Laserfiche WebLink
ABBREVIATIONS <br />BLDG Building N <br />3M Bench Mad, <br />CB Catch Bonin <br />CONC Can—t. <br />OP n.cUI. Iran FP. <br />EL EloVati- <br />EX EV U1.11.9 THE <br />FEE F-Whd Floor EI�tion <br />W Imat <br />M MH NO Mal. T 1 <br />AX �d— <br />M. Z—o U) �vs,,?D A 141 <br />MIN uii— <br />pvc P.W.YI Ch=da <br />ROP [Wnfamd ar.. P,,., ARCHITECTS <br />20' 10' 0 20' 40 1 212 Pird Ave N Suitt, 460 <br />Minneapolis. MN 55401 <br />f -29 www.fourriclationarckcam <br />pL 612,344L9430 <br />f. 612340-5431 <br />NIM <br />RIM 920.17, STORM SEWER INLeM NOT SHOWN ON PLAN <br />MY RECISIVE RUNOFF FROM CONSTRUCTION <br />ACTIWTIEL INSTALL INLET SE01MENT <br />Ur <br />'Z -2 - - <br />5030 Bmakip <br />\� _ `\,��• na. -� ` J�� x,., r PROTECTION PER VrIAIL 3/CSOO ON ALL W—� MM W4211M <br />STORM IN= TMT MXY R=ne RUNOFF. Phc- a" 904MM <br />EIKB&f <br />-Air Fmc M 1101-IN1121 <br />x U <br />2 <br />KFYFP NOTES <br />INSTALL ROCK CONSTRUCTION ENTRANCE TO DETAIL <br />1/0500. <br />KEYED NOTES ARE DENOTED By ® ONPUN-QD W. aa� Dowae <br />- <br />Lo <br />TV <br />-91 �INSTALL PERIMETER ER - ITSION CONTROL REFER To DETAILS 2/0800 AND <br />E A 4/CSOO <br />T <br />-7. qTR INSTALL MI -Er SEDIMENT PROTECTION- REFER To DETAIL 3/C5OO- <br />cN�z. <br />REMOVE CURB AND GUTTER IN ITS ENTIRETY TG THE EXTENT SHOWN. <br />SAWCUv AND REMOVE AT NEAREST JOINT. <br />SAWCUT AND REMOVE BITUMINOUS PAVEMENT IN ITS ENUPETY 70 THE <br />EMENTS SHOWN. <br />roNr.7 <br />REMOVE EXISTING TREES IN THEIR ENTIRETY INCLUDING STUMPS, <br />t <br />c, -Z, <br />EXISTING FAIRVIEW MONUMENT SIGN TO REMAIN- <br />PRCTECf AT &I TIMES.f2 <br />Z -URB <br />EXISTING TREE To REMAIN. PROTECT AT ALL TIMES. <br />L/ <br />-01F4 <br />019_Cj3j -2 r,, , <br />_1 -23 2EHQLMQR REHQYAL NDIES- <br />3 <br />plo EROSION SEDIMENT CONTROL MEASURES ARES BE <br />CH EEHr.E) ID THE CITY OF HUGO. ALL SILT FENCES SHALL <br />1. PRIOR TO START OF DEMOLMON, ALL <br />INSTALLED BY THE CCNTRACTOR AND INSPECTED Y FENCES HALL BE <br />g, S.2C D - SILT E S <br />INV S 914.73 NSTALLED ALONG THE CONTOUR. <br />-PC, [E16 1: LPINV S 97'..12 <br />1 BE INSTALLED AND WSPEOM PRIOR To ANY CONSTRUCTION ACrMTY <br />2 L TIES <br />2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN THE LOCATION OF ALL EXISTING UTIU <br />THE LOCATION, ELEVATION AND MARK ALL EXISTING UftIUTIES 48 <br />THE CONTRACTOR SHALL VERIFY <br />HOURS BEFORE 0ONSTRUC1)ON STARTS. THE ENGINEER. ARCHITECT OR OWNER DOES NOT <br />E THAT ALL THE UTILITIES ARE MAPPED, OR IF MAPPED. <br />LPO UARANTE ARE SHOWN CORRECTLY. <br />H -464-OD02 FOR FIELD LOCATING DUSTING UTILIDES. <br />CONTACT AT 651 <br />CONTACT GOP ER STATE ONE CALL <br />UTILITY OWNER IF DAMAGE OCCURS DUE TO CONSTRUCTION. <br />E <br />3. THERE MY BE MISCELLANEOUS ITEMS TO BE REMOVED THAT ARE NOT IDENTIFIED ON THCS