HomeMy WebLinkAbout2014.04.23 Parks PacketAgenda
Parks Commission Meeting of April 23, 2014
Hugo City Hall, 7:00 pm
7:00 pm
Approve Minutes from March 26, 2014 Meeting
7:02 pm
Trail Development Policy Draft
7:30 pm
Recreation Program Workshop Recap
8:00 pm
Irish Avenue Park
8:30 pm
Hanifl Concession Stand
9:00 pm
Adjournment
Background
Parks Commission Meeting of April 23, 2014
Hugo City Hall, 7:00 pm
7:00 pm Approve Minutes from February 26, 2014 Meeting
Staff recommends approval of the minutes of the Parks Commission meeting of March 26,
2014.
7.02 pm Trail Development Policy Draft
At the meeting of Mach 26, 2014, the Parks Commission discussed a trail development policy.
Currently, the Trail and Sidewalk Plan guides the construction of trails and sidewalks. The
majority of trails and sidewalks in Hugo are constructed through land development or road
reconstruction projects. The Parks Commission may desire to construct an improvement that
would otherwise not be through these normal means. In order to determine which improvement
shall take priority for the limited city funds, a criteria was established to evaluate which
improvement shall take priority.
A draft of the Trail Development Policy was put together with the criteria that the Parks
Commission discussed at the last meeting.
Staff recommends that the Parks Commission make changes to the draft Trail Development
Policy and recommend approval to the City Council.
PLEASE SEE THE DRAFT POLICY.
7:30 pm Recreation Program Workshop Recap
A joint workshop with the City Council was held on Wednesday, April 9.
A policy was drafted which would guide future recreation programming in the City of Hugo. Staff
recommends changes be made to the draft policy. Staff also recommends that the Parks
Commission discuss adding any other policy statements that may further shape future
recreation programming.
PLEASE SEE THE DRAFT POLICY AND MEETING MINUTES.
8:00 pm Irish Avenue Park
At the meeting of January 8, 2014 the Parks Commission discussed the history and other
background information of Irish Avenue Park. The next step is to identify stakeholders and hold
public meetings to draft Master Plan Development Guidelines.
PLEASE SEE THE ATTACHED MEMO.
8:20 pm Hanifl Concession Stand
At the meeting of March 26, 2114 the Parks Commission shared an interest in making the
concession stand at Hanifl Fields Athletic Park available. Staff has researched options for the
operation of the stand as directed.
PLEASE SEE THE ATTACHED MEMO.
9:00 pm Adjournment
Questions were raised at the Recreation Workshop of Wednesday, April 9 about the Fox
Meadows Development. City Engineer Jay Kennedy put together a memo with the findings
established at the time the preliminary plat was approved by the City Council. He has also
provided options for alternatives for the Parks Commissions consideration.
Minutes
Parks Commission, City of Hugo
March 26, 2014
7:00 P.M.
Council Chambers, City Hall
Call to Order
Present: Rachel Berger, Mat Rauschendorfer, Nicole Schmid, Jim Taylor, Tom Windisch
Staff Present: Shayla Syverson, Parks Planner
Debi Close, Secretary
Absent: Joan Benner, Dave Strub
Jim Taylor called the meeting to order at 7:00 p.m.
I. Approval of Minutes from February Meeting
Rauschendorfer made a motion, Schmid seconded to approve the minutes of the February 26,
2014 meeting.
Taylor and Windisch abstained.
Ayes: Rauschendorfer and Schmid
Motion carried.
Trail Development Polic
Shayla Syverson, Parks Planner reviewed a section in the Comprehensive Plan on future trails
and sidewalks. Parks Commissioners discussed a policy that would prioritize trail projects.
Parks Commission members agreed that safety and connectivity to destination spots in the
community were high priority.
Rauschendorfer requested an understanding of why mill and overlay street improvement
projects don't incorporate sidewalk or trail improvements when repairs are already being done.
Scott Anderson, Public Works Director informed that mill and overlay projects are resurfacing
the existing street. Additions to the project such as curbs, sidewalks, trails or widening of the
streets for bike or walking paths would require possible assessments, land acquisition, and
higher costs.
An interest was shared in a policy to prioritize where and what trails are important and to be
able to work with resident requests. Possible criteria were discussed including feasibility,
density of neighborhoods, community hubs, etc.
City Staff was directed to draft a Trail Development Policy for future revisions.
