My WebLink
|
Help
|
About
|
Sign Out
Home
2012.11.14 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2012
>
2012.11.14 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 9:08:02 AM
Creation date
6/23/2016 8:59:34 AM
Metadata
Fields
Template:
Commissions
Meeting Date
11/14/2012
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
140th Street: <br />Currently the trail along the east side of Fenway Boulevard connects east along 140th <br />Street via sidewalk. With the anticipated connection of the Hardwood Creek Trail, other <br />options should be looked at. A trail connection on the north side of the roadway is shown <br />in the plan and may be possible dependent on the amount of right-of-way in the area. <br />147th Street: <br />As Marvin Lavalle develops his property that is west of Lions Park towards Oneka <br />Parkway, 147th Street is planned to extend west. Trail construction in conjunction with <br />the road project is an option. <br />3. PLAN UPDATES: <br />The following will be changed on the Trail and Sidewalk Plan (Map 7-F of the <br />Comprehensive Plan). <br />• Update with new construction in the Oneka Lake Neighborhood. <br />• Update with new construction in the Prairie Village Development <br />• Add a planned trail through Excel Energy property/ dedicated land from <br />Fenway Boulevard to Clearwater Creek Preserve Park. <br />Several updates could be made to the snowmobile trails on the plan in partnership with <br />the Hugo Snowmobile Club and Washington County. <br />4. NEXT STEPS: <br />Staff recommends discussion the Trail and Sidewalk Plan. The Parks Commission could <br />identify specific connections that they would like to staff to prepare additional <br />information on and continue the discussion at a future meeting. <br />ATTACHMENTS: <br />1. Excerpt from the Parks, Trails and Open Space Plan <br />2. Trail and Sidewalk Plan <br />3. Aerial of Oneka Elementary North Trail Connection <br />4. Prairie Village Preliminary Platt <br />5. Hardwood Creek Trail Missing Connection Map <br />6. Aerial of 1401h Street Trail Connection <br />7. Aerial of 147th Street Trail Connection <br />8. Star Trail Snowmobile Club Trail Map <br />-2- <br />Trail Plan Updates <br />November 14, 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.