PART II.C. - TERMINATION OF COVERAGE
<br />1. TEfMNATON OR COVERAGE WHEN CQJSTRuC71GN IS COMPLETE: ALL PEMITTEE(S) MUST SUBMIT A
<br />NOTICE OF TERMINATION (NOT) TO THE MPCA ON A FORM PROVIDED BY THE COMML930MEN WITHIN 30
<br />DAYS AFTER ALL ACTIVITIES REQUIRED FOR FINAL STABIUZATION (SEE PART IV.G) ARE COMPLETE THE
<br />PERMITTEES)' COVERAGE UNDER THIS PERMIT TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF
<br />THE NOT.
<br />2. TERMINATION OF COVERAGE WHEN TRANSFER OF OWNERSHIP OCCURS ALL PERMITIEE(S) MUST
<br />SUBMT A NOT ON A FORM PROVIDED BY THE COMMISSIONER WITHIN 30 DAYS AFTER SELLING OR
<br />OTHERWISE LEGALLY TRANSFERRING THE ENTIRE STE, INCLUDING PERMIT RESPONSIBILITY FOR ROAD$
<br />(E.G, STREET SWEEPING) AND STORMWAWA INFRASTRUCTURE FINAL CLEAN OUT. OR TRANSFERRING
<br />PORTIONS OF A SITE TO ANOTHER PARTY. THE PERMITTEE(S)' COVERAGE UNDER THIS PERMIT
<br />TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF THE NOT.
<br />3. PERMTTEE(S) MAY TERMINATE PERMIT COVERAGE PRIOR TO COMPLETION OF ALL CONSTRUCTION
<br />ACTIVITY IF ALL OF THE FOLLOWING CONDITIONS ARE MET. AFTER THE PERMIT IS TERMINATED UNDER
<br />THIS PART. IF THERE IS ANY SUBSEQUENT DEVELOPMENT ON THE REMAIRNG PORTIONS OF THE S17E
<br />WHERE CONSTRUCTION ACTIVITY WAS NOT COMPLETE. NEW PERMIT COVERAGE MUST BE OBTAINED IF
<br />THE SUBSEQUENT DEVELOPMENT ITSELF OR AS PART OF THE REMAINING COMMON PLAN OF
<br />DEVELOPMENT OR SALE WILL RESULT IN LAND DISTURBING ACTIVITIES OF ONE (1) OR MORE ACRES IN
<br />SIZE.
<br />A. CONSTRUCTION ACTIVITY HAS CEASED FOR AT LEAST 90 DAYS
<br />S AT LEAST 90 PERCENT (BY AREA) OF ALL ORIGINALLY PROPOSED CONSTRUCTION ACTIVITY HAS
<br />BEEN COMPLETED AND PERMANENT COVER ESTABLISHED ON THOSE AREAS
<br />C. ON AREAS WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE PERMANENT COVER HAS BEEN
<br />ESTABLISHED.
<br />D. THE 97E IS IN COMPLIANCE NTH PMT IV.G2. AND PART IV.C.3. AND WHERE APPLICABLE, PART
<br />IVLG4, OR PART IV.115.
<br />4, PpMITTEE(S) MAY TERMINATE COVERAGE UPON APPROVAL BY THE MPCA IF INFORMATION IS
<br />SUBMITTED TO THE MPCA DOCUMENTING THAT TERMINATION IS APPROPRIATE BECAUSE THE PROJECT IS
<br />CANCELED,
<br />PART III.A.3 - TRAINING DOCUMENTATION
<br />TRAINING DOCUMENTATION: THE PERMTTEE(S) SHALL ENSURE THE INOMOuALS IDENTIFIED IN PART IILF
<br />HAVE BEEN TRAINED IN ACCORDANCE NTH THIS PERMIT'S TRAINING REQUIREMENTS, THE PERMITTEE(S)
<br />SHALL ENSURE THE TRAINING IS RECORDED IN OR WITH THE SWPPP BEFORE THE START OF
<br />CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PRDJECT HAVE BEEN DETERMINED.
<br />DOCUMENTATION SHALL INCLUDE:
<br />A. NAMES OR THE PERSONNEL ASSOCIATED WIN THIS PROJECT THAT ARE REQUIRED TO BE TRAINED
<br />PER PART III.F.1. OF THIS PERMIT.
<br />B DATES OF TRAINING AND NAME OF INSTRUCTOR(S) AND ENTITY PROVIDING TRAINING
<br />C. CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING
<br />PART 111.6 - SWPPP AMENDMENTS
<br />THE PERMITTEE(S) MUST AMEND THE SWPPP AS NECESSARY 70 INCLUDE ADDITIONAL REQUIREMENTS,
<br />SUCH AS ADDITIONAL OR MODIFIED BMPS THAT ARE DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR
<br />ADDRESS SITUATIONS WHENEVER:
<br />1, THERE 15 A CHANGE IN DESIGN. CONSTRUCTION. OPERATION. MAINTENANCE. WEATHER OR SEASONAL
<br />CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLw'fANT5 TO SURFACE
<br />WATERS OR UNDERGROUND WATERS.
<br />2. INSPECTIONS DR INVESTIGATIONS BY ITE OWNER OR OPERATORS, USEPA OR MPCA OFFICIALS
<br />INDICATE THE SWPPP IS NGT EFFECTIVE IN EUMINATING OR S INIFICANTLY MINIMIZING THE DISCHARGE
<br />OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS OR THAT THE DISCHARGES ARE
<br />CAUSING WATER QUALITY STANDARD EXC®ANCES (E.G.. NUISANCE CONDITIONS IS DEFINED IN MINN.
<br />S 7050.0210, SUMP. 2).
<br />3, THE SWPPP IS NOT ACHIEING THE GENERAL OBJECTIVES OF MINIMIZING POLLUTANTS IN
<br />STORMWATER DISCHARGES ASSOCIATED NTH CONSTRUCRGN ACTIVITY, OR THE SWPPP IS NOT
<br />CONSISTENT WITH THE TERMS AND CONDITIONS OF THIS PERMIT.
