My WebLink
|
Help
|
About
|
Sign Out
Home
2016.05.10 CC Minutes - Neighborhood Meeting on Oneka Lake Blvd
Hugo
>
City Council
>
City Council Minutes
>
2016 CC Minutes
>
2016.05.10 CC Minutes - Neighborhood Meeting on Oneka Lake Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 8:10:04 AM
Creation date
6/28/2016 8:10:04 AM
Metadata
Fields
Template:
City Council
Document Type
Minutes
Meeting Date
5/10/2016
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES FOR THE HUGO CITY COUNCIL <br /> 1471" STREET/ONEKA LAKE BOULEVARD <br /> OPEN HOUSE ON ROAD PROJECT <br /> TUESDAY, MAY 10, 2016 <br /> PRESENT: Klein, Miron, Petryk, Weidt <br /> ABSENT: Haas <br /> ALSO PRESENT: City Administrator Bryan Bear, WSB Engineers Jim Stremel and Lydia <br /> Larson, and Senior Engineering Technician Steve Duff <br /> An open house was held in the Oneka Room at City Hall for residents along the 147th <br /> Street/Oneka Lake Boulevard to discuss the street reconstruction project. The residents were able <br /> to view the construction plans and ask questions of staff regarding proposed construction. <br /> There were 15 residents that attended the open house. Some of the issues voiced by residents <br /> included concerns regarding the speed of traffic on the roadway, school bus pick up area at <br /> Foxhill Avenue North and 147th Street, and there was a desire to see a crosswalk installed. A <br /> resident on Glenbrook Avenue North thought a connection to the trail at Glenbrook would be <br /> nice, as people currently walk through his yard to get on the trail. He stated he was willing to <br /> give the City an easement over his property to construct the connection. Residents questioned the <br /> timing of construction, and staff responded that it was anticipated construction would begin after <br /> the 4th of July holiday. Residents in attendance were positive and looking forward to the project <br /> being completed. <br /> The meeting started at 5:30 pm and completed by 7:00 pm. <br /> Respectfully Submitted, <br /> Steve Duff <br /> Senior Engineering Technician <br />
The URL can be used to link to this page
Your browser does not support the video tag.