE CRAOINC, INSPECTION AND MAINTENANCE OF <br />PART N.C. AIA OTHER CONSTRUCTOR PRACTICES THAT MINIMIZE EROSION AS NECESSARY M COMPLY <br />WITH THIS PERMIT AND PROTECT WATERS OF THE STATE THE LOCATION OF AREAS NOT TO BE <br />DSTURRED MUST ICE DEUNEATEL M WIN FLAG$ STAKES, SIGNS. GILT FENCE ETC.) ON THE PROJECT <br />SITE OMM WORC WEOIRS THE PERMITIEE(S) MUST MINIMIZE THE NEW FOR OSTIRBANCE OF PORTIONS <br />OF THE PROJECT RUT HAVE STEEP SLOPES. FGR THOSE SLOPED AREAS WICK MUST BE DISTURBED. <br />MI <br />THE PERrmos) MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICES DESIGNED <br />FOR STEEP SLOPES (ESI. SLOPE DURING AND TERRACING). <br />Z THE POWITMq MUST STADME ALL EXPOSED SOL AREAS ONtt M ST0CRRUES STABIUZADON <br />MUST BE INITIATED MATELY TO LIMIT SOL EROSION WHENEVER ANY ODNSIRUC LOU . NAS <br />PERMANENTLY OR TEMPORARILY C"= ON ANY PORTON OF THE 97E AND WILL NOT RESUME FOR A <br />PERIOD EXCEEONG 7 CALENDAR DAY1 STASUZATIOR MUST SE COMPLETED NO LATER THAN 14 <br />CALENDAR DAYS AFTER TIME COYSULICIM MINTY IN THAT PORTON OF THE SITE HAS TEMPORARILY <br />OR PERIMENTLY CEASED, <br />S IF USING STORNWAIER CONVEYANCE CHANNELS, THE PERYtrEE(5) MUSt DESIGN THE CHANNELS TO <br />RODE WATER AROUND UNSFABILIZED AREAS ON THE SITE MMD TD REDUCE CTIMON, UNLESS INFEASIBLE <br />THE PENATREEfs MUST USE EROSION CONTROLS AND VELOCITY DISSIPATION DEVICES SUCH AS CHECK <br />DAMS, SEDIMENT TRAPS. RIPRAP, OR GROUTED RTPRAP AT OUTLETS WTHIN AND ALONG THE LENGTH OF <br />ANY CONSTRUCTED STORMNATER CONVEYANCE CHANNE, AND AT ANY OUTLET. 70 PROVIDE A <br />NON-EROSIVE FLOW VELOCITY, TO MINIMIZE EROSION OF CHANNELS AND THEIR EMBANKMENTS, O TLEM <br />AOJACENf STREAM (ARKS SLOPES, AND DOWNSTREAM WATERS "NG DISCHARGE CONDITIONS. <br />4, THE PEAMITTEE(5) MIST STABILIZE THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR <br />PDUANENT DRAMA DITCH OR SWALE THAT DRAIN$ WATER FROM ANY PORI= OF THE CONSTRUCTION <br />91E, OR DIVENTS WATER ARO ND THE BITE, WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE OR <br />FROM THE POINT OF DISCHAR E Oro MY SURFACE WATER. STAMIZATDN OF THE LAST 200 LINEAL <br />PET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A GIURFACE WATER OR PROPERTY <br />THE POUrME(S) SHALL COMPLETE STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR <br />PERMANENT DITCHES OR SWAES WITHIN 7 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER <br />OR PROPERTY EDGE AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORA'4LY OR <br />PERMANENTLY CEASTDL <br />TEMPORARY OR PERMANENT 0970HES OR SWALES THAT ARE BIND USED AS A SEDIMENT CONTAINMENT <br />SYSTEM DURING CONSTRUCTION (NTH PROPERLY DESIGNED ROCK -DITCH CECCS. BI0 ROUST GILT CINES, <br />ETC00 NOT NEW TO BE STABILIZED DURING THE TEMPORARY PERIOD OF ITS USE AS A SEDIMENT <br />CGN AINMENT SYSTEM. THESE MEAS MUST BE STABILIZED WTRN 24 HORS AFTER NO LONGER BEING <br />USED AS A SEDIMENT CONTAINMENT SYSTEM. <br />APPLYING MULCH, HYDROMULCH. TACOFER. P0.YAORYLAMIDE OR SIMILAR ERD90N PREVENTION <br />PRACTICES IS NOT ACCEPTABLE STABILIZATION IN ANY PART OF A TEMPORARY OR PERMANENT DRAINAGE <br />DITCH OR SWALE <br />5, RPE OUTLETS MUST BE PROVIDED VAIN TEMPORARY OR PERMANENT ENERGY DI99PA710N WITHIN 24 <br />HOURS AFTER CONNECTION TO A SURFACE WATER, <br />L UNLESS INFEASIBLE DUE TO LACK OF PERVIOUS OR VEGETATED REAS, THE PERIITTEDS) MUST <br />DUECT DISCHARGES FROM LAMPS TO VEGETATED AREAS OF THE SITE ONCLUDINC ANY NATURAL IUFFER� <br />W ORDER TO INCREASE SEDIMENT REMOVAL AND MANSTORMWATERE STORMWATER INFILTRATION. THE PERMIT'w <br />MUST USE VELOCITY INSSPA71ON DEVICES IF NECESSARY TO PREVENT DD9ON WHEN DIRECTING <br />STMW ATTER TO VECETAIED AREAS. <br />PMT W.C. - SEDIMENT CONTROL PRAC110E3 <br />1. THE PERMITTEE(S) MUST EMPLOY SEDIMENT CONTROL PRACTICES AS NECESSARY TO MINIMIZE SEDIMENT <br />FROM ENTERING SURFACE WATERS, MCWDND CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS, A <br />TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDMENF BASINS THAT ARE DESIGNED AS PART OF <br />A SEDIMENT CONTAINMENT SYSTEM (E.G. DITCHES WTH ROCK -CHECK DAMS) REQUIRE SEGMENT CONTROL <br />PRACTICES ONLY AS APPROPRIATE FOR WE CONDITIONS. <br />B. F THE DOWN GRADIENT SEDIMI T CONTROLS ARE OYEIMMED (BASIN ON FREQUENT FAILURE OR <br />EXCI SDVE MAINTENANCE REQUIREMENT). THE PERMI LAST INSTALL ADDITIONAL IRGRAOEFIT <br />SEGMENT COTMM PRACTICES ON RWUMUNT SUPS <br />AMT <br />THE OWEROAONCi AND THE SWPPP <br />MUST BE AMENDED TO IDENTIFY THESE ADDITIONAL PRACTICES AS REWIRED M PART RLD L -M <br />Z SEDIMENT CONTROL PRACTICES MUST BE ESTARLffiED ON ALL DOWN GRAODNT PERIMETERS AFD BE <br />LOCATED U'CRADENT OF ANY SIIFFER ZONES, THE PERIMETER SEDIMENT CONTROL PR4C710E MUST BE IN <br />PLACE BEFORE ANY UPGRADUENT LAND -DISTURBING ACTIVITIES BEGIN, THESE PRACTICES SHALL REMAIN IN <br />PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABUSUEO IN ACCODA14CE WITH PART TVG <br />3. THE PERNITTEM SHALL RE -INSTALL ALL SEDIMENT CONTROL PRACTICES THAT HAVE BEEN ADJUSTED <br />OR REMOVED TO ACCOMMODATE SHORT -MGM ACRMTIES SUCH AS CLEARING OR OdIBRMC. OR PASSAGE <br />OF VEHICLES, IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY HAS BEEN COMPLETE& THE PERMITIEE(S) <br />SMALL COMPETE ANY SORT -TERM ACTIVITY THAT REQUIRES REMAIVAL OF SEDIMENT CONTROL <br />PRACTICES AS QUICKLY AS POSSIBLE THE PERYITTTE(S1 MUST RE -INSTALL SEDIMENT CONTROL <br />PRACTICES BEFORE THE Next PRECIPITABON EVENT EVEN IF THE SHORT -TEAM ACTIVITY IS NOT <br />COMPLETE <br />4. ALL STORM GRAFI INLETS MOIST BE PROTECTED BY APPROPRIATE SUPS OUTING CONSTRICTION UNTIL <br />ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STAWUZEM INLET <br />PROTECTION MAY BE GEUOVED FOR A PARTICULAR INLET F A SPECIFIC SAFETY CONCERN (STREET <br />FMOOMG/PREEZING) HAS BEEN IDENTIFIED BY THE PERMITTEE($) OR THE JURISDICTIONAL AUTHORITY <br />(ESI. CIRY/COINTT/FDWNSHP/EINOOT ENONEER)ME PERMITTEES) MUST DOCUMENT THE NEW FOR <br />OVAL M THE SWPPP. <br />5. 