<br />4, AT ANY TRUE AFTER PERMIT COVERAGE IS EFFECTIVE, THE MPCA MAY DETERMINE THAT THE
<br />PROJECTS STORMWATER DISCHARGES MAY CAUSE, HAVE REASONABLE PDTE14TLAL TO CAUSE, OR
<br />CONTRIBUTE TO NON -ATTAINMENT OF ANY APPLICABLE WATER QUALITY STANDARD, OR THAT THE
<br />SWPPP DOES NOT INCORPORATE THE APPLICABLE REQUIREMENTS IN PART IILA.B., (IMPAIRED WATERS
<br />AND TMDLS). IF A WATER DUALITY STANDARD CHANGES DURING THE TERM OF THIS PERMIT, THE MPG
<br />ELL NATE A DETERMINATION AS TO WHETHER A MODIFICATION OF THE SWPPP IS NECESSARY TO
<br />ADDRESS THE NEW STANDARD. IF THE MPCA MAKES SUCH OETERMINATION(S) OR ANY OF THE
<br />DETERMINATIONS IN PMTS III.B.I.-3., THE MPG WILL NOTIFY THE PERMITTEE(S) IN WRITING IN
<br />RESPONSE, THE PERMITTEE(S) MUST AMEND THE SYIPPP TO ADDRESS THE IDENTIFIED CONCERNS AND
<br />SUBMIT INFORMATION REQUESTED BY THE MPCA, WHICH MAY NCLUOE AN INDIVIDUAL PERMIT
<br />APPuCATCN. IF THE MPG'S WRITTEN NOTIFICATION REQUIRES A RESPONSE, FAILURE TO RESPOND
<br />WITHIN THE SPECIFIED TIMEFRAME CONSTITUTES A PERMIT VIOLATION.
<br />PART III.C. - TEMPORARY SEDIMENT BASINS
<br />WHERE FIVE (5) OR MORE ACRES O DISTURCED 501L DRAIN TO A COMMON LOCATION, THE PERMITTEE(S) MUST
<br />PROVIDE A TEMPORARY SEDIMENT BASH TO PROVIDE TREATMENT 70 THE RUNOFF BEFORE IT LEAVES THE
<br />CONSTRUCTION STE DR ENTERS SURFACE WATERS, A TEMPORARY SEDIMENT BASIN MAY BE CONVERTED TO A
<br />PERMANENT BASIN AFTER CONSTRUCTION Is COMPLETE THE TEMPORARY BASIN IS NO LONGO REQUIRED WHEN
<br />PERMANENT COVER HAS REDUCED THE ACREAGE OF DISTURBED SOIL TO LESS THAN FINE (5) ACNES DRAINING TD A
<br />COMMON LOCATION. THE PERWTTIE(S) IS/ME ENCOURAGED, BUT NOT REWIRED. TO INSTALL TEMPORARY SEGMENT
<br />BASINS WHERE APPROPRIATE IN AREAS WITH STEEP SLOPES OR HIGHLY ERODIBLE SOILS EVEN IF LESS THAN FIVE (5)
<br />ACRES DRAINS TO ONE AREA THE BASINS MIDST BE DESIGNED AND CONSTRUCTED ACC✓ RIDING TO THE FOLLOWING
<br />REQUIREMENTS:
<br />1, THE BASINS MIST PROVIDE LIVE STORAGE FOR A CALCULATED VOLUME OF RUNOFF FROM A TWO-YEAR, 24-H OM
<br />STORM FROM EACH ACRE DRAINED TO THE BASIN, EXCEPT THAT IN NO CASE SHALL THE BANR PRO" LESS THAN
<br />LOGO CUBIC FEET OF LIVE STORAGE FROM EACH ACRE DRAINED TO THE BIN,
<br />2 WERE THE CALCULATION W PMT W.C.I. HAS NOT BEEN PERFCRMM A TEMPORARY SEDIMENT BASIN PROVIDING
<br />5,600 CUBIC FEET OF LIVE STORAGE PER ACRE DRAINED TG THE BASIN SHALL BE PROVIDED FOR THE ENTIRE
<br />DRAINAGE AREA OF THE TEMPORARY BASIN.
<br />3, TEMPORARY BASIN OUTLETS MUST BE DESIGNED TO PREVENT SHDRT-CROMING AND RM
<br />HE DISONGE OF
<br />FLOATING DEBRIS THE SASN MUST BE DESIGNED NTH THE AIMUTY TO ALLOW COLPLETE BASN DRAIDOWN FOR
<br />MAINTENANCE ACTIWTES AND MUST INCLUDE A STABIL12ED EMERGENCY OVERFLOWN TO PREVENT FAILURE! OF POND
<br />INTEGRITY. THE OUTLET STRUCTURE MUST BE DESGNED TO WITHDRAW WATER FROM THE SURFACE IN ORDER TO
<br />MINIMITE THE OSOHAIW OR POLLUTANTS EXCEPT THAT THE DISE OF A SURFACE WIHORAWAL MECHANISM FOR
<br />DISCHARGE OF THE BASIN MAY BE TEMPORARILY SUSPENDED DURING FROM CONDITIONS. ENERGY OISSPATION MIDST
<br />BE PROVIDED PCR THE BASIN OUTLET (SEE PMT rv.BS).
<br />4. SEDIMENT BASINS MUST BE SITUATED OUTSIDE OF SURFACE WATERS AND ANY BUFFER ZONE REWIRED UNDER
<br />APPENDIX A. r-3, AND MUST BE DESIGNED TO AVOID DRAINING WATER FROM WETLAND$ UNLESS THE IMPACT TO THE
<br />WETLAND 6 IN COMPLIANCE NTH THE REOUREMENTS OF APPENDIX A. PMT D.
