Laserfiche WebLink
PART II.C. - TERMINATION OF COVERAGE <br />1. TEfMNATON OR COVERAGE WHEN CQJSTRuC71GN IS COMPLETE: ALL PEMITTEE(S) MUST SUBMIT A <br />NOTICE OF TERMINATION (NOT) TO THE MPCA ON A FORM PROVIDED BY THE COMML930MEN WITHIN 30 <br />DAYS AFTER ALL ACTIVITIES REQUIRED FOR FINAL STABIUZATION (SEE PART IV.G) ARE COMPLETE THE <br />PERMITTEES)' COVERAGE UNDER THIS PERMIT TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF <br />THE NOT. <br />2. TERMINATION OF COVERAGE WHEN TRANSFER OF OWNERSHIP OCCURS ALL PERMITIEE(S) MUST <br />SUBMT A NOT ON A FORM PROVIDED BY THE COMMISSIONER WITHIN 30 DAYS AFTER SELLING OR <br />OTHERWISE LEGALLY TRANSFERRING THE ENTIRE STE, INCLUDING PERMIT RESPONSIBILITY FOR ROAD$ <br />(E.G, STREET SWEEPING) AND STORMWAWA INFRASTRUCTURE FINAL CLEAN OUT. OR TRANSFERRING <br />PORTIONS OF A SITE TO ANOTHER PARTY. THE PERMITTEE(S)' COVERAGE UNDER THIS PERMIT <br />TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF THE NOT. <br />3. PERMTTEE(S) MAY TERMINATE PERMIT COVERAGE PRIOR TO COMPLETION OF ALL CONSTRUCTION <br />ACTIVITY IF ALL OF THE FOLLOWING CONDITIONS ARE MET. AFTER THE PERMIT IS TERMINATED UNDER <br />THIS PART. IF THERE IS ANY SUBSEQUENT DEVELOPMENT ON THE REMAIRNG PORTIONS OF THE S17E <br />WHERE CONSTRUCTION ACTIVITY WAS NOT COMPLETE. NEW PERMIT COVERAGE MUST BE OBTAINED IF <br />THE SUBSEQUENT DEVELOPMENT ITSELF OR AS PART OF THE REMAINING COMMON PLAN OF <br />DEVELOPMENT OR SALE WILL RESULT IN LAND DISTURBING ACTIVITIES OF ONE (1) OR MORE ACRES IN <br />SIZE. <br />A. CONSTRUCTION ACTIVITY HAS CEASED FOR AT LEAST 90 DAYS <br />S AT LEAST 90 PERCENT (BY AREA) OF ALL ORIGINALLY PROPOSED CONSTRUCTION ACTIVITY HAS <br />BEEN COMPLETED AND PERMANENT COVER ESTABLISHED ON THOSE AREAS <br />C. ON AREAS WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE PERMANENT COVER HAS BEEN <br />ESTABLISHED. <br />D. THE 97E IS IN COMPLIANCE NTH PMT IV.G2. AND PART IV.C.3. AND WHERE APPLICABLE, PART <br />IVLG4, OR PART IV.115. <br />4, PpMITTEE(S) MAY TERMINATE COVERAGE UPON APPROVAL BY THE MPCA IF INFORMATION IS <br />SUBMITTED TO THE MPCA DOCUMENTING THAT TERMINATION IS APPROPRIATE BECAUSE THE PROJECT IS <br />CANCELED, <br />PART III.A.3 - TRAINING DOCUMENTATION <br />TRAINING DOCUMENTATION: THE PERMTTEE(S) SHALL ENSURE THE INOMOuALS IDENTIFIED IN PART IILF <br />HAVE BEEN TRAINED IN ACCORDANCE NTH THIS PERMIT'S TRAINING REQUIREMENTS, THE PERMITTEE(S) <br />SHALL ENSURE THE TRAINING IS RECORDED IN OR WITH THE SWPPP BEFORE THE START OF <br />CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PRDJECT HAVE BEEN DETERMINED. <br />DOCUMENTATION SHALL INCLUDE: <br />A. NAMES OR THE PERSONNEL ASSOCIATED WIN THIS PROJECT THAT ARE REQUIRED TO BE TRAINED <br />PER PART III.F.1. OF THIS PERMIT. <br />B DATES OF TRAINING AND NAME OF INSTRUCTOR(S) AND ENTITY PROVIDING TRAINING <br />C. CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING <br />PART 111.6 - SWPPP AMENDMENTS <br />THE PERMITTEE(S) MUST AMEND THE SWPPP AS NECESSARY 70 INCLUDE ADDITIONAL REQUIREMENTS, <br />SUCH AS ADDITIONAL OR MODIFIED BMPS THAT ARE DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR <br />ADDRESS SITUATIONS WHENEVER: <br />1, THERE 15 A CHANGE IN DESIGN. CONSTRUCTION. OPERATION. MAINTENANCE. WEATHER OR SEASONAL <br />CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLw'fANT5 TO SURFACE <br />WATERS OR UNDERGROUND WATERS. <br />2. INSPECTIONS DR INVESTIGATIONS BY ITE OWNER OR OPERATORS, USEPA OR MPCA OFFICIALS <br />INDICATE THE SWPPP IS NGT EFFECTIVE IN EUMINATING OR S INIFICANTLY MINIMIZING THE DISCHARGE <br />OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS OR THAT THE DISCHARGES ARE <br />CAUSING WATER QUALITY STANDARD EXC®ANCES (E.G.. NUISANCE CONDITIONS IS DEFINED IN MINN. <br />S 7050.0210, SUMP. 2). <br />3, THE SWPPP IS NOT ACHIEING THE GENERAL OBJECTIVES OF MINIMIZING POLLUTANTS IN <br />STORMWATER DISCHARGES ASSOCIATED NTH CONSTRUCRGN ACTIVITY, OR THE SWPPP IS NOT <br />CONSISTENT WITH THE TERMS AND CONDITIONS OF THIS PERMIT. <br />4, AT ANY TRUE AFTER PERMIT COVERAGE IS EFFECTIVE, THE MPCA MAY DETERMINE THAT THE <br />PROJECTS STORMWATER DISCHARGES MAY CAUSE, HAVE REASONABLE PDTE14TLAL TO CAUSE, OR <br />CONTRIBUTE TO NON -ATTAINMENT OF ANY APPLICABLE WATER QUALITY STANDARD, OR THAT THE <br />SWPPP DOES NOT INCORPORATE THE APPLICABLE REQUIREMENTS IN PART IILA.B., (IMPAIRED WATERS <br />AND TMDLS). IF A WATER DUALITY STANDARD CHANGES DURING THE TERM OF THIS PERMIT, THE MPG <br />ELL NATE A DETERMINATION AS TO WHETHER A MODIFICATION OF THE SWPPP IS NECESSARY TO <br />ADDRESS THE NEW STANDARD. IF THE MPCA MAKES SUCH OETERMINATION(S) OR ANY OF THE <br />DETERMINATIONS IN PMTS III.B.I.