PART II.C. - TERMINATION OF COVERAGE
<br />L. TERMINATION OF COVERAGE WEN CONSTRUCTION IS COMPLETE: ALL PERIATTEE(S) MUST SUBMIT A
<br />NOTICE OF TERMINATION (NOT) TO TIMI MPGA ON A FORM PROMOED BY THE COMMISSIONER MINN .LO
<br />DAYS AFTER ALL ACTIVITIES TEOMRED FOR FINAL STABILIZATION (SEE PART A,0.) ARE COMPLETE. 711E
<br />PENNMITIEE(5)' COVERAGE (NYDER THIS PERMIT TERMINATES At MIDNIGHT ON THE SUINWDN DATE OF
<br />INE NOT.
<br />Z TERMINATION OF COVERAGE WHEN TAMSM OF OWNERSHIP OCLURR ALL POWirNI(S) MUST
<br />SUBMIT A NOT ON A FORM PROVIDED BY THE COMMISSIONER WITHIN 30 DAYS AFTER SELUND OR
<br />07HERVAM LEGALLY RANSFERRMG THE ENTIRE SITE INCLUDING PERMIT RESPONSIBILITY FOR ROADS
<br />(ESI, STREET SWEEPROW AND STORUWATER INFRASTRUCTURE FINAL CLEAN OUT OR TRANSFERRING
<br />PORTIONS OF A STE TO MOTHER PARTY. THE PERMITTE(S' COVERAGE UNDER THIS PERRT
<br />TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF THE MDT.
<br />3. PERMITEE(S) MAY IEBMINAIE PERMIT COVERAGE PRIOR TO COMPLETION OF ALL OMMMUCUM
<br />AC71MTY K ALL OF THE FOLLOWING CONDITIONS ARE MET. AFTER SE PERMIT IS TERMINATED UNDER
<br />1ASi0 CONSTR GOON 19 ANY
<br />= NOTTCOMPLMMENT ON THE NEW PERMIT COVERAGE MUST BE OBUMAINING PORTIONS OF ANVEID FE
<br />THE SUBSEQUENT DEVELOPMENT ITSELF OR AS PART OF THE REMAINING COMMON PLAN OF
<br />DEVELOPMENT OR SALE WILL RESULT IN LAND DISTURBING ACTIVITIES OF ONE (1) OR MORE ACRES IN
<br />A CONSTRUCRON ACTIVITY HAS CEASED FOR AT LEAST BO DAYS,
<br />B. AT LEAST 90 PER IENt BY OF ALL ORIGINALLY PROPOSED CONSTRUCTICN ACTIVITY HAS
<br />BEEN COMPLETED AND PERIMANENT COVER ESrAMISIED ON THOSE AREAS
<br />G ON AREAS WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE. PERMANENT COVER HAS BEEN
<br />ESTABLISHED.
<br />0. THE 917E 15 IN COMPLIANCE MTN PART MMU, AND PART IV.ILl AND WHERE APPLICABLE. PART
<br />HCG.0 OR PART MOLL
<br />4. PERMITTEE(97 MAY TERMINATE COVERAGE UPON APPROVAL BY THE MPCA IF INFORMATION IS
<br />SUBMITTED 7d THE MPCA DOCUMENTING THAT TERIJINAROW IS APPROPAIME BECAUSE THE PROJECT RR
<br />CANCELED.
<br />PART I11.A.3 - TRAINING DOCUMENTATION
<br />TRAINING OGCUMENTAIIOR: THE PERMITTEE(S) SHALL DMRE THE RUIVICUALS IDENTIFIED W PART IILF
<br />HAVE SEEN TRAINED IN ACCORDANCE WITH TLS PERMIT'S TRAINING REOLAIS. NEMEPTHE PERMIrEE(s)
<br />SHALL ENSURE THE TRAINING IS RECORDED IN OR WITH THE SWPPP BEFORE THE START OF
<br />CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PADJECT HAVE OM DETERMINED,
<br />DOCUMENTATION SHAM INMLME:
<br />A NAMES OF THE PERSONNEL ASSOCIATED WTH THIS PROJECT THAT ARE REQUIRED TO BE TRAINED
<br />PER PART IIIA(. OF TINS PERMIT.
<br />B.DATES OF TRAINING AND NAME OF K51MXTC RM AND ENTITY PAOVONG STAINING.
<br />G CONTENT OF TRAINING COURSE OR WOMMOP INCLUDING THE NUMBER OF HOURS OF TRAINING
<br />PA?T III:R . c'ATs; AMLA. MLN!5
<br />THE PERIITTEE(S) MUST MEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS.
<br />SUCH AS A0017IONAL OR MODIFIED SUPS THAT ARE DESIGNED m CORRECT PROBLEMS IDENTFIED GR
<br />ADDRESS SITUATIONS WHENEVER:
<br />1. THERE IS A CHANGE N DESIGN, CONSIRUCTIQN. OPERATION, MAINTENANCE. WEATHER ON SEASONAL
<br />CONDITIOS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE
<br />WATERS OR UNDERGROUND WATER&
<br />Z INSPECTIONS OR INVESTIGATIONS BY SITE OWNER OR OPERATORS USEPA OR PPCA OFFICALS
<br />INDICATE TIE SWPPP IS NOT EFFECTME IN ERJINARN
<br />0 OR 9ERS O NTH L THE D G THE DISCHARGEARE
<br />OF POLLUTANTS 7D SURFACE WATERS OR UNDERGROUND WATERS CR THAT THE DL7CIARCES ARE
<br />CAUSING WATER QUALITY STANDARD DICFIDMICES (M. NUISANCE CONDITIONS AS DEFINED IN MINN.
<br />R. 7050.0210. SUBP. 4
<br />S THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF MINWIDNG PDLLUTAN73 IN
<br />STORUWATER INEWARM ASSOCIATED WITH CONSMUCBON ACTIVITY, OR THE SWAP IS NOT
<br />CONSISTENT WITH THE TERMS AND CONDITIONS OF THIS PERMIT.