<br />5. THE TEMPORARY BASINS MUST BE CONSTRUCTED AND MADE OPERATIONAL PRIOR TO 10 OR MORE ACES OF
<br />DISTURBED SOL DRAINING TO A COMMON LOCATOL
<br />L WHERE A TEMPORARY SEDIMENT BASIN MEETING THE REGUIREMENES OF THIS PMT 15 INFEASIBLE, EQUIVALENT
<br />SEDIMENT CONTROLS SUCH AS SMALLER SEDIMENT BASINS, AND/OR SEDIMENT TRAPS, SLT FENCES, VEGETATIVE
<br />BUFFER STRIPS OR ANY APPROPRIATE COMBINATION OF MEASURES ARE REGUIRED FOR ALL ODWN-SLOPE
<br />BOUNDARIES OF THE CONSTRUCTION AREA AND FOR SIDE -SLOPE BOUNDARIES AS DICTAED BY INDIVIDUAL STE
<br />CONDITIONS IN DETERMINING NETHER INSTALLING A SEDIMENT BASIN LS INFEASSLE, THE PERMITIEEM MUST
<br />CONSIDER PUBLIC SAFETY AND MAY CONSIDER FACTORS RICH AS 517E SUIIS, SLOPE, AND AVAILABLE AREA ON STE
<br />THIS DETERMINATION OF INFEASIBILITY MUST BE DOCUMENTED IN THE SWPPP PRE PART ILAi
<br />PART III.E - RECORD RETENTION
<br />THE SNW (ORIGINAL OR COPES) INCLUDING. ALL CHANGES TO IT, AND INSPECTIONS AND
<br />MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION BY THE PERMITTEES)
<br />WIND HAS/HAVE OPERATIONAL CONTROL OF THAT PORTON OF THE STEL THE SWPPP CAN BE KEPT IN
<br />EITHER THE FIELD OFFICE OR IN AN ON-STE VEHICLE DuRNG NORMAL WORKING HOURS.
<br />ALL DMINER(S) MUST KEEP THE FOLLOWING RECORDS ON FILE FOR THREE (3) YEARS AFTER SUBMITTAL
<br />OF THE NO1T' AS DUT NED IN PART II.C. THIS DOES NOT INCLUDE ANY RECORDS AFTER SUBMTTAL OF
<br />1. THE FINAL 5WPPP
<br />2 ANY OTHER STORwwATER RELATED PERMITS REQUIRED FOR THE PROJECT
<br />3, RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION (PART IV,E.
<br />INSPECTIONS AND MAINTENANCE)
<br />PART III.E - RECORD RETENTION (CONT)
<br />4. ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED,
<br />INCLUDING ALL MCHT-OF-WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS
<br />REGARDING PERPETUAL MAINTENANCE AND
<br />5. ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STDRMWATER
<br />MANAGEMENT SYSTEMS,
<br />PART III.F. - TRAINING REQUIREMENTS
<br />THE PERMIT7EE(S) SHALL ENSURE THE FOLLOWING INDIVIDUALS IDENTIFIED IN THIS PART HAVE BEEN
<br />TRAINED IN ACCORDANCE WITH THIS PERMIT'S TRAINING RCQUIREMENIS
<br />1. NFO MUST BE TRAINED:
<br />A. INDIIDUAL(S) PREPARING THE SWPPP FOR THE PROJECT
<br />B. INdIOUAL(S) OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP AND
<br />INDMDUAL(S) PERPOfeAnO INSPECTIONS AS RECURRED IN PART IV.E. one OF THESE INDIVIDUAL(S)
<br />MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPGA.
<br />CL INDIIDUAL(5) PERFORMING OR SUPERVISING THE INSTALLATION. MAINTENANCE AND REPAIR OF
<br />BMPS AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES
<br />2. TRAINING CONTENT. THE CONTENT ANG EXTENT OF TRAINING MUST BE COMMENSURATE NTH THE
<br />INDIVIDUALS JOB DUTIES AND RESPOMIMU71ES WTH REGARD TO ACTIVITIES COVERED UNDER THIS
<br />PERMIT FOR THE PROJECT, AT LEAST ONE INDIVIDUAL PRESENT ON THE PERMITTED PROJECT SITE (OR
<br />AVAILABLE TG THE PROJECT SITE IN 72 HOURS) MUST BE TRAINED IN THE JG13 DUTIES DESCRIBED IN
<br />PART IIIALI. AND PART III.F.1.G
<br />3. THE PERMITTEE(S) SHALL ENSURE THAT THE INDIVIDUALS ARE TRAINED SY LOCAL, STATE, FEDERAL
<br />AGENCIES, PROFESSIONAL ORGANIZATONS, OR OTHER ENTITIES NTH EXPERTISE IN EROSION
<br />PREVENTION, SEDIMENT CONTROL, PERMANENT STORMWATER MANAGEMENT AND THE MINNESOTA
<br />NPOES/SDS CONSTRUCTION STORMWATER PERMIT. AN UPDATE REFRESHER -TRAINING MUST BE
<br />ATTENDED EVERY THREE (3) YEARS STARTING THREE (3) YEARS FROM THE ISSUANCE DATE OF THIS
<br />PERMIT.
<br />IV.B. EROSION PREVENTION PRACTICES
<br />1. THE PERMITTEE S) MUST PLAN FOR AND IMPLEMENT APPROPRIATE BMPS SUCH AS CONSTRUCTION
<br />PHASING, VEGETA W BUFFER STRIPS, HORIZONTAL SLOPE GRADING INSPECTION AND MAINTENANCE OF
<br />PART IV.E. AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION AS NECESSARY TO COMPLY
<br />WTH THIS PERMIT AND PROTECT WATERS OF THE STATE. THE LOCATION CF AREAS NOT TO BE
<br />DISTURBED MUST BE DEUNEATED (E.G., NIH RAGS STAKES SIGNS, SILT FENCE ETC.) ON THE PROJECT
<br />SITE BEFORE WORK BEGINS. THE PERMITTEE(5) MUST MINIMIZE THE NEED FOR DISTURBANCE OF PORTIONS
<br />OF THE PROJECT THAT HAVE STEEP SLOPES FOR THOSE SLOPED MEAS WHICH MUST BE DISTURBED,
<br />THE PERMITTEE(S) MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICES DESIGNED
<br />FOR STEEP SLOPES (E.G.. SLOPE DRAINING AND TERRACING),
<br />2. THE PERMITIEE(S) MUST STABILIZE ALL EXPOSED SOIL AREAS (INCLUDING STOCKPILES). STABEIZATION
<br />MUST BE WBTATEO IMMEDIATELY TO UNIT SOIL EROSION WHENEVER ANY CONSTRUCTION TVITT HAS
<br />PERMANENTLY OR TEMPORARILY CEASED ON ANY PORTON OF THE SITE AND ELL NOT RESUME FOR A
<br />PERIOD EXCEEDING 7 CALENDAR DAYS STABILIZATION MUST BE COMPLETED NO LATER THAN 14
<br />CALENDAR DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE STE HAS TEMPORARILY
<br />ON PERMANENTLY CEASED.