III. Recreation Program Update
Shayla Syverson, Parks Planner updated on the programs being offered this summer including:
Nature Camp, Park Play days, Sky hawk sports camps, Movie nights and Washington County
Library programs/events.
IV. Other
Parks Commissioners asked about the concession stand at Hanifl Fields Athletic Park. Staff
was directed to research what it would take to make the stand available for park users.
VI. Adjournment
Rauschendorfer made a motion, Schmid seconded to adjourn the meeting at 8:57 pm.
All ayes.
Motion carried.
TRAIL DEVELOPMENT POLICY
CITY OF HUGO, MN
APPROVED BY THE CITY COUNCIL ON MAY 1, 2014
APPROVED BY THE PARKS, RECREATION, AND OPEN SPACE COMMISSION MAY 1, 2014
PURPOSE
The Parks, Recreation, and Open Space Commission may desire to construct a trail, sidewalk, or other improvement
that would otherwise not be constructed through normal means. In order to determine which improvement shall
take priority for limited funding, the following criteria has been established to evaluate proposed improvements.
PRIORITIES
Priority will be given to improvements that meet the following criteria:
• Will not be constructed in the future through normal means such as street reconstruction or land
redevelopment.
• Is identified in the Parks, Trails and Sidewalks Plan.
• Provide connections between neighborhoods and parks, schools, recreational areas, and/or commercial
areas.
• Provide connections to regional trails or other large trail networks to extend Hugo's trail system.
• Have minimal physical barriers, such as: wetlands, significant slopes.
• Enhance safety for pedestrians in areas that have high traffic speeds, narrow roads, or uncontrolled
intersections.
• Requested by and of interest to Hugo residents.
• Is located on city -owned land or easement or land that is available through willing sellers.
• Is economical, providing a high impact with minimal financial investment.
• Is feasible and does not interfere with future improvements or development.
• Provide access to and from well -populated residential neighborhoods.
• Widely utilized because of existing pedestrian uses or proximity to popular areas.
PROCESS
The Parks Commission shall identify a trail or sidewalk improvement, utilizing the criteria, and include it in their
Capital Improvement Plan. The Parks Capital Improvement Plan is subject to annual approval by the City Council.
RECREATION PROGRAM POLICY
CITY OF HUGO, MN
APPROVED BY THE CITY COUNCIL MAY 1, 2014
APPROVED BY THE PARKS, RECREATION, AND OPENS PACE COMMISSION MAY 1, 2014
PURPOSE
As Hugo continues to grow and the needs of its residents changes, this policy will guide what role the City of Hugo
will play in future recreation programming and services.
GOALS
PARTNER WITH LOCAL PROGRAM PROVIDERS
• Support local recreation providers in their work to provide programs and services for residents.
• Maintain regular communication with local program providers and work to cross promote programs.
• Encourage a wide variety of programs to fit the diverse recreation interests and needs within the
community.
• Collaborate with local program providers to offer well-designed and cost-effective programs.
• Work to ensure that the city's programs and services do not duplicate or compete with those of other
providers.
UTILIZE HUGO PARKS, TRAILS, AND FACILITIES
• Offer recreation programs that take advantage of Hugo's excellent parks and trails system.
• Provide facilities and fields and make them available to local program providers.
• Utilize the Field Rental Policy to prioritize field use. Ensure that Hugo residents are well -served by the
organizations that receive priority.
• Encourage use of the parks for events, programs, and informal activities.
• Continue to develop additional parks, trails, and facilities to meet the recreational needs of the growing
community.
OFFER A VARIETY OF QUALITY PROGRAMS AND EVENTS
• Offer unique programs that are otherwise not available to Hugo residents.
• Serve all areas of Hugo by providing programs in a variety of locations.
• As successful programs are established, continue to expand them and offer them on an annual basis.
• Offer programs at a law cost for residents and strive to cover costs with whatever program profits made.
• Understand the diversity of Hugo residents and offer a variety of programs that reach the entire community.
OTHER?
BUILD COMMUNITYSPIRIT? ENGAGE THE HUGO COMMUNITY?
SUSTAINABILITY/ENVIRONMENTALISM/WATER CONSERVATION?
STEWARDSHIP/ VOLUNTEERISM?
MARKETING?