<br />4, At ANY TIME AFTER PERMIT COVERAGE IS EFFECTIVE, THE RPG MAY oeummuc MAT MITE
<br />PROJECYS STORMWATER DISWARGES MAY CAUSE, HAVE REASONABLE POTENTIAL TD CAUSE. OR
<br />CONTRIBUTE TO NON -ATTAINMENT OF ANY APPLICABLE WATER QUALITY STANDARD, OR THAT THE
<br />SWPPP DOES NOT INCORPORATE THE APPLICABLE RWOREMEN15 IN PART DULL, (IMPAIRED WATERS
<br />AND NGLS). F A WATER QUALITY STANDARD CHANCES DURING THE TERM OF THIS PERMIT, THE MPGA
<br />WILL MAKE A DETERMINATION AS TO Y&M'DM A MODB7CANCH OF THE SWPPP IS NECESSARY to
<br />ADDRESS THE NEW STANDARD. F THE MPCA MAKES SUCH DETERMNATION(S) OR ANY OF THE
<br />DETUMNAMNS IN PARTS ILEI. -3., THE MI -CA TILL NOBES) FY THE PERMITTEIN VOTING IN
<br />RESPONSE, THE PERM17IEE(S) MUST AMEND THE SWPPP TO AOORESS THE IUENBFIW CONCERNS AND
<br />SUBMIT WFORMAMON REOIiESSTwo BY THE MPG. VNICH MAY INCLUDE AN INDIVIDUAL PERMIT
<br />APPLICATION, F THE MPCA'S WRITTEN NOTIFICATION REQURES A RESPONSE, FAILURE TO RESPOND
<br />WTHIN THE SPECIFIED TIMEFRAME CONS07UIES A PERMIT VIOLATION.
<br />PART III.C. - TEMPORARY SEDIMENT BASINS
<br />"ONE FIVE (6) OR NGE ACRES OF OISBIRBED SOL DRAW TO A COMMON IOCABOIA THE PERUDTIEE(MUST
<br />PROM A TEMPORARY SEDIMENT SON TO PROVIDE ZREAIAIENR 10 THE RWOW BE:WE If LEAVES THE
<br />CONSTRUCT" SITE OR FRIERS SURFACE WAYBILL A TEMPORARY SEDIMENT BASH MAY BE CONVERTED TO A
<br />PERMANENT BASH AFTER CONSTRUCTION IS COMPLETE, DE IEYPdtARY SAW IS NO LONGER RECORD 1IEN
<br />PERMANENT COYER HAS REDUCED THE ACREAGE OF DLSWRBW SOL TO LER THAN FIVE (3) ACRES DURING A A
<br />COMMON LUXAWK THE PERITEE(S) 15/ARE ENCOURAGED, BUT NOT ODIUM TO (STALL TEMPORARY SEDIMENT
<br />BASINS WHERE APPROPRIATE IN AREAS WIN STEEP SLOPES ON HRJTLY DWOBUE SOLS EVEN 1F LESS THAN FIVE (5)
<br />ACRES GRANS TO ONE AEA THE BASINS MUST BE DE900 AS CONSTRUCTED ACCORDING TO THE FOLLOWING
<br />1. THE BANS M LUST PROVOE UNE STORAGE FOR A CALCULATED VOLUME OF RUNOFF FROM A TWO-1EAR, 24-NOLIR
<br />STORM FROM EACH ACRE GRAWED 10 NNE BASIN. CmVT THAT IN NO GSE SHALL THE BASIN PROVIDE LESS THAN
<br />IJ61111) CUBIC FEET OF ULE 310RACE TNA EACH ADE DROWNED RBE SASH.
<br />2. WHERE THE CU OU11CI1 R PMT MCI. HAS NOT BEEN PERFORMS A TEMPORARY SEDIMENT BASIN PROVIDING
<br />JADO WBC FEET OF LIVE STORAGE PER ACRE GRAINED TO THE BASIN SHALL E PROVIDED FOR BE EWWIE
<br />DRAINAGE AREA OF TUE TEMPORARY BASK
<br />1 TEMPORARY BASIN OUTLETS MUST BE DE900 TO PREVENT SHOT-CRCULIM AND THE DISCHARGE O
<br />FLOATING DENS NE BASH MUST BE DESO ED WITH THE ABOM TO ALLOW COMPLETE BASIN CRA111DDMN FOR
<br />MAINTENANCE ACTIVIIES, AND WST INCLUDE A STABILIZED EIMERCDICY OVERFLOW TO PREVENT FAILURE OF PDO
<br />INTEGRITY THE OURET STRICTURE MUST BE DESIGNED To WNOAw WATER FROM INC SMFACE IN ORDER R
<br />MINIMIZE THE MSDMM O POLLUTANTS EXCEPT THAT ONE USE OF A SURFACE 11117IORAWAL YEWRISM FOR
<br />DISCHARGE CE BE BASIN MAY BE TEMPORARILY SUSPENDED DURMC FROM CONDITIONS. ENERGY DISSIPATION MUST
<br />BE PROMED FOR THE BASH OUTLET PART HMBS.)<
<br />4, SMIMNT BASINS MUST BE STUA OUTSIDE d: RICE WANDS AND ANY BUFFER ZONE ACQUIRED UNDER
<br />APPENDIX AGS, AHO MAST BE DESIGNED TO AWO CRAMxG TIMM FROM WEEAN05 OOESS THE MPACT TO ONE
<br />IME7LAIC IS N COMPLIANCE WN HE REOWUMENTS OF APPENDIX A, PART M
<br />& ?HE TEMPORARY BASINS MUST BE CpL41RIICTED AND MADE OPERATIONAL PRIOR R 10 OR MORE ACRES OF
<br />DISTUEM SM. DRAINING TO A COMMON LOCATION.
<br />L WETS A TEMPORARY SEDIMENT BAST MEETING THE REODREMNTR OF INS PART 15 WEASISIZ EQUIVALENT
<br />SEDYENT CIIIROLS 9L1i AS SMAUDR 9OL F BA9N5 AND/OR SEDIMENT RAPS SILT FERITCS VEGETATIVE
<br />BUFFER S17RPSA GR ARY MPROPRAATE CaM81 ION OF MEAyptEs ARE REQUIRED FOR ALL COW -SLOPE
<br />MINDANES OF THE COSiMRCAOR AREA AND FOR SBE -SLOPE BOUNDARIES AS DICTATED BY MMMOUAL SITE
<br />CONDITIONS IN OEMOMM WHETTER 1NSTAUJW A SEDIMENT SM S INFEASIBLE THE PERMT1EE[5} MUST
<br />CONSIDER RISJC SAFETY AND YAY (bWEOER FACTORS SACH AR SIE SOLS. ROPE. AND AVAILABLE AREA ON 97E
<br />THIS OEIERMNAVI QF IFFA.9BRM7Y ANSf E OOCIMF/MTED IN INE SWPPP PATE PART BAS.
<br />PART III,E - RECORD RETENTION
<br />THE SWPPP (ORIGINAL OR DOPES) INCLUDING, ALL CHANGES 7O IT. AND NSPECDCHS AND
<br />MAINTENANCE RECORDS MUST Be KEPT AT THE SIE DURING CONSTRUCTION BY THE PERMTIEES)
<br />WHO HAS/HAAE OPERATIONAL CONTROL F THAT PORION OF THE STE. THE SWPPP CAN E KEPT IN
<br />OTHER THE FTE1.D OFFICE OR W M ON-33TE VEHICLE DURNG NORMAL WORKING HOURS,
<br />ALL OWNER(S) MUST KEEP THE FOLLOWING RECORDS ON FILE FOR THREE (3) (EARS AFTER SUBNTIAL
<br />OF THE NBT AS OATUNED IN PART ILC. 7145 DOES NOT INCLUDE ANY RECORDS AFTER SUBMITTAL OF
<br />THE NOT.
