My WebLink
|
Help
|
About
|
Sign Out
Home
2016.08.25 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2016 PC Packets
>
2016.08.25 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 2:36:39 PM
Creation date
8/22/2016 2:29:35 PM
Metadata
Fields
Template:
Commissions
Meeting Date
8/25/2016
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WS8 <br />. Pji!d:ngale3acy—your legacy. <br />August 16, 2016 <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Site Plan Review <br />Sprouts Pediatric Dentistry <br />WSB Project No. 3288-070 <br />Dear Ms. Juba: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have completed our review for the Sprouts Pediatric Dentistry site. The following information was <br />received for review: <br />Construction Plans, prepared by The Foundation Architects and BKBM Engineers, dated July 8, <br />2016 <br />■ Hydrology Report prepared by BKBM Engineers, dated June 24, 2016 <br />Based on the review of the plans, we offer the following comments related to the application: <br />Grading. Drainage, and Utilities <br />1. The site was originally graded as part of the Victor Gardens South Village project in 2004. The site <br />was included with the overall drainage plans for the South Village project, and therefore the rate <br />control and NURP ponding standards have been met. The current rules require volume control <br />measures, which the applicant has included with their site plan. We are working with the applicant <br />to modify the design so that the requirements are met. We believe that the required modifications <br />can be made without major changes to the site plan, and are comfortable recommending approval <br />pending changes. <br />2. Drainage from the site will enter an existing storm sewer system constructed with Victor Gardens <br />South Village, which will route stormwater to the existing stormwater ponds. <br />3. Sanitary Sewer and Water Service was extended to the property as part of the Victor Gardens South <br />Village project. The plans include connecting to the existing utilities and extending them into the <br />new building. <br />4. We are currently working directly with the applicant to address minor "red -line" comments. <br />Approval should be contingent upon resolution of the comments. <br />Equal Opportunity Employer <br />wsbeng.com <br />K;103288-07OVdminiDocsi3288-070 CDM LTR -r juba-08I6Y6-SpmutsPedfotricSP-do <br />
The URL can be used to link to this page
Your browser does not support the video tag.