My WebLink
|
Help
|
About
|
Sign Out
Home
2016.07.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2016 CC Packets
>
2016.07.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:42:57 PM
Creation date
7/1/2016 11:40:30 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
7/5/2016
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hugo City Council Agenda <br />Street CIP Workshop <br />Monday, June 27, 2016 <br />7:00 p.m. <br />Mayor Weidt called the meeting to order at 7 p.in. <br />Present: Haas, Klein, Petryk, Miron, Weidt <br />Absent: None <br />Also Present: City Administrator Bryan Bear, City Engineer Jay Kennedy, Finance Director Ron <br />Otkin, Public Works Director Scott Anderson, and City Clerk Michele Lindau. <br />City Administrator Bryan Bear stated that the purpose of the meeting was to identify Council <br />priorities with respect to additional levy capacity that will available at the end of 2019 when <br />most of the city's bonds will be retired. This additional capacity can be used to either fully fund <br />the street CIP or be used to fund improvements to Lions Park as was discussed at a joint <br />workshop with the Parks Commission. He stated that although the city could issue bonds for the <br />park improvements, the Council would need to levy approximately $464,000 per year for 15 <br />years to repay them. However, it is the Finance Director's goal to eliminate borrowing. Thus, <br />the Council needs to provide direction on what projects should be funded with this additional <br />levy capacity. <br />City Engineer Jay Kennedy provided a report that categorized city streets by their condition, and <br />presented the Council with eight prioritized projects for their consideration. The costs for these <br />eight projects totaled $15 million with primary funding coming from state -aid (34%), property <br />taxes (46%) and special assessments (20%). <br />Haas talked about the miscalculation of the population projection by the Met Council which <br />impacts how state transportation dollars are distributed. Bear explained the City did appeal the <br />population estimate and that the Met Council it has revised our population upward. <br />Finance Director Ron Otkin discussed the current roadway CIP levy of $539,657, which is not <br />sufficient to complete all eight prioritized road projects. But the CIP would be fully funded if all <br />of the additional levy capacity, beginning in 2020, were dedicated to road improvements. He <br />also explained that if the city issued bonds for improvements to Lions Park, the annual levy of <br />$464,000 would result in a tax increase of $133 on a median valued homestead. <br />Otkin also explained that the City's equipment replacement program is fully funded through <br />2020, including the replacement of the 1992 pumper/tanker truck for $500,000; however, there <br />will not be sufficient funds to purchase an aerial fire truck without the issuance of equipment <br />certificates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.