<br />1. THE FILL SMVP
<br />Z ANY OTHER STONWAIER RELATED PERMITS REWMIED FOR RE PROJECT
<br />3. RECORDS OF ALL INSPECTION AND MAINTENANCE CDNOUMEO DURING CONSTRUCTION (PART IVE.
<br />NSPECDOES AND MAINTENANCE)
<br />PART III.E - RECORD RETENTION (CONT)
<br />& ALL PERMANENT OPERATION AND MAINTENANCE ACREEYENTS THAT HAVE BEEN IMPLEMENTED.
<br />INCLUDING ALL RIGHT-OF-WAY, CNRACTS COVENANTS AND OMEN BINDING RETIREMENTS
<br />REGARDING PER WINTENANCE AND
<br />5. ALL REOWREO CALWLATIOiS FOR DESIGN OF THE TEUPORMe AND PERMANENT STORUWATER
<br />MANAGEMENT SYSTEM
<br />PART III.F, - TRAINING REQUIREMENTS
<br />THE PE%WTTECM SHALL TRAINED IN ACCORDANCE MIN THIS PERMIRE THE T'S TRAINING AWANDJEWIMO INDIVIDUALS B7gR,E0 IN THIS PART HAVE BEEN
<br />1, WHO MOIST BE TRAINED;
<br />A IN IVIOUAL(S) PREPARING THE SWPPP FOR THE PROJECT
<br />L WCIVIDUALM DYERSUING WPLEMBVTAlN1N Of. REMSM AND AMENDING TIME SWPPP AND
<br />MMOL PERFORMING WSPECRONS AS REQUIRED IN PART N.E ONE OF THESE INONMDUAL(S}
<br />MUST Be VAILABLE FOR AN ONSITE INSPECTION WTHW 72 HOURS UPON REDLIEST BY TFE PPCA
<br />C. WGMDUALCSI PERFORMNG OR SUPERVLgNC THE NSTAL ATION. MAINTENANCE AND REPAIR OF
<br />IMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MOIST BE TRAINED W THESE JOB OUTIES.
<br />2. TRAINING CONTENT THE CONTENT AND EMT OF DRAWING MIST BE COMMENSURATE MTN THE
<br />INOIMWIL'S JOB DUTIR AND RESPONSIBILITIES WITH REGAD TO ACTIVITIES COVERED TINDER THIS
<br />PERMIT FOR 1HE PROJECT. AT (FAST ONE INDIVIDUAL PRESENT ON THE PU MMED PROJECT STE (OR
<br />AVAILABLE TO THE PROJECT STE IN 72 HOURS) MUST Be TRAINED IN THE JOB CITIES DESCRIBED W
<br />PART W.F.1.B. AND PMT U.F.1.C.
<br />3. THE PERMITTEES) SHALL ENSURE THAT INC WIVRIUALS ARE TRADED BY LOCAL, STATE, FEDERAL
<br />AGENCIES. PROFESSIONAL ORGANIZATIONS. OR OTHER ENTITIES WITH EXPERTISE IN SROSON
<br />PREVENTION, SEDIMENT CONTROL, PERMANENT STCRMWATEA MANAGEMENT AND THE MINNESOTA
<br />NPOES/SOS CO(SEAUCRCN STORUWATER PERMIT. AN UPDATE RURM"-TRAMMING MUST BE
<br />ATTENDED EVERY THREE (3) YEARS STARTING THREE (3) YEARS FROM THE ISSUANCE DATE OF THIS
<br />PERMIT.
<br />W.B. EROSION PREVENTION PRACTICES
<br />1. THE PUMTEE(S) MUST PLAN FOR AND IMPLEMENT APPROPRIATE SUPS SUCH AS CONSTRUCTION
<br />PHASING, VEGETATIVE WINTER STRIPS. HOR2MTAL SLOPE CRAOINC, INSPECTION AND MAINTENANCE OF
<br />PART N.C. AIA OTHER CONSTRUCTOR PRACTICES THAT MINIMIZE EROSION AS NECESSARY M COMPLY
<br />WITH THIS PERMIT AND PROTECT WATERS OF THE STATE THE LOCATION OF AREAS NOT TO BE
<br />DSTURRED MUST ICE DEUNEATEL M WIN FLAG$ STAKES, SIGNS. GILT FENCE ETC.) ON THE PROJECT
<br />SITE OMM WORC WEOIRS THE PERMITIEE(S) MUST MINIMIZE THE NEW FOR OSTIRBANCE OF PORTIONS
<br />OF THE PROJECT RUT HAVE STEEP SLOPES. FGR THOSE SLOPED AREAS WICK MUST BE DISTURBED.
<br />MI
<br />THE PERrmos) MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICES DESIGNED
<br />FOR STEEP SLOPES (ESI. SLOPE DURING AND TERRACING).
<br />Z THE POWITMq MUST STADME ALL EXPOSED SOL AREAS ONtt M ST0CRRUES STABIUZADON
<br />MUST BE INITIATED MATELY TO LIMIT SOL EROSION WHENEVER ANY ODNSIRUC LOU . NAS
<br />PERMANENTLY OR TEMPORARILY C"= ON ANY PORTON OF THE 97E AND WILL NOT RESUME FOR A
<br />PERIOD EXCEEONG 7 CALENDAR DAY1 STASUZATIOR MUST SE COMPLETED NO LATER THAN 14
<br />CALENDAR DAYS AFTER TIME COYSULICIM MINTY IN THAT PORTON OF THE SITE HAS TEMPORARILY
<br />OR PERIMENTLY CEASED,
<br />S IF USING STORNWAIER CONVEYANCE CHANNELS, THE PERYtrEE(5) MUSt DESIGN THE CHANNELS TO
<br />RODE WATER AROUND UNSFABILIZED AREAS ON THE SITE MMD TD REDUCE CTIMON, UNLESS INFEASIBLE
<br />THE PENATREEfs MUST USE EROSION CONTROLS AND VELOCITY DISSIPATION DEVICES SUCH AS CHECK
<br />DAMS, SEDIMENT TRAPS. RIPRAP, OR GROUTED RTPRAP AT OUTLETS WTHIN AND ALONG THE LENGTH OF
<br />ANY CONSTRUCTED STORMNATER CONVEYANCE CHANNE, AND AT ANY OUTLET. 70 PROVIDE A
<br />NON-EROSIVE FLOW VELOCITY, TO MINIMIZE EROSION OF CHANNELS AND THEIR EMBANKMENTS, O TLEM
<br />AOJACENf STREAM (ARKS SLOPES, AND DOWNSTREAM WATERS "NG DISCHARGE CONDITIONS.
