My WebLink
|
Help
|
About
|
Sign Out
Home
2016.03.02 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2016
>
2016.03.02 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 4:10:32 PM
Creation date
6/23/2016 12:54:54 PM
Metadata
Fields
Template:
Commissions
Meeting Date
3/2/2016
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HUGO LIONS PARK MASTER PLAN <br />Lawn Space: <br />• A long linear open lawn space is shown that is shaped in a manner that can <br />accommodate large events, such as Good Neighbor Days, or it can accommodate several <br />smaller events at once. <br />• Open skating is shown in an area close to the fire pit location but on the side that would <br />be more protected from cold winds. <br />• The western section of the lawn space shows a backstop. This can be further developed <br />to include a T -ball infield or it can remain as simple as a backstop with turf lawn space <br />Recreational Amenities: <br />• Memorial: <br />o A memorial space is shown aligned with the main central walkway coming from City <br />Hall. <br />o Either sides of the memorial space are green spaces for either stormwater <br />management (if necessary), or they can be landscaped islands meant to provide <br />separation of the memorial from the more active park spaces so the memorial can <br />be a more passive and reflective space. <br />o An open green lawn on the west side of the memorial space will provide a gathering <br />space for special memorial events. <br />• Main Park Building: <br />o The main park pavilion building is shown aligned on the same axis as the main City <br />Hall walkway and Memorial space. <br />o The building is set up higher so the east facing side of the building can accommodate <br />a stage area facing the smaller lawn space. Walkways around the perimeter of the <br />building provide a ramping system to get from the higher building elevation back <br />down to site grades. <br />o The main portion of the building would provide open picnic space. <br />o The northern piece of the building would be an internal meeting room that also <br />provides warming house space and restrooms. <br />• Fire Pit: <br />o North of the building, closest to the warming house area, is the central fire pit <br />location with green turf space surrounding it. <br />o There is a retaining wall system around the green space for seating. <br />o The green space can be flooded in the winter as an extension of the skating area. <br />o The fire pit can be used during all seasons. <br />• Splash Pad: <br />o The Splash Pad is located west of the park building. The design of this space can <br />either be informal and natural, or it can be designed to be more formal as a type of <br />plaza extension for the building. <br />21 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.