<br />3, IF LING STORNWATER CONVEYANCE CHANNELS, THE PERMITTEE(S) MUST DESIGN THE CHANNELS TO
<br />ROUTE WATER AROUND LUNSTAOI AREAS ON THE STE AND TD REDUCE EROSION, UNLESS INFEASIBLE
<br />THE PERMITIEE(S) MUST USE EROSION CONTROLS AND VELOCITY DISSIPATION DEICES SUCH AS CHECK
<br />DAMS, SEDIMENT TRAM RIPRAP, OR GROUTED RIPRAP AT OUTLETS WITHIN AND ALONG THE LENGTH OF
<br />ANY CONSTRUCTED STORMWATER CONVEYANCE CHANNEL. AND AT ANY OUTLET, TO PROVIDE A
<br />NON-EROSIVE FLOW VELOCITY, TO MINIMIZE EROSION OR CHANNELS AND THEIR EIMBANKMENTS, OUTLETS,
<br />ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM WATERS DURING DISCHARGE CONDITIONS.
<br />4, THE PERMITTEE(S) MUST STABILIZE THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR
<br />PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM ANY PORTON OF THE CONSTRuCTON
<br />STE OR DIVERTS WATER AROUND THE SITE, WHIN 200 LINEAL FEET FROM THE PROPERTY EDGE OR
<br />FROM THE PONT OF DISCHARGE INTO ANY SURFACE WATER. STABIuZATDN OF THE LAST 200 LINEAL
<br />FEET MUST BE COMPLETED WITHIN 24 HAIRS AFTER CONNECTING TO A SURFACE WATER OR PROPERTY
<br />EDGE.
<br />THE PERMITIEE(S) SHALL COMPLETE STABILIZATION OF THE REMAINING PORTIONS OF ANY WAWDRMT OR
<br />PERMANENT DITCHES GR SWALES WITHIN 7 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER
<br />OR PROPERTY EDGE AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR
<br />PERMANENTLY CEASED.
<br />TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT
<br />SYSTEM DURING CONSTRUCTION (NTH PROPERLY DESIGNED ROCK -DITCH CHECKS, BO ROLLS SLT DIKES
<br />MD NOT NEED TO BE STARNZED DURING THE TEMPORARY PERIOD OF ITS USE AS A SEDIMENT
<br />CON AINMENT SYSTEM. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BERG
<br />USED AS A SEDIMENT CONTAINMENT SYSTEM,
<br />APPLYING MULCH, HYDRDMULCH. TACKIFER, POLYACRYLAMIDE DR SIMILAR EROSION PREVENTION
<br />PRACTICES IS NOT ACCEPTABLE STABILIZATION N ANY PMT OF A TEMPORARY OR PERMANENT DRAINAGE
<br />DITCH OR SWALE,
<br />5. PIPE OUTLETS MUST BE PROVIDED NTH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24
<br />HOURS AFTER CONNECTION TO A SURFACE WATER,
<br />B. UNLESS INFEASIBLE
<br />DUE TO LACK OF PERVIOUS OR VEGETATED AREAS, THE PERMITTEES) MUST
<br />DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS OF THE STE (INCLUDING ANY NATURAL BUFFERS)
<br />IN ORDER TO INCREASE SEDIMENT REMOVAL AND MAwMIZE STORMwATER INFILTRATION. THE PERMITTEE(S)
<br />MUST DISE VELOCITY DISSIPATION DEVICES IF NECESSARY ZD PREVENT EROSION NREM DIRECTING
<br />STORNWATER TO VEGETATED AREAS
<br />PART IV.C. - SEDIMENT OONTROL PRACTICES
<br />1. THE PERMITTEE(S) MUST EMPLOY SEDIMENT CONTROL PRACTIOEES AS NECESSARY TO MINIMIZE SEDIMENT
<br />FROM ENTERINGSURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS A
<br />TEMPORARY DR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS THAT ARE DESIGNED AS PMT OF
<br />A SEDIMENT CONTAINMENT SYSTEM (EG, DITCHES NTH ROCK -CHECK DAMS) REQUIRE SEGMENT CONTROL
<br />PRACTICES CULT AS APPROPRIATE FFGR SITE CONDITIONS.
<br />B. IF THE DOWN GRADIENT SEDIMENT CONTROLS ME OVERLOADED (BASED ON FREQUENT FAILURE OR
<br />EXCESSIVE MAINTENANCE REQUIREMENT), THE PERMITIEE(S MUST INSTALL ADDITIONAL uPCRAGENT
<br />SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO UMINATE THE OVERLOADING, AND THE SWPPP
<br />MUST BE AMENDED TO IDENTIFY NESE ACKNIMAL PRACTICES AS REQUIRED IN PMT AILS 1.-3.
<br />2. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS AND BE
<br />LOCATED UPGRADEANT OF ANY SUFFER ZONES THE PERIMETER SEDIMENT CONTROL PRACTICE MUST BE IN
<br />PLACE BEFORE ANY UPGRADIENT LAND -DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN N
<br />PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED IN ACCORDANCE WITH PART IV.G
<br />S. THE PERMITTEE(S) SHALL RE -INSTALL ALL SEDIMENT CONTROL PRAC710ES THAT HAVE BEEN ADJUSTED
<br />OR REMOVED TO ACCOMMODATE SHORT -TERN ACTIVITIES SUCH AS CLEARING OR GRUBBINO, OR PASSAGE
<br />OF VEHICLES IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY HAS BEEN COMPLETED. THE PERMITTEE(S)
<br />SHALL COMPLETE ANY SHORT-TERM ACTIVITY THAT REQUIRES REMOVAL OF SEDIMENT OONTROL
<br />PRACTICES AS QUICKLY AS POSSIBLE, THE PERMITTEE(S) MUST RE -INSTALL SEDIMENT CONTROL
<br />PRACTICES BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE SHORT-TERM ACTIVITY IS NOT
<br />COMPLETE
<br />4, ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL
<br />ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED. INLET
<br />PROTECTION MAY BE REMOVED FOR A PMTICuLAR INLET IF A SPECIFIC SAFETY CONCERN (STREET
<br />FLOWING/FREEZING) HAS BEEN IDENTIFIED BY THE PERLITTEE(S) OR THE JURISDICTIONAL AUTHCRITY
<br />REMOVAL I�f SI/MWINSHIP/MNOOT ENdNEER).THE PERMITTEES) MUST DOCUMENT THE NEED FOR
<br />A TEMPORARY SOL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND
<br />CANNOT SE PLACED IN ANY NATURAL BUFFERS OR SLFFACE WATERS, INCLUDING STORMWAIER
<br />CONVEYANCES SUCH AS DURB AND CUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS THERE IS A
<br />BYPASS N PLACE FOR THE STORMWATER.