<br />4, THE PEAMITTEE(5) MIST STABILIZE THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR
<br />PDUANENT DRAMA DITCH OR SWALE THAT DRAIN$ WATER FROM ANY PORI= OF THE CONSTRUCTION
<br />91E, OR DIVENTS WATER ARO ND THE BITE, WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE OR
<br />FROM THE POINT OF DISCHAR E Oro MY SURFACE WATER. STAMIZATDN OF THE LAST 200 LINEAL
<br />PET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A GIURFACE WATER OR PROPERTY
<br />THE POUrME(S) SHALL COMPLETE STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR
<br />PERMANENT DITCHES OR SWAES WITHIN 7 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER
<br />OR PROPERTY EDGE AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORA'4LY OR
<br />PERMANENTLY CEASTDL
<br />TEMPORARY OR PERMANENT 0970HES OR SWALES THAT ARE BIND USED AS A SEDIMENT CONTAINMENT
<br />SYSTEM DURING CONSTRUCTION (NTH PROPERLY DESIGNED ROCK -DITCH CECCS. BI0 ROUST GILT CINES,
<br />ETC00 NOT NEW TO BE STABILIZED DURING THE TEMPORARY PERIOD OF ITS USE AS A SEDIMENT
<br />CGN AINMENT SYSTEM. THESE MEAS MUST BE STABILIZED WTRN 24 HORS AFTER NO LONGER BEING
<br />USED AS A SEDIMENT CONTAINMENT SYSTEM.
<br />APPLYING MULCH, HYDROMULCH. TACOFER. P0.YAORYLAMIDE OR SIMILAR ERD90N PREVENTION
<br />PRACTICES IS NOT ACCEPTABLE STABILIZATION IN ANY PART OF A TEMPORARY OR PERMANENT DRAINAGE
<br />DITCH OR SWALE
<br />5, RPE OUTLETS MUST BE PROVIDED VAIN TEMPORARY OR PERMANENT ENERGY DI99PA710N WITHIN 24
<br />HOURS AFTER CONNECTION TO A SURFACE WATER,
<br />L UNLESS INFEASIBLE DUE TO LACK OF PERVIOUS OR VEGETATED REAS, THE PERIITTEDS) MUST
<br />DUECT DISCHARGES FROM LAMPS TO VEGETATED AREAS OF THE SITE ONCLUDINC ANY NATURAL IUFFER�
<br />W ORDER TO INCREASE SEDIMENT REMOVAL AND MANSTORMWATERE STORMWATER INFILTRATION. THE PERMIT'w
<br />MUST USE VELOCITY INSSPA71ON DEVICES IF NECESSARY TO PREVENT DD9ON WHEN DIRECTING
<br />STMW ATTER TO VECETAIED AREAS.
<br />PMT W.C. - SEDIMENT CONTROL PRAC110E3
<br />1. THE PERMITTEE(S) MUST EMPLOY SEDIMENT CONTROL PRACTICES AS NECESSARY TO MINIMIZE SEDIMENT
<br />FROM ENTERING SURFACE WATERS, MCWDND CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS, A
<br />TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDMENF BASINS THAT ARE DESIGNED AS PART OF
<br />A SEDIMENT CONTAINMENT SYSTEM (E.G. DITCHES WTH ROCK -CHECK DAMS) REQUIRE SEGMENT CONTROL
<br />PRACTICES ONLY AS APPROPRIATE FOR WE CONDITIONS.
<br />B. F THE DOWN GRADIENT SEDIMI T CONTROLS ARE OYEIMMED (BASIN ON FREQUENT FAILURE OR
<br />EXCI SDVE MAINTENANCE REQUIREMENT). THE PERMI LAST INSTALL ADDITIONAL IRGRAOEFIT
<br />SEGMENT COTMM PRACTICES ON RWUMUNT SUPS
<br />AMT
<br />THE OWEROAONCi AND THE SWPPP
<br />MUST BE AMENDED TO IDENTIFY THESE ADDITIONAL PRACTICES AS REWIRED M PART RLD L -M
<br />Z SEDIMENT CONTROL PRACTICES MUST BE ESTARLffiED ON ALL DOWN GRAODNT PERIMETERS AFD BE
<br />LOCATED U'CRADENT OF ANY SIIFFER ZONES, THE PERIMETER SEDIMENT CONTROL PR4C710E MUST BE IN
<br />PLACE BEFORE ANY UPGRADUENT LAND -DISTURBING ACTIVITIES BEGIN, THESE PRACTICES SHALL REMAIN IN
<br />PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABUSUEO IN ACCODA14CE WITH PART TVG
<br />3. THE PERNITTEM SHALL RE -INSTALL ALL SEDIMENT CONTROL PRACTICES THAT HAVE BEEN ADJUSTED
<br />OR REMOVED TO ACCOMMODATE SHORT -MGM ACRMTIES SUCH AS CLEARING OR OdIBRMC. OR PASSAGE
<br />OF VEHICLES, IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY HAS BEEN COMPLETE& THE PERMITIEE(S)
<br />SMALL COMPETE ANY SORT -TERM ACTIVITY THAT REQUIRES REMAIVAL OF SEDIMENT CONTROL
<br />PRACTICES AS QUICKLY AS POSSIBLE THE PERYITTTE(S1 MUST RE -INSTALL SEDIMENT CONTROL
<br />PRACTICES BEFORE THE Next PRECIPITABON EVENT EVEN IF THE SHORT -TEAM ACTIVITY IS NOT
<br />COMPLETE
<br />4. ALL STORM GRAFI INLETS MOIST BE PROTECTED BY APPROPRIATE SUPS OUTING CONSTRICTION UNTIL
<br />ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STAWUZEM INLET
<br />PROTECTION MAY BE GEUOVED FOR A PARTICULAR INLET F A SPECIFIC SAFETY CONCERN (STREET
<br />FMOOMG/PREEZING) HAS BEEN IDENTIFIED BY THE PERMITTEE($) OR THE JURISDICTIONAL AUTHORITY
<br />(ESI. CIRY/COINTT/FDWNSHP/EINOOT ENONEER)ME PERMITTEES) MUST DOCUMENT THE NEW FOR
<br />OVAL M THE SWPPP.