-3., THE MPG WILL NOTIFY THE PERMITTEE(S) IN WRITING IN <br />RESPONSE, THE PERMITTEE(S) MUST AMEND THE SYIPPP TO ADDRESS THE IDENTIFIED CONCERNS AND <br />SUBMIT INFORMATION REQUESTED BY THE MPCA, WHICH MAY NCLUOE AN INDIVIDUAL PERMIT <br />APPuCATCN. IF THE MPG'S WRITTEN NOTIFICATION REQUIRES A RESPONSE, FAILURE TO RESPOND <br />WITHIN THE SPECIFIED TIMEFRAME CONSTITUTES A PERMIT VIOLATION. <br />PART III.C. - TEMPORARY SEDIMENT BASINS <br />WHERE FIVE (5) OR MORE ACRES O DISTURCED 501L DRAIN TO A COMMON LOCATION, THE PERMITTEE(S) MUST <br />PROVIDE A TEMPORARY SEDIMENT BASH TO PROVIDE TREATMENT 70 THE RUNOFF BEFORE IT LEAVES THE <br />CONSTRUCTION STE DR ENTERS SURFACE WATERS, A TEMPORARY SEDIMENT BASIN MAY BE CONVERTED TO A <br />PERMANENT BASIN AFTER CONSTRUCTION Is COMPLETE THE TEMPORARY BASIN IS NO LONGO REQUIRED WHEN <br />PERMANENT COVER HAS REDUCED THE ACREAGE OF DISTURBED SOIL TO LESS THAN FINE (5) ACNES DRAINING TD A <br />COMMON LOCATION. THE PERWTTIE(S) IS/ME ENCOURAGED, BUT NOT REWIRED. TO INSTALL TEMPORARY SEGMENT <br />BASINS WHERE APPROPRIATE IN AREAS WITH STEEP SLOPES OR HIGHLY ERODIBLE SOILS EVEN IF LESS THAN FIVE (5) <br />ACRES DRAINS TO ONE AREA THE BASINS MIDST BE DESIGNED AND CONSTRUCTED ACC✓ RIDING TO THE FOLLOWING <br />REQUIREMENTS: <br />1, THE BASINS MIST PROVIDE LIVE STORAGE FOR A CALCULATED VOLUME OF RUNOFF FROM A TWO-YEAR, 24-H OM <br />STORM FROM EACH ACRE DRAINED TO THE BASIN, EXCEPT THAT IN NO CASE SHALL THE BANR PRO" LESS THAN <br />LOGO CUBIC FEET OF LIVE STORAGE FROM EACH ACRE DRAINED TO THE BIN, <br />2 WERE THE CALCULATION W PMT W.C.I. HAS NOT BEEN PERFCRMM A TEMPORARY SEDIMENT BASIN PROVIDING <br />5,600 CUBIC FEET OF LIVE STORAGE PER ACRE DRAINED TG THE BASIN SHALL BE PROVIDED FOR THE ENTIRE <br />DRAINAGE AREA OF THE TEMPORARY BASIN. <br />3, TEMPORARY BASIN OUTLETS MUST BE DESIGNED TO PREVENT SHDRT-CROMING AND RM <br />HE DISONGE OF <br />FLOATING DEBRIS THE SASN MUST BE DESIGNED NTH THE AIMUTY TO ALLOW COLPLETE BASN DRAIDOWN FOR <br />MAINTENANCE ACTIWTES AND MUST INCLUDE A STABIL12ED EMERGENCY OVERFLOWN TO PREVENT FAILURE! OF POND <br />INTEGRITY. THE OUTLET STRUCTURE MUST BE DESGNED TO WITHDRAW WATER FROM THE SURFACE IN ORDER TO <br />MINIMITE THE OSOHAIW OR POLLUTANTS EXCEPT THAT THE DISE OF A SURFACE WIHORAWAL MECHANISM FOR <br />DISCHARGE OF THE BASIN MAY BE TEMPORARILY SUSPENDED DURING FROM CONDITIONS. ENERGY OISSPATION MIDST <br />BE PROVIDED PCR THE BASIN OUTLET (SEE PMT rv.BS). <br />4. SEDIMENT BASINS MUST BE SITUATED OUTSIDE OF SURFACE WATERS AND ANY BUFFER ZONE REWIRED UNDER <br />APPENDIX A. r-3, AND MUST BE DESIGNED TO AVOID DRAINING WATER FROM WETLAND$ UNLESS THE IMPACT TO THE <br />WETLAND 6 IN COMPLIANCE NTH THE REOUREMENTS OF APPENDIX A. PMT D. <br />5. THE TEMPORARY BASINS MUST BE CONSTRUCTED AND MADE OPERATIONAL PRIOR TO 10 OR MORE ACES OF <br />DISTURBED SOL DRAINING TO A COMMON LOCATOL <br />L WHERE A TEMPORARY SEDIMENT BASIN MEETING THE REGUIREMENES OF THIS PMT 15 INFEASIBLE, EQUIVALENT <br />SEDIMENT CONTROLS SUCH AS SMALLER SEDIMENT BASINS, AND/OR SEDIMENT TRAPS, SLT FENCES, VEGETATIVE <br />BUFFER STRIPS OR ANY APPROPRIATE COMBINATION OF MEASURES ARE REGUIRED FOR ALL ODWN-SLOPE <br />BOUNDARIES OF THE CONSTRUCTION AREA AND FOR SIDE -SLOPE BOUNDARIES AS DICTAED BY INDIVIDUAL STE <br />CONDITIONS IN DETERMINING NETHER INSTALLING A SEDIMENT BASIN LS INFEASSLE, THE PERMITIEEM MUST <br />CONSIDER PUBLIC SAFETY AND MAY CONSIDER FACTORS RICH AS 517E SUIIS, SLOPE, AND AVAILABLE AREA ON STE <br />THIS DETERMINATION OF INFEASIBILITY MUST BE DOCUMENTED IN THE SWPPP PRE PART ILAi <br />PART III.E - RECORD RETENTION <br />THE SNW (ORIGINAL OR COPES) INCLUDING. ALL CHANGES TO IT, AND INSPECTIONS AND <br />MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION BY THE PERMITTEES) <br />WIND HAS/HAVE OPERATIONAL CONTROL OF THAT PORTON OF THE STEL THE SWPPP CAN BE KEPT IN <br />EITHER THE FIELD OFFICE OR IN AN ON-STE VEHICLE DuRNG NORMAL WORKING HOURS. <br />ALL DMINER(S) MUST KEEP THE FOLLOWING RECORDS ON FILE FOR THREE (3) YEARS AFTER SUBMITTAL <br />OF THE NO1T' AS DUT NED IN PART II.C. THIS DOES NOT INCLUDE ANY RECORDS AFTER SUBMTTAL OF <br />1. THE FINAL 5WPPP <br />2 ANY OTHER STORwwATER RELATED PERMITS REQUIRED FOR THE PROJECT <br />3, RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION (PART IV,E. <br />INSPECTIONS AND MAINTENANCE) <br />PART III.E - RECORD RETENTION (CONT) <br />4. ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, <br />INCLUDING ALL MCHT-OF-WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS <br />REGARDING PERPETUAL MAINTENANCE AND <br />5. ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STDRMWATER <br />MANAGEMENT SYSTEMS, <br />PART III.F. - TRAINING REQUIREMENTS <br />THE PERMIT7EE(S) SHALL ENSURE THE FOLLOWING INDIVIDUALS IDENTIFIED IN THIS PART HAVE BEEN <br />TRAINED IN ACCORDANCE WITH THIS PERMIT'S TRAINING RCQUIREMENIS <br />1. NFO MUST BE TRAINED: <br />A. INDIIDUAL(S) PREPARING THE SWPPP FOR THE PROJECT <br />B. INdIOUAL(S) OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP AND <br />INDMDUAL(S) PERPOfeAnO INSPECTIONS AS RECURRED IN PART IV.E. one OF THESE INDIVIDUAL(S) <br />MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPGA. <br />CL INDIIDUAL(5) PERFORMING OR SUPERVISING THE INSTALLATION. MAINTENANCE AND REPAIR OF <br />BMPS AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES <br />2. TRAINING CONTENT. THE CONTENT ANG EXTENT OF TRAINING MUST BE COMMENSURATE NTH THE <br />INDIVIDUALS JOB DUTIES AND RESPOMIMU71ES WTH REGARD TO ACTIVITIES COVERED UNDER THIS <br />PERMIT FOR THE PROJECT, AT LEAST ONE INDIVIDUAL PRESENT ON THE PERMITTED PROJECT SITE (OR <br />AVAILABLE TG THE PROJECT SITE IN 72 HOURS) MUST BE TRAINED IN THE JG13 DUTIES DESCRIBED IN <br />PART IIIALI. AND PART III.F.1.G <br />3. THE PERMITTEE(S) SHALL ENSURE THAT THE INDIVIDUALS ARE TRAINED SY LOCAL, STATE, FEDERAL <br />AGENCIES, PROFESSIONAL ORGANIZATONS, OR OTHER ENTITIES NTH EXPERTISE IN EROSION <br />PREVENTION, SEDIMENT CONTROL, PERMANENT STORMWATER MANAGEMENT AND THE MINNESOTA <br />NPOES/SDS CONSTRUCTION STORMWATER PERMIT. AN UPDATE REFRESHER -TRAINING MUST BE <br />ATTENDED EVERY THREE (3) YEARS STARTING THREE (3) YEARS FROM THE ISSUANCE DATE OF THIS <br />PERMIT. <br />IV.B. EROSION PREVENTION PRACTICES <br />1. THE PERMITTEE S) MUST PLAN FOR AND IMPLEMENT APPROPRIATE BMPS SUCH AS CONSTRUCTION <br />PHASING, VEGETA W BUFFER STRIPS, HORIZONTAL SLOPE GRADING INSPECTION AND MAINTENANCE OF <br />PART IV.E. AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION AS NECESSARY TO COMPLY <br />WTH THIS PERMIT AND PROTECT WATERS OF THE STATE. THE LOCATION CF AREAS NOT TO BE <br />DISTURBED MUST BE DEUNEATED (E.G., NIH RAGS STAKES SIGNS, SILT FENCE ETC.) ON THE PROJECT <br />SITE BEFORE WORK BEGINS. THE PERMITTEE(5) MUST MINIMIZE THE NEED FOR DISTURBANCE OF PORTIONS <br />OF THE PROJECT THAT HAVE STEEP SLOPES FOR THOSE SLOPED MEAS WHICH MUST BE DISTURBED, <br />THE PERMITTEE(S) MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICES DESIGNED <br />FOR STEEP SLOPES (E.G.. SLOPE DRAINING AND TERRACING), <br />2. THE PERMITIEE(S) MUST STABILIZE ALL EXPOSED SOIL AREAS (INCLUDING STOCKPILES). STABEIZATION <br />MUST BE WBTATEO IMMEDIATELY TO UNIT SOIL EROSION WHENEVER ANY CONSTRUCTION TVITT HAS <br />PERMANENTLY OR TEMPORARILY CEASED ON ANY PORTON OF THE SITE AND ELL NOT RESUME FOR A <br />PERIOD EXCEEDING 7 CALENDAR DAYS STABILIZATION MUST BE COMPLETED NO LATER THAN 14 <br />CALENDAR DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE STE HAS TEMPORARILY <br />ON PERMANENTLY CEASED. <br />3, IF LING STORNWATER CONVEYANCE CHANNELS, THE PERMITTEE(S) MUST DESIGN THE CHANNELS TO <br />ROUTE WATER AROUND LUNSTAOI AREAS ON THE STE AND TD REDUCE EROSION, UNLESS INFEASIBLE <br />THE PERMITIEE(S) MUST USE EROSION CONTROLS AND VELOCITY DISSIPATION DEICES SUCH AS CHECK <br />DAMS, SEDIMENT TRAM RIPRAP, OR GROUTED RIPRAP AT OUTLETS WITHIN AND ALONG THE LENGTH OF <br />ANY CONSTRUCTED STORMWATER CONVEYANCE CHANNEL. AND AT ANY OUTLET, TO PROVIDE A <br />NON-EROSIVE FLOW VELOCITY, TO MINIMIZE EROSION OR