<br />6. INHERE VEHICLE TRAFFIC LEAVES ANY PART OF THE SITE (OR ONTO PAVED ROADS W7HIN THE SITE):
<br />A, THE PERMITTEE(S) MUST INSTALL A VEHICLE TRACKING BMP TO MINIMIZE THE TRACK OUT OF
<br />SEDIMENT FROM THE CONSTRUCTION SITE EXAMPLES OF VEHICLE TRACKING BMPS INCLUDE (BUT ARE NOT
<br />LIMITED TO) ROOK PADS, MUD MATS, SLASH MULCH, CONCRETE OR STEEL WASH RACKS, OR EQUIVALENT
<br />SYSTEMS
<br />B, THE PERMITTEES) MUST USE STREET SWEEPING IF SUCH VEHICLE TRACKING BMPS ARE NOT ADEQUATE
<br />TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET (SEE PMT M.E.5.D.),
<br />7. THE PERMITTEE(5) MUST INSTALL TEMPORARY sEGIMENTATBN BASINS AS RELIRED IN PART MILD OF
<br />THIS PERMIT.
<br />PART IV.G - SEDIMENT CONTROL PRACTICES (CONT.)
<br />S. THE PERMITTEES) MUST MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL
<br />MINIMIZING SOIL COMPACTION I$ Not REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA OF THE SITE
<br />DICTATES THAT IT BE COMPACTED.
<br />9. THE PERMITTEES) MUST PRESERVE A 50 FOOT NATURAL BUFFER OR (IF A BUFFER IS INFEASIBLE ON
<br />THE STE) PROVIDE REDUNDANT SEDIMENT CONTROLS WHEN A SURFACE WATER LS LOCATED WITHIN 50
<br />FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER.
<br />NATURAL BUFFERS ARE NOT REQUIRED ADJACENT TO ROAD DITCHES, JUDICIAL DITCHES, COUNTY DITCHES,
<br />STORMWATER CONVEYANCE CHANNELS. STORM DRAIN INLETS, AND SEDIMENT BASINS THE PERIWTIEE(S)
<br />IS/ANE NOT REQUIRED TD ENHANCE THE DUALITY OF THE VEGETATION THAT ALREADY EXISTS IN THE
<br />BUFFER OR PROVIDE VEGETATION IF NONE EXIST. HOWEVER, PERMITTEE(S) CAN IMPROVE THE NATURAL
<br />BUFFER NTH VEGETATION,
<br />PART W.D. - DEWATERING AND BASIN DRAINING
<br />1. THE PERMITTEES) MUST DISCHARGE TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWATERING
<br />OR BASIN DRAINING (E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) TO A
<br />TEMPORARY OR PERMANENT SEGMENTATION BASIN ON THE PROJECT SITE UNLESS INFEASIBLE. THE
<br />PERMITTEES) MAY DISCHARGE FROM THE TEMPORARY OR PERMANENT SEDIMENTATION BASINS TO
<br />SURFACE WATERS IF THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE
<br />TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT NUISANCE CONDITIONS (SEE MINN. R.
<br />7050.0210, SUMP, 2) ELL NOT RESULT FROM THE DISCHARGE, IF THE WATER CANNOT BE DISCHARGED
<br />TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE SUWFACE WATER. IT MUST BE TREATED WITH THE
<br />APPROPRIATE BMPS, SUCH THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER
<br />OR DOWNSTREAM PROPERTIES. IF THE PERMITTEE(S) MUST DISCHARGE WATER THAT CONTAINS OIL OR
<br />GREASE. THE PERMITTEES) MUST USE AN OL -WATER SEPARATOR OR SUITABLE FILTRATION DEICE
<br />(E.G. CARTRIDGE FILTE11%MUST ENSURE THAT DISCHARGANSEEINN POINTS ARE ADEQUATELTS PADS) PRIOR ToY IPSCHARGING RDTECTTE13 FROMTHEWAMITT
<br />EROSON AND THEEE(S)
<br />THE
<br />DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP. SAND BAGS PLASTIC SHEETING, OR
<br />OTHER ACCEPTED ENERGY DISSIPATION MEASURES.
<br />2 All WATER FROM DEWATERING OR BASIN -DRAWING ACTIVITIES MUST BE DISCHARGED IN A MANNER
<br />THAT DOES NOT CAUSE NUISANCE CONDITIONS EROSION IN RECEIVING CHANNELS GR ON ODWNSLOPE
<br />PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACT TO THE WEILAND.