<br />5. 7EMPORARY SIL STOCKPILES OUST HAVE SLT FENCE OR OTHER EFFECTIVE SEDIMENT CGMTROLS. AND
<br />CAN 07 BE PLACED IN ANY NATURAL BUFFERS OR SURFACE wATERS INCLUDING STCWATER
<br />CONVEYANCES SUCH AS OUR AND GLITTER SYSTEMS OR COMM AND DITCHES UNLESS THERE S A
<br />BYPASS N PLACE FOR THE SIORHWATER,
<br />6. %WK VEHICLE TRAFFIC LEAVES ANY PMT OF THE STE (OR ONTO PAYED ROADS WITHIN THE SITE):
<br />A THE PERMITTEES) MUST INSTALL A VEHICLE SACKING NIP 10 MINIMIZE THE RACK CUT OF
<br />SEDIMENT FROM THE CONSTRUCTION SITE EXAMPLES OF VEHICLE TRACKING $MPS INCWOE (RUT ARE MIXT
<br />UMRED TO) ROCK PADS -MUD MATS, SLASH MULCH, CONCRETE OR STEEL WASH RACKS DR EQUIVALENT
<br />SYSTEMS
<br />B. THE PERMTIEE(S) MUST USE STREET SWEEPING F SUCH VEHICLE TRACKING RIPS ARE NOT ADEQUATE
<br />TO PREVENT SEDIMENT FROM BEING TRACKED CYTO THE STREET (SEE PART
<br />7. THE PERMITTEE(S) MUST INSTALL TEMPORARY SEDIMENTATION BASINS AS RZQURM IN PART IILC. OF
<br />THIS PERMIT.
<br />PART IV.C. - SEDIMENT CONTROL PRACTICES (CONT.)
<br />L THE PERMIT DE[9{) NU9T YINIW2E SOL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL
<br />YDwIWNG SOIL ACTION IS NOT REQUIRED WHERE THE FUNCTION Or A SPCCFIC AREA OF THE SITE
<br />DICTATES THAT IT BE COMPACZED.
<br />A THE PERYITIEE(S) MUST PRESERVE A 30 FOOT NATURAL BUFFER OR OF A BUFFER IS INFEASIBLE ON
<br />THE SITE) PROVIDE REDIINDANt SEDIMENT CONTROLS WHEN A SURFACE WATER IS LOCATED NATION 50
<br />FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER,
<br />NATURAL BLLFFERS ARE NOT REOMM ADJACENT TO ROAD DITCHES, JUDICIAL CITCHM COUNTY DITCHES,
<br />STORMWATER CONVEYANCE CHANNELS. STORM DRAW TIBET$ AND SEGMENT BASINS. THE PERMITIEE(S)
<br />IS/ARE NOT REOORED TO ENHANCE THE QUALITY OF THE VEGETATION THAT ALREADY EXISTS IN TIE
<br />BUFFER OR PROVIDE VEGETATION IF NONE EXIST. HOWEVER, PEAMIrUm CAN IMPROVE THE NATURAL
<br />BUFFER WTH VEGETATION.
<br />PART JV.D. - DEWATERING AND BASIN DRAWING
<br />L THE PERMITTEES) MUST DISCHARGE TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWA71FMG
<br />OR BASIN DRAWN (EQr PUMPED WSMARDES, TRENCHAMN CUTS FOR DRAINAGE) 70 A
<br />TEMPORARY OR PERMANENT SEDWIENTATIDW BASIN ON THE PROJECT STE UNLESS INFEASIBLE THE
<br />FERMI 5) MAY DISCKANGE FROM THE TEMPORARY OR PERMANENT SEDIMENrARM BASINS TO
<br />SURFACE TOTS F THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE
<br />TREATMENT HAS BEEN OBTAINED IN THE BASIN AND SHAT NUISANCE CONDITIONS (SEE MINN. R.
<br />7050.0210. SUSP. 2) WILL NOT RESULT FROM THE DISCHARGE. F THE WATER CANNOT BE DISCHAA3ED
<br />TO A SEDIMENTATION BASIN PRIOR 70 ENTERING THE SURFACE WATER. IT MUST BE TREATED NATH THE
<br />APPROPRIATE SUPS, SUCH BUT THE DISCHARGE GOES NOT ADVERSELY AFFECT THE RECEIVING WATER
<br />OR DOMMREAM PROPERTIES IF THE PUtMWME($) MUST DISCHARGE NATER THAT CONTAINS GL OR
<br />GREABE, THE PERMITTEES) MUST USE AN OTL-WATER SEPARATOR OR SUITABLE FLTRABGN DEVICE
<br />THE PERUITIMS
<br />MUST ENSURE THF r. CARTRIDGEAT DISCHARGE HARGE POINTS ARE ABSORBENTS PADS) ADEQUATELY PRPRIOR TO OIIEIM
<br />ECTED FROGING THEWAERO90N AND NOM NNE
<br />DISCHARGE MUST BE DISPERSED OVER NATURAL ROOK RRUIP. SAID BAGS, PLASTIC SHEETIN% OR
<br />OTHER ACCEPTED ENERGY D139PAWON MEAaRM
<br />2. ALL WATER FROM DEWATERING OR BASIN -DRAINING ACTIVITIES MUST BE DISCHARGED W A YAWNER
<br />THAT DOES NOT CAUSE NUISANCE CWM70M EROSION IN RECEIVING CHANNELS OR ON DOWNSLOPE
<br />PACPER M OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACT TO INE WETLAND.
<br />1 F THE PERMITTEES) IS/AAE USING FILTERS WITH BACKWASH WATER, THE POWITIMS) MUST HAUL
<br />THE BACKWASH WAlTiERR AWAY FOR OSPDSAL. RETURN THE BACKWASH WATER TD THE BEGINNING OF
<br />THE TREATMENT PROLES$ OR MCCTPDRA7E THE BACKWASH WATER INTO THE 97E IN A MANNER
<br />THAT DOES NOT CAUSE EROSION. WE PERMITTEES) MAY DISCHARGE BACKWASH WATER 70 THE
<br />SANITARY SEWER F PERMISSION 1S GRANTED BY TIE SANITARY SEWER AUTHORITY. THE PERMITTEE(S)
<br />MUST REPLACE AND CLEAN THE FILTER MEDIA USED IN UEWATERNG DEVICES WHEN REQUIRED TO
<br />RETAIN ADEQUATE FUNCTION
<br />PART IV.E - INSPECTIONS AND MAINTENANCE
<br />1. THE MUTTS= MUST ENSURE THAT A 1RAWED PERSON (AS IDENTIFIED IN PART F.AAA.) WILL
<br />ROUTINELY WSPECT THE EN11RE CONSTRUCTION STE At LEAST ONCE EVERY SEVEN (J) DAYS DURING
<br />ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RADWALL EVENT GREATER THAN LS COWES W
<br />M HOURS. FOLLOWING AN INSPECTION THAT OCCURS WTHN 24 NDURS AFTER A RAINFALL EVENT. THE
<br />NEXT INSPECBDIN MUST BE CONDUCTED WITHIN SEVEN (7) DAYS AFTER THE RAINFALL EVENT.
