Laserfiche WebLink
eir <br />FAT£ <br />r y a <br />7. <br />-yrti 1 t <br />"'lir <br />% <br />EXISTING DRAINAGE AREAS <br />10 -YR STORM (4.11 <br />RUNOFF (CFS) <br />100 -YR STORM (5.90-) <br />RUNOFF (GS) <br />7� <br />INPERWOUS AREA PERVIOUS AREA TOTAL AREA <br />C OUT (CFS) STORM EVENT <br />DRAINAGE AREA <br />(ACNES) <br />(ACRES, (ACRES) <br />2 -YEAR 10 -YEAR IOD -YEAR <br />ROUTING <br />0.28 <br />A <br />1.02 <br />{2.79 (4.167 <br />(7.15 <br />NWT_ <br />1 <br />0,07 <br />0.4" 095 <br />0.97 1 190 <br />3.79 <br />TO PARKING LOT STORM SEWER <br />2 <br />0.00 <br />0.31 0.31 <br />0.51 1.01 <br />2.20 <br />TC RESIDENTIAL SW <br />3 <br />0.01 <br />0.03 0.04 <br />0.o8 o i5 <br />0.31 <br />TO NW HWY 8 BLVD. <br />TOTAL <br />O.D7 <br />092 0.90 <br />1.54 2.96 1 <br />6.30 <br />0.19 <br />eir <br />FAT£ <br />r y a <br />7. <br />-yrti 1 t <br />"'lir <br />% <br />r <br />10 -YR STORM (4.11 <br />RUNOFF (CFS) <br />100 -YR STORM (5.90-) <br />RUNOFF (GS) <br />7� <br />1 <br />2_ <br />(2.79') <br />G OUT (CFS) STORM EVENT <br />_YEAR 100- R ROUTING <br />4.16") (7.15 <br />NJ <br />O.D3 <br />0.09 <br />0,11 <br />0.28 <br />A <br />1.02 <br />TO RAIN GARDEN I <br />eir <br />FAT£ <br />r y a <br />7. <br />-yrti 1 t <br />ABBREVIATIONS <br />PROPOSED DRAINAGE AREAS <br />10 -YR STORM (4.11 <br />RUNOFF (CFS) <br />100 -YR STORM (5.90-) <br />RUNOFF (GS) <br />DRAINAGE AREA <br />1 <br />2_ <br />(2.79') <br />G OUT (CFS) STORM EVENT <br />_YEAR 100- R ROUTING <br />4.16") (7.15 <br />NJ <br />O.D3 <br />0.09 <br />0,11 <br />0.28 <br />0.51 <br />1.02 <br />TO RAIN GARDEN I <br />RAN GARDEN 1 <br />STORMWATER RUNOFF SUMMARY <br />ABBREVIATIONS <br />PROPOSED DRAINAGE AREAS <br />10 -YR STORM (4.11 <br />RUNOFF (CFS) <br />100 -YR STORM (5.90-) <br />RUNOFF (GS) <br />DRAINAGE AREA <br />IMPERVIOUS AREA PERVIOUS iREA TOTAL AREA <br />(ACRES) (ACRES) (ACRES) <br />2_ <br />(2.79') <br />G OUT (CFS) STORM EVENT <br />_YEAR 100- R ROUTING <br />4.16") (7.15 <br />I <br />O.D3 <br />0.09 <br />0,11 <br />0.28 <br />0.51 <br />1.02 <br />TO RAIN GARDEN I <br />RAN GARDEN 1 <br />NWT_ <br />FCgh Wutar Laws <br />INV <br />0.10 <br />0.42 <br />0.93 <br />TO STORM SEWER <br />2 <br />0.D4 <br />0.07 <br />0.10 <br />DAD <br />0.52 <br />1,02 <br />TO RAIN GARDEN 2 <br />MAIN GARDEN 2 <br />NWL <br />Nmrnul Wnler Level <br />PVC <br />OA2 <br />0.20 <br />0.99 <br />TO STORM SEWER <br />J <br />0.19 <br />0.15 <br />0.33 <br />1.07 <br />1,75 <br />3.29 <br />TO RAIN GARDEN 3 <br />HAITI GARDEN 3 <br />C. <br />0.22 <br />2.55 <br />TO STORM SEWER <br />4 <br />0.23 <br />0-00.27 <br />1.11 <br />1.7D <br />3.00 <br />TD PARKING LOT STORM SEWER <br />5 <br />0.01 <br />093 <br />0.04 <br />C.Oa <br />DA5 <br />0.31 <br />TO NW TWa BLVD. <br />6 <br />0.00 <br />0.05 <br />0.05 <br />GAU <br />0.20 <br />0.43 <br />TO RESIDENTIAL SW <br />TOTAL <br />0.49 <br />0.42 <br />0.90 <br />1.45 <br />2.39 <br />8.11 <br />STORMWATER RUNOFF SUMMARY <br />ABBREVIATIONS <br />2 -YR STORM (2.75^ <br />RUNOFF (CES) <br />10 -YR STORM (4.11 <br />RUNOFF (CFS) <br />100 -YR STORM (5.90-) <br />RUNOFF (GS) <br />DOSTING SITE 1.54 <br />2.96 <br />6.30 <br />PROPOSED SITE 1.45 <br />2.89 <br />6.11 <br />MINIMUM ESTIMATED QUANTITIES FOR EROSION <br />1 +! 1'Yy' ♦lgne- H CONTROL <br />NEM DESCRIPTION ESfI1MTED QUANTITY <br />ORNWIGE STRICT. NLEF FILTER 5 EACH <br />RIO[ LDNSTRIY_n7N ENTRANCE 1 EACH <br />CONCRETE WASHOUT 1 EACH <br />PERIMETER EROSION CONTROL 434 LF <br />EROSION CDNTROw ®AIV10.f )IX SY <br />- NOTE OUANTIfEIS SHOWN ARE THE MINIMUM REOUIRED, <br />ADDITIONAL QUANTITIES MAY BE NEEDED IF REWIRED BY <br />HUGO VICINITY MAP THE MPCA, WA`CRSHCO IXSTRICT, OR CITY. CONTILACTCR <br />IS RESPWISIB..E FOR Fl?lAL DETERMINATION OF <br />k OtWMnES PRIOR TO CONSTRLCTGN. <br />INSPECTIONS <br />EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS <br />AND WITHIN 1-4 HOURS FOLLOWING A 1/2 INCH <br />OVER 24 HOURS RAIN EVENT. <br />STABILIZED AREAS: ONCE EVERY 30 DAYS, <br />FROZENGROUND: AS SOON AS RUNOFF <br />OCCURS OR PRIOR TO RESUMING <br />COMLSTRUCTION, <br />FINAL STABILIZ"TION <br />ZTApLRAMON BY UNIFORM PERENNIAL <br />VEGEfATI.E CO.ER (70% DENSITY) <br />DMUNAGE DITCHES STABILIZED. <br />ALL TEMPORARY SYNTHETIC ANO STRUCTURAL <br />BLIP'S REMOVED. <br />CLEAN OUT SEDhanm• FROM CONVEYANCES AND <br />SEDIMENTATION BASINS (RETURN TO DESIGN <br />CAPACITY). <br />1. LANG TERN MAINTENANCE Or THE SITE <br />WILL BE PERFORMED BY THE OWNER. <br />INCLUDED MAINTENANCE FOR STORMWATER <br />DEVISES SNN.L BE- <br />I.I. <br />INSPECT RAIN GUARDIAN ON A <br />BIANNUAL BASIS, ONCE IN THE SPRING <br />AND ONCE IN THE FALL <br />1.2. CLEAN RAIN GUARDIAN OF SEDIMENT <br />AND DEBRIS ANNUALLY OR WHEN <br />SEDIMENTS FILL I OF THE STORAGE <br />VOLUME, <br />POLLUTION PREVENTION <br />LIANAGEMENT MEASURES <br />SOLID WASTE DISPOSED PROPERLY; COMPLY <br />WITH MPGA REQUIREMENTS. <br />RAZARODUS WASTE STORED (SECONDARY <br />CONTAINMENT. RESTRICTED ACCESS) AND <br />DISPOSED IN COMPLIANCE WITH MPCA <br />REQUIREMENTS. <br />DMW40L WASHING OF TRICK,; AND OTHER <br />CONSTRUCTION VEHICLES MUST BE LIMITED TO <br />A DEFINED AREA OF THE SCE. RUNDFF MUST <br />BE CONTAINED AND WASTE PROPERLY DISPOSED. <br />NO ENGINE DEGREASING ALLOWED ON-STfE. <br />CONCREI WA410Uf ON-SITE: ALL LIQUID AND <br />SOLID WASTES GENERATED BY CONCRETE <br />WASHOUT OPERATIONS MUST BE CONTANED