CHANNELS AND THEIR EIMBANKMENTS, OUTLETS, <br />ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM WATERS DURING DISCHARGE CONDITIONS. <br />4, THE PERMITTEE(S) MUST STABILIZE THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR <br />PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM ANY PORTON OF THE CONSTRuCTON <br />STE OR DIVERTS WATER AROUND THE SITE, WHIN 200 LINEAL FEET FROM THE PROPERTY EDGE OR <br />FROM THE PONT OF DISCHARGE INTO ANY SURFACE WATER. STABIuZATDN OF THE LAST 200 LINEAL <br />FEET MUST BE COMPLETED WITHIN 24 HAIRS AFTER CONNECTING TO A SURFACE WATER OR PROPERTY <br />EDGE. <br />THE PERMITIEE(S) SHALL COMPLETE STABILIZATION OF THE REMAINING PORTIONS OF ANY WAWDRMT OR <br />PERMANENT DITCHES GR SWALES WITHIN 7 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER <br />OR PROPERTY EDGE AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR <br />PERMANENTLY CEASED. <br />TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT <br />SYSTEM DURING CONSTRUCTION (NTH PROPERLY DESIGNED ROCK -DITCH CHECKS, BO ROLLS SLT DIKES <br />MD NOT NEED TO BE STARNZED DURING THE TEMPORARY PERIOD OF ITS USE AS A SEDIMENT <br />CON AINMENT SYSTEM. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BERG <br />USED AS A SEDIMENT CONTAINMENT SYSTEM, <br />APPLYING MULCH, HYDRDMULCH. TACKIFER, POLYACRYLAMIDE DR SIMILAR EROSION PREVENTION <br />PRACTICES IS NOT ACCEPTABLE STABILIZATION N ANY PMT OF A TEMPORARY OR PERMANENT DRAINAGE <br />DITCH OR SWALE, <br />5. PIPE OUTLETS MUST BE PROVIDED NTH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 <br />HOURS AFTER CONNECTION TO A SURFACE WATER, <br />B. UNLESS INFEASIBLE <br />DUE TO LACK OF PERVIOUS OR VEGETATED AREAS, THE PERMITTEES) MUST <br />DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS OF THE STE (INCLUDING ANY NATURAL BUFFERS) <br />IN ORDER TO INCREASE SEDIMENT REMOVAL AND MAwMIZE STORMwATER INFILTRATION. THE PERMITTEE(S) <br />MUST DISE VELOCITY DISSIPATION DEVICES IF NECESSARY ZD PREVENT EROSION NREM DIRECTING <br />STORNWATER TO VEGETATED AREAS <br />PART IV.C. - SEDIMENT OONTROL PRACTICES <br />1. THE PERMITTEE(S) MUST EMPLOY SEDIMENT CONTROL PRACTIOEES AS NECESSARY TO MINIMIZE SEDIMENT <br />FROM ENTERINGSURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS A <br />TEMPORARY DR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS THAT ARE DESIGNED AS PMT OF <br />A SEDIMENT CONTAINMENT SYSTEM (EG, DITCHES NTH ROCK -CHECK DAMS) REQUIRE SEGMENT CONTROL <br />PRACTICES CULT AS APPROPRIATE FFGR SITE CONDITIONS. <br />B. IF THE DOWN GRADIENT SEDIMENT CONTROLS ME OVERLOADED (BASED ON FREQUENT FAILURE OR <br />EXCESSIVE MAINTENANCE REQUIREMENT), THE PERMITIEE(S MUST INSTALL ADDITIONAL uPCRAGENT <br />SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO UMINATE THE OVERLOADING, AND THE SWPPP <br />MUST BE AMENDED TO IDENTIFY NESE ACKNIMAL PRACTICES AS REQUIRED IN PMT AILS 1.-3. <br />2. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS AND BE <br />LOCATED UPGRADEANT OF ANY SUFFER ZONES THE PERIMETER SEDIMENT CONTROL PRACTICE MUST BE IN <br />PLACE BEFORE ANY UPGRADIENT LAND -DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN N <br />PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED IN ACCORDANCE WITH PART IV.G <br />S. THE PERMITTEE(S) SHALL RE -INSTALL ALL SEDIMENT CONTROL PRAC710ES THAT HAVE BEEN ADJUSTED <br />OR REMOVED TO ACCOMMODATE SHORT -TERN ACTIVITIES SUCH AS CLEARING OR GRUBBINO, OR PASSAGE <br />OF VEHICLES IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY HAS BEEN COMPLETED. THE PERMITTEE(S) <br />SHALL COMPLETE ANY SHORT-TERM ACTIVITY THAT REQUIRES REMOVAL OF SEDIMENT OONTROL <br />PRACTICES AS QUICKLY AS POSSIBLE, THE PERMITTEE(S) MUST RE -INSTALL SEDIMENT CONTROL <br />PRACTICES BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE SHORT-TERM ACTIVITY IS NOT <br />COMPLETE <br />4, ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL <br />ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED. INLET <br />PROTECTION MAY BE REMOVED FOR A PMTICuLAR INLET IF A SPECIFIC SAFETY CONCERN (STREET <br />FLOWING/FREEZING) HAS BEEN IDENTIFIED BY THE PERLITTEE(S) OR THE JURISDICTIONAL AUTHCRITY <br />REMOVAL I�f SI/MWINSHIP/MNOOT ENdNEER).THE PERMITTEES) MUST DOCUMENT THE NEED FOR <br />A TEMPORARY SOL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND <br />CANNOT SE PLACED IN ANY NATURAL BUFFERS OR SLFFACE WATERS, INCLUDING STORMWAIER <br />CONVEYANCES SUCH AS DURB AND CUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS THERE IS A <br />BYPASS N PLACE FOR THE STORMWATER. <br />6. INHERE VEHICLE TRAFFIC LEAVES ANY PART OF THE SITE (OR ONTO PAVED ROADS W7HIN THE SITE): <br />A, THE PERMITTEE(S) MUST INSTALL A VEHICLE TRACKING BMP TO MINIMIZE THE TRACK OUT OF <br />SEDIMENT FROM THE CONSTRUCTION SITE EXAMPLES OF VEHICLE TRACKING BMPS INCLUDE (BUT ARE NOT <br />LIMITED TO) ROOK PADS, MUD MATS, SLASH MULCH, CONCRETE OR STEEL WASH RACKS, OR EQUIVALENT <br />SYSTEMS <br />B, THE PERMITTEES) MUST USE STREET SWEEPING IF SUCH VEHICLE TRACKING BMPS ARE NOT ADEQUATE <br />TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET (SEE PMT M.E.5.D.), <br />7. THE PERMITTEE(5) MUST INSTALL TEMPORARY sEGIMENTATBN BASINS AS RELIRED IN PART MILD OF <br />THIS PERMIT. <br />PART IV.G - SEDIMENT CONTROL PRACTICES (CONT.) <br />S. THE PERMITTEES) MUST MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL <br />MINIMIZING SOIL COMPACTION I$ Not REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA OF THE SITE <br />DICTATES THAT IT BE COMPACTED. <br />9. THE PERMITTEES) MUST PRESERVE A 50 FOOT NATURAL BUFFER OR (IF A BUFFER IS INFEASIBLE ON <br />THE STE) PROVIDE REDUNDANT SEDIMENT CONTROLS WHEN A SURFACE WATER LS LOCATED WITHIN 50 <br />FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER. <br />NATURAL BUFFERS ARE NOT REQUIRED ADJACENT TO ROAD DITCHES, JUDICIAL DITCHES, COUNTY DITCHES, <br />STORMWATER CONVEYANCE CHANNELS. STORM DRAIN INLETS, AND SEDIMENT BASINS THE PERIWTIEE(S) <br />IS/ANE NOT REQUIRED TD ENHANCE THE DUALITY OF THE VEGETATION THAT ALREADY EXISTS IN THE <br />BUFFER OR PROVIDE VEGETATION IF NONE EXIST. HOWEVER, PERMITTEE(S) CAN IMPROVE THE NATURAL <br />BUFFER NTH VEGETATION, <br />PART W.D. - DEWATERING AND BASIN DRAINING <br />1. THE PERMITTEES) MUST DISCHARGE TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWATERING <br />OR BASIN DRAINING (E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) TO A <br />TEMPORARY OR PERMANENT SEGMENTATION BASIN ON THE PROJECT SITE UNLESS INFEASIBLE. THE <br />PERMITTEES) MAY DISCHARGE FROM THE TEMPORARY OR PERMANENT SEDIMENTATION BASINS TO <br />SURFACE WATERS IF THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE <br />TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT NUISANCE CONDITIONS (SEE MINN. R. <br />7050.0210, SUMP, 2) ELL NOT RESULT FROM THE DISCHARGE, IF THE WATER CANNOT BE DISCHARGED <br />TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE SUWFACE WATER. IT MUST BE TREATED WITH THE <br />APPROPRIATE BMPS, SUCH THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER <br />OR DOWNSTREAM PROPERTIES. IF THE PERMITTEE(S) MUST DISCHARGE WATER THAT CONTAINS OIL OR <br />GREASE. THE PERMITTEES) MUST USE AN OL -WATER SEPARATOR OR SUITABLE FILTRATION DEICE <br />(E.G. CARTRIDGE FILTE11%MUST ENSURE THAT DISCHARGANSEEINN POINTS ARE ADEQUATELTS PADS) PRIOR ToY IPSCHARGING RDTECTTE13 FROMTHEWAMITT <br />EROSON AND THEEE(S) <br />THE <br />DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP. SAND BAGS PLASTIC SHEETING, OR <br />OTHER ACCEPTED ENERGY DISSIPATION MEASURES. <br />2 All WATER FROM DEWATERING OR BASIN -DRAWING ACTIVITIES MUST BE DISCHARGED IN A MANNER <br />THAT DOES NOT CAUSE NUISANCE CONDITIONS EROSION IN RECEIVING CHANNELS GR ON ODWNSLOPE <br />PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACT TO THE WEILAND. <br />3. IF THE PERMITTEES) IS/ARE USING FILTERS NTH BACKWASH WATER, THE PERMITTEE(S) MUST HALL <br />THE BACKWASH WMA AWAY FOR DISPOSAL, RETURN THE BACKWASH WATER TO THE BEGINNING OF <br />THE TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATER INTO THE 197E IN A MANNER <br />THAT 000 NOT CAUSE EROSION. THE PERMITTEES) MAY DISCHARGE BACKWASH WATER TO THE <br />SANITARY SEWER IF PERMISSION IS GRANTED BY THE SANITARY SEWER AUTHORITY. THE PERMITTEES) <br />MUST REPLACE AND CLEAN THE FILTER MEDIA USED IN DEWATERIR7G DEVICES WHEN REQUIRED TO <br />RETAIN ADEQUATE FUNCTION <br />PART IV.E. - INSPECTIONS AND MAINTENANCE <br />1. THE PERMITTEE(S) MUST ENSURE THAT A TRAINED PERSON (AS IDENTIFIED IN PMT IILA.3.A.) ELL <br />Y N 7 DAYS DURING <br />ACUTELY INSPECT THE ENTRE CONSTRCURS SITE A LEAST ONES EVER SIEVE ( ) <br />ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN <br />24 HOURS FOLLOWING AN INSPECTOR THAT OCCURS WITHIN 24 HOURS AFTER A RAINFALL EVENT, THE <br />NEXT INSPECTION MUST BE CONDUCTED WITIRN SEVEN (7) DAYS AFTER THE RAINFALL EVENT. <br />2. ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED WITHIN <br />24 HOURS N WRITING AND THESE RECORDS MUST BE RETAINED NTH TIRE SWPPP IN ACCORDANCE <br />WITH PMT III.E. RECORDS OF EACH INSPECTOR AND MAINTENANCE ACTIVITY SHALL INCLUDE: <br />A DATE AND TIME OF INSPECTORS <br />9. NAME OF PERSDN(S) CONDUCTING INSPECTIONS <br />C. 1`09INGS OF INSPECTICNS OCCLUDING THE SPECIFIC LOCATION WERE CORRECTIVE ACTIONS ARE <br />NEEDED <br />D. CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE <br />ACTIVITIES) <br />E. DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 1/2 INCH (0.5 INCHES) IN 24 HOURS <br />RAINFALL AMOUNTS MUST BE OBTAINED BY A PROPERLY MAINTAINED RAIN GAUGE INSTALLED ONSITE. <br />A WEATHER STATION THAT IS WTHIN 1 MILE OF YOUR LOCATION OR A WEATHER REPORTING SYSTEM <br />THAT PROVIDES STE SPECIFIC RAINFALL DATA FROM RADAR SUMMARIES <br />F. IF ANY DISCHARGE IS OBSERVED TO BE OCCURRING DURING THE INSPECTION, A RECORD OF ALL <br />POINTS OF THE PROPERTY FROM WENICH THERE IS A 0SCHARCE MUST BE MADE, AND THE DISCHARGE <br />SHOULD BE DESCRIBED (I.E.. COLOR. WOR. FLOATING, SETTLED. OR SUSPENDED SQUIDS FOAM, OIL <br />SHEEN, AND OTHER OBVIOUS INDICATORS OF POLLUTANTS) AND PHOTOGRAPHED. <br />G ANY AMENDMENTS TO THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE <br />OOCMFNTED AS REQUIRED IN PART 111.8. WTHIN SEVEN (7) CALENDAR DAYS, <br />I INSPECTION FREQUENCY AUJASTMENT <br />A WHERE PMTS OF THE PROJECT STE HAVE PERMANENT COVER, BUT WORK REMAINS ON OTHER <br />PMTS OF THE SITE, THE PERMITTEE(S) MAY REDUCE INSPECTIONS OF THE AREAS NTH PERMANENT <br />DOM TO ONCE PER MONTH. <br />B. RHEREOGNSIRUCTION SITES HAVE PERMANENT COVER ON ALL EXPOSED SOIL MEAS AND NO <br />CONSTRUCTION ACTMTY IS OCCURRING ANYWHERE ON THE SITE. THE SITE MUST BE INSPECTED DURING <br />NON -FROZEN GROUND CONDITIONS AT LEAST ONCE PER MONTH FOR A PERIOD OF TWELVE (12) <br />MONTHS. FOLLOWING THE TWELFTH MONTH OF PERMANENT COVER AND NO CONSTRUCTION ACTIVITY, <br />INSPECTIONS MAY BE TERMINATED UNTIL CONSTRUCTION ACTIVITY IS ONCE AGAIN INITIATED UNLESS <br />THE PERMITTEES) IS/ME NOTIFIED IN NOTING BY THE MPG THAT EROSION ISSUES HAVE BEEN <br />DETECTED AT THE SITE AND INSPECTIONS NEED TO RESUME <br />C WHERE W13RK HAS SEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, THE INSPECTIONS MAY <br />BE SUSPENDED. THE REQUIRED INSPECTIONS AND MAINTENANCE SCHEDULE MUST BEGIN WTHIN 24 <br />HOURS AFTER RUNOFF OCCURS AT THE SITE OR 24 HOURS PRIOR TO RESUMING CONSTRUCTION. <br />WHICHEVER COMES FIRST. <br />4. THE PERMITTEES) IS/ARE RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF TEMPORARY <br />AND PERMANENT WATER QUALITY MANAGEMENT BAPS, AS WELL AS ALL EROSION PREVENTION AND <br />SEDIMENT CONTROL BMPS, UNTIL ANOTHER PERMITTEE HAS OBTAINED COVERAGE UNDER THIS PERMIT <br />ACCORDING TO PMT II.BU, OR THE PROJECT HAS UNDERGONE FINAL STABILIZATION, AND AN NOT HAS <br />BEEN SUBMITTED TO THE MPCA. <br />5. THE PERMITTEE5) MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL SNIPS AND <br />POLLUTION PREVEN%N MANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS DURING <br />ALL ROUTINE AND POST-RANFALL EVENT INSPECTIONS, ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, <br />REPLACED, OR SUPPLEMENTED NTH FUNCTIONAL SUPS BY THE END OF THE NEXT BIISNESS DAY <br />AFTER DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS UNLESS ANOTHER TIME FRAME <br />IS SPECIFIED BELOW. THE PERMITTEE(S) MUST INVESTIGATE AND COMPLY NTH THE FOLLOWING <br />INSPECTION AND MAINTENANCE REQUIREMENTS: <br />A. ALL PERIMETER CONTROL DEVICES MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED HIEN THEY <br />BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES ONE-HALF (1/2) OF THE HEIGHT OF THE OEVIDU. <br />THESE REPAIRS MUST BE MADE BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR <br />THEREAFTER AS SOON AS FIELD CONDITIONS