PLANS. <br />THE CONTRACTORSHALLVISITSTHE SITE AND REVIEW THE DOCUMENTS TO 09TAJN A CLEAR <br />F 12" RCP <br />RM UNDERSTANDING OF THE INTENDED SCOPE OF WORK. <br />�sEwE;-- 4. ANY LIRUTIES NOT INDICATED FOR REMOVAL OR ABANDONMENT, ARE TO BE PROTECTED AT ALL <br />WiTT11 I . <br />�4\j�c TIMES. <br />V <br />'4 -X\ ou�o THE SCOPE OF THE PROJECT FROM <br />5. ALL EXISTING CURB AND GUITER IS TO BE REMOVED WITHIN <br />THE SAN CUT LINES TO THE NEAREST JOINT. <br />EDGE OFF - Ce 5 6 -8905 <br />INC.- ( 1) 31 <br />670V NOUS 6, THE BACKGROUND INFORIJATION WAS PREPARED BY KEMPER & ASSOCIATES <br />MID IM 91"P <br />M❑T <\ 3 12" RCP <br />1. 4! <br />V <br />T, <br />L <br />Tu. STORM. GP-NERAI NgICS, <br />CR <br />2 <br />X14'.86.(121 RCP S -r - I. THE CONTRACTOR SHALL DEVELOP AND IMPLEMENT A TRAEEC CONTROL PLAN WHILE WORKING <br />SE glm.WITHIN THE RIGHT-OF-WAY. THE TRAFFIC CONTROL PLAN SHALL BE APPROVED BY THE CITY <br />T' V1. :NA NW <br />9114.6066 1 'P <br />RCP RCP) ENGWEERING DEPARTMENT PRIOR TO STREET ENCROACHMENT - <br />:r SW 9 -S2,VL1. iv, RE 915.73 (12 2. CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING AND RENEW ALL CONSTRUCTION DOCUMENTS <br />:NV NV ME ITEMS THAT <br />AT I- RCP) S7W,,-, N j)1575 (1C' Pl.'C) P T <br />NW 915.75 (12- RCP) AN GEOTECHNICAL REPORTS. No ACOrrt0N'4- COMPENSATION WILL BE ALLOWED FCR <br />RIM 920.5 SHOULD I -b -S BEEN ANTICIPATED BY PERFORMING THE ABOVE. <br />r & THE ROCK CONSTRUCTION ENTRANCE INDICATED ON THE PLAN IS SHOWN IN AN APPROXIMATE <br />eff" <br />IN <br />Y5 LOCATION. PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR IS To CODRDINATE WITH THE <br />OF HUGO FOR THE EXACT ROCK CONSTRUCTION ENTRANCE LOCATION. <br />Ilk <br />2 OL <br />LPQ <br />Nn <br />:SMH <br />STORM <br />HIM 920 u <br />17CP <br />ED SEWERE C, <br />lIly, 'IN "OP.08 6" F. <br />1MINOU-- <br />INV 9m.35 (B" P,�C) <br />2 <br />RIM 917.39 <br />IW SF 972-97 (21" <br />W. NW 312 Be'RrP) <br />IN. NE .1 -Fa <br />N I <br />'SlTf, BENCH1.9WK: <br />TOP NUT -@Z. <br />922.03 <br />> <br />Nl� <br />I - - i,- CC) <br />% <br />0 <br />1 REMOLITION AND EROSION CONT RIDL PLAN <br />IQ <br />10 <br />I - ZU <br />I cgrbty that this plant specification. Or <br />report was prepared by me Or urld6f <br />my direct supwvlslon and that I am A <br />duly Llcem;94 Professional Erighm <br />under the laws of the State of Minnesota <br />Joel W. Mader <br />Cate 06-242016 R.9, NO. 19181 <br />ccuu/v <br />(AP) <br />EMH - . . <br />- Ca <br />IM <br />R92"j, <br />It- -- <br />RIM 91973 <br />LLj <br />.1 1' <br />.!IPI 920.5:. <br />FOUND <br />3. <br />In <br />In <br />ca <br />a <br />>� <br />ilack <br />--vou"O 1/2' -MIA <br />LLj <br />0 <br />NC3cn <br />(RLS 4889)' <br />LP <br />R R <br />x I Up <br />C; <br />EM TR <br />101- <br />C/) <br />coo k <br />copwiaht 