My WebLink
|
Help
|
About
|
Sign Out
Home
2010.07.14 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2010
>
2010.07.14 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 4:08:27 PM
Creation date
6/22/2016 4:00:06 PM
Metadata
Fields
Template:
Commissions
Meeting Date
7/14/2010
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 5. Incentive Project Funding ��Q p�010 <br />Project Title: Community Education on Green Building Methods at the <br />Hanifl Shelter <br />Target Area: Greening Our Community: encouraging sustainable building <br />in Hugo AND Green Building <br />Description of Proposed Project: <br />The City of Hugo is home to the Hanifl Fields Athletic Park which is home to 6 soccer <br />fields and will be the location of several annual athletic tournaments. On an average <br />summer night, the park is used by approximately 300 park -goers. In the next year, with <br />tournaments and events planned to be held, it is estimated that over 6,000 guests will <br />visit the Hanifl Fields Athletic Park. <br />A Sub -Committee planned the design of the shelter which is being constructed at the <br />Hanifl Fields Athletic Park. The LEED rating system was used as a guide to incorporate <br />"green" systems and building strategies into construction of the shelter. Among the <br />features and strategies included are: recycling of site demolition waste materials, <br />lowering demands on water through the use of rain barrels, planting of natural grasses, <br />use of a hi -efficiency heating system, and use of recycled -content building materials. <br />The shelter includes a gathering room which was built to provide an opportunity for <br />environmental classes. <br />This incentive project will give park visitors the opportunity to learn about the green <br />elements included at the site. A message center, which is made from recycled plastic, <br />will be installed outside of the shelter to provide educational opportunities to all park <br />visitors. Signs will be incorporated in the landscaping which point out the rain gardens, <br />rain barrels, and native plantings and explains their role in our environment. Also, a <br />bulletin board and presentation cabinet (includes dry -erase board/presentation screen) <br />will be installed inside of the building for use in classroom settings. <br />Estimated Cost of Incentive Project: $ 12,050 <br />Outdoor Bulletin Board in the Gathering Room <br />Presentation Cabinet in the Gathering Room <br />Outdoor Message Center <br />Individual Education signs (3) <br />Lavatory System made from recycled materials (2) <br />TOTAL <br />$ 850 <br />$ 2,000 <br />$ 2,500 <br />$ 900 <br />5,800 <br />$ 12,050 <br />
The URL can be used to link to this page
Your browser does not support the video tag.