Laserfiche WebLink
Alk <br />PYS.S <br />Buildbg a -e�aCV YOcx'cgacy. <br />June 15, 2016 <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, M N 55038 <br />Re: Preliminary and Final Plat Review <br />Bald Eagle Industrial Park 6th Addition <br />WSB Project No. 3288-050 <br />Dear Ms. Juba: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the application materials for the Bald Eagle Industrial Park 6 1 Addition project <br />including the following: <br />Preliminary Plat prepared by EG Rud and Sons, dated May 13, 2016, revision date June 6, 2016 <br />Final Plat prepared by EG Rud and Sons, dated June 6, 2016 <br />Based on our review, we offer the following comments regarding the concept plan: <br />Stormwater Management <br />The proposed plat does not include any site grading or proposed construction of impervious surface. <br />As such, no stormwater management plan is required at this time. The specific stormwater <br />management will be required at the time construction occurs within each site(s). The applicant may <br />wish to plan their stormwater management collaboratively between the two parcels for efficiency; <br />however, this is not required. <br />2. The site is within the drainage area of the Bald Eagle Industrial Park pond project completed when <br />the Industrial Park was developed. As a result, a portion of the stormwater storage and treatment <br />requirements are met. The RCWD rules have changed since the Industrial Park was developed, and <br />the volume reduction requirements will apply as the sites develop, as well as providing storage for <br />larger rain events. This will be reviewed in detail as building plans move forward. <br />The City stormwater trunk fee will apply to these properties, and will be calculated and collected at <br />the time of building permit. <br />Street and Utilities <br />1. The property has direct access to Fenway Boulevard, and driveway connections can be made at the <br />time the properties are developed. The specific driveway locations and details will be reviewed at <br />the time the properties are developed. <br />Equal Opportunity Employer <br />wsheng.com <br />HjGty of HugolLettem and memoyi3288-050 COM LTR -r jubo-06I516-8EWth.do" <br />