My WebLink
|
Help
|
About
|
Sign Out
Home
1978.10.25 PC Minutes
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Minutes
>
1978 PC Minutes
>
1978.10.25 PC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2015 4:37:09 PM
Creation date
2/27/2015 12:39:17 PM
Metadata
Fields
Template:
Commissions
Meeting Date
10/25/1978
Document Type
Minutes
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ffj <br />MINUTES OF TIE PROCEEDINGS <br />OF THE <br />HUGO PLANNING COMMISSION <br />October 259 1978 <br />The meeting was called to order by acting Chairman Teddy Peltier at 8:11 PM. <br />PRESENT: Peloquin, Peltier, Greger, Woeltge and McAllister <br />Dan Koehler, Washington County Planning, was also present. <br />ABSENT: Gillen and Ehret <br />Motion made by Peloquin, seconded by Woeltge, to approve the minutes of October 11, <br />1978, as presented. <br />VOTING FOR: Peloquin, Peltier, Greger, Woeltge and McAllister <br />Motion Carried <br />GERALD DABE — REZONLUG <br />Mr. Dabe was present, and submitted the necessary information requested at the previous <br />meeting. (EIMT ARRIVED AT 8:13 PM). A report and sketch plan were presented by <br />Howard Kuusisto. The Commission discussed at length the proposed easement. Dan <br />Koehler and Tom Crever both approved of the perc tests as presented. <br />Dan Koehler suggested that the city request a 60' easement to run along the length of <br />the 40 acres to the west. <br />A public hearing will be held November 8, 1978, to consider Mr. Dabe's request for a <br />rezoning. Mr. Dabe was also instructed to make application of a Minor Subdivision. <br />DICK GENRICH — VARIANCE <br />Mr. Genrich has now made application for a variance from the standard drain field to <br />electro—osmosis system for sewage system on two building sites. The previous perc <br />tests presented failed to meet the city's standards. <br />Mr. Koehler had contacted PCA and they stated that it was an alternative system, and <br />would only recommend installation where a standard system has failed. They do not <br />recommend for new development. He said that data on the system is not complete as of <br />this time. Tom Crever had done some investigation, and he stated that he would like <br />see how it operates so that it could possibly incorporated into Hugo. <br />Mr. Coolbroth, president of the companyp was present and related to the Commission the <br />principle of the system. Data on the system was presented to the Commission for their <br />review. <br />Motion made by Greger, seconded by McAllister, to table the request until the meeting <br />of November 89 1978, for further review of material presented. <br />VOTING FOR: Peloquin, Greger, Woeltge, McAllister, and Ehret <br />ABSTAINED: Peltier <br />Motion Carried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.