Laserfiche WebLink
Terre De Ueau - Sketch Plan <br />Page 5 <br />anticipated increase in traffic. The applicant should show how access could be made to the <br />property to the east, south of 135t' Street (Atkinson Property). <br />The property is located within the northeast quadrant of the Highway 61 and 130th Street <br />intersection. The intersection is signalized, and the signal/intersection was designed assuming the <br />development of this property. Staff does not expect improvements to the intersection itself as a <br />result of the proposed development. <br />A long-range plan was developed in 2008 for Highway 61 that includes the following for <br />Highway 61: <br />• Four -lane divided roadway <br />• An additional 40 feet of right-of-way required within the development property. <br />• Full access at 137th Street <br />• Right-in/right-out access at 134" Street <br />As the development proceeds, improvements to Highway 61 may be required based on the <br />anticipated traffic. Potential improvements may include the addition of turn lanes on Highway 61 <br />or improvements to existing intersections, and would be based on the information in the traffic <br />study and input from MnDOT. <br />If the proposed development moves forward, nearly all of the roadway segment between <br />Highway 61 and Goodview Avenue will be developed on the north and south sides. 130t' Street <br />is currently a two-lane, rural section roadway. Staff recommends that the City Council and <br />Commissions discuss the possible upgrade of 130'h Street to an urban -section collector between <br />Highway 61 and Goodview Avenue as outlined in the City's long-range plans. This developer <br />may be responsible for these improvements. <br />The applicant is showing a long road connecting the north and south portions of the <br />development. It's in staff opinion that traffic calming measures should be taken into <br />consideration on the proposed long roadway. The goal of traffic calming is to reduce speeds, <br />reduce cut through traffic, and improve safety including non -motorized traffic. Although, the <br />applicant has designed the road with slight curves, the roadway will need to be further analyzed <br />in regards to creating turns within the roadway and the access to home sites directly off the <br />roadway. <br />Park and Trails <br />The Master Park Plan indicates a public park in this area. The City owns 18 -acres of land, <br />consisting of some wetlands, on the west side of the site, which is adjacent to the parkland <br />proposed by the applicant. The outlot is not included in the parkland dedication calculation. <br />The applicant is showing a large public park area on the plan central to the development with <br />trail connections to provide access to the park. The park area is 10.2 acres excluding the wetlands <br />and easement areas. The proposed park includes passive areas, as well as, a playground, shelter, <br />soccer field, and potential playfield. It's unclear what would be included in the playfield and it <br />seems disconnected from the rest of the active park area. The applicant may consider relocating <br />the playfield area to be accessible from the active park area in order to be considered for parkland <br />