ALLOW ACCESS <br />B. TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE CRANED AND THE SEDIMENT <br />REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES ONE-HALF (1/2) THE <br />STORAGE VOLUME. TANNAGE <br />AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR <br />AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART IVD.). <br />G SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED <br />FOR EVIDENCE OF EROSION AND SEDIMENT DEPOSITION DURING EACH INSPECTION. THE PERMITTEE(S) <br />MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE <br />WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS AND RESTABWZE THE MEAS WHERE SEDIMENT <br />REMOVAL RESULTS IN EXPOSED SOIL. THE REMOVAL AND STABILIZATION MUST TAE PLACE "THIN <br />SEVEN (7) 13AYS CCESS <br />CONSTRAINTS THE OISCOVEFFY UPRECLUDED <br />ERMI )SRALL USE ANUESS REASONABLE EFFORTS TOYORTAACCESS. <br />N , OR PHYSICAL IFF <br />PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS GF <br />OBTAINING ACCESS. THE PERMITTEES) Is/ME RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL <br />STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING <br />ANY WORK IN SURFACE WATERS. <br />D. CONSTRUCTION SITE VEHICLE EXIT LOCJATIORS MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE <br />SEDIMENT TRACKING ONTO PAVED SURFACES TRACKED SEDIMENT MUST BE REMOVED FROM ALL PAVED <br />SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A <br />SHORTER ONE TO COMPLY WITH PMT IV.CB, <br />E. STREETS AND OTHER AREAS ADJACENT TO THE PROJECT MUST BE INSPECTED FOR EVIDENCE GF <br />OFF-SITE ACCUMULATIONS OF SEDIMENT. IF SEDIMENT IS PRESENT. IT MUST BE REMOVED IN A MANNER <br />AND AT A FREQUENCY SUFFICIENT M MINIMIZE OFF-STE IMPACTS (E.G., FUGTIVE SEDIMENT IN <br />STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY <br />HAZARD TD USERS OF PUBUC STREETS). <br />IS, ALL INFILTRATION MEAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING <br />CONSTRUCTION ACTIVITY IS REACHING THE INFILTRATION AREA, ALL INFILTRATION AREAS MUST BE <br />INSPECTED TO ENSURE THAT EQUIPMENT IS NOT BEING DRIVEN ACROSS Te INFILTRATION AREA. STORM WATER PRLLRTIRN PREYEIITIRN PLAN <br />VICTOR GARDENS NORTH VILLAGE 7TH ADDITION <br />PART IV.F. - POLLUTION PREVENTION MANAGEMENT MEASURES <br />THE PERMITTEES) SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT MEASURES <br />OR THE SITE: <br />I. STORAGE, HANDING AND DISPOSAL OF CONSIRUCTION PRODUCTS. MATERIALS, AND WASTES: THE <br />PERMITTEES) SHALL COMPLY WITH THE FOLLOWING TO MINIMIZE THE EXPOSURE TO STORMWATER OF <br />ANY OF THE PRODUCTS. MATERIALS. OR WASTES. PRODUCTS OR WA510 WHICH ARE EITHER NOT A <br />SOURCE OF CONTAMINATION TO STORMWATER OR ARE DESIGNED TO BE EXPOSED TO STORMWATER ME <br />NOT HELD TO THIS REQUIREMENT: <br />L BUILDING PRODUCTS THAT HAVE THE POTENTIAL TD LEACH POLLUTANTS MUST BE UNDER COVER <br />G, PLASTIC SHEETING OR TEAIPORMY ROOFS TO PREVENT THE DISCHARGE OF POLLUTANTS OR <br />ROTECTED BY A SIMILARLY EFFECTIVE (FANS ESIGNED TO MINIMIZE CONTACT "TH STORNwATEN. <br />B. PESTICIDES. HERBICIDES, INSECTICIDES. FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE <br />MATERIALS MUST BE UNDER COVER (LG., PLASTIC SHEETING OR TEMPORARY ROOFS) TO PREVENT THE <br />DISCHARGE OF POLLUTANTS OR PROTECTED BY SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE <br />CONTACT NTH STORMWATER, <br />C HAlARDOUS MATERIALS, TOXIC WASTE, (NCUJOINC OIL, DIESEL FUEL. GASOLINE, HYDRAULIC FLUIDS, <br />PAINT SOLVENTS. PETROLEUM-BASED PRODUCTS, WOW PRESERVATIVES, ADDITIVES. CURING <br />COMPOUNDS, AND ACIDS) MUST BE PROPERLY STORED IN SEALED CONTAINERS TO PREVENT SPILL$ <br />LEAKS OR OTHER DISCHARGE RESTRICTED ACCESS STORAGE AREAS MUST BE PROVIDED TO PREVENT <br />VANDALISM. STORAGE AND DISPOSAL OR HAZARDOUS WASTE OR HAZARDOUS MATERIALS MUST BE IN <br />COMPLIANCE NTH MINN. R. CH, 7045 INCLUDING SECONDARY CONTAINMENT AS APPLICABLE. <br />0. SOLID WASTE MUST BE STORED. COLLECTED AND DISPOSED OF PROPERLY IN COMPLIANCE NTH <br />MINN. R. CH. 7035, <br />E. PORTABLE TOILETS MUST BE POSITIONED 50 THAT THEY ARE SMILE AND ELL NOT SE TIPPED OR <br />KNOCKED OVER SANITARY WASTE MUST BE DISPOSED OF PROPERLY IN ACCORDANCE WITH MINN. R. <br />CH. 7041, <br />2. FUELING AND MAINTENANCE