7EMPORARY SIL STOCKPILES OUST HAVE SLT FENCE OR OTHER EFFECTIVE SEDIMENT CGMTROLS. AND <br />CAN 07 BE PLACED IN ANY NATURAL BUFFERS OR SURFACE wATERS INCLUDING STCWATER <br />CONVEYANCES SUCH AS OUR AND GLITTER SYSTEMS OR COMM AND DITCHES UNLESS THERE S A <br />BYPASS N PLACE FOR THE SIORHWATER, <br />6. %WK VEHICLE TRAFFIC LEAVES ANY PMT OF THE STE (OR ONTO PAYED ROADS WITHIN THE SITE): <br />A THE PERMITTEES) MUST INSTALL A VEHICLE SACKING NIP 10 MINIMIZE THE RACK CUT OF <br />SEDIMENT FROM THE CONSTRUCTION SITE EXAMPLES OF VEHICLE TRACKING $MPS INCWOE (RUT ARE MIXT <br />UMRED TO) ROCK PADS -MUD MATS, SLASH MULCH, CONCRETE OR STEEL WASH RACKS DR EQUIVALENT <br />SYSTEMS <br />B. THE PERMTIEE(S) MUST USE STREET SWEEPING F SUCH VEHICLE TRACKING RIPS ARE NOT ADEQUATE <br />TO PREVENT SEDIMENT FROM BEING TRACKED CYTO THE STREET (SEE PART <br />7. THE PERMITTEE(S) MUST INSTALL TEMPORARY SEDIMENTATION BASINS AS RZQURM IN PART IILC. OF <br />THIS PERMIT. <br />PART IV.C. - SEDIMENT CONTROL PRACTICES (CONT.) <br />L THE PERMIT DE[9{) NU9T YINIW2E SOL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL <br />YDwIWNG SOIL ACTION IS NOT REQUIRED WHERE THE FUNCTION Or A SPCCFIC AREA OF THE SITE <br />DICTATES THAT IT BE COMPACZED. <br />A THE PERYITIEE(S) MUST PRESERVE A 30 FOOT NATURAL BUFFER OR OF A BUFFER IS INFEASIBLE ON <br />THE SITE) PROVIDE REDIINDANt SEDIMENT CONTROLS WHEN A SURFACE WATER IS LOCATED NATION 50 <br />FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER, <br />NATURAL BLLFFERS ARE NOT REOMM ADJACENT TO ROAD DITCHES, JUDICIAL CITCHM COUNTY DITCHES, <br />STORMWATER CONVEYANCE CHANNELS. STORM DRAW TIBET$ AND SEGMENT BASINS. THE PERMITIEE(S) <br />IS/ARE NOT REOORED TO ENHANCE THE QUALITY OF THE VEGETATION THAT ALREADY EXISTS IN TIE <br />BUFFER OR PROVIDE VEGETATION IF NONE EXIST. HOWEVER, PEAMIrUm CAN IMPROVE THE NATURAL <br />BUFFER WTH VEGETATION. <br />PART JV.D. - DEWATERING AND BASIN DRAWING <br />L THE PERMITTEES) MUST DISCHARGE TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWA71FMG <br />OR BASIN DRAWN (EQr PUMPED WSMARDES, TRENCHAMN CUTS FOR DRAINAGE) 70 A <br />TEMPORARY OR PERMANENT SEDWIENTATIDW BASIN ON THE PROJECT STE UNLESS INFEASIBLE THE <br />FERMI 5) MAY DISCKANGE FROM THE TEMPORARY OR PERMANENT SEDIMENrARM BASINS TO <br />SURFACE TOTS F THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE <br />TREATMENT HAS BEEN OBTAINED IN THE BASIN AND SHAT NUISANCE CONDITIONS (SEE MINN. R. <br />7050.0210. SUSP. 2) WILL NOT RESULT FROM THE DISCHARGE. F THE WATER CANNOT BE DISCHAA3ED <br />TO A SEDIMENTATION BASIN PRIOR 70 ENTERING THE SURFACE WATER. IT MUST BE TREATED NATH THE <br />APPROPRIATE