Irish Avenue Park Planning
TO: City of Hugo Parks, Recreation and Open Space Commission
FROM: Shayla Syverson, Parks Planner
DATE: April 18, 2014 for the Parks Commission meeting of April 23, 2014
1 INTRODUCTION
The City of Hugo purchased 125 acres in 2010 for a future community park. The property is likely to be
developed in 10-15 years and a master plan is needed to prepare for that development. The Parks
Commission has discussed a planning process that gathers extensive input from Hugo residents.
AT the meeting of January 8, 2014, the Parks Commission reviewed the property history, and the Parks,
Trails and Open Space Plan.
The next step is to develop Master Plan Guidelines.
2 PLANNING PROCESS
The following is the tentative plan and timeline for planning of Irish Avenue Park:
lr .. the RaFks1 TFails
,
2. Develop Master Plan Guidelines
3. Master Plan/ Concept Planning: 2015
4. Design Development: 2016
S. Finalize the Design
6. Construction Document Preparation
3 PLANNING OPTIONS
3.1 STAKEHOLDERS
The Parks Commission should identify who the stakeholders are for Irish Avenue Park and in what
capacity they should be involved in planning it: Options include:
• All Hugo residents
• Residents adjacent to the property
• Area Athletic Associations
• School Districts/Community Education Departments
• Special Interest Groups
• Other
Irish Avenue Park Planning April 23, 2014 1
3.2 POTENTIAL PROCESS
With Lions Park, there were two public meetings held after informal meetings and conversations with
individual stakeholders. The City Council did not approve hiring a consultant for this phase of the
process and staff conducted the meetings.
At the first public meeting, held in September 2011, stakeholders were invited including the Lions Club,
the Hugo Good Neighbors Food Shelf, surrounding property owners and the public. A Visual Preference
Survey was conducted in which workshop participants were asked to rank different images of a variety
of park uses and features. In small group discussions, preferences for how the park could look and be
used started.
At the second public meeting, held in October 2011, stakeholders brainstormed goals that would shape
how the park would develop, look, and be used.
At a Parks Commission meeting of November 9, 211, the Lions Park Master Plan Guidelines were revised
and recommended to the City Council. The City Council approved the Guidelines on November 21,
2011.
4 RECOMMENDATION
Staff recommends that the Parks Commission should discuss how to engage residents and stakeholders.
Stakeholder meetings could be held in June and July. Staff recommends that a recommendation be
made to the City Council for approval to hold public meetings to put together Master Plan Development
Guidelines for Irish Avenue Park.
5 ATTACHMENTS
1. Lions Park Master Plan Development Guidelines
Irish Avenue Park Planning April 23, 2014
Lions Park Master Plan
Development Guidelines
Drafted November 3, 2011
INTRODUCTION
Lions Park is one of the most well known parks in the City of Hugo. It is currently
the location of Good Neighbor Days. The community festival is put on annually
by the Hugo Lions Club. The park is used throughout the warmer months for
family reunions, company picnics and other gatherings.
Repairs were made to the existing tennis courts and skate equipment was
installed in the summer of 2010. At that time, the City Council discussed
additional improvement and future development. It was decided that a master
plan should be put together to ensure that all future investments into
development at Lions Park build toward the public's long term vision of the park.
HISTORY OF LIONS PARK
Lions Park was the only public active recreation park in Hugo for many years.
There were once lit fields that attracted people from all over the metro to see
baseball games in Hugo. Lions Park was home to the first playground in Hugo.
The property was once the location of Hugo City Hall and a water tower. Hugo
City Hall has since been re -built on property adjacent to Lions Park.
At the time of creating this plan, Lions Park has the following features:
2 little league baseball fields (used occasionally by White Bear
Lake Community Services and Recreation)
A 50' by 120' fenced, concrete surface skate park
2 tennis courts/pickleball courts
1 basketball half -court
Four square game surface
Playground equipment
3+ stall garage building used by the Lions Club for Hugo Good
Neighbor Days
Park shelter with 10 picnic tables
Former Public Works Garage used by the Hugo Good Neighbors
Food Shelf
GUIDING DOCUMENTS
The 2030 Comprehensive Plan shall be studied in conjunction with using these
design guidelines for Lions Park.
Lions Park Page 1 of 5
Development Guidelines
t4o'
Parks Plan- 2030 Comprehensive Plan
The City of Hugo 2030 Comprehensive Plan includes the Parks, Trails, and Open
Space Plan. It is an update to the Parks Master Plan that was adopted in 1998.
