My WebLink
|
Help
|
About
|
Sign Out
Home
2013.12.19 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2013 PC Packets
>
2013.12.19 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 1:12:47 PM
Creation date
2/20/2015 1:11:56 PM
Metadata
Fields
Template:
Commissions
Meeting Date
12/19/2013
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />December 12, 2013 <br />Page 4 <br />applicant, and needs to be reviewed and approved by the City prior to consideration of the <br />final plat. <br />2. The preliminary development plan as shown does not indicate any proposed wetland impacts <br />in the area adjacent to the first phase of the development. <br />3. The proposed stormwater management pond near Oneka Parkway is preliminarily designed <br />in a manner that will affect the existing Branch 3 of Judicial Ditch #3. The concept is similar <br />to the existing pond located within the northwest quadrant of the CSAH 8/Oneka Parkway <br />intersection. There will need to be coordination with the Rice Creek Watershed District, as <br />well as the DNR, moving forward to develop a final layout, plan, and wetland/ditch permit. <br />Infrastructure Development Fees <br />1. There are development fees and utility oversizing credits that will apply to the project at the <br />time of final plat. These items will be calculated at the time of the final plat, and <br />memorialized within the Development. Agreement. <br />We will continue to work with the developer to address technical design and other minor issues <br />related to the project as the project moves forward. It is recommended that approvals related to <br />this application be subject to resolving the issues outlined within the "red -line" detailed <br />engineering comments that will be sent directly to the applicant's engineer. <br />Thank you for the opportunity to provide comments on this project. If you have any questions, <br />please do not hesitate to contact me at 763-287-7192. <br />Sincerely, <br />j <br />Associate Inc. <br />edy, P <br />neer <br />cc: Scott Anderson, Public Works Director <br />Steve Duff, Senior Engineering Technician <br />H.1ayofH.Sc"L-wrr dxw uc-.LTR-iuba-LnF`afn1y1113.dc, <br />
The URL can be used to link to this page
Your browser does not support the video tag.