Laserfiche WebLink
14o'SB <br />_ Z g. <br />Y Amociwes, h c. Infrastructure ■ Engineering ■ Planning n Construction <br />701 Xenla Avenue South <br />Suite 300 <br />Minneapolis, MN 56416 <br />Tel: 763-541-4600 <br />Fax: 763-641-1700 <br />June 18, 2014 <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Site Plan Review <br />New Life Church <br />WSB Project No. 1904-65 <br />Dear Ms. Juba: <br />We have completed our review of the New Life Church site plan. Generally the project includes <br />an addition/expansion of the current facility. <br />From an engineering standpoint, the primary concern is related to issuance of a storm water <br />permit. Based on our review of the size and scope of the facility expansion, a storm water permit <br />is not required. The applicant will need to develop an approved erosion control plan, which has <br />been submitted and reviewed. There will need to be a few minor modifications made to the <br />erosion control plan, after which the storm water management requirements will be met. <br />Thank you for the opportunity to provide comments on this project. If you have any questions, <br />please do not hesitate to contact me at 763-287-7192. <br />Sincerely, <br />WSB & Associates Inc. <br />nnedIP1 Engin <br />cc: Steve Duff, Senior Engineering Technician <br />Katy Thompson, Water Resource Engineer <br />x.iCM,an+d.asrsr0.da <br />