The current plan details existing and future parks, trails, and open space. The
description of Lions Park outlines it as a community park, serving several
neighborhoods and the community as a whole. Community parks should be
easily accessed via trails and major roads. They should offer unique amenities
and provide adequate parking and restroom facilities.
Lions Park is described as currently serving as a community park and "continues
to function as a significant central gathering area for the community and hosts
large events such as Good Neighbor Days."
Downtown Plan
The City of Hugo Downtown Plan and Design Guidelines was approved April 10,
2007. The plan details how the downtown area, which surrounds Lions Park, will
develop. The downtown plan is pedestrian oriented. Future development will
include unique businesses and shops, traditional residential blocks, and mixed-
use developments with office space and multi -family housing. Life -cycle housing
which will be a draw to senior citizens is also anticipated to be developed.
Although a community center and public library are shown adjacent to the park
on the Downtown Master Plan, the park was discussed as having active park
features.
PLANNING PROCESS
One of the 2011 goals of the Parks, Recreation and Open Space Commission
was to do concept planning for Lions Park and develop a long term vision for how
the park will be used and what the park will look like. The Commission discussed
hosting public planning workshops. They desired to invite residents to participate
that live the neighborhood surrounding the park and all Hugo residents.
Public Workshop #1
A public workshop was held on September 27, 2011. Stakeholders were invited
including the Lions Club, the Hugo Good Neighbors Food Shelf, surrounding
property owners and the public. A Visual Preference Survey was conducted in
which workshop participants were asked to rank fifty different images on a scale
of 1 (like) to 5 (dislike). The images included a variety of park uses and features.
After small group discussions, the images were narrowed down to 6 pictures of
parks that they preferred. Discussions included having a multi -use park shelter
that could be used year-round and serve as a focal point in Hugo. The shelter
was envisioned to build community spirit and be a gathering place and used for
Lions Park Page 2 of 5
Development Guidelines
tirio'
things such as performing arts, farmers markets, youth events, Hugo Good
Neighbor Days, and as a covered ice skating rink. Also, the park should satisfy
the needs of the nearby residents with park features such as play equipment,
walking paths, open space and other neighborhood park amenities. Landscaping
should be used to compliment the features and beautify the park.
The following images were selected by residents at the workshop to demonstrate
options for how the park may look. They are concepts only.
Figure 1: Holiday Decorations Building
Community Spirit
Figure 2: Open Space Surrounded by
Landscaping and Capped by a
Performance Shelter
Figure 3: Walking Paths, Benches,
Landscaping and the Gazebo Accommodate
Senior Citizens
Figure 4: Shelter That Doubles as an
Amphitheater for Youth Activities,
Performances and Other Community Events
Figure 5: Playgrounds, Open Spaces and Other Figure 6: Large Pavilion Used Year -Round
Park Amenities Accessible by Sidewalks For Events, Athletics, and Other Community
Gatherings
Lions Park Page 3 of 5
Development Guidelines
CiVo
Public Workshop #2
Using the feedback gathered at the first public workshop, residents discussed
guidelines for future development at a public workshop held on October 18,
2011. Goals were brainstormed, utilizing desirable park qualities described at
the first meeting. Lions Park was envisioned to continue to be used for
significant community events and be a highlight of the Hugo Parks System.
DEVELOPMENT GUIDELINES
Goal 1: Ensure that Lions Park is safe and functional.
Guidelines:
Provide adequate parking, restrooms and lighting for park users.
Utilize pedestrian lighting and minimize light pollution.
Consider access points of the park when determining the layout of park features
such as parking, sidewalks, trails and gathering places.
Connect the park to the trails, bike paths and sidewalks to provide pedestrian
access to the park.
Provide connections throughout the park which offer safe, off-street pedestrian
options.
Take advantage of opportunities to expand the park with development and
changes in the downtown area.
Goal 2: Emphasize Hugo's
through design of Lions Park.
Guidelines:
country charm and character
Consider rain gardens and other natural landscaping.
Provide continuity between the design of the park and the design of the
downtown.
Encourage master gardeners and other professionals to assist with construction
and maintenance of landscaping.
Encourage holiday lighting and other decorations to beautify the park in the
winter.
Lions Park Page 4 of 5
Development Guidelines _
HCtbo
ugo
Maintain picturesque view sheds.
Consider construction of a gazebo or other major focal point.
Goal 3: Offer unique recreation facilities and attractions to
support a variety of ages, interests and seasons, fitting a
community park.
