Laserfiche WebLink
Chairman Senkler called the regular meeting to order at 7:00 PM. <br />PRESENT: Mezzano, Thoreson, Oswald, Barnes, Senkler <br />City Administrator, Ken Huber <br />Acting Secretary, Mary Ann Creager <br />ABSENT: Chuck Henry <br />Mezzano made motion, Oswald seconded, to approve the minutes for the <br />Planning Commission meeting of February 22, 1989 as amended. <br />All aye. Motion Carried. <br />The Harstad Companies have made application to the City of Hugo for the <br />subdivision of a 56.2 acre tract of land on Out1ots A, B, and C of Hugo <br />Meadows subdivision. The property is zoned SFU, and it is the intent of <br />the developer to subdivide the property into 89 single family dwelling <br />lots. The Hugo Planning Commission held a public hearing on this request <br />February 22, 1989, at which time the public had an opportunity to comment <br />on this proposal. At the conclusion of the hearing, Ken Briggs, <br />representing the Harstad Companies, requested that this matter be tabled <br />to the March 22nd Planning Commission meeting affording them an <br />opportunity to address the major concerns of the Commission. The major <br />concerns raised by the Planning Commission were as follows: <br />1. The closeness of the proposed building sites to the holding ponds. <br />2. Elimination of proposed detention ponds 3 and 4 in Block 5. <br />3. The culvert size and drainage concerns affecting the property to the <br />south of this proposed plat. <br />4. The quality of the fill material to be used to raise building sites to <br />proper elevation. <br />5. The proposed building sites meet FHA/HUD requirements, and that a <br />distance of 4 feet is maintained between the planned lowest floor <br />level and the estimated high groundwater elevation. <br />The developers have now submitted a revised plan consolidating all <br />drainage into a single holding pond designed at a location that provides <br />for a greater distance from the building site pads. The developers have <br />also indicated that they have been in touch with FHA/HUD to assure <br />compliance with floor elevations as they relate to the water table. The <br />developers have also conducted soil tests to better evaluate the <br />groundwater elevation as it relates to this development. In that the <br />staff had not completed it's review of the redesigned plat, there were no <br />specific recommendations regarding special conditions for preliminary plat <br />approval. <br />John Johnson, engineer for Harstad Companies, was present to review the <br />revised plat as it related to drainage, lot locations, roadway, and <br />elevations. Mr. Johnson stated the present rate of runoff from the <br />property is 80 csf, and that number would eventually be reduced to 65 <br />csf. The pond elevation has been set at 927', and the lowest basement <br />elevation would be at 931'. Mr. Johnson stated that Harstad Companies <br />P.C. Minutes - 3-22=89 1 <br />