IN <br />A LEAK -PROOF CORTAINME T FACILITY OR <br />IMPERMEABLE LINER. A COMPACTED CLAY LINER <br />THAT DOES NOT ALLOW LIQUIDS TO ENTER <br />GROUND WATER IS CONSIDERED AN <br />IMPERMEABLE UNER. THE LIQUID AND SOUD <br />WASTES MUST NOT CONTACT THE GROUND, AND <br />THERE MUST NOF BE RUNOFF FROM THE <br />CONCRETE WASHOUT OPERATIONS OR <br />A <br />RR <br />A <br />S <br />LQIAO AND SOLD WASTES MUST BE DISPOSED <br />or PROPERLY AND IN COMPLIANCE WITH MPCA <br />REGULATION& A SIGN MUST BE INSTALLED <br />ADJACENT TO FAKIR WASHOUT FACILITY TO <br />INFORM CONCRETE EQUIPMENT OPERATORS TO <br />UTIU2E THE PROPER FACLTIES. THE CONCRETE <br />wASHOJT AREA INDICATED ON THE PLANS IS <br />SHOWN IN AN APPROXIMATE LOCATION. PRIOR <br />TO THE START OF CONSTRUCTION, THE <br />OONTRALTCR SHALL DETERMINE THE EXACT <br />LOCATION IN ACCORDANCE WITH MPGA <br />REQUIREMENTS. <br />N <br />1 <br />1 <br />I <br />I <br />40' 20' 0 40' 80' <br />SCALE 11 . 40. <br />CONSTRUCTION ACTMTY EROSION <br />P P <br />CONTRACTOR SRNs STAS!UZE ALL EXPOSED <br />SOL MFRS (INCLUDING STOCKPILES). <br />STABILIZATION MUST BE INITIATED IMMEDIATELY <br />TO LIMB SOIL EROSION WHENEVER ANY <br />CCNSIRVI ACTIVITY HAS PERMANENTLY OR <br />TEMPORARILY CEASED ON AN, PORTION OF THE <br />SITE AND WILL NOT RESUME FOR A PEROO <br />EXCEEDING 14 CALENDAR DRYS. STABILIZATION <br />MUST BE COMPLETED NO LATER THAN 14 <br />CALENDAR DAYS AFTER THE CONSTRUCTION <br />ACTIVITY IN THAT PORTION OF THE SITE HAS <br />TEMPORARILY OR PERMANENTLY CEASED. <br />FOR PUBUC WATER THAT THE DNR HAS <br />PROMULGATED 'WORK IN WATER RESTRICT1DN5" <br />DURING SPECIFIED FISH SPAWNING TIME <br />FRAMES, ALL EXPOSED SOIL AREAS THAT ARE <br />WITHIN 200 FEET OF THE WATERS EDGE, AND <br />DRAIN TO THESE WATERS MUST COMPLETE THE <br />STASIUZATON ACTIVES WITHIN 24 HOURS <br />OURNG THE RESIRICTION PERIOD. <br />PIPE OUTLETS MOIST BE PROVIDED WITH <br />TEMPORARY OR PERMANENT ENERGY DISSIPATION <br />WITHIN 24 -HOURS AFTER OONNECrKON TO A <br />SURFACE wATFR. <br />SEDIMENT CONTROL MEASURES MUST BE <br />INSTALLED ON ALL DOWN GRADIENT PERIMETERS <br />BEFORE ANY UPGRADIENT LAID DISTURBING <br />ACTIVITIES BEGIN. <br />eFroMFM ND EROSION CONTROL <br />MAINTENANCE <br />PERIMETER SEDIMENT CONTROL PRACTICES: <br />WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF <br />THE BMP, THE SEDIMENT MUST 19E REMOVED <br />WTHIN 24 HOURS. IF PERIMETER SEDIMENT <br />CONTROL HAS BEEN DAMAGED OR IS NOT <br />FUNCnoI PROPERLY, T MUST BE REPAIRED <br />AND/OR REPLACED WITHIN 24 HOURS. <br />PERIMETER BNP MEASURES MAY INCLUDE SILT <br />FENDING. <br />[ONSrauCTION SITE VEHICLE EXT LOCATIONS: <br />ALL TRACKED SEDIMENT ONTO PAVED SURFACES <br />MUST BE