My WebLink
|
Help
|
About
|
Sign Out
Home
2014.05.14 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2014
>
2014.05.14 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 11:32:19 AM
Creation date
6/23/2016 11:31:27 AM
Metadata
Fields
Template:
Commissions
Meeting Date
5/14/2014
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Shayla Syverson <br />April 16, 2014 <br />Page 2 <br />3. The Parks Commission could recommend that the City Council consider creating a wider <br />pavement section that would allow space for non -vehicular traffic. We estimated the cost of <br />adding three feet of paved surface (27 feet total) to the roadway will cost $17,000-$18,000, and <br />the funding would likely be a City responsibility. <br />Based on our review, we recommend that a trail improvement be made adjacent to 125th Street at the <br />time the properties adjacent to the roadway develop in the future. At that time, an urban -section <br />roadway will be constructed, along with City utilities as necessary. <br />Thank you for the opportunity to provide comments regarding this issue. If you have any questions, <br />please do not hesitate to contact me at 763-287-7192. <br />Sincerely, <br />WSB & Associates, Inc. <br />Jay Kennedy, PE <br />City Engineer <br />cc: Steve Duff, Senior Engineering Technician <br />Rachel Juba, Planner <br />K. U904 -061M, simo 060310.do, <br />
The URL can be used to link to this page
Your browser does not support the video tag.