SUPS, SUCH BUT THE DISCHARGE GOES NOT ADVERSELY AFFECT THE RECEIVING WATER <br />OR DOMMREAM PROPERTIES IF THE PUtMWME($) MUST DISCHARGE NATER THAT CONTAINS GL OR <br />GREABE, THE PERMITTEES) MUST USE AN OTL-WATER SEPARATOR OR SUITABLE FLTRABGN DEVICE <br />THE PERUITIMS <br />MUST ENSURE THF r. CARTRIDGEAT DISCHARGE HARGE POINTS ARE ABSORBENTS PADS) ADEQUATELY PRPRIOR TO OIIEIM <br />ECTED FROGING THEWAERO90N AND NOM NNE <br />DISCHARGE MUST BE DISPERSED OVER NATURAL ROOK RRUIP. SAID BAGS, PLASTIC SHEETIN% OR <br />OTHER ACCEPTED ENERGY D139PAWON MEAaRM <br />2. ALL WATER FROM DEWATERING OR BASIN -DRAINING ACTIVITIES MUST BE DISCHARGED W A YAWNER <br />THAT DOES NOT CAUSE NUISANCE CWM70M EROSION IN RECEIVING CHANNELS OR ON DOWNSLOPE <br />PACPER M OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACT TO INE WETLAND. <br />1 F THE PERMITTEES) IS/AAE USING FILTERS WITH BACKWASH WATER, THE POWITIMS) MUST HAUL <br />THE BACKWASH WAlTiERR AWAY FOR OSPDSAL. RETURN THE BACKWASH WATER TD THE BEGINNING OF <br />THE TREATMENT PROLES$ OR MCCTPDRA7E THE BACKWASH WATER INTO THE 97E IN A MANNER <br />THAT DOES NOT CAUSE EROSION. WE PERMITTEES) MAY DISCHARGE BACKWASH WATER 70 THE <br />SANITARY SEWER F PERMISSION 1S GRANTED BY TIE SANITARY SEWER AUTHORITY. THE PERMITTEE(S) <br />MUST REPLACE AND CLEAN THE FILTER MEDIA USED IN UEWATERNG DEVICES WHEN REQUIRED TO <br />RETAIN ADEQUATE FUNCTION <br />PART IV.E - INSPECTIONS AND MAINTENANCE <br />1. THE MUTTS= MUST ENSURE THAT A 1RAWED PERSON (AS IDENTIFIED IN PART F.AAA.) WILL <br />ROUTINELY WSPECT THE EN11RE CONSTRUCTION STE At LEAST ONCE EVERY SEVEN (J) DAYS DURING <br />ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RADWALL EVENT GREATER THAN LS COWES W <br />M HOURS. FOLLOWING AN INSPECTION THAT OCCURS WTHN 24 NDURS AFTER A RAINFALL EVENT. THE <br />NEXT INSPECBDIN MUST BE CONDUCTED WITHIN SEVEN (7) DAYS AFTER THE RAINFALL EVENT. <br />Z ALL INSPECTIONS AND MAINTENANCE CONDUCTED WRING CONSTRUCTION MUST BE RECORDED WITHIN <br />24 "MRS IN WRITING AND THESE RECORDS MUST BE RETAINED WTH THE SWPPP IN ACCORDANCE <br />MTN PART IRE RECORDS OF EACH INSPECTCH AND MAINTENANCE ACTIVIn SHALL NCLUDD <br />A DATE AND TIME OF INSPECTIONS <br />L NAME OF PFRSOI{5) CONDUCTING INSPECRONS <br />G MNOR" Of INSPECONSV INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE ACTIONS ARE <br />NEEDED <br />M CORRECTIVE ACTIONS TAKEN (INCLUDING 041E3, TIMES, AND PARTY COMPLETING MAINTENANCE <br />ACBMTEM <br />E DATE AND MOUNT OF ALL RAINFALL EVENS GREATER THAN 1/2 INCH (0.S INCHES) IN 24 HOURS, <br />RAINFALL AMOUNTS MUST BE OBTAINED TRY A PROPERLY MAINTAINED RAN GMJCE INSTALLED ONSITE, <br />A WEATHER STATION THAT IS WITHIN T MILE OF YOUR LOCATION ON A WEATHER REPCRXNG SYSTEM <br />BUT PROVIDES SITE SPECIFIC RAINFALL DATA FROM RADAR SIDIYARES <br />F. F ANY DISCHARGE IS OBSERVED TD BE OCCURRING DURING THE INSPWRON, A