Guidelines:
Design park amenities to be flexible in use so as to be used for different
purposes in different seasons such as a skating area that may serve as the
location for a flea market or a warming house that may double as a concession
stand in the summer.
Consider unique features such as a skating rink, large picnic pavilion with
modern kitchen facilities, walking paths and band shell.
Encourage use of the park for performing arts such as movies, concerts, dances
and art displays.
Maintain open green spaces suitable for carnivals, Good Neighbor Days and
other large events.
Provide a multi -use park suitable for significant community gatherings and which
provides recreational amenities to the adjacent residential neighborhoods.
Provide a playground for the adjacent residential neighborhood.
Goal 4: Build community spirit.
Guidelines:
Provide and encourage use of facilities for community building events such as
Hugo Good Neighbor Days, carnivals, flea markets, farmers markets, and more.
Consider the park a hub; centrally located in the city and adjacent to prominent
public buildings and downtown commercial district.
IMPLEMENTATION
The Lions Park Design Guidelines shall be used by the Parks, Recreation and
Open Space Commission as well as the City Council and staff whenever an
improvement the Park is to be made.
Lions Park Page 5 of 5
Development Guidelines
HugoG@ o�
Concession Stand
TO: City of Hugo Parks, Recreation and Open Space Commission
FROM: Shayla Syverson, Parks Planner
DATE: April 18, 2014 for the Parks Commission Meeting of April 23, 2014
1 INTRODUCTION
At the meeting of March 26, 2014, the Parks Commission shared an interest in providing a concession
stand at Hanifl Fields Athletic Park. Staff was directed to research operation of the concession stand.
2 PREVIOUS CONCESSION STAND USE
2.1 HUGO LIONS CLUB PARTNERSHIP
During the summers of 2011 and 2012, the Hugo Lions Club (Lions) operated the concession stand with
assistance from the White Bear Soccer Club (WBSC). The Lions handled the permits, inventory, and
finances. WBSC provided the volunteers to staff the concession stand. According to the City's
agreement with the Lions, volunteer organizations were to receive at least 50% of the profits made by
the concession stand at the time of their service.
2.2 FEEDBACK
WBSC offered feedback that the challenge of coordinating volunteers was not offset by the funds raised
by their organization. They would be willing to advertise the volunteer opportunity to WBSC members,
but do not want to be in charge of staffing. WBSC also advised that the stand only be open on evenings
when 6 or more games are being played and not on the weekends. The Lions shared that having signage
by the fields dramatically increased their sales. The items that were purchased the most were water
and sports drinks. Food in general, was not as popular. They highly advised against perishable food
items as it is difficult to manage.
3 CONCESSION STAND OPERATION
The Parks Commission has shared an interest in operating the concession stand as a service to the
community. The general concept for the concession stand would be to create a staff position to run the
stand and that profits should cover costs. The Lions and WBSC would continue to operate the
concession stand at their tournaments and other special events.
3.1 STAFFING
The spring season runs from May 1 to July 31. At this time, the concession stand would be staffed on
Monday, Tuesday, Wednesday, or Thursday evenings when 6+ games are planned to be held. WBSC
reported that they do not believe that their fields would be used enough on Fridays, Saturdays, or
Sundays to warrant opening the concession stand. It is likely that the stand would be open at least 3
nights per week from S:OOpm to 9:OOpm. The idea would be that if the fields were not busy, the stand
would be closed. This would result in approximately 12-15 hours per week or 160-200 hours for the
spring season.
The cost of a staff person would be approximately $1,900 to $2,400 for the spring season. This includes
a wage of $11.00 per hour as well as the required benefit and workers compensation costs.
The fall season runs from August 1 to November 1. Staffing would include Saturdays and some
weeknights, subject to the 6 game minimum. While hours of operation and staffing costs are likely to
increase, the sales and profits are likely to increase as well. The start of the school year may affect staff
availability.
Shayla Syverson, Parks Planner and/or the Public Works Staff on-call would be available to assist with
emergency situations as needed.
3.2 INVENTORY
Inventory would include beverages such as water, sports drinks, and soda. Beverages may need to be
purchased through a Coca Cola distributer as they have provided the beverage cooler that is currently
used in the stand. Food items would include chips, granola bars, crackers, candy, peanuts, fruit snacks,
etc. Items would likely be purchased in bulk and inventory would be restocked as need throughout the
season. The items would be marked up to recover the costs of the concession stand.