<br />Z ALL INSPECTIONS AND MAINTENANCE CONDUCTED WRING CONSTRUCTION MUST BE RECORDED WITHIN
<br />24 "MRS IN WRITING AND THESE RECORDS MUST BE RETAINED WTH THE SWPPP IN ACCORDANCE
<br />MTN PART IRE RECORDS OF EACH INSPECTCH AND MAINTENANCE ACTIVIn SHALL NCLUDD
<br />A DATE AND TIME OF INSPECTIONS
<br />L NAME OF PFRSOI{5) CONDUCTING INSPECRONS
<br />G MNOR" Of INSPECONSV INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE ACTIONS ARE
<br />NEEDED
<br />M CORRECTIVE ACTIONS TAKEN (INCLUDING 041E3, TIMES, AND PARTY COMPLETING MAINTENANCE
<br />ACBMTEM
<br />E DATE AND MOUNT OF ALL RAINFALL EVENS GREATER THAN 1/2 INCH (0.S INCHES) IN 24 HOURS,
<br />RAINFALL AMOUNTS MUST BE OBTAINED TRY A PROPERLY MAINTAINED RAN GMJCE INSTALLED ONSITE,
<br />A WEATHER STATION THAT IS WITHIN T MILE OF YOUR LOCATION ON A WEATHER REPCRXNG SYSTEM
<br />BUT PROVIDES SITE SPECIFIC RAINFALL DATA FROM RADAR SIDIYARES
<br />F. F ANY DISCHARGE IS OBSERVED TD BE OCCURRING DURING THE INSPWRON, A RECDRD OF ALL
<br />POINTS OF THE PROPERTY FROM WITCH HERE 15 A DISCHARGE MUST BE MADE, AND THE DISCHARGE
<br />SHOULD BE DESCRIBED (LEL, COLOR, ODOR. RpATINM SETTLED, OR SUSPENDED SOLIDS. FOAK CIL
<br />SHEEN. AND OTHER OBVIOUS INDICATORS OF POLLUTANTS) AND PHOTOCRAPFDR
<br />G ANY AMENDMENTS TD THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE
<br />DOCUMENTED AS REQUIRED IN PART IILEL WITHIN SEVEN (7) CALENDAR DAYS
<br />3. INSPECTION FREQUENCY ADJUSTMENT
<br />A WHERE PARRS OF THE PROJECT 97E HAVE PERMANENT COVER, BUT WORK REMARKS ON OTHER
<br />PARTS OF THE SITE, THE PERMTIERS) MAY REDUCE INSPECTIONS OF THE AREAS WITH PERMANENT
<br />COVER TO ONCE PER YOUTH.
<br />L WHERE CONSTRUCTION SITES HAVE PERMANENT COYER ON ALL EXPOSED SOL AREAS AND NO
<br />CONSTRUCTION ACTIVITY 19 OCCURRING ANYWHERE ON THE Site, THE SITE MOST BE INSPECT50 DURING
<br />WN -FROZEN GROUND CONDITIONS AT LEAST ONCE PER MONTH FOR A PERIOD OF TWELVE (12)
<br />MONTHS. FOLLOWING THE TWELFTH MONTH OF PERMANENT COVER AND NO CONSTRICTION ACTIVITY,
<br />INSPECTIONS MAY BE TERMINATED UNTIL CONSTRUCTION ACTIVITY IS ONCE AGAIN VITIATED UNLESS
<br />THE PERMITTEES) IS/ARE N071FIED IN NOTING BY THE MPCA THAT EROSION ISSUES HAVE BEEN
<br />DETECTED SITE THE SITE AND INSPECTIONS NEED TO RESUME
<br />C. WHERE WCIM HAS BEEN SUSPENDED DIME TO FROZEN GROUND CONDITIONS. THE INSPECTIONS MAY
<br />BE SU$PENOW. THE REQUIRED INSPECTIONS AND MAINTENANCE SCHEDULE MUST BEGIN WOW 24
<br />HOURS AFTER R NOFF OCCURS AT THE SITE CA 24 HORS PRIOR TO RESUMING CONSTRUCTION,
<br />WHICHEVER COMES FIRSL
<br />4. THE PERWITTEO(S) IS/AIE RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF TEMPORARY
<br />AND PERMANENT WATER QUALITY MANAGEMENT SUPS AS WELL AS ALL EROSION PREYENTNN AND
<br />SEGMENT CONTROL RMPA UNTIL ANOTHER PERMITTEE HAS OBTAINED COVERAGE ODDER THIS PERMIT
<br />ACCORDING TO PART OLDS, OR 111E PROJECT HAS UNDEROCINE FINAL STABIUZATION, AND AN NOT HAS
<br />BEEN SUBMITTED TO THE UTICA
<br />5 THE PERU MUST IN9'ECi ALL EB09CN PREVENIM MA SEDIMENT CONTROL SUPS AND
<br />POLIUBON P YARAK,YAIEN7 MIDLRURES 70 ENSURE INTEGRITY AND EFFECTIVENESS DURING
<br />ALL ROUTINE AND POST-EWNFAL. EVENT INSPECTION& ALL NONFUNCTIONAL SUPS MUST WE RWARE%
<br />RD -LAM. OR SUPPLEMENTED MTN FUNCTIONAL NPS BY THE END OF THE NEXT BUSINESS DAY
<br />AFTER DISCOVERY. W AS SOON AS FIELD CONOTI NS ALLOW ACCESS UNLESS ANOTHER TIME FRAME
<br />IS SPECFIED BELOW THE PCNMITIEE(S) MUST IMESBCATE AND COMPLY MTN THE AxXo NO
<br />AI
<br />INSPECTION AND MAINTENANCE REQUIREMENTS:
<br />A ALL PERIMETER CONTROL CEVICES MUST BE REPAMM REPLACED. OR SUPPLEMENTED WHEN THEY
<br />EMkIE THEE REPAIRS MUST K MADE BY THE END OF NCTIONAL OR THE SEDIMENT TIE4 NEXT BUSN(E99 DAY AFTER DISCOVERY, OR DEVICE THE HECHT OF THE
<br />THEREAFTER AS SOON AS FIELD CONDITIONS ALLOW ACCESS.
<br />B. TEMPORARY AND PERMANENT SEDIVENTATIGN BASINS MUST BE DRAINED AND THE SEDIMENT
<br />REMOVED MEN THE DEPTH OF SEDIMENT COU.ECTED N THE BASIN READIES ONE-HALF (1/2) THE
<br />STORAGE VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED MTHIN 72 HOURS OF DISCOVERY. OR
<br />AS SOLI AS FIELD CONDITIONS ALLOW ACCESS (SEE PART (V.0.).