RECDRD OF ALL <br />POINTS OF THE PROPERTY FROM WITCH HERE 15 A DISCHARGE MUST BE MADE, AND THE DISCHARGE <br />SHOULD BE DESCRIBED (LEL, COLOR, ODOR. RpATINM SETTLED, OR SUSPENDED SOLIDS. FOAK CIL <br />SHEEN. AND OTHER OBVIOUS INDICATORS OF POLLUTANTS) AND PHOTOCRAPFDR <br />G ANY AMENDMENTS TD THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE <br />DOCUMENTED AS REQUIRED IN PART IILEL WITHIN SEVEN (7) CALENDAR DAYS <br />3. INSPECTION FREQUENCY ADJUSTMENT <br />A WHERE PARRS OF THE PROJECT 97E HAVE PERMANENT COVER, BUT WORK REMARKS ON OTHER <br />PARTS OF THE SITE, THE PERMTIERS) MAY REDUCE INSPECTIONS OF THE AREAS WITH PERMANENT <br />COVER TO ONCE PER YOUTH. <br />L WHERE CONSTRUCTION SITES HAVE PERMANENT COYER ON ALL EXPOSED SOL AREAS AND NO <br />CONSTRUCTION ACTIVITY 19 OCCURRING ANYWHERE ON THE Site, THE SITE MOST BE INSPECT50 DURING <br />WN -FROZEN GROUND CONDITIONS AT LEAST ONCE PER MONTH FOR A PERIOD OF TWELVE (12) <br />MONTHS. FOLLOWING THE TWELFTH MONTH OF PERMANENT COVER AND NO CONSTRICTION ACTIVITY, <br />INSPECTIONS MAY BE TERMINATED UNTIL CONSTRUCTION ACTIVITY IS ONCE AGAIN VITIATED UNLESS <br />THE PERMITTEES) IS/ARE N071FIED IN NOTING BY THE MPCA THAT EROSION ISSUES HAVE BEEN <br />DETECTED SITE THE SITE AND INSPECTIONS NEED TO RESUME <br />C. WHERE WCIM HAS BEEN SUSPENDED DIME TO FROZEN GROUND CONDITIONS. THE INSPECTIONS MAY <br />BE SU$PENOW. THE REQUIRED INSPECTIONS AND MAINTENANCE SCHEDULE MUST BEGIN WOW 24 <br />HOURS AFTER R NOFF OCCURS AT THE SITE CA 24 HORS PRIOR TO RESUMING CONSTRUCTION, <br />WHICHEVER COMES FIRSL <br />4. THE PERWITTEO(S) IS/AIE RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF TEMPORARY <br />AND PERMANENT WATER QUALITY MANAGEMENT SUPS AS WELL AS ALL EROSION PREYENTNN AND <br />SEGMENT CONTROL RMPA UNTIL ANOTHER PERMITTEE HAS OBTAINED COVERAGE ODDER THIS PERMIT <br />ACCORDING TO PART OLDS, OR 111E PROJECT HAS UNDEROCINE FINAL STABIUZATION, AND AN NOT HAS <br />BEEN SUBMITTED TO THE UTICA <br />5 THE PERU MUST IN9'ECi ALL EB09CN PREVENIM MA SEDIMENT CONTROL SUPS AND <br />POLIUBON P YARAK,YAIEN7 MIDLRURES 70 ENSURE INTEGRITY AND EFFECTIVENESS DURING <br />ALL ROUTINE AND POST-EWNFAL. EVENT INSPECTION& ALL NONFUNCTIONAL SUPS MUST WE RWARE% <br />RD -LAM. OR SUPPLEMENTED MTN FUNCTIONAL NPS BY THE END OF THE NEXT BUSINESS DAY <br />AFTER DISCOVERY. W AS SOON AS FIELD CONOTI NS ALLOW ACCESS UNLESS ANOTHER TIME FRAME <br />IS SPECFIED BELOW THE PCNMITIEE(S) MUST IMESBCATE AND COMPLY MTN THE AxXo NO <br />AI <br />INSPECTION AND MAINTENANCE REQUIREMENTS: <br />A ALL PERIMETER CONTROL CEVICES MUST BE REPAMM REPLACED. OR SUPPLEMENTED WHEN THEY <br />EMkIE THEE REPAIRS MUST K MADE BY THE END OF NCTIONAL OR THE SEDIMENT TIE4 NEXT BUSN(E99 DAY AFTER DISCOVERY, OR DEVICE THE HECHT OF THE <br />THEREAFTER AS SOON AS FIELD CONDITIONS ALLOW ACCESS. <br />B. TEMPORARY AND PERMANENT SEDIVENTATIGN