2016 <br />[-:3 <br />S <br />CH. <br />ABBREVIATIONS <br />BLDG Building N <br />3M Bench Mad, <br />CB Catch Bonin <br />CONC Can—t. <br />OP n.cUI. Iran FP. <br />EL EloVati- <br />EX EV U1.11.9 THE <br />FEE F-Whd Floor EI�tion <br />W Imat <br />M MH NO Mal. T 1 <br />AX �d— <br />M. Z—o U) �vs,,?D A 141 <br />MIN uii— <br />pvc P.W.YI Ch=da <br />ROP [Wnfamd ar.. P,,., ARCHITECTS <br />20' 10' 0 20' 40 1 212 Pird Ave N Suitt, 460 <br />Minneapolis. MN 55401 <br />f -29 www.fourriclationarckcam <br />pL 612,344L9430 <br />f. 612340-5431 <br />NIM <br />RIM 920.17, STORM SEWER INLeM NOT SHOWN ON PLAN <br />MY RECISIVE RUNOFF FROM CONSTRUCTION <br />ACTIWTIEL INSTALL INLET SE01MENT <br />Ur <br />'Z -2 - - <br />5030 Bmakip <br />\� _ `\,��• na. -� ` J�� x,., r PROTECTION PER VrIAIL 3/CSOO ON ALL W—� MM W4211M <br />STORM IN= TMT MXY R=ne RUNOFF. Phc- a" 904MM <br />EIKB&f <br />-Air Fmc M 1101-IN1121 <br />x U <br />2 <br />KFYFP NOTES <br />INSTALL ROCK CONSTRUCTION ENTRANCE TO DETAIL <br />1/0500. <br />KEYED NOTES ARE DENOTED By ® ONPUN-QD W. aa� Dowae <br />- <br />Lo <br />TV <br />-91 �INSTALL PERIMETER ER - ITSION CONTROL REFER To DETAILS 2/0800 AND <br />E A 4/CSOO <br />T <br />-7. qTR INSTALL MI -Er SEDIMENT PROTECTION- REFER To DETAIL 3/C5OO- <br />cN�z. <br />REMOVE CURB AND GUTTER IN ITS ENTIRETY TG THE EXTENT SHOWN. <br />SAWCUv AND REMOVE AT NEAREST JOINT. <br />SAWCUT AND REMOVE BITUMINOUS PAVEMENT IN ITS ENUPETY 70 THE <br />EMENTS SHOWN. <br />roNr.7 <br />REMOVE EXISTING TREES IN THEIR ENTIRETY INCLUDING STUMPS, <br />t <br />c, -Z, <br />EXISTING FAIRVIEW MONUMENT SIGN TO REMAIN- <br />PRCTECf AT &I TIMES.f2 <br />Z -URB <br />EXISTING TREE To REMAIN. PROTECT AT ALL TIMES. <br />L/ <br />-01F4 <br />019_Cj3j -2 r,, , <br />_1 -23 2EHQLMQR REHQYAL NDIES- <br />3 <br />plo EROSION SEDIMENT CONTROL MEASURES ARES BE <br />CH EEHr.E) ID THE CITY OF HUGO. ALL SILT FENCES SHALL <br />1. PRIOR TO START OF DEMOLMON, ALL <br />INSTALLED BY THE CCNTRACTOR AND INSPECTED Y FENCES HALL BE <br />g, S.2C D - SILT E S <br />INV S 914.73 NSTALLED ALONG THE CONTOUR. <br />-PC, [E16 1: LPINV S 97'..12 <br />1 BE INSTALLED AND WSPEOM PRIOR To ANY CONSTRUCTION ACrMTY <br />2 L TIES <br />2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASCERTAIN THE LOCATION OF ALL EXISTING UTIU <br />THE LOCATION, ELEVATION AND MARK ALL EXISTING UftIUTIES 48 <br />THE CONTRACTOR SHALL VERIFY <br />HOURS BEFORE 0ONSTRUC1)ON STARTS. THE ENGINEER. ARCHITECT OR OWNER DOES NOT <br />E THAT ALL THE UTILITIES ARE MAPPED, OR IF MAPPED. <br />LPO UARANTE ARE SHOWN CORRECTLY. <br />H -464-OD02 FOR FIELD LOCATING DUSTING UTILIDES. <br />CONTACT AT 651 <br />CONTACT GOP ER STATE ONE CALL <br />UTILITY OWNER IF DAMAGE OCCURS DUE TO CONSTRUCTION. <br />E <br />3. THERE MY BE MISCELLANEOUS ITEMS TO BE REMOVED THAT