<br />G SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED
<br />FOR EVIDENCE OF EROSON AND SEDIMENT DEPOSITION DURING EACH INSPECTICL THE PERLIM"
<br />MUST REMOVE ALL DELTAS AND SEDIUEHT GEPCSTED W SURFACE RATERS, INCLUDING DRAINAGE
<br />WAYS, CATCH BASINS AND OTHER DRAINAGE SYSTEMS, AND RE9TABRIZE THE AREAS WHERE MOMENT
<br />REMOVAL RESULTS IN EXPOSED SOL THE REMOVAL AND STASIUZA71OR MUST TACE PLACE WITHIN
<br />SEVEN (7) DAYS OF DISCOVERY UNLESS PRM M OW RY QED REGULATORY, OR PHYSICAL ACCESS
<br />CONSTRAINTS THE PERUTTEF(S) SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. F
<br />PRECLUDED. REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN EVEN (7) CALENDAR DAYS OF
<br />OBTAIYVC ACCESS. THE PERMIT7EF(S) IS/ARE RESPONSIBLE FOR CONTACIING ALL LOCAL REGIONAL
<br />STALE AND FEDERAL A) HoWin S ANO RECEIVING ANY APPUCAWLE PERMITS PRIOR TO CONDUCTING
<br />ANY WORK IN SURFACE WATERS.
<br />Q CONSTRUCTION SHE VEHICLE EXIT LOCATIONS MUST BE INSPWM FDIC EVIDENCE OF OFF-SITE
<br />SEDIMENT RAIONC ONTO PAVED SURFACES. TRACKED SBXME14T LUST E REMOVED FROM ALL PAVED
<br />SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF DISCOVERY, OR F APPLICABLE, WITHIN A
<br />SHORTER TIME TO COMPLY MTN PART IKC.d,
<br />E STREETS AND OTHER AREAS ADJACENT TO THE PROJECT MUST Ort INSPECTED FOR EVIDENCE OF
<br />OFF-SITE ACCUMULATIONS OF SEDIMENT, F SEDIMENT IS PRESENT. IT MUSE BE REMOVED IN A MANNER
<br />AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-STE IMPACTS (EG, FUGITIVE SEDIMENT IN
<br />SMUTS WAD E WASHED N70 STORM SEWERS BY 711E NEXT RAN ARDOR POSE A &AFETY
<br />14AZARD TO USERS OF PUBLIC 911RUl ).
<br />5. ALL INFILTRATION AREAS MUST Be INSPECTED TO ENSURE THAT NO SEDIMENT FROM CORNING
<br />CONSTRUCTION ACTIVITY IS REACHING THE INFILTRATION AREA ALL INFILTRATION AREAS MUST BE
<br />INSPEC7E0 TO ENSURE THAT EQUIPMENT IS NOT ENDING DRIVER ACROSS THE INFILTRATION AREA.
<br />PART IV.F. - POLLUTION PREVENTION MANAGEMENT MEASURES
<br />THE PEANIT7ESHALL IMPLEMENT THE FOLLUMN6 POLLUTION PREVDITION MANAGEMENT MEASURES
<br />ON THE SIZEE(S)
<br />1. STODGE, HANOLN(k AND DISPOSAL OF CONSTRUCTION PRODUCTS, MATERIALS. AND WASTES THE
<br />PERYTTEE(SI SHALL COMPLY WITH TIE FOLLOWING M MINIMIZE THE DPOSURE TO SRIRMMWATER OF
<br />ANY 6 PRODUCTS MATERIALS, ON WASTES, PRODUCTS OR WASTES WHICH ARE EITHER NOT A
<br />SORCE CF CONTAMINATION TO 9RRMWATER OR ARE DESIGNS) TO BE EXPOSED TD STORMWATER ARE
<br />NDT HELD TO THIS REQUIREMENT.-
<br />A.
<br />EQUIREMENT;
<br />A OuLDNG PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS MUST BE UWDM COVER
<br />M. PLASTIC SHEETING OR TEMPORARY RDCFS) TO PREVENT THE DISCHARGE OF POLLUTANTS OR
<br />PROTECTED BY A SIMILARLY EFFECTIVE MEAR5 W R MINIMIZE CONTACT WITH STORMWATER.
<br />B. PESTICOM HERBICIDES, INSECTIMM FERNUZERS. TREATMENT CHEMICALS, AND UWOSCAPE
<br />MATERIALS MUST BE UNDER COVER (EJC., PLASTIC SHEEDNO OR TEMPORARY ROOF
<br />F TO PRETETIT THE
<br />DISCHARGE OF POLLUTANTS OR PROTECTED BY SIMILARLY EFFECTIVE MEANS DESIGN M MINIYRE
<br />CONTACT WITH STORMWATER.
<br />G HAZARDOUS MATERIAL$ 7010C WASTE, ONCWOWC CH. OES0. FUEL CASMML NYORAUUC FLUIDS,
<br />PAINT SOLVENTS PETRGIEUM-BASED PRODUCTS. WON PRESERVAIMM ADDITIVES. CURING
<br />COMPOURDSJ AND ACIDS) MUST BE PROPERLY STORED N SEALED ODN7AINERS TO PREVENT SR=
<br />LEAKS CR OTHER CI9OIARCL RESTRICTED ACCESS STORAGE AREAS MOIST BE PROVIDED TO PREVENT
<br />VANDIWSV. STORAGE AND O3POM OF HAZARDOUS WASTE OR HAZARDOUS MAIEDALS MUST Be IN
<br />COMPLIANCE WITH MOM. R CH. 7045 INCLUDING SECONDARY CONTAINMENT AS APPUCABLE
<br />D. SOLD WASTE MUST BE STORED, COLLECTED AND DISPOSED OF PROPERLY IN COMPLIANCE MIN
<br />MINK. R CH. 70M
<br />E PORTABLE TOILETS MUST BE POSITIONED ED THAT THEY ARE SECURE AND TILL NOT BE TMPPEO OR
<br />KNOCKED OVER. SANITARY WASE MUST BE DISPOSED OF PROPERLY IN AMDDANLE ACTH MINN. FL
<br />CK. 7041,
<br />Z FUELING AND MAINTENANCE OF EQUIPMENT OR VOWASc SPILL PREVENTION AND RESPONSE THE
<br />PERMITTEE(S) SHALL TAKE REASONABLE STEPS TO PREVENT 711E DISCHARGE OF SPRLED OR LEAKED
<br />CEUICALS LN UDWG FURL, FROM ANY AREA WERE CHEMICALS ON FUEL WILL BE LOAM OR
<br />IAADADM INCLUDING THE 115E OF DRIP PANS OR ABSORBENTS UNLESS INFEASIBLE. THE PONME(S)
<br />MUST CONDUCT FUELING IN A CONTAINED AREA UNLESS INFEASIBLE. THE PERMWIMS MUST ENSURE
<br />ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TOES TD CLEAN UP DISCHARGED MATERIALS AND THAT
<br />AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED NAIVE" THE
<br />PERMIT S) MUST REPORT AND CLEAN UP SPILLS IMMEDIATELY AS RWORED BY MILAN. STAT. 0
<br />113061, USAW DRY CLEAN UP MEASURES WHERE POSSIBLE.