OF EQUIPMENT OR VEHICLES. SPILL PREVENTION AND RESPONSE: THE <br />PERMITTEE(S) SHALL TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR LEAKED <br />CHEMICALS INOWOING FUEL. FROM ANY AREA WHERE CHEMICALS OR FUEL ELL BE LOADED OR <br />UNLOADED INCLUDING THE USE OF DRIP PANS OR ABSORBENTS UNLESS INFEASIBLE. THE PERMITTEES) <br />MUST CONDUCT FUELING IN A CONTAINED AREA UNLESS INFEASIBLE. THE PERRTTEE(S) MUST ENSURE <br />ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEW UP DISCHARGED MATERIALS AND THAT <br />AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. THE <br />PERMITTLE(S) MUST REPORT AND CLEAN UP SPILLS IMMEDIATELY AS REQUIRED BY MINN. STAT. (I <br />115.081, USING DRY CLEW UP MEASURES WHERE POSSIBLE. <br />S VEHICLE AND EQUIPMENT WASHING: IF THE PERMITTEES) WASH THE EXTERIOR OF VEHICLES OR <br />EQUIPMENT ON THE PROJECT SITE, WASHING MUST BE LIMITED TO A DEFINED AREA OF THE SITE <br />RUNOFF FROM THE WASHING AREA MUST BE CONTAINED IN A SEDIMENT BASIN OR OTHER SIMILARLY <br />EFFECTIVE CONTROLS AND WASTE FROM THE WASHING ACTIVITY MUST RE PROPERLY DISPOSED OF. THE <br />PERMITTEE(S) MUST PROPERLY USE AND STORE SOAPS, DETERGENTS OR SOLVENTS NO ENGINE <br />DEGREASING IS ALLOWED ON SITE. <br />4. CONCRETE AND OTHER WASHOUTS WASTE THE PERMITIEE(S) MUST PROVIDE EFFECTIVE <br />CONTAINMENT FOR ALL UQUID AND SOLID WASTES GENERATED BY WASHOUT OPERATIONS (CONCRETE, <br />STUCCO. PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS) <br />RELATED TO THE CONSTRuCTIdN ACTIVITY. THE LIQUID AND SOLID WASHOUT WASTES MUST NOT <br />CONTACT THE GROUND, AND THE CONTAINMENT MUST BE DESIGNED 50 THAT IT GOES NOT RESULT IN <br />RUNOFF FROM THE WASHOUT OPERATIONS OR AREAS LLQu1D AND SOLID WASTES MUST BE DISPOSED <br />OF PROPERLY AND IN COUPUARCE WITH MPCA RULES A SIGN MUST BE INSTALLED ADJACENT TO EACH <br />WASHOUT FACILITY THAT REQUIRES SITE PERSONNEL TO URuZE THE PROPER FACILITIES FOR DISPOSAL <br />OF CONCRETE AND OTHER WASHOUT WASTES <br />PART W.G. FINAL STABILIZATION <br />ME PERMITTEES) MUST ENSURE FINAL STABlUZA71ON OF THE SITE. FINAL STABILIZATION IS NOT <br />COMPLETE UNTIL ALL REQUIREMENTS OF PMTS IVLG1,-5. ME COMPLETE <br />1. ALL SOIL DISTURBING ACTIVITIES AT THE STE RAVE BEEN COMPLETED AND ALL SOLS ARE <br />STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT OF ITS <br />EXPECTED FINAL GROWTH DENSITY OVER THE ENTIRE PERVIOUS SURFACE AREA, OR OTHER EQUIVALENT <br />MEANS NECESSARY TO PREVENT SGL FAILURE UNDER EROSIVE CONDITIONS <br />2. THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS CONSTRUCTED, MEETS ALL REQUIREMENTS IN <br />PART IIIA AND IS OPERATING AS DESONED, TEMPORARY OR PERMANENT SEDIMENTATION BASINS THAT <br />ARE TO BE USED AS PERMANENT WATER DUALITY MANAGEMENT BASINS HAVE BEEN CLEANED OF ANY <br />ACCUMULATED SEDIMENT. ALL SEDIMENT HAS BEEN REIMOVE3 FROM CONVEYANCE SYSTEMS AND <br />DITCHES ARE STABIUZM WITH PERMANENT COVER. <br />I ALL TEMPORARY SYNTHETIC AND STRUCTURAL EROSION PREVENTION AMID SEDIMENT CONTROL BMPS <br />(SUCH AS SILT FENCE) HAVE BEEN REMOVED ON THE PORTIONS OF THE STE FOR WHICH THE <br />PERMITIEE(S) IS/AAE RESPONSIBLE. BMPS DESIGNED TO DECOMPOSE ON SITE (SUCH AS SOME <br />COMPOST LOGS) MAY BE LEFT IN PLACE. <br />C FOR RESIDENTIAL CONSTRUCTION ONLY, INDIVIDUAL LOTS ARE CONSIDERED FINALLY STABILIZED IF <br />THE STRJMRUS) ME FINISHED AND TEMPORARY EROSION PROTECTION AND DOWHGRADIENT <br />PERIMETER CON HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN SOLD TO THE HOMEOWNER. <br />ADDITIONALLY, THE PERMITTEE HAS DISTRIBUTED THE MPCA%'HOMEOWNER FACT SHEET- TO THE <br />HOMEOWNER TO INFORM THE HOMEONNER OF THE NEED FOR, AND BENEFITS OF. PERMANENT COVER. <br />5, FOR CONSTRUCTOR PROJECTS DN AGRICULTURAL LAND (E.G. PIPEUNES ACROSS CROP. FIELD <br />PASTURE OR RANGE LAND) THE DISTURBED LAND HAS BEEN RETURNED TO ITS PRECO NSTRUCTON <br />AGRICULTURAL USE. <br />DKAWN SY: DESIGN BY: <br />C.M. I C.W.P. <br />CHCKO BY: PROJ. ND. <br />G.W.P. I 151568 <br />ORIGINAL DATE: <br />FEBRUARY 10. 2016 <br />PREPARED FOR: <br />KETTLER <br />CONSTRUCTION <br />)r <br />f 1 <br />l <br />FTE I- 'NN.?ILII <br />PLOWE . <br />6776 LANE DRIVE <br />SUITE 110 <br />LINO L"RES, MN 55014 <br />PHONE: (05113614210 <br />FMK: (6611361-3701 <br />C5.1 <br />