<br />3. IF THE PERMITTEES) IS/ARE USING FILTERS NTH BACKWASH WATER, THE PERMITTEE(S) MUST HALL
<br />THE BACKWASH WMA AWAY FOR DISPOSAL, RETURN THE BACKWASH WATER TO THE BEGINNING OF
<br />THE TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATER INTO THE 197E IN A MANNER
<br />THAT 000 NOT CAUSE EROSION. THE PERMITTEES) MAY DISCHARGE BACKWASH WATER TO THE
<br />SANITARY SEWER IF PERMISSION IS GRANTED BY THE SANITARY SEWER AUTHORITY. THE PERMITTEES)
<br />MUST REPLACE AND CLEAN THE FILTER MEDIA USED IN DEWATERIR7G DEVICES WHEN REQUIRED TO
<br />RETAIN ADEQUATE FUNCTION
<br />PART IV.E. - INSPECTIONS AND MAINTENANCE
<br />1. THE PERMITTEE(S) MUST ENSURE THAT A TRAINED PERSON (AS IDENTIFIED IN PMT IILA.3.A.) ELL
<br />Y N 7 DAYS DURING
<br />ACUTELY INSPECT THE ENTRE CONSTRCURS SITE A LEAST ONES EVER SIEVE ( )
<br />ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN
<br />24 HOURS FOLLOWING AN INSPECTOR THAT OCCURS WITHIN 24 HOURS AFTER A RAINFALL EVENT, THE
<br />NEXT INSPECTION MUST BE CONDUCTED WITIRN SEVEN (7) DAYS AFTER THE RAINFALL EVENT.
<br />2. ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED WITHIN
<br />24 HOURS N WRITING AND THESE RECORDS MUST BE RETAINED NTH TIRE SWPPP IN ACCORDANCE
<br />WITH PMT III.E. RECORDS OF EACH INSPECTOR AND MAINTENANCE ACTIVITY SHALL INCLUDE:
<br />A DATE AND TIME OF INSPECTORS
<br />9. NAME OF PERSDN(S) CONDUCTING INSPECTIONS
<br />C. 1`09INGS OF INSPECTICNS OCCLUDING THE SPECIFIC LOCATION WERE CORRECTIVE ACTIONS ARE
<br />NEEDED
<br />D. CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE
<br />ACTIVITIES)
<br />E. DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 1/2 INCH (0.5 INCHES) IN 24 HOURS
<br />RAINFALL AMOUNTS MUST BE OBTAINED BY A PROPERLY MAINTAINED RAIN GAUGE INSTALLED ONSITE.
<br />A WEATHER STATION THAT IS WTHIN 1 MILE OF YOUR LOCATION OR A WEATHER REPORTING SYSTEM
<br />THAT PROVIDES STE SPECIFIC RAINFALL DATA FROM RADAR SUMMARIES
<br />F. IF ANY DISCHARGE IS OBSERVED TO BE OCCURRING DURING THE INSPECTION, A RECORD OF ALL
<br />POINTS OF THE PROPERTY FROM WENICH THERE IS A 0SCHARCE MUST BE MADE, AND THE DISCHARGE
<br />SHOULD BE DESCRIBED (I.E.. COLOR. WOR. FLOATING, SETTLED. OR SUSPENDED SQUIDS FOAM, OIL
<br />SHEEN, AND OTHER OBVIOUS INDICATORS OF POLLUTANTS) AND PHOTOGRAPHED.
<br />G ANY AMENDMENTS TO THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE
<br />OOCMFNTED AS REQUIRED IN PART 111.8. WTHIN SEVEN (7) CALENDAR DAYS,
<br />I INSPECTION FREQUENCY AUJASTMENT
<br />A WHERE PMTS OF THE PROJECT STE HAVE PERMANENT COVER, BUT WORK REMAINS ON OTHER
<br />PMTS OF THE SITE, THE PERMITTEE(S) MAY REDUCE INSPECTIONS OF THE AREAS NTH PERMANENT
<br />DOM TO ONCE PER MONTH.
<br />B. RHEREOGNSIRUCTION SITES HAVE PERMANENT COVER ON ALL EXPOSED SOIL MEAS AND NO
<br />CONSTRUCTION ACTMTY IS OCCURRING ANYWHERE ON THE SITE. THE SITE MUST BE INSPECTED DURING
<br />NON -FROZEN GROUND CONDITIONS AT LEAST ONCE PER MONTH FOR A PERIOD OF TWELVE (12)
<br />MONTHS. FOLLOWING THE TWELFTH MONTH OF PERMANENT COVER AND NO CONSTRUCTION ACTIVITY,
<br />INSPECTIONS MAY BE TERMINATED UNTIL CONSTRUCTION ACTIVITY IS ONCE AGAIN INITIATED UNLESS
<br />THE PERMITTEES) IS/ME NOTIFIED IN NOTING BY THE MPG THAT EROSION ISSUES HAVE BEEN
<br />DETECTED AT THE SITE AND INSPECTIONS NEED TO RESUME
<br />C WHERE W13RK HAS SEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, THE INSPECTIONS MAY
<br />BE SUSPENDED. THE REQUIRED INSPECTIONS AND MAINTENANCE SCHEDULE MUST BEGIN WTHIN 24
<br />HOURS AFTER RUNOFF OCCURS AT THE SITE OR 24 HOURS PRIOR TO RESUMING CONSTRUCTION.
<br />WHICHEVER COMES FIRST.
<br />4. THE PERMITTEES) IS/ARE RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF TEMPORARY
<br />AND PERMANENT WATER QUALITY MANAGEMENT BAPS, AS WELL AS ALL EROSION PREVENTION AND
<br />SEDIMENT CONTROL BMPS, UNTIL ANOTHER PERMITTEE HAS OBTAINED COVERAGE UNDER THIS PERMIT
<br />ACCORDING TO PMT II.BU, OR THE PROJECT HAS UNDERGONE FINAL STABILIZATION, AND AN NOT HAS
<br />BEEN SUBMITTED TO THE MPCA.
<br />5. THE PERMITTEE5) MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL SNIPS AND
<br />POLLUTION PREVEN%N MANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS DURING
<br />ALL ROUTINE AND POST-RANFALL EVENT INSPECTIONS, ALL NONFUNCTIONAL BMPS MUST BE REPAIRED,
<br />REPLACED, OR SUPPLEMENTED NTH FUNCTIONAL SUPS BY THE END OF THE NEXT BIISNESS DAY
<br />AFTER DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS UNLESS ANOTHER TIME FRAME
<br />IS SPECIFIED BELOW. THE PERMITTEE(S) MUST INVESTIGATE AND COMPLY NTH THE FOLLOWING
<br />INSPECTION AND MAINTENANCE REQUIREMENTS:
<br />A. ALL PERIMETER CONTROL DEVICES MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED HIEN THEY
<br />BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES ONE-HALF (1/2) OF THE HEIGHT OF THE OEVIDU.
