Laserfiche WebLink
P.C. Minutes - November 26, 1991 <br />Page 2 <br />1. Survey must be submitted to the Council within 90 days of preliminary <br />survey acceptance or Planning Commission approval shall be null and <br />void. <br />2. Survey approval shall be contingent on compliance with the survey <br />conditions, as well as a grading, stormwater drainage, and a survey <br />submitted. <br />3. All conditions of survey approval must be met prior to the stamping of <br />any deeds for recording by the`city clerk unless permitted by council <br />action. <br />4. The property lines on site be identified by the owners to assure <br />property setbacks when buildings are to be constructed if required by <br />the building inspector. All lots must be properly staked. <br />5. Proposed driveway or drainage areas within the area surveyed must <br />include the installation of a minimum 15" diameter, corrugated metal <br />culvert in a manner acceptable to the City. <br />6. No building permits shall be issued until survey has been approved and <br />recorded with Washington County. <br />7. All conditions of approval by Rice Creek Watershed District must be <br />complied with. <br />S. All fees relating to this subdivision shall be paid by the applicant <br />including the cost of recording documents with Washington County. <br />9. Any driveway permits requiring access to highways or county roads may <br />not be issued until the necessary permits are secured from Washington <br />County. <br />10. The minimum lowest floor elevation on Parcel B shall be 2' above the <br />100 year flood mark or 4' above the high groundwater mark which ever <br />is greater. <br />11. No improvements, grading, or landscaping shall be permitted in the <br />identified drainage areas without the express written authorization of <br />the City and the appropriate watershed district. <br />12. All property owners shall be responsible for maintenance of drainage <br />areas within easements on their property. The owners shall comply <br />with all conditions and restrictions applicable to identified <br />wetlands. <br />13. The developer shall permit access to the referenced site for periodic <br />inspections to assure conformance with the conditions of survey <br />approval. <br />All aye, motion passed <br />Commissioner Mezzano has graciously volunteered to serve on the Board of <br />Zoning Adjustments. A recommendation will be made to the City Council to <br />appoint Mr. Mezzano for a one year term. <br />David Schumann asked if the city council denies a request, where can the <br />applicant appeal the decision. He was informed that the Planning <br />Commission would inquire for him. <br />Motion made by Mezzano, seconded by Davis to adjourn at 7:28PM. <br />All aye, motion passed. <br />Carole LaBelle, Secretary <br />Hugo Planning Commission <br />