3.3 PERMITS
A food handler license can be acquired through the Minnesota Department of Agriculture for the sale
pre-packaged and labeled food items. The Lions Club used this permit process which included a site
inspection. The concession stand meets the facility requirements for this license.
Other options would include going through Washington County Public Health. Generally, the permits
are more restrictive and expensive through the County because as there isn't a permit option that aligns
with how the concession stand is likely to be operated.
4 NEXTSTEPS
The next steps of the Concession Stand would be to put together a detailed budget and plan which the
Parks Commission may recommend for approval to the City Council.
If the City Council approval is given, a seasonal concession stand staff position would need to be
created. The City Council oversees all staffing changes and follows a process for hiring decisions. A job
description and the authorization to advertise the position opening would be subject to City Council
approval. Applications would be taken for the position. Interviews would be conducted. A
recommendation to hire an applicant for the seasonal concession stand staff position would be subject
to City Council approval.
5 STAFF RECOMMENDATION
Staff recommends that the Parks Commission provide an update to the City Council and move forward
on staffing the concession stand at Hanifl Fields Athletic Park.
A
WSB
- Infrastructure . Engineering . Planning . Construction
& Assactates, Inc. 9 Q 9
April 16, 2014
Ms. Shayla Syverson
Parks Planner
City of Hugo
14669 Fitzgerald Avenue North
Hugo, MN 55038
Re: 125th Street Improvements
Fox Meadows Development
WSB Project No. 1904-57
Dear Ms. Syverson:
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763.541-4800
Fax: 763-541-1700
We have completed our review related to the provision of a trail along 125th Street in response to your
request. A summary of our findings is provided as follows:
125th Street is currently paved adjacent to Highway 61; however, the remainder of the roadway
has a gravel surface and ends at a cul-de-sac near the City's Well 96. The roadway serves
minimal traffic. When Fox Meadows is developed, 1256h Street will be extended and connect
to the roadways within the subdivision. Vehicles from within Fox Meadows and, to some
extent, Beaver Ponds, will utilize 125th Street to gain access to/from Highway 61 once the
connection is made. 125' Street as a gravel road is not adequate to accommodate the expected
traffic from a maintenance standpoint-, therefore, 125th Street will be paved as a requirement to
developing Fox Meadows including the segment outside of the plat.
The property adjacent to 125th Street between Highway 61 and the Fox Meadows plat is
agricultural/large lot in nature, and we expect that some or all of the property will develop in
the future. We expect that 125h Street will be improved to an urban section roadway at that
time, which would include pedestrian/bicycle facilities. 125th Street will be paved and
constructed as a rural section roadway as part of the Fox Meadows development, with the
understanding that it will need to be improved in the future when development occurs. The
street will be paved and constructed to a width of 24 feet, with 3 -foot wide gravel shoulders.
The roadway is outside the extents of the Fox Meadows Plat, and as a result the City typically
is not in a position to require the developer to provide additional improvements over and above
those necessary to provide adequate public facilities, i.e. a paved roadway rather than a gravel
surface.
2. Utilities will not be extended beneath 1256 street as part of the Fox Meadows project. Utilities
may need to be constructed within the 125th street right of way when the parcels to the north
and south of 125' Street develop. The utilities will be constructed at that time, since they will
benefit the developing property, rather than in advance which would trigger assessments to the
adjacent rural properties.
X:I190-061L9R-r.lmn-060310dx
Ms. Shayla Syverson
April 16, 2014
Page 2
3. The Parks Commission could recommend that the City Council consider creating a wider
pavement section that would allow space for non -vehicular traffic. We estimated the cost of
adding three feet of paved surface (27 feet total) to the roadway will cost $17,000-$18,000, and
the funding would likely be a City responsibility.
Based on our review, we recommend that a trail improvement be made adjacent to 125th Street at the
time the properties adjacent to the roadway develop in the future. At that time, an urban -section
roadway will be constructed, along with City utilities as necessary.
Thank you for the opportunity to provide comments regarding this issue. If you have any questions,
please do not hesitate to contact me at 763-287-7192.
Sincerely,
WSB & Associates, Inc.
J nnedy, PE
ity ngineer
cc: Steve Duff, Senior Engineering Technician
Rachel Juba, Planner
K'I1904-061LTF-,oiewiefl(A310 Aoa