<br />THESE REPAIRS MUST BE MADE BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR
<br />THEREAFTER AS SOON AS FIELD CONDITIONS ALLOW ACCESS
<br />B. TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE CRANED AND THE SEDIMENT
<br />REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES ONE-HALF (1/2) THE
<br />STORAGE VOLUME. TANNAGE
<br />AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR
<br />AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART IVD.).
<br />G SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED
<br />FOR EVIDENCE OF EROSION AND SEDIMENT DEPOSITION DURING EACH INSPECTION. THE PERMITTEE(S)
<br />MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE
<br />WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS AND RESTABWZE THE MEAS WHERE SEDIMENT
<br />REMOVAL RESULTS IN EXPOSED SOIL. THE REMOVAL AND STABILIZATION MUST TAE PLACE "THIN
<br />SEVEN (7) 13AYS CCESS
<br />CONSTRAINTS THE OISCOVEFFY UPRECLUDED
<br />ERMI )SRALL USE ANUESS REASONABLE EFFORTS TOYORTAACCESS.
<br />N , OR PHYSICAL IFF
<br />PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS GF
<br />OBTAINING ACCESS. THE PERMITTEES) Is/ME RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL
<br />STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING
<br />ANY WORK IN SURFACE WATERS.
<br />D. CONSTRUCTION SITE VEHICLE EXIT LOCJATIORS MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE
<br />SEDIMENT TRACKING ONTO PAVED SURFACES TRACKED SEDIMENT MUST BE REMOVED FROM ALL PAVED
<br />SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A
<br />SHORTER ONE TO COMPLY WITH PMT IV.CB,
<br />E. STREETS AND OTHER AREAS ADJACENT TO THE PROJECT MUST BE INSPECTED FOR EVIDENCE GF
<br />OFF-SITE ACCUMULATIONS OF SEDIMENT. IF SEDIMENT IS PRESENT. IT MUST BE REMOVED IN A MANNER
<br />AND AT A FREQUENCY SUFFICIENT M MINIMIZE OFF-STE IMPACTS (E.G., FUGTIVE SEDIMENT IN
<br />STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY
<br />HAZARD TD USERS OF PUBUC STREETS).
<br />IS, ALL INFILTRATION MEAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING
<br />CONSTRUCTION ACTIVITY IS REACHING THE INFILTRATION AREA, ALL INFILTRATION AREAS MUST BE
<br />INSPECTED TO ENSURE THAT EQUIPMENT IS NOT BEING DRIVEN ACROSS Te INFILTRATION AREA. STORM WATER PRLLRTIRN PREYEIITIRN PLAN
<br />VICTOR GARDENS NORTH VILLAGE 7TH ADDITION
<br />PART IV.F. - POLLUTION PREVENTION MANAGEMENT MEASURES
<br />THE PERMITTEES) SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT MEASURES
<br />OR THE SITE:
<br />I. STORAGE, HANDING AND DISPOSAL OF CONSIRUCTION PRODUCTS. MATERIALS, AND WASTES: THE
<br />PERMITTEES) SHALL COMPLY WITH THE FOLLOWING TO MINIMIZE THE EXPOSURE TO STORMWATER OF
<br />ANY OF THE PRODUCTS. MATERIALS. OR WASTES. PRODUCTS OR WA510 WHICH ARE EITHER NOT A
<br />SOURCE OF CONTAMINATION TO STORMWATER OR ARE DESIGNED TO BE EXPOSED TO STORMWATER ME
<br />NOT HELD TO THIS REQUIREMENT:
<br />L BUILDING PRODUCTS THAT HAVE THE POTENTIAL TD LEACH POLLUTANTS MUST BE UNDER COVER
<br />G, PLASTIC SHEETING OR TEAIPORMY ROOFS TO PREVENT THE DISCHARGE OF POLLUTANTS OR
<br />ROTECTED BY A SIMILARLY EFFECTIVE (FANS ESIGNED TO MINIMIZE CONTACT "TH STORNwATEN.
<br />B. PESTICIDES. HERBICIDES, INSECTICIDES. FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE
<br />MATERIALS MUST BE UNDER COVER (LG., PLASTIC SHEETING OR TEMPORARY ROOFS) TO PREVENT THE
<br />DISCHARGE OF POLLUTANTS OR PROTECTED BY SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE
<br />CONTACT NTH STORMWATER,
<br />C HAlARDOUS MATERIALS, TOXIC WASTE, (NCUJOINC OIL, DIESEL FUEL. GASOLINE, HYDRAULIC FLUIDS,
<br />PAINT SOLVENTS. PETROLEUM-BASED PRODUCTS, WOW PRESERVATIVES, ADDITIVES. CURING
<br />COMPOUNDS, AND ACIDS) MUST BE PROPERLY STORED IN SEALED CONTAINERS TO PREVENT SPILL$
<br />LEAKS OR OTHER DISCHARGE RESTRICTED ACCESS STORAGE AREAS MUST BE PROVIDED TO PREVENT
<br />VANDALISM. STORAGE AND DISPOSAL OR HAZARDOUS WASTE OR HAZARDOUS MATERIALS MUST BE IN
<br />COMPLIANCE NTH MINN. R. CH, 7045 INCLUDING SECONDARY CONTAINMENT AS APPLICABLE.
<br />0. SOLID WASTE MUST BE STORED. COLLECTED AND DISPOSED OF PROPERLY IN COMPLIANCE NTH
<br />MINN. R. CH. 7035,
<br />E. PORTABLE TOILETS MUST BE POSITIONED 50 THAT THEY ARE SMILE AND ELL NOT SE TIPPED OR
<br />KNOCKED OVER SANITARY WASTE MUST BE DISPOSED OF PROPERLY IN ACCORDANCE WITH MINN. R.