BASINS MUST BE DRAINED AND THE SEDIMENT <br />REMOVED MEN THE DEPTH OF SEDIMENT COU.ECTED N THE BASIN READIES ONE-HALF (1/2) THE <br />STORAGE VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED MTHIN 72 HOURS OF DISCOVERY. OR <br />AS SOLI AS FIELD CONDITIONS ALLOW ACCESS (SEE PART (V.0.). <br />G SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED <br />FOR EVIDENCE OF EROSON AND SEDIMENT DEPOSITION DURING EACH INSPECTICL THE PERLIM" <br />MUST REMOVE ALL DELTAS AND SEDIUEHT GEPCSTED W SURFACE RATERS, INCLUDING DRAINAGE <br />WAYS, CATCH BASINS AND OTHER DRAINAGE SYSTEMS, AND RE9TABRIZE THE AREAS WHERE MOMENT <br />REMOVAL RESULTS IN EXPOSED SOL THE REMOVAL AND STASIUZA71OR MUST TACE PLACE WITHIN <br />SEVEN (7) DAYS OF DISCOVERY UNLESS PRM M OW RY QED REGULATORY, OR PHYSICAL ACCESS <br />CONSTRAINTS THE PERUTTEF(S) SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. F <br />PRECLUDED. REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN EVEN (7) CALENDAR DAYS OF <br />OBTAIYVC ACCESS. THE PERMIT7EF(S) IS/ARE RESPONSIBLE FOR CONTACIING ALL LOCAL REGIONAL <br />STALE AND FEDERAL A) HoWin S ANO RECEIVING ANY APPUCAWLE PERMITS PRIOR TO CONDUCTING <br />ANY WORK IN SURFACE WATERS. <br />Q CONSTRUCTION SHE VEHICLE EXIT LOCATIONS MUST BE INSPWM FDIC EVIDENCE OF OFF-SITE <br />SEDIMENT RAIONC ONTO PAVED SURFACES. TRACKED SBXME14T LUST E REMOVED FROM ALL PAVED <br />SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF DISCOVERY, OR F APPLICABLE, WITHIN A <br />SHORTER TIME TO COMPLY MTN PART IKC.d, <br />E STREETS AND OTHER AREAS ADJACENT TO THE PROJECT MUST Ort INSPECTED FOR EVIDENCE OF <br />OFF-SITE ACCUMULATIONS OF SEDIMENT, F SEDIMENT IS PRESENT. IT MUSE BE REMOVED IN A MANNER <br />AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-STE IMPACTS (EG, FUGITIVE SEDIMENT IN <br />SMUTS WAD E WASHED N70 STORM SEWERS BY 711E NEXT RAN ARDOR POSE A &AFETY <br />14AZARD TO USERS OF PUBLIC 911RUl ). <br />5. ALL INFILTRATION AREAS MUST Be INSPECTED TO ENSURE THAT NO SEDIMENT FROM CORNING <br />CONSTRUCTION ACTIVITY IS REACHING THE INFILTRATION AREA ALL INFILTRATION AREAS MUST BE <br />INSPEC7E0 TO ENSURE THAT EQUIPMENT IS NOT ENDING DRIVER ACROSS THE INFILTRATION AREA. <br />PART IV.F. - POLLUTION PREVENTION MANAGEMENT MEASURES <br />THE PEANIT7ESHALL IMPLEMENT THE FOLLUMN6 POLLUTION PREVDITION MANAGEMENT MEASURES <br />ON THE SIZEE(S) <br />1. STODGE, HANOLN(k AND DISPOSAL OF CONSTRUCTION PRODUCTS, MATERIALS. AND WASTES THE <br />PERYTTEE(SI SHALL COMPLY WITH TIE FOLLOWING M MINIMIZE THE DPOSURE TO SRIRMMWATER OF <br />ANY 6 PRODUCTS MATERIALS, ON WASTES, PRODUCTS OR WASTES WHICH ARE EITHER NOT A <br />SORCE CF CONTAMINATION TO 9RRMWATER OR ARE DESIGNS) TO BE EXPOSED TD STORMWATER ARE <br />NDT HELD TO THIS REQUIREMENT.