ARE NOT IDENTIFIED ON THCS PLANS. <br />THE CONTRACTORSHALLVISITSTHE SITE AND REVIEW THE DOCUMENTS TO 09TAJN A CLEAR <br />F 12" RCP <br />RM UNDERSTANDING OF THE INTENDED SCOPE OF WORK. <br />�sEwE;-- 4. ANY LIRUTIES NOT INDICATED FOR REMOVAL OR ABANDONMENT, ARE TO BE PROTECTED AT ALL <br />WiTT11 I . <br />�4\j�c TIMES. <br />V <br />'4 -X\ ou�o THE SCOPE OF THE PROJECT FROM <br />5. ALL EXISTING CURB AND GUITER IS TO BE REMOVED WITHIN <br />THE SAN CUT LINES TO THE NEAREST JOINT. <br />EDGE OFF - Ce 5 6 -8905 <br />INC.- ( 1) 31 <br />670V NOUS 6, THE BACKGROUND INFORIJATION WAS PREPARED BY KEMPER & ASSOCIATES <br />MID IM 91"P <br />M❑T <\ 3 12" RCP <br />1. 4! <br />V <br />T, <br />L <br />Tu. STORM. GP-NERAI NgICS, <br />CR <br />2 <br />X14'.86.(121 RCP S -r - I. THE CONTRACTOR SHALL DEVELOP AND IMPLEMENT A TRAEEC CONTROL PLAN WHILE WORKING <br />SE glm.WITHIN THE RIGHT-OF-WAY. THE TRAFFIC CONTROL PLAN SHALL BE APPROVED BY THE CITY <br />T' V1. :NA NW <br />9114.6066 1 'P <br />RCP RCP) ENGWEERING DEPARTMENT PRIOR TO STREET ENCROACHMENT - <br />:r SW 9 -S2,VL1. iv, RE 915.73 (12 2. CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING AND RENEW ALL CONSTRUCTION DOCUMENTS <br />:NV NV ME ITEMS THAT <br />AT I- RCP) S7W,,-, N j)1575 (1C' Pl.'C) P T <br />NW 915.75 (12- RCP) AN GEOTECHNICAL REPORTS. No ACOrrt0N'4- COMPENSATION WILL BE ALLOWED FCR <br />RIM 920.5 SHOULD I -b -S BEEN ANTICIPATED BY PERFORMING THE ABOVE. <br />r & THE ROCK CONSTRUCTION ENTRANCE INDICATED ON THE PLAN IS SHOWN IN AN APPROXIMATE <br />eff" <br />IN <br />Y5 LOCATION. PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR IS To CODRDINATE WITH THE <br />OF HUGO FOR THE EXACT ROCK CONSTRUCTION ENTRANCE LOCATION. <br />Ilk <br />2 OL <br />LPQ <br />Nn <br />:SMH <br />STORM <br />HIM 920 u <br />17CP <br />ED SEWERE C, <br />lIly, 'IN "OP.08 6" F. <br />1MINOU-- <br />INV 9m.35 (B" P,�C) <br />2 <br />RIM 917.39 <br />IW SF 972-97 (21" <br />W. NW 312 Be'RrP) <br />IN. NE .1 -Fa <br />N I <br />'SlTf, BENCH1.9WK: <br />TOP NUT -@Z. <br />922.03 <br />> <br />Nl� <br />I - - i,- CC) <br />% <br />0 <br />1 REMOLITION AND EROSION CONT RIDL PLAN <br />IQ <br />10 <br />I - ZU <br />I cgrbty that this plant specification. Or <br />report was prepared by me Or urld6f <br />my direct supwvlslon and that I am A <br />duly Llcem;94 Professional Erighm <br />under the laws of the State of Minnesota <br />Joel W. Mader <br />Cate 06-242016 R.9, NO. 19181 <br />DEMOLITION AND EROSION <br />CONTROL PLAN <br />Date DEL24.2016 <br />P,*Ot N-ber 16127 <br />C100 <br />(AP) <br />LLj <br />In <br />In <br />ca <br />>� <br />ilack <br />LLj <br />0 <br />NC3cn <br />C; <br />101- <br />C/) <br />copwiaht 2016 <br />DEMOLITION AND EROSION <br />CONTROL PLAN <br />Date DEL24.2016 <br />P,*Ot N-ber 16127 <br />C100 <br />