My WebLink
|
Help
|
About
|
Sign Out
Home
2014.05.14 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2014
>
2014.05.14 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 11:32:19 AM
Creation date
6/23/2016 11:31:27 AM
Metadata
Fields
Template:
Commissions
Meeting Date
5/14/2014
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail Development Priorities <br />Overall Priority Medium <br />Use Alternate Use Alternate High <br />Strategy Strategy <br />All trails shall be included in the Trails Plan <br />All trails shall not be scheduled to be built with a road reconstruction project or land development in the near future <br />Trails shall be located on city -owned land or easement or land that is available through willing sellers <br />If a Trail does not meet the above requirements, an alternate strategy shall be used and the trail shall not be built as envisioned <br />Enhances safety for pedestrians in areas that have high traffic speeds, narrow roads, or uncontrolled intersections <br />Provides connection between neighborhoods and parks, schools, recreational areas, and/or commercial areas. <br />Requested by and of interest to Hugo residents <br />Minimal in physical barriers, such as: wetlands, significant slopes <br />Economical, providing a high impact with minimal financial investment <br />Feasible and does not interfere with future improvements or development <br />Complexity of the project <br />Providing connections between neighborhoods and parks, schools, recreational areas, and/or commercial areas <br />Providing connections to regional trails or other large trail networks to extend Hugo's trail system <br />Widely utilized because of existing pedestrian uses or proximity to popular areas <br />Hardwood Creek <br />Priorities <br />125th Street <br />Oneka Lake Blvd. <br />Elmcrest Avenue <br />Trail <br />Identified in the Trails Plan <br />Pass <br />Pass <br />Pass <br />Pass <br />' <br />Not scheduled to be built in the near future <br />Anticipated <br />Fail <br />Pass <br />Pass <br />` <br />Available land <br />Pass <br />Pass <br />Fail <br />Pass <br />Summary <br />Temporary Only <br />Fail <br />Fail <br />Pass <br />Safety enhancement needed <br />Maybe <br />Maybe <br />Yes <br />Yes <br />Missing connection <br />Minor <br />Yes <br />Yes <br />Yes <br />Requested by residents <br />No <br />No <br />Yes <br />No <br />Summary <br />Minimal Need <br />Use Alt. Routes <br />Strong Need <br />Strong Need <br />Minimal physical barriers <br />Yes <br />Yes <br />No <br />No <br />Expense <br />Minimal <br />Significant <br />Significant <br />Significant <br />' <br />Interference with development <br />Will be replaced <br />Will be replaced <br />With development <br />No <br />Feasibility/ ease of construction <br />Easy <br />Easy <br />Difficult <br />Difficult <br />Summary <br />High Feasibility <br />Feasible <br />Low Feasibility <br />Low Feasibility <br />Connections made <br />No <br />Yes <br />Yes <br />Yes <br />Regional trail network access <br />No <br />Yes <br />Yes <br />Yes <br />Existing pedestrian uses/ proximity <br />No <br />Yes <br />Yes <br />Yes <br />• <br />Minimal local <br />Strong but alt. <br />Significant <br />Significant <br />Summary <br />connections made <br />routes available <br />connections made <br />connections made <br />Overall Priority Medium <br />Use Alternate Use Alternate High <br />Strategy Strategy <br />All trails shall be included in the Trails Plan <br />All trails shall not be scheduled to be built with a road reconstruction project or land development in the near future <br />Trails shall be located on city -owned land or easement or land that is available through willing sellers <br />If a Trail does not meet the above requirements, an alternate strategy shall be used and the trail shall not be built as envisioned <br />Enhances safety for pedestrians in areas that have high traffic speeds, narrow roads, or uncontrolled intersections <br />Provides connection between neighborhoods and parks, schools, recreational areas, and/or commercial areas. <br />Requested by and of interest to Hugo residents <br />Minimal in physical barriers, such as: wetlands, significant slopes <br />Economical, providing a high impact with minimal financial investment <br />Feasible and does not interfere with future improvements or development <br />Complexity of the project <br />Providing connections between neighborhoods and parks, schools, recreational areas, and/or commercial areas <br />Providing connections to regional trails or other large trail networks to extend Hugo's trail system <br />Widely utilized because of existing pedestrian uses or proximity to popular areas <br />
The URL can be used to link to this page
Your browser does not support the video tag.