<br />3. VO4ME AND EQUIPMENT WASHING, F INE PERMTTMS) WASH THE EXTERIOR OF VOKIM Olt
<br />EQUIPMENT ON THE PROJECT SIZE, WASHING MUST BE UUITED TO A DEFINED AREA OF THE SIE.
<br />RUNOFF FROM THE WASMO AREA MUST BE CONTAINED IN A SEDIMENT BASH OR 01HO SIMILARLY
<br />EFFECTIVE CONTROLS AND WASTE FROM THE WASHING ACTIVITY MUST BE PROPERLY DISPOSED OF, UNE
<br />PERMITIEE(S) MUST PROPERLY USE AND STORE SOAPS, DETERGENTS, OR SOLVENTS, ND DIME
<br />DECREASING IS ALLOWED ON SITE.
<br />4. CONCRETE AND OTHER WASHOUTS WASTE THE P"YtMM MUST PROVIDE EFFECTIVE
<br />CONTAINMENT FOR ALL UQUID AND SCUD WASTES GENERATED BY WASHOUT OPERATIONS (CONCRETE
<br />STUCCO, PAINT, FORAM RELEASE GLS, CL ONG COMPOUNDS AND OTHER CONSTRUCTION MATERIALS)
<br />RELATED TO THE CONSTRUCTION ACTIVITY, THE LIQUID AND SCLO WASHOUT WASTES MUST NOT
<br />CONTACT THE GROUND. AND THE CONTRNUDT MUST E DESIGNED 50 THAT If DOES NOT RESULT ON
<br />IMHOFF FROM THE WASHOUT OPERATIONS OR AREAS UQUID AND SOD WASTES MUST BE DISPOSED
<br />OF PROPERLY AND N COMPLIANCE WITH MPGA RULES A SCM MUST BE INSTALLED ADJACENT TO EACH
<br />WASHOUT FACILITY THAT REQUIRES SITE PERSONNEL TO UTUZE THE PROPER FACHTIES FOR OtBPOSAL
<br />OF CONIMIC AND OTHER WASHOUT WASTES.
<br />PART IV.Il FINAL STABILIZATION
<br />THE PUNITTEE(5) MUST ENSURE FINAL STAT UZATIOI OF THE SITE. FINAL STABILIZATION IS NOT
<br />COMPLETE UNTIL ALL REGARBMQNTS OF PARTS N.G1.ti7. ARE COMPLETE:
<br />1. ALL SOL DISTURBING ACTIVITIES AT THE SITE HAVE SEEN COMPLETED AND ALL SOLS ARE
<br />STABIUZW BY A UNIFORM PERENNIAL VEGETATIVE COYER WIN A DENSITY OF 70 PERCENT OF ITS
<br />EXPECTED FINAL GROWTH DENSITY OVER THE ENTIRE PERSONS SURFACE AREA, OR OTHER EQUIVALENT
<br />MEANS NECESSARY TO PREVENT SOL FAILURE UNDER EROSIVE CONDITION&
<br />Z THE PERTHLNENT STOFNw%lER MANAGEMENT SISTEMI 15 CONSTRUCTED. MEETS ALL REQBRSAENTS IN
<br />PART W.0. AND IS OPERATING AS DESIGNED, TEMPORARY OR PERMANENT SEDIMENTATION RAM THAT
<br />ARE TD BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS HAVE BET7N QZANW OF ANY
<br />ACOMULATED SEDIMENT. ALL SEDIMENT VAS BEEN REMOVE) FROM CCNVEYAHCE SYSTEM AND
<br />DITCHES ARE STABILIZED WITH PERMANENT COWL
<br />I ALL TEMPORARY SYNTHETIC AND STRUCTURAL EROSION PREVENTION AND SEDIMENT CONTROL IMPS
<br />(SUCH AS SRF FENCE) HAVE BEEN REMOVED ON THE PORTIONS OF THE SITE FOR WHICH THE
<br />PERRMITIEE(S) IS/ARE RESPONSIBLE BLIPS DESIGNED TO DECOMPOSE ON SITE (SUCH AS SOME
<br />COMPOST LOOS) MAY BE LEFT IN PLACE.
<br />4. FOR MOENTIAL CONSMMBCN ONLY, INDIVIDUAL LOTS ARE CON9DEBED FINALLY STAEUZE0 F
<br />THE STRIMILMIX0 ARE FINISHED AND TEMPORARY EROSION PROTECTION AND COWNGRAOIENT
<br />PERIMETER CONTROL, HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN SOD TO THE HONEpwRO.
<br />ADDITIONALLY. THE PERMITTEE HAS DISTRIBUTED THE MPG'S 'FwmmmER FACT SNEEr TO THE
<br />HOMEOWNER TO INFO IA THE HOYEMMIER OF THE NEW FOR AND MR, TS OF. PERMANENT COMDR.
<br />5. FOR CONSTRUCTION PROJECTS ON AGRICULTURAL LAND (LC. PIPELINES ACROSS (SAP, FIELD
<br />PASTURE OR RANGE LAND) THE GISRMED LAND HAS BEEN RETURNED TO ITS PRECONSIRUCTON
<br />AGRICULTURAL USE.
<br />DRAWN BH DESIGN BY:
<br />A.G. A/.
<br />/HOKDBY: PRDJ.ND.
<br />ORIGINAL DATEV
<br />MARCH 25.2074
<br />Z
<br />z 0
<br />(O C z d J0.
<br />O LE o
<br />OO az
<br />D Z x� IZ
<br />cCL
<br />o pa
<br />p m
<br />PREPARED FOR:
<br />ORCHARD HILL
<br />ASSOCIATES, LLC
<br />WrE PLANNING
<br />4 ENGINEERING
<br />PLOWE
<br />ENGINEERING, DMC.
<br />8775 LAKE ERNE
<br />SUITE 170
<br />LINO LAM MN 03014
<br />PHONE: QRST) M14210
<br />FAX (651) MW 701
<br />STORM WATER POLLUTION PREVENTION PLAN
<br />HUGO SENIOR HOUSING COMMUNITY I C4-1
<br />
|