- <br />A. <br />EQUIREMENT; <br />A OuLDNG PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS MUST BE UWDM COVER <br />M. PLASTIC SHEETING OR TEMPORARY RDCFS) TO PREVENT THE DISCHARGE OF POLLUTANTS OR <br />PROTECTED BY A SIMILARLY EFFECTIVE MEAR5 W R MINIMIZE CONTACT WITH STORMWATER. <br />B. PESTICOM HERBICIDES, INSECTIMM FERNUZERS. TREATMENT CHEMICALS, AND UWOSCAPE <br />MATERIALS MUST BE UNDER COVER (EJC., PLASTIC SHEEDNO OR TEMPORARY ROOF <br />F TO PRETETIT THE <br />DISCHARGE OF POLLUTANTS OR PROTECTED BY SIMILARLY EFFECTIVE MEANS DESIGN M MINIYRE <br />CONTACT WITH STORMWATER. <br />G HAZARDOUS MATERIAL$ 7010C WASTE, ONCWOWC CH. OES0. FUEL CASMML NYORAUUC FLUIDS, <br />PAINT SOLVENTS PETRGIEUM-BASED PRODUCTS. WON PRESERVAIMM ADDITIVES. CURING <br />COMPOURDSJ AND ACIDS) MUST BE PROPERLY STORED N SEALED ODN7AINERS TO PREVENT SR= <br />LEAKS CR OTHER CI9OIARCL RESTRICTED ACCESS STORAGE AREAS MOIST BE PROVIDED TO PREVENT <br />VANDIWSV. STORAGE AND O3POM OF HAZARDOUS WASTE OR HAZARDOUS MAIEDALS MUST Be IN <br />COMPLIANCE WITH MOM. R CH. 7045 INCLUDING SECONDARY CONTAINMENT AS APPUCABLE <br />D. SOLD WASTE MUST BE STORED, COLLECTED AND DISPOSED OF PROPERLY IN COMPLIANCE MIN <br />MINK. R CH. 70M <br />E PORTABLE TOILETS MUST BE POSITIONED ED THAT THEY ARE SECURE AND TILL NOT BE TMPPEO OR <br />KNOCKED OVER. SANITARY WASE MUST BE DISPOSED OF PROPERLY IN AMDDANLE ACTH MINN. FL <br />CK. 7041, <br />Z FUELING AND MAINTENANCE OF EQUIPMENT OR VOWASc SPILL PREVENTION AND RESPONSE THE <br />PERMITTEE(S) SHALL TAKE REASONABLE STEPS TO PREVENT 711E DISCHARGE OF SPRLED OR LEAKED <br />CEUICALS LN UDWG FURL, FROM ANY AREA WERE CHEMICALS ON FUEL WILL BE LOAM OR <br />IAADADM INCLUDING THE 115E OF DRIP PANS OR ABSORBENTS UNLESS INFEASIBLE. THE PONME(S) <br />MUST CONDUCT FUELING IN A CONTAINED AREA UNLESS INFEASIBLE. THE PERMWIMS MUST ENSURE <br />ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TOES TD CLEAN UP DISCHARGED MATERIALS AND THAT <br />AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED NAIVE" THE <br />PERMIT S) MUST REPORT AND CLEAN UP SPILLS IMMEDIATELY AS RWORED BY MILAN. STAT. 0 <br />113061, USAW DRY CLEAN UP MEASURES WHERE POSSIBLE. <br />3. VO4ME AND EQUIPMENT WASHING, F INE PERMTTMS) WASH THE EXTERIOR OF VOKIM Olt <br />EQUIPMENT ON THE PROJECT SIZE, WASHING MUST BE UUITED TO A DEFINED AREA OF THE SIE. <br />RUNOFF FROM THE WASMO AREA MUST BE CONTAINED IN A SEDIMENT BASH OR 01HO SIMILARLY <br />EFFECTIVE CONTROLS AND WASTE FROM THE WASHING ACTIVITY MUST BE PROPERLY DISPOSED OF, UNE <br />PERMITIEE(S) MUST PROPERLY USE AND STORE SOAPS, DETERGENTS, OR SOLVENTS, ND DIME <br />DECREASING IS ALLOWED ON SITE. <br />4. CONCRETE AND OTHER WASHOUTS WASTE THE P"YtMM MUST PROVIDE EFFECTIVE <br />CONTAINMENT FOR ALL UQUID AND SCUD WASTES GENERATED BY WASHOUT OPERATIONS (CONCRETE <br />STUCCO, PAINT, FORAM RELEASE GLS, CL ONG COMPOUNDS AND OTHER CONSTRUCTION MATERIALS) <br />RELATED TO THE CONSTRUCTION ACTIVITY, THE LIQUID AND SCLO