My WebLink
|
Help
|
About
|
Sign Out
Home
1989.12.27 PC Minutes
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Minutes
>
1989 PC Minutes
>
1989.12.27 PC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2015 10:21:04 AM
Creation date
2/25/2015 10:13:31 AM
Metadata
Fields
Template:
Commissions
Meeting Date
12/27/1989
Document Type
Minutes
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The purchase of the 60 ft. wide strip of land, from Dan Ramberg to <br />provide access to 170th St. for Tract B, be completed and an <br />application be made to the Washington County Auditor for consolidation <br />into a single lot as shown on the certificate of survey. <br />2. No further subdivision of Tract B of this certificate of survey be <br />permitted without the formal platting of the property and construction <br />of an approved public roadway to the site. <br />3. The final survey must be submitted to the city council within 90 days <br />of preliminary survey acceptance or planning commission approval shall <br />be null and void. <br />4. All conditions of survey approval must be met prior to the stamping of <br />any deeds for recording by the city clerk unless otherwise permitted <br />by council action. <br />5. The property lines on site must be identified by the applicants to <br />assure proper setbacks when buildings are to be constructed if <br />required by the building inspector. <br />6. Proposed driveways or drainage areas within the development must <br />include installation of a minimum 15" diameter corrugated metal <br />culvert in a manner acceptable to the city. <br />7. Securing the required permits from the watershed district is required <br />prior to final survey approval. <br />S. All fees relating to this subdivision shall be paid by the applicant <br />including the cost of recording documents with Washington County. <br />9. Any driveway permits requiring access to highways or county roads may <br />not be issued until the necessary permits are secured from Washington <br />County or the Minnesota Dept. of Transportation. <br />10. Percolation tests for each buildable site must be submitted to the <br />city prior to final survey approval. <br />11. Dedication of required parkland or payment of fee in lieu of parkland <br />dedication shall be paid to the city prior to final survey approval. <br />12. This approval shall be granted with the understanding that said <br />subdivision does not create any landlocked parcels by the petitioner <br />and land owner. <br />13. No improvements, landscaping, or grading shall be permitted in the <br />defined drainage areas without the express written authorization of <br />the city and the approved watershed districts. <br />14. All property owners shall be responsible for maintenance of drainage <br />areas within easements on their property. <br />15. Developer shall comply with all requirements and restrictions <br />applicable to identified wetlands. <br />16. The developer shall permit access to the referenced site for periodic <br />inspections to assure conformance with this subdivision. <br />17. Legal descriptions of all parcels to be subdivided should be included. <br />All aye, motion passed. <br />Planning commissioners held a brief discussion regarding the resumption of <br />work on the comprehensive plan map. It was agreed that the clerk's office <br />would forward information discussed at previous meetings for the benefit <br />of those members not involved in earlier discussions. <br />Motion made by Henry, seconded by Senkler to adjourn at 8:30PM. <br />All aye, motion passed. <br />e4A4-� 674��� <br />Carole LaBelle, Secretary <br />Hugo Planning Commission <br />P.C. Minutes 12-27-89 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.