My WebLink
|
Help
|
About
|
Sign Out
Home
1988.12.28 PC Minutes
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Minutes
>
1988 PC Minutes
>
1988.12.28 PC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2015 9:42:44 AM
Creation date
2/25/2015 11:34:18 AM
Metadata
Fields
Template:
Commissions
Meeting Date
12/28/1988
Document Type
Minutes
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The prelimnary survey be submitted to the city council within 90 days <br />of the commission's recommendation and the revised survey incorporate <br />the recommendations of the staff, Rice Creek Watershed District, and <br />other governmental agencies. <br />2. The preliminary survey will not be submitted to the council until all <br />legal, engineering, and staff recommendations have been incorporated <br />into the survey. <br />3. All fees relating to the subdivision shall be paid by the applicant <br />including the cost of recording documents with Washington County. <br />4. Developer pay fee in lieu of parkland dedication at the time of final <br />survey approval. <br />5. A drainage plan including holding ponds and ditches must be approved <br />by the watershed district and maintained by the property owner with <br />the method of maintenance to be reviewed by the city engineer. <br />6. Mailbox locations shall be approved by the United States Postal <br />Service. <br />7. Developer shall install one tree per lot of a minimal size within the <br />subdivision development as per city regulations. <br />8. Approved driveways or drainageways, must include the installation of a <br />minimum 15" diameter, corrugated metal culvert acceptable to the city <br />if required by the city building inspector. <br />9. The developer shall secure Rice Creek Watershed district approval of <br />their on site drainage plan prior to approval of the final survey by <br />the city council. <br />10. Percolation tests must be completed on each of the buildable lots and <br />must be submitted to the city for review prior to final survey <br />approval. <br />11. Lot lines within the subdivision must be identified to determine <br />proper building setbacks if required by the building inspector. <br />12. The 16' X 26' shed located on the north border of Tract A be removed <br />prior to the stamping of any deeds for conveyance of Tract A. <br />13. Mr. Valento shall deed to the City of Hugo the easterly 33' of Tracts <br />B and C and the westerly 33' of Tract A and the residual lot north of <br />Tract A for right-of-way purposes. <br />14. The Rice Creek Watershed District shall establish the proper building <br />elevations for residential construction in Tracts B and C of this <br />survey. <br />15. The primary access to all sites identified on this survey shall be <br />directly from a public roadway. <br />All aye, motion passed. <br />Mr. Valento agreed to be placed on the city council agenda January 17, <br />1989 to give Mr. Peltier time to gather his information regarding the <br />roadway location. <br />Mr. Huber informed the planning commission that any suggestions for <br />changes in the zoning ordinance should be submitted as soon as possible. <br />Chairman Senkler enthusiastically volunteered for the position on the <br />Board of Zoning Adjustments. <br />Chairman Senkler and commissioners wished Tom Jesinski good luck in his <br />new position as councilman and thanked him for his time and contributions <br />to the planning commission. <br />Motion made by Senkler, seconeded by Jesinski to adjourn at 9:20PM. <br />Carole LaBelle, Secretary <br />Hugo Planning Commission <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.