WASHOUT WASTES MUST NOT <br />CONTACT THE GROUND. AND THE CONTRNUDT MUST E DESIGNED 50 THAT If DOES NOT RESULT ON <br />IMHOFF FROM THE WASHOUT OPERATIONS OR AREAS UQUID AND SOD WASTES MUST BE DISPOSED <br />OF PROPERLY AND N COMPLIANCE WITH MPGA RULES A SCM MUST BE INSTALLED ADJACENT TO EACH <br />WASHOUT FACILITY THAT REQUIRES SITE PERSONNEL TO UTUZE THE PROPER FACHTIES FOR OtBPOSAL <br />OF CONIMIC AND OTHER WASHOUT WASTES. <br />PART IV.Il FINAL STABILIZATION <br />THE PUNITTEE(5) MUST ENSURE FINAL STAT UZATIOI OF THE SITE. FINAL STABILIZATION IS NOT <br />COMPLETE UNTIL ALL REGARBMQNTS OF PARTS N.G1.ti7. ARE COMPLETE: <br />1. ALL SOL DISTURBING ACTIVITIES AT THE SITE HAVE SEEN COMPLETED AND ALL SOLS ARE <br />STABIUZW BY A UNIFORM PERENNIAL VEGETATIVE COYER WIN A DENSITY OF 70 PERCENT OF ITS <br />EXPECTED FINAL GROWTH DENSITY OVER THE ENTIRE PERSONS SURFACE AREA, OR OTHER EQUIVALENT <br />MEANS NECESSARY TO PREVENT SOL FAILURE UNDER EROSIVE CONDITION& <br />Z THE PERTHLNENT STOFNw%lER MANAGEMENT SISTEMI 15 CONSTRUCTED. MEETS ALL REQBRSAENTS IN <br />PART W.0. AND IS OPERATING AS DESIGNED, TEMPORARY OR PERMANENT SEDIMENTATION RAM THAT <br />ARE TD BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS HAVE BET7N QZANW OF ANY <br />ACOMULATED SEDIMENT. ALL SEDIMENT VAS BEEN REMOVE) FROM CCNVEYAHCE SYSTEM AND <br />DITCHES ARE STABILIZED WITH PERMANENT COWL <br />I ALL TEMPORARY SYNTHETIC AND STRUCTURAL EROSION PREVENTION AND SEDIMENT CONTROL IMPS <br />(SUCH AS SRF FENCE) HAVE BEEN REMOVED ON THE PORTIONS OF THE SITE FOR WHICH THE <br />PERRMITIEE(S) IS/ARE RESPONSIBLE BLIPS DESIGNED TO DECOMPOSE ON SITE (SUCH AS SOME <br />COMPOST LOOS) MAY BE LEFT IN PLACE. <br />4. FOR MOENTIAL CONSMMBCN ONLY, INDIVIDUAL LOTS ARE CON9DEBED FINALLY STAEUZE0 F <br />THE STRIMILMIX0 ARE FINISHED AND TEMPORARY EROSION PROTECTION AND COWNGRAOIENT <br />PERIMETER CONTROL, HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN SOD TO THE HONEpwRO. <br />ADDITIONALLY. THE PERMITTEE HAS DISTRIBUTED THE MPG'S 'FwmmmER FACT SNEEr TO THE <br />HOMEOWNER TO INFO IA THE HOYEMMIER OF THE NEW FOR AND MR, TS OF. PERMANENT COMDR. <br />5. FOR CONSTRUCTION PROJECTS ON AGRICULTURAL LAND (LC. PIPELINES ACROSS (SAP, FIELD <br />PASTURE OR RANGE LAND) THE GISRMED LAND HAS BEEN RETURNED TO ITS PRECONSIRUCTON <br />AGRICULTURAL USE. <br />DRAWN BH DESIGN BY: <br />A.G. A/. <br />/HOKDBY: PRDJ.ND. <br />ORIGINAL DATEV <br />MARCH 25.2074 <br />Z <br />z 0 <br />(O C z d J0. <br />O LE o <br />OO az <br />D Z x� IZ <br />cCL <br />o pa <br />p m <br />PREPARED FOR: <br />ORCHARD HILL <br />ASSOCIATES, LLC <br />WrE PLANNING <br />4 ENGINEERING <br />PLOWE <br />ENGINEERING, DMC. <br />8775 LAKE ERNE <br />SUITE 170 <br />LINO LAM MN 03014 <br />PHONE: QRST) M14210 <br />FAX (651) MW 701 <br />STORM WATER POLLUTION PREVENTION PLAN <br />HUGO SENIOR HOUSING COMMUNITY I C4-1 <br />