Laserfiche WebLink
WSB <br />As,BO� a`�c Engineering 1 Planning 1 Environmental 0 Construction 701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tal: 763-541-4800 <br />Fax: 763-541-1700 <br />March 9, 2011 <br />Mr. Bryan Bear <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Preliminary Sanitary Sewer Review <br />Areand Property (130 ' Street N and TH 61) <br />WSB Project No. 1904-00 <br />Dear Mr. Bear: <br />As you requested, we have reviewed the Arcand Property with respect to sanitary sewer service <br />in accordance with the City's Comprehensive Sanitary Sewer Plan. It is estimated that <br />approximately one third of the Arcand Property can be served by the gravity sewer, if the sewer <br />was extended from the 130th StreetrM 61 intersection. The sewer flows from the remaining two <br />thirds of the parcel and will need to be directed to a lift station prior to entering the gravity sewer <br />within Subdistrict E3. <br />Please find the attached figure that details the portion of the Anand Property as it relates to the <br />City's Comprehensive Sanitary Sewer Plan. The above referenced property is located at the <br />northeast corner of the 130'' Street North and Trunk Highway 61 mtersection and is within the <br />City's Sewer Subdistrict E4. As shown, a portion of the property is in Sanitary Sewer Subdistrict <br />E4, which was planned to be served via Subdistrict E3, and eventually outletting to the MC:ES <br />Interceptor sewer. <br />We preliminarily evaluated the existing elevations within the Arcand Property and the existing <br />elevations of the sanitary sewer within Subdnstrict E3. Sewer flows from Subdistrict E4 can <br />either be direc--ted to the gravity sewer within Subdistrict E3 or to Lift Station No. 4 located <br />within the eastern portion of Subdistrict F,3, depending on the final grading plan of the Arcand <br />Property. The attached figure also details the approximate areas to be served by gravity sewer <br />versus a lift station. However. during site phasing, it is recommended that as site elevations are <br />finalized and the feasibility of gravity sewer be evaluated in greater detail. <br />Minneapolis 1 St. Cloud <br />•�b�xNiiPJd.nl7ovbh .r.,.wear-AhtYrl.,'rYr'N.•ddic <br />Equal Opportunity Employer <br />