<br />CH. 7041,
<br />2. FUELING AND MAINTENANCE OF EQUIPMENT OR VEHICLES. SPILL PREVENTION AND RESPONSE: THE
<br />PERMITTEE(S) SHALL TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR LEAKED
<br />CHEMICALS INOWOING FUEL. FROM ANY AREA WHERE CHEMICALS OR FUEL ELL BE LOADED OR
<br />UNLOADED INCLUDING THE USE OF DRIP PANS OR ABSORBENTS UNLESS INFEASIBLE. THE PERMITTEES)
<br />MUST CONDUCT FUELING IN A CONTAINED AREA UNLESS INFEASIBLE. THE PERRTTEE(S) MUST ENSURE
<br />ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEW UP DISCHARGED MATERIALS AND THAT
<br />AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. THE
<br />PERMITTLE(S) MUST REPORT AND CLEAN UP SPILLS IMMEDIATELY AS REQUIRED BY MINN. STAT. (I
<br />115.081, USING DRY CLEW UP MEASURES WHERE POSSIBLE.
<br />S VEHICLE AND EQUIPMENT WASHING: IF THE PERMITTEES) WASH THE EXTERIOR OF VEHICLES OR
<br />EQUIPMENT ON THE PROJECT SITE, WASHING MUST BE LIMITED TO A DEFINED AREA OF THE SITE
<br />RUNOFF FROM THE WASHING AREA MUST BE CONTAINED IN A SEDIMENT BASIN OR OTHER SIMILARLY
<br />EFFECTIVE CONTROLS AND WASTE FROM THE WASHING ACTIVITY MUST RE PROPERLY DISPOSED OF. THE
<br />PERMITTEE(S) MUST PROPERLY USE AND STORE SOAPS, DETERGENTS OR SOLVENTS NO ENGINE
<br />DEGREASING IS ALLOWED ON SITE.
<br />4. CONCRETE AND OTHER WASHOUTS WASTE THE PERMITIEE(S) MUST PROVIDE EFFECTIVE
<br />CONTAINMENT FOR ALL UQUID AND SOLID WASTES GENERATED BY WASHOUT OPERATIONS (CONCRETE,
<br />STUCCO. PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS)
<br />RELATED TO THE CONSTRuCTIdN ACTIVITY. THE LIQUID AND SOLID WASHOUT WASTES MUST NOT
<br />CONTACT THE GROUND, AND THE CONTAINMENT MUST BE DESIGNED 50 THAT IT GOES NOT RESULT IN
<br />RUNOFF FROM THE WASHOUT OPERATIONS OR AREAS LLQu1D AND SOLID WASTES MUST BE DISPOSED
<br />OF PROPERLY AND IN COUPUARCE WITH MPCA RULES A SIGN MUST BE INSTALLED ADJACENT TO EACH
<br />WASHOUT FACILITY THAT REQUIRES SITE PERSONNEL TO URuZE THE PROPER FACILITIES FOR DISPOSAL
<br />OF CONCRETE AND OTHER WASHOUT WASTES
<br />PART W.G. FINAL STABILIZATION
<br />ME PERMITTEES) MUST ENSURE FINAL STABlUZA71ON OF THE SITE. FINAL STABILIZATION IS NOT
<br />COMPLETE UNTIL ALL REQUIREMENTS OF PMTS IVLG1,-5. ME COMPLETE
<br />1. ALL SOIL DISTURBING ACTIVITIES AT THE STE RAVE BEEN COMPLETED AND ALL SOLS ARE
<br />STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT OF ITS
<br />EXPECTED FINAL GROWTH DENSITY OVER THE ENTIRE PERVIOUS SURFACE AREA, OR OTHER EQUIVALENT
<br />MEANS NECESSARY TO PREVENT SGL FAILURE UNDER EROSIVE CONDITIONS
<br />2. THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS CONSTRUCTED, MEETS ALL REQUIREMENTS IN
<br />PART IIIA AND IS OPERATING AS DESONED, TEMPORARY OR PERMANENT SEDIMENTATION BASINS THAT
<br />ARE TO BE USED AS PERMANENT WATER DUALITY MANAGEMENT BASINS HAVE BEEN CLEANED OF ANY
<br />ACCUMULATED SEDIMENT. ALL SEDIMENT HAS BEEN REIMOVE3 FROM CONVEYANCE SYSTEMS AND
<br />DITCHES ARE STABIUZM WITH PERMANENT COVER.
<br />I ALL TEMPORARY SYNTHETIC AND STRUCTURAL EROSION PREVENTION AMID SEDIMENT CONTROL BMPS
<br />(SUCH AS SILT FENCE) HAVE BEEN REMOVED ON THE PORTIONS OF THE STE FOR WHICH THE
<br />PERMITIEE(S) IS/AAE RESPONSIBLE. BMPS DESIGNED TO DECOMPOSE ON SITE (SUCH AS SOME
<br />COMPOST LOGS) MAY BE LEFT IN PLACE.
<br />C FOR RESIDENTIAL CONSTRUCTION ONLY, INDIVIDUAL LOTS ARE CONSIDERED FINALLY STABILIZED IF
<br />THE STRJMRUS) ME FINISHED AND TEMPORARY EROSION PROTECTION AND DOWHGRADIENT
<br />PERIMETER CON HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN SOLD TO THE HOMEOWNER.
<br />ADDITIONALLY, THE PERMITTEE HAS DISTRIBUTED THE MPCA%'HOMEOWNER FACT SHEET- TO THE
<br />HOMEOWNER TO INFORM THE HOMEONNER OF THE NEED FOR, AND BENEFITS OF. PERMANENT COVER.
<br />5, FOR CONSTRUCTOR PROJECTS DN AGRICULTURAL LAND (E.G. PIPEUNES ACROSS CROP. FIELD
<br />PASTURE OR RANGE LAND) THE DISTURBED LAND HAS BEEN RETURNED TO ITS PRECO NSTRUCTON
<br />AGRICULTURAL USE.
<br />DKAWN SY: DESIGN BY:
<br />C.M. I C.W.P.
<br />CHCKO BY: PROJ. ND.
<br />G.W.P. I 151568
<br />ORIGINAL DATE:
<br />FEBRUARY 10. 2016
<br />PREPARED FOR:
<br />KETTLER
<br />CONSTRUCTION
<br />)r
<br />f 1
<br />l
<br />FTE I- 'NN.?ILII
<br />PLOWE .
<br />6776 LANE DRIVE
<br />SUITE 110
<br />LINO L"RES, MN 55014
<br />PHONE: (05113614210
<br />FMK: (6611361-3701
<br />C5.1
<br />
|