Laserfiche WebLink
Municode <br />Subdivision, 4 to 15 $540.00 $5,000.00 <br />lots <br />Subdivision, 16 to 30$700.00 $10,000.00 <br />lots <br />Subdivision, Over 30 :$23.00 per lot $20,000.00 <br />lots <br />VARIANCE RELATED <br />Variance to zoning '$200.00 <br />ordinance <br />m im irATIONC <br />Page 5 of 6 <br />Audit $55.00 <br />ICTION/REHAB: <br />Comprehensive plan $55.00 <br />truck load) <br />_ <br />1ulunici al code $125.00 <br />residential/duplex <br />ironing map $7.00 <br />Zoning ordinance $65.00 <br />rental deposit <br />Other publications Cost + 10% <br />DVD recordings 510.00 <br />Official news a er exempt <br />PUBLIC WORKS RELATED <br />Grass/weed mowing $75.00 first half hour (minimum charge) <br />Grass/weed mowing $50.00 each additional hour or fraction thereof <br />Street sweeping 5150.00 per hour <br />ROADWAY RECONSTRI <br />ICTION/REHAB: <br />Single-family <br />truck load) <br />residential/duplex <br />!Hydrant meter <br />rates: <br />rental deposit <br />Complete <br />$5,200.00 <br />per unit <br />reconstruction <br />rental <br />Partial <br />$4,100.00 <br />her unit <br />reconstruction <br />Roadway <br />:$3,400.00 <br />per unit <br />reclamation/overlay_ <br />$1,632.00 <br />per SAC unit <br />Urban roadway <br />$2,100.00 <br />per unit <br />overlay <br />$588.00 <br />per SAC unit <br />!Rural roadway <br />$1,800.00 <br />per unit <br />overlay <br />530.00 <br />_ <br />II ITII ITV RFI ATFn. <br />Hydrant water (per <br />$20.00 <br />truck load) <br />_s <br />!Hydrant meter <br />$700.00 <br />rental deposit <br />Hydrant meter <br />$20.00 <br />per day + $2.20/thousand gallons <br />rental <br />per SACunit <br />Sewer infrastructure <br />$3,100.00 <br />Fee (in lieu of <br />assessment) <br />!fewer infrastructure <br />$1,632.00 <br />per SAC unit <br />trunk fee <br />Sewer infrastructure <br />$588.00 <br />per SAC unit <br />(SAC) fee <br />Sewer utility_permit <br />530.00 <br />_ <br />Nater infrastructure <br />$3,100.00 <br />per SACunit <br />fee (in lieu of <br />assessment) <br />Nater infrastructure <br />$1,960.00 <br />her SAC unit <br />trunk fee <br />Nater infrastructure <br />'5680.00 <br />per SAC unit <br />(WAC) fee <br />http://library. municode.com/print. aspx?clientID= l 43 56&HTMRequest=http%3 a%2t%2flib... 6/4/2010 <br />