REMOVED WITHIN 24 HOURS OF <br />DISCOVERY OR MORE FREQUENTLY IF REQUIRED <br />BY CITY OR WATERSHED, <br />CONSTRUCTION SITE DEWATERING, <br />THE CONTRACTOR SKILL BE RESPONSIBLE FOR <br />OBTAINING ALL DEVWATERWG PERMITS. DISCHARGE <br />FROM ALL DENATERING OPERATIONS SHALL BE <br />DIRECTED TO ON-SITE DEPRESSIONS, NO <br />DISCHARGE FROM DEWATERING OPERATIONS <br />SHALLBE DIRECTED OFF-SITE TOWARDS A <br />WATER Or THE STATE. <br />AGENCY CONTACTS <br />CITY OF HL'GC <br />ENGINEERING DEPARTMENT <br />PHONE: (851) 762-6300 <br />MINNESOTA POLLUTION CONTROL AGENCY <br />PHONE: (651) 296-6300 <br />RICE CREEK WATERSHED DISTRICT <br />PHI (763) 39B-3070 <br />RIWE <br />THE am <br />QNOAT <br />ARCHITECTS <br />212 Third Avg N Sults 460 <br />Minneapolis, MN 55401 <br />www.foundetionarcll.cont <br />p. 612.340.5430 <br />f. 612340.5431 <br />_­_ 9T30Btow"BoRewd <br />BKBM -I- Warm �`W� <br />"""a' <br />"Io ecu" WSAa80 <br />6M911®0-0, Pea: 0"84SOM <br />owemblilm- <br />lli M1rvwd b a• be,u� a �� eel b W p4ea d �r <br />Di7resa or eq vt M rrN s qee �_. eWe rrev sour <br />I certify drat this plan, specification. or <br />report was prepared by me or War <br />my direct supervision and that I am a <br />duly Licensed Professional EF4r ser <br />Under the laws of t11e state of Minnesota <br />Joel W. Mader <br />Date 06-242016 Reg. No, 191al <br />ABBREVIATIONS <br />DLDG <br />au ng <br />BLP <br />Beet MonogemeM Practice <br />BW <br />BoBom of Wall <br />QU <br />Cotah Bonin <br />CONIC <br />Conerele <br />EEV <br />Eawnon <br />EK <br />Edsting <br />FIFE <br />Fnlehed Floor Eleao6en <br />NWT_ <br />FCgh Wutar Laws <br />INV <br />Invert <br />MAX <br />Mmdmurn <br />MH <br />Mar4+Me <br />MINMinimum <br />'101 <br />MPGA <br />oto %II.Iion Control <br />Agency <br />fir%% <br />NotII PollYWrrt IN -h -g. <br />NPOES <br />Eminelien SYatem <br />NWL <br />Nmrnul Wnler Level <br />PVC <br />Pd7virryl Chloride <br />RCP <br />Reinforced Concrete Pipe <br />TW <br />Top of Wall <br />w.O, <br />Washout <br />INSPECTIONS <br />EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS <br />AND WITHIN 1-4 HOURS FOLLOWING A 1/2 INCH <br />OVER 24 HOURS RAIN EVENT. <br />STABILIZED AREAS: ONCE EVERY 30 DAYS, <br />FROZENGROUND: AS SOON AS RUNOFF <br />OCCURS OR PRIOR TO RESUMING <br />COMLSTRUCTION, <br />FINAL STABILIZ"TION <br />ZTApLRAMON BY UNIFORM PERENNIAL <br />VEGEfATI.E CO.ER (70% DENSITY) <br />DMUNAGE DITCHES STABILIZED. <br />ALL TEMPORARY SYNTHETIC ANO STRUCTURAL <br />BLIP'S REMOVED. <br />CLEAN OUT SEDhanm• FROM CONVEYANCES AND <br />SEDIMENTATION BASINS (RETURN TO DESIGN <br />CAPACITY). <br />1. LANG TERN MAINTENANCE Or THE SITE <br />WILL BE PERFORMED BY THE OWNER. <br />INCLUDED MAINTENANCE FOR STORMWATER <br />DEVISES SNN.L BE- <br />I.I. <br />INSPECT RAIN GUARDIAN ON A <br />BIANNUAL BASIS, ONCE IN THE SPRING <br />AND ONCE IN THE FALL <br />1.2. CLEAN RAIN GUARDIAN OF SEDIMENT <br />AND DEBRIS ANNUALLY OR WHEN <br />SEDIMENTS FILL I OF THE STORAGE <br />VOLUME, <br />POLLUTION PREVENTION <br />LIANAGEMENT MEASURES <br />SOLID WASTE DISPOSED PROPERLY; COMPLY <br />WITH MPGA REQUIREMENTS. <br />RAZARODUS WASTE STORED (SECONDARY <br />CONTAINMENT. RESTRICTED ACCESS) AND <br />DISPOSED IN COMPLIANCE WITH MPCA <br />REQUIREMENTS. <br />DMW40L WASHING OF TRICK,; AND OTHER <br />CONSTRUCTION VEHICLES MUST BE LIMITED TO <br />A DEFINED AREA OF THE SCE. RUNDFF MUST <br />BE CONTAINED AND WASTE PROPERLY DISPOSED. <br />NO ENGINE DEGREASING ALLOWED ON-STfE. <br />CONCREI WA410Uf ON-SITE: ALL LIQUID AND <br />SOLID WASTES GENERATED BY CONCRETE <br />WASHOUT OPERATIONS MUST BE CONTANED IN <br />A LEAK -PROOF CORTAINME T FACILITY OR <br />IMPERMEABLE LINER. A COMPACTED CLAY LINER <br />THAT DOES NOT ALLOW LIQUIDS TO ENTER <br />GROUND WATER IS CONSIDERED AN <br />IMPERMEABLE UNER. THE LIQUID AND SOUD <br />WASTES MUST NOT CONTACT THE GROUND, AND <br />THERE MUST NOF BE RUNOFF FROM THE <br />CONCRETE WASHOUT OPERATIONS OR <br />A <br />RR <br />A <br />S <br />LQIAO AND SOLD WASTES MUST BE DISPOSED <br />or PROPERLY AND IN COMPLIANCE WITH MPCA <br />REGULATION& A SIGN MUST BE INSTALLED <br />ADJACENT TO FAKIR WASHOUT FACILITY TO <br />INFORM CONCRETE EQUIPMENT OPERATORS TO <br />UTIU2E THE PROPER FACLTIES. THE CONCRETE <br />wASHOJT AREA INDICATED ON THE PLANS IS <br />SHOWN IN AN APPROXIMATE LOCATION. PRIOR <br />TO THE START OF CONSTRUCTION, THE <br />OONTRALTCR SHALL DETERMINE THE EXACT <br />LOCATION IN ACCORDANCE WITH MPGA <br />REQUIREMENTS. <br />N <br />1 <br />1 <br />I <br />I <br />40' 20' 0 40' 80' <br />SCALE 11 . 40. <br />CONSTRUCTION ACTMTY EROSION <br />P P <br />CONTRACTOR SRNs STAS!UZE ALL EXPOSED <br />SOL MFRS (INCLUDING STOCKPILES). <br />STABILIZATION MUST BE INITIATED IMMEDIATELY <br />TO LIMB SOIL EROSION WHENEVER ANY <br />CCNSIRVI ACTIVITY HAS PERMANENTLY OR <br />TEMPORARILY CEASED ON AN, PORTION OF THE <br />SITE AND WILL NOT RESUME FOR A PEROO <br />EXCEEDING 14 CALENDAR DRYS. STABILIZATION <br />MUST BE COMPLETED NO LATER THAN 14 <br />CALENDAR DAYS AFTER THE CONSTRUCTION <br />ACTIVITY IN THAT PORTION OF THE SITE HAS <br />TEMPORARILY OR PERMANENTLY CEASED. <br />FOR PUBUC WATER THAT THE DNR HAS <br />PROMULGATED 'WORK IN WATER RESTRICT1DN5" <br />DURING SPECIFIED FISH SPAWNING TIME <br />FRAMES, ALL EXPOSED SOIL AREAS THAT ARE <br />WITHIN 200 FEET OF THE WATERS EDGE, AND <br />DRAIN TO THESE WATERS MUST COMPLETE THE <br />STASIUZATON ACTIVES WITHIN 24 HOURS <br />OURNG THE RESIRICTION PERIOD. <br />PIPE OUTLETS MOIST BE PROVIDED WITH <br />TEMPORARY OR PERMANENT ENERGY DISSIPATION <br />WITHIN 24 -HOURS AFTER OONNECrKON TO A <br />SURFACE wATFR. <br />SEDIMENT CONTROL MEASURES MUST BE <br />INSTALLED ON ALL DOWN GRADIENT PERIMETERS <br />BEFORE ANY UPGRADIENT LAID DISTURBING <br />ACTIVITIES BEGIN. <br />eFroMFM ND EROSION CONTROL <br />MAINTENANCE <br />PERIMETER SEDIMENT CONTROL PRACTICES: <br />WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF <br />THE BMP, THE SEDIMENT MUST 19E REMOVED <br />WTHIN 24 HOURS. IF PERIMETER SEDIMENT <br />CONTROL HAS BEEN DAMAGED OR IS NOT <br />FUNCnoI PROPERLY, T MUST BE REPAIRED <br />AND/OR REPLACED WITHIN 24 HOURS. <br />PERIMETER BNP MEASURES MAY INCLUDE SILT <br />FENDING. <br />[ONSrauCTION SITE VEHICLE EXT LOCATIONS: <br />ALL TRACKED SEDIMENT ONTO PAVED SURFACES <br />MUST BE REMOVED WITHIN 24 HOURS OF <br />DISCOVERY OR MORE FREQUENTLY IF REQUIRED <br />BY CITY OR WATERSHED, <br />CONSTRUCTION SITE DEWATERING, <br />THE CONTRACTOR SKILL BE RESPONSIBLE FOR <br />OBTAINING ALL DEVWATERWG PERMITS. DISCHARGE <br />FROM ALL DENATERING OPERATIONS SHALL BE <br />DIRECTED TO ON-SITE DEPRESSIONS, NO <br />DISCHARGE FROM DEWATERING OPERATIONS <br />SHALLBE DIRECTED OFF-SITE TOWARDS A <br />WATER Or THE STATE. <br />AGENCY CONTACTS <br />CITY OF HL'GC <br />ENGINEERING DEPARTMENT <br />PHONE: (851) 762-6300 <br />MINNESOTA POLLUTION CONTROL AGENCY <br />PHONE: (651) 296-6300 <br />RICE CREEK WATERSHED DISTRICT <br />PHI (763) 39B-3070 <br />RIWE <br />THE am <br />QNOAT <br />ARCHITECTS <br />212 Third Avg N Sults 460 <br />Minneapolis, MN 55401 <br />www.foundetionarcll.cont <br />p. 612.340.5430 <br />f. 612340.5431 <br />_­_ 9T30Btow"BoRewd <br />BKBM -I- Warm �`W� <br />"""a' <br />"Io ecu" WSAa80 <br />6M911®0-0, Pea: 0"84SOM <br />owemblilm- <br />lli M1rvwd b a• be,u� a �� eel b W p4ea d �r <br />Di7resa or eq vt M rrN s qee �_. eWe rrev sour <br />I certify drat this plan, specification. or <br />report was prepared by me or War <br />my direct supervision and that I am a <br />duly Licensed Professional EF4r ser <br />Under the laws of t11e state of Minnesota <br />Joel W. Mader <br />Date 06-242016 Reg. No, 191al <br />copydqM 2016 <br />STORM WATER PLAN <br />Dais M24.201d <br />Project Nmber 16127 <br />C600 <br />Z- <br />Z <br />W <br />V <br />� <br />Z <br />r <br />a <br />m <br />W <br />cog <br />CL <br />= ae°DiI Y <br />fir%% <br />cc <br />r <br />O <br />Z w <br />7 <br />a: <br />O :E <br />CL <br />V) <br />101i <br />�E x in <br />copydqM 2016 <br />STORM WATER PLAN <br />Dais M24.